SlideShare a Scribd company logo
1 of 39
OPEN PLAN OFFICE FOR ACADEMICS
Case Study : KPI Move to VWB1
Changing Academic Workplace
By Olivera Katic-Kerzan
Introduction to the King’s College Estate
ORIGINAL PROPOSAL
(REJECTED)
VWB1 EXISTING FURNITURE LAYOUT
DESIGN PROPOSAL – KPI MOVE TO VWB1
1. Proposal
• Open Plan Admin and Academic Offices
• 1no Open Plan Senior Academic Office
2. Constraints
• Sensitive Information - No privacy
• No quiet space for research
• No Soft Seating – Waiting Area/ Social Gathering/Rest Area
• No flexibility
• No meeting room for group discussion/presentation
• Too loud – noise disruption
3. Planning Solutions
• University’s Standard Academic Space
• Proposed Innovative Solution
4. Concept Images
• Open Plan Work Environments
• Kitchen/Rest Area/Waiting Area
• Hot Desks/Meeting Space/Departmental Library
• Single Senior Lecturer’s Open Plan Office
KITCHEN – SOCIAL GATHERING/REST AREA/
INFORMAL MEETING SPACE
WAITING AREA
HOT DESKS/DEPT. LIBRARY/MEETING RM/
PRIVATE STUDY
OPEN PLAN ACADEMIC AND ADMIN OFFICES
OPEN PLAN ACADEMIC AND ADMIN OFFICES
NEW BRIEF
DESIGN BRIEF – PHASE 2 REFURBISHMENT VWB1
1. Concept
• To provide a friendly, open and external facing environment both for the research teams of varying sizes that will be based on the
floor and for senior visiting fellows and dignitaries. We would like to project a ‘think-tank-esque’ image with a transparent,
contemporary and ‘buzzy’ design, that makes the best possible use of the natural light on this floor.
• We are looking to create an open plan environment with a small number of single person offices, break-out rooms and meeting
rooms. As part of the design we need to ensure that space is available for informal meetings.
• The open plan space should not be organised with regular blocks of facing desks, but be more ‘random’ in layout with cogent
groups identifiable through colocation and design. We would like to preserve the sense of space that the large floor with large
numbers of windows provides. We would prefer not too many high dividing units in order to preserve a sense of space on the floor.
2. Facilities Required
• Five offices
• Area (ideally with glass wall) with hot desks, sofas etc., for visiting fellows (at least eight desks) adjacent to the office of the Director.
• Office for Director
• Two meeting rooms ( for 25/30 people) suitable for hosting high level dignitaries in, for example, policy round table discussions,
with AV and floor to ceiling whiteboards and nearby kitchen facilities
• Open plan reception area with comfortable seating for visitors at south end of floor
• Large office for the Media Standards Trust - space for six staff
• Area for professional services staff at south end of floor close to reception area.
• Open plan space not organised in ‘blocks’ of facing desks
• At least two break out rooms for staff from open plan space to use for small meetings
• New furniture would be required for all staff Open Plan Admin and Academic Offices
• One Open Plan Senior Academic Office
Jonathan Grant
Director & Professor of Public Policy
The Policy Institute at King’s
THE POLICY INSTITUTE @ KING’S
DEPARTMENT GROUPING
Pension Policy Institute
(PPI)
14
Social Care Workforce
Research Unit (SCWRU)
19
Humanitarian Futures
Programme (HFP)
6
International Centre for
Security Analysis (ICSA)
15
UK in a Changing
Europe (ESRC)
8
Ramphal Institute
5
Media Standards Trust
(MST)
6
King’s Policy Institute
(KPI) – Core staff
13
International Centre for
University Policy Research
(ICUPR)
3
Professional Services
9
Visiting Fellows
8
Total Floor Area: 1040m2
Total Number of People: 106
NEW PROPOSAL
DESIGN STAGES
1. Zoning and Grouping discussed and agreed with the Director
• 12 Max-packs proposed (approx. 2 months)
2. Working with Departments
• Getting a brief from the Head of Department
• Requirements discussed in detail
• Proposal issued including design solution suggestions
• Revisions requested
• Final revision signed off
3. Design Process
• Working with one Department at a time
• Understanding client’s needs, values and priorities
• Any special needs and requirements
• The nature of research of the department
• Need for meeting space, privacy and confidentiality
• Storage and library space
• Understanding grouping within teams
• Regular meetings with the Director and Project team
4. Final Proposal Signed Off (20th Revision)
VIRGINIA WOOLF BUILDING LEVEL 1
APPROVED PROPOSAL
Lifts
Male
W.C.
Kitchen &
Rest Area
Elec.
Cup'd
Dry
Riser
Elec.
Cup'd
Cleaner
(No access)
Risers
(No access)
Lift Lobby
Carillion Office
Female
W.C.
1
2
3
4
6
5
7
10
9
8
12
11
1
13
14
2
2
1 4
3
2
4
2
3
4
5
6.
7
10
8
9.
11 14
12
13
15
1618
17
Jill Manthorpe
Prof. Services
4no people + Receptionist
ICSA
12no people + 2no hot desks
HFP
4no People
SCWRU
18no people
MST
1
3
ESRC Director
14no People
PENSIONS POLICY INSTITUTE (PPI)
KPI STORAGE
Column
1600mm
Meeting Table
Jonathan
Grant
1320H
SCST9ESD
Tambour
5
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
M-Table
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
M-Table
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
ESRC Hub
4-5no People
Ramphal
Institute
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Jo Kidd
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Core stuff
Delivery Group
6no People
All New partitions to be glass
New partition.
All New partitions
to be glass
Meeting Table
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Future growth
2no desks
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
International Centre for
University Policy Research
2no People + Paul Blackmore
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
New partition.
All New partitions
to be glass
Shelving
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Shelving
Jon Davis
M-Table
2
1
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1
1320H
SCST9ESD
Tambour
M-Table
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Paul
Blackmore
M-Table
Policy Impact
Director
TBC
Policy Analysis
Director
TBC
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
FREM BOOK SHELVES
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
M-Table
Keith
Britto
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
M-Table
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
Rack
Rack
Rack
239
240
241
FC
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
FREM BOOK SHELVES
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour
1320H
SCST9ESD
Tambour1320H
SCST9ESD
Tambour
50no New stacking
meeting
chairs MXP1C/JJ
(Xpresso.one by Connection)
25no New stacking
meeting
chairs MTE1A
(Team by Connection)
10no 1500x750mm white
interlocking/collapsible tables
8no stacking
meeting
chairs MTE1A
(Team by Connection)
2no 1500x7500mm white
interlocking/collapsible tables &
1no 1500mm white End
1 2
Mel
Duffield
Chris
Curry
1600mm
SILCOCK
DANIELA
ELLIS
CIARAN
ADAMS
JOHN
LIGHTBOURNE
MARITHA
OTHER
AN
OTHER
AN
3
4
5
6.
7
8
9
10
13
OTHER
AN
14
11
12
1193.8974
New Storage area for stacking
meeting chairs and tables from
meeting room when not in use.
Ian Hible to find the best
solution to this request.
Shelving
New shelving and small kitchenette
for drinks making facilities
with built-in fridge.
Ian Hible to find the best
solution to this request.
2
1
3
4
5 6
7
8
9
10
11
12 13
14
15
18
17
16
19
20
21
22
23
24
25
26
27
28
29
30
32
31
33
34
36
35 37
38
39
40
41
42
43
44
45 46 47
48 49
50
5152
53
54
55 56
VWB LEVEL 1 PROPOSED LAYOUT
L
Lo
ST
VIR
PR
VIRGINIA WOOLF BUILDING LEVEL 1
DEPARTMENT GROUPING
Pension Policy Institute (PPI)
14
Social Care Workforce Research
Unit (SCWRU)
19
Humanitarian Futures
Programme (HFP)
6
International Centre for Security
Analysis (ICSA)
15
UK in a Changing Europe
(ESRC)
8
Ramphal Institute
5
Media Standards Trust (MST)
6
King’s Policy Institute (KPI) –
Core staff
13
International Centre for University
Policy Research (ICUPR)
3
Professional Services
9
Visiting Fellows
8
NORTH END VWB1 AGREED/APPROVED LAYOUT
SOUTH END VWB1 AGREED/APPROVED LAYOUT
STORAGES & SIDE FILLERS - TAYLOR MADE
Side fillers and storages
act as a cable management
KITCHEN – SOCIAL GATHERING/INFORMAL
MEETING/REST AREA
ESRC, ICSA, HFP & SCWRU DEPARTMENTS
ESRC, ICSA, HFP & SCWRU DEPARTMENTS
INTERNATIONAL CENTRE & KPI DEPARTMENTS
MAIN RECEPTION
INTERNATIONAL CENTRE & KPI DEPARTMENTS
INTERNATIONAL CENTRE & KPI DEPARTMENTS
LARGE MEETING ROOM
VISITING FELLOWS AREA
FINAL OUTCOME
KPI, PROFESSIONAL SERVICES, ICUPR
DEPARTMENTS & VISITING FELLOWS AREA
MEETING ROOMS,KITCHEN, POD & MAIN RECEPTION
ESRC, ICSA, HFP & SCWRU DEPARTMENTS
PPI & SCWRU DEPARTMENTS, LIBRARY & KITCHEN
OPEN PLAN OFFICE FOR ACADEMICS
LESSONS LEARNED
1. Get the Decision Maker on your side
2. Understand your client, their needs and requirements
3. Define the need in order to find the solution quicker
4. Include Academics in your project
• Design process
• Decision making
• Ask what they want to achieve
• Values and priorities
• Approval
5. Process is time consuming, cannot be rushed
POST-OCUPANCY FEEDBACK
Q&A’s
1. What is your personal opinion of the design process and of the final outcome?
Excellent – the designer delivered the brief of creating an open, transparent, creative space.
2. How did your academic staff feel about the proposed scheme and how well did they settle into the new working environment?
To begin with there was some uncertainty, but now people are settled in and there are no negative comments.
3. What are your favourite features?
The space, light and colour scheme.
4. What could have been done better?
The only thing that could have been improved is if everything could have been completed in a shorter time frame.
5. Do you have further comments on any aspect of the project?
Overall the project went very well. We are all delighted with the outcome.
Jonathan Grant
Director & Professor of Public Policy
The Policy Institute at King’s
• King’s has acquired the Bush House Building (ex BBC
World Service and 2 neighbouring buildings, providing
approx 30,000 sqm NUA of space for expansion.
• We are currently working with the faculties to ensure
that lessons learned in this project are carried forward.
NEXT STEPS
THANK YOU

More Related Content

Viewers also liked

Ayodele resume 2
Ayodele resume 2Ayodele resume 2
Ayodele resume 2Ayo Ade
 
York School District unlocking potencial for learning
York School District unlocking potencial for learningYork School District unlocking potencial for learning
York School District unlocking potencial for learningiamprosperous
 
Matemáticas para la ingeniería
Matemáticas para la ingenieríaMatemáticas para la ingeniería
Matemáticas para la ingenieríaDaina Maccioni
 
Bab 4-mengupas-penyelenggaraan-kekuasaan-negara
Bab 4-mengupas-penyelenggaraan-kekuasaan-negaraBab 4-mengupas-penyelenggaraan-kekuasaan-negara
Bab 4-mengupas-penyelenggaraan-kekuasaan-negaraeli priyatna laidan
 
Teoria parcial 2
Teoria parcial 2Teoria parcial 2
Teoria parcial 2mimijumo
 
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan Negara
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan NegaraPkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan Negara
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan NegaraNandha Zulyana
 

Viewers also liked (8)

Ayodele resume 2
Ayodele resume 2Ayodele resume 2
Ayodele resume 2
 
York School District unlocking potencial for learning
York School District unlocking potencial for learningYork School District unlocking potencial for learning
York School District unlocking potencial for learning
 
Matemáticas para la ingeniería
Matemáticas para la ingenieríaMatemáticas para la ingeniería
Matemáticas para la ingeniería
 
Bab 4-mengupas-penyelenggaraan-kekuasaan-negara
Bab 4-mengupas-penyelenggaraan-kekuasaan-negaraBab 4-mengupas-penyelenggaraan-kekuasaan-negara
Bab 4-mengupas-penyelenggaraan-kekuasaan-negara
 
Teoria parcial 2
Teoria parcial 2Teoria parcial 2
Teoria parcial 2
 
Jasmine Resume 4
Jasmine Resume 4Jasmine Resume 4
Jasmine Resume 4
 
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan Negara
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan NegaraPkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan Negara
Pkn Bab 4 kelas XI semester 1 Mengupas Penyelenggaraan Kekuasaan Negara
 
Lumbreras geografia
Lumbreras   geografiaLumbreras   geografia
Lumbreras geografia
 

Similar to VWB1 Case Study Presentation_Final PW ed

Paul Wass - Building a Shelter
Paul Wass - Building a ShelterPaul Wass - Building a Shelter
Paul Wass - Building a ShelterDogs Trust
 
Aurora Cambridge
Aurora CambridgeAurora Cambridge
Aurora Cambridgefelnne
 
Fa14 pad asn2_ef_mlh_final
Fa14 pad asn2_ef_mlh_finalFa14 pad asn2_ef_mlh_final
Fa14 pad asn2_ef_mlh_finalHenning Thomsen
 
Aurora cambridgebas-website-on-screen-show
Aurora cambridgebas-website-on-screen-showAurora cambridgebas-website-on-screen-show
Aurora cambridgebas-website-on-screen-showMatthew Polaine
 
Anders Vergaderen Uiteenzetting Buroconcept
Anders Vergaderen Uiteenzetting BuroconceptAnders Vergaderen Uiteenzetting Buroconcept
Anders Vergaderen Uiteenzetting BuroconceptBirgit Roels
 
KRAUSE JULIE PORTFOLIO
KRAUSE JULIE PORTFOLIOKRAUSE JULIE PORTFOLIO
KRAUSE JULIE PORTFOLIOJulie Krause
 
Amer Sassila_Portfolio (IIT Works)
Amer Sassila_Portfolio (IIT Works)Amer Sassila_Portfolio (IIT Works)
Amer Sassila_Portfolio (IIT Works)Amer Sassila
 
030918 day one conference volunteer webinar final
030918 day one conference volunteer webinar final030918 day one conference volunteer webinar final
030918 day one conference volunteer webinar finalDayOne
 
Southeast library meeting 12 16-2020
Southeast library meeting 12 16-2020Southeast library meeting 12 16-2020
Southeast library meeting 12 16-2020DCPublicLibrary
 
AMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxAMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxNehaKandur
 
Trying to build a quality PFI- Powell Down and Bloom
Trying to build a quality PFI- Powell Down and BloomTrying to build a quality PFI- Powell Down and Bloom
Trying to build a quality PFI- Powell Down and BloomArchitects for Health
 
Emily Stinemetz_Portfolio
Emily Stinemetz_PortfolioEmily Stinemetz_Portfolio
Emily Stinemetz_PortfolioEmily Stinemetz
 
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1NRP
 
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaCHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaMerrileeDelvalle969
 
Case study on canteen design
Case study on canteen designCase study on canteen design
Case study on canteen designAnandKasaudhan
 

Similar to VWB1 Case Study Presentation_Final PW ed (20)

Paul Wass - Building a Shelter
Paul Wass - Building a ShelterPaul Wass - Building a Shelter
Paul Wass - Building a Shelter
 
Aurora Cambridge
Aurora CambridgeAurora Cambridge
Aurora Cambridge
 
Fa14 pad asn2_ef_mlh_final
Fa14 pad asn2_ef_mlh_finalFa14 pad asn2_ef_mlh_final
Fa14 pad asn2_ef_mlh_final
 
Report minemetsa web_pdf_spreads
Report minemetsa web_pdf_spreadsReport minemetsa web_pdf_spreads
Report minemetsa web_pdf_spreads
 
Aurora cambridgebas-website-on-screen-show
Aurora cambridgebas-website-on-screen-showAurora cambridgebas-website-on-screen-show
Aurora cambridgebas-website-on-screen-show
 
Roadshow 2016
Roadshow 2016Roadshow 2016
Roadshow 2016
 
Anders Vergaderen Uiteenzetting Buroconcept
Anders Vergaderen Uiteenzetting BuroconceptAnders Vergaderen Uiteenzetting Buroconcept
Anders Vergaderen Uiteenzetting Buroconcept
 
portfolio-new
portfolio-newportfolio-new
portfolio-new
 
KRAUSE JULIE PORTFOLIO
KRAUSE JULIE PORTFOLIOKRAUSE JULIE PORTFOLIO
KRAUSE JULIE PORTFOLIO
 
Amer Sassila_Portfolio (IIT Works)
Amer Sassila_Portfolio (IIT Works)Amer Sassila_Portfolio (IIT Works)
Amer Sassila_Portfolio (IIT Works)
 
030918 day one conference volunteer webinar final
030918 day one conference volunteer webinar final030918 day one conference volunteer webinar final
030918 day one conference volunteer webinar final
 
Micro Apartment Design
Micro Apartment DesignMicro Apartment Design
Micro Apartment Design
 
Southeast library meeting 12 16-2020
Southeast library meeting 12 16-2020Southeast library meeting 12 16-2020
Southeast library meeting 12 16-2020
 
AMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxAMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptx
 
Trying to build a quality PFI- Powell Down and Bloom
Trying to build a quality PFI- Powell Down and BloomTrying to build a quality PFI- Powell Down and Bloom
Trying to build a quality PFI- Powell Down and Bloom
 
Emily Stinemetz_Portfolio
Emily Stinemetz_PortfolioEmily Stinemetz_Portfolio
Emily Stinemetz_Portfolio
 
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1
NRP Masterprijs, inzending 2019 - Afstudeerboek herontwikkeling julianakerk 1
 
Housing gr
Housing grHousing gr
Housing gr
 
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project PhaCHAPTER 5THE DESIGN PROCESSOverview of Project Pha
CHAPTER 5THE DESIGN PROCESSOverview of Project Pha
 
Case study on canteen design
Case study on canteen designCase study on canteen design
Case study on canteen design
 

VWB1 Case Study Presentation_Final PW ed

  • 1. OPEN PLAN OFFICE FOR ACADEMICS Case Study : KPI Move to VWB1 Changing Academic Workplace By Olivera Katic-Kerzan
  • 2. Introduction to the King’s College Estate
  • 5. DESIGN PROPOSAL – KPI MOVE TO VWB1 1. Proposal • Open Plan Admin and Academic Offices • 1no Open Plan Senior Academic Office 2. Constraints • Sensitive Information - No privacy • No quiet space for research • No Soft Seating – Waiting Area/ Social Gathering/Rest Area • No flexibility • No meeting room for group discussion/presentation • Too loud – noise disruption 3. Planning Solutions • University’s Standard Academic Space • Proposed Innovative Solution 4. Concept Images • Open Plan Work Environments • Kitchen/Rest Area/Waiting Area • Hot Desks/Meeting Space/Departmental Library • Single Senior Lecturer’s Open Plan Office
  • 6. KITCHEN – SOCIAL GATHERING/REST AREA/ INFORMAL MEETING SPACE
  • 9. OPEN PLAN ACADEMIC AND ADMIN OFFICES
  • 10. OPEN PLAN ACADEMIC AND ADMIN OFFICES
  • 12. DESIGN BRIEF – PHASE 2 REFURBISHMENT VWB1 1. Concept • To provide a friendly, open and external facing environment both for the research teams of varying sizes that will be based on the floor and for senior visiting fellows and dignitaries. We would like to project a ‘think-tank-esque’ image with a transparent, contemporary and ‘buzzy’ design, that makes the best possible use of the natural light on this floor. • We are looking to create an open plan environment with a small number of single person offices, break-out rooms and meeting rooms. As part of the design we need to ensure that space is available for informal meetings. • The open plan space should not be organised with regular blocks of facing desks, but be more ‘random’ in layout with cogent groups identifiable through colocation and design. We would like to preserve the sense of space that the large floor with large numbers of windows provides. We would prefer not too many high dividing units in order to preserve a sense of space on the floor. 2. Facilities Required • Five offices • Area (ideally with glass wall) with hot desks, sofas etc., for visiting fellows (at least eight desks) adjacent to the office of the Director. • Office for Director • Two meeting rooms ( for 25/30 people) suitable for hosting high level dignitaries in, for example, policy round table discussions, with AV and floor to ceiling whiteboards and nearby kitchen facilities • Open plan reception area with comfortable seating for visitors at south end of floor • Large office for the Media Standards Trust - space for six staff • Area for professional services staff at south end of floor close to reception area. • Open plan space not organised in ‘blocks’ of facing desks • At least two break out rooms for staff from open plan space to use for small meetings • New furniture would be required for all staff Open Plan Admin and Academic Offices • One Open Plan Senior Academic Office Jonathan Grant Director & Professor of Public Policy The Policy Institute at King’s
  • 13. THE POLICY INSTITUTE @ KING’S DEPARTMENT GROUPING Pension Policy Institute (PPI) 14 Social Care Workforce Research Unit (SCWRU) 19 Humanitarian Futures Programme (HFP) 6 International Centre for Security Analysis (ICSA) 15 UK in a Changing Europe (ESRC) 8 Ramphal Institute 5 Media Standards Trust (MST) 6 King’s Policy Institute (KPI) – Core staff 13 International Centre for University Policy Research (ICUPR) 3 Professional Services 9 Visiting Fellows 8 Total Floor Area: 1040m2 Total Number of People: 106
  • 15. DESIGN STAGES 1. Zoning and Grouping discussed and agreed with the Director • 12 Max-packs proposed (approx. 2 months) 2. Working with Departments • Getting a brief from the Head of Department • Requirements discussed in detail • Proposal issued including design solution suggestions • Revisions requested • Final revision signed off 3. Design Process • Working with one Department at a time • Understanding client’s needs, values and priorities • Any special needs and requirements • The nature of research of the department • Need for meeting space, privacy and confidentiality • Storage and library space • Understanding grouping within teams • Regular meetings with the Director and Project team 4. Final Proposal Signed Off (20th Revision)
  • 16. VIRGINIA WOOLF BUILDING LEVEL 1 APPROVED PROPOSAL Lifts Male W.C. Kitchen & Rest Area Elec. Cup'd Dry Riser Elec. Cup'd Cleaner (No access) Risers (No access) Lift Lobby Carillion Office Female W.C. 1 2 3 4 6 5 7 10 9 8 12 11 1 13 14 2 2 1 4 3 2 4 2 3 4 5 6. 7 10 8 9. 11 14 12 13 15 1618 17 Jill Manthorpe Prof. Services 4no people + Receptionist ICSA 12no people + 2no hot desks HFP 4no People SCWRU 18no people MST 1 3 ESRC Director 14no People PENSIONS POLICY INSTITUTE (PPI) KPI STORAGE Column 1600mm Meeting Table Jonathan Grant 1320H SCST9ESD Tambour 5 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour M-Table 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour M-Table 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour ESRC Hub 4-5no People Ramphal Institute 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Jo Kidd 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Core stuff Delivery Group 6no People All New partitions to be glass New partition. All New partitions to be glass Meeting Table 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Future growth 2no desks 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour International Centre for University Policy Research 2no People + Paul Blackmore 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour New partition. All New partitions to be glass Shelving 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Shelving Jon Davis M-Table 2 1 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1 1320H SCST9ESD Tambour M-Table 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Paul Blackmore M-Table Policy Impact Director TBC Policy Analysis Director TBC 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour FREM BOOK SHELVES 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour M-Table Keith Britto 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour M-Table 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour Rack Rack Rack 239 240 241 FC 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour FREM BOOK SHELVES 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour 1320H SCST9ESD Tambour1320H SCST9ESD Tambour 50no New stacking meeting chairs MXP1C/JJ (Xpresso.one by Connection) 25no New stacking meeting chairs MTE1A (Team by Connection) 10no 1500x750mm white interlocking/collapsible tables 8no stacking meeting chairs MTE1A (Team by Connection) 2no 1500x7500mm white interlocking/collapsible tables & 1no 1500mm white End 1 2 Mel Duffield Chris Curry 1600mm SILCOCK DANIELA ELLIS CIARAN ADAMS JOHN LIGHTBOURNE MARITHA OTHER AN OTHER AN 3 4 5 6. 7 8 9 10 13 OTHER AN 14 11 12 1193.8974 New Storage area for stacking meeting chairs and tables from meeting room when not in use. Ian Hible to find the best solution to this request. Shelving New shelving and small kitchenette for drinks making facilities with built-in fridge. Ian Hible to find the best solution to this request. 2 1 3 4 5 6 7 8 9 10 11 12 13 14 15 18 17 16 19 20 21 22 23 24 25 26 27 28 29 30 32 31 33 34 36 35 37 38 39 40 41 42 43 44 45 46 47 48 49 50 5152 53 54 55 56 VWB LEVEL 1 PROPOSED LAYOUT L Lo ST VIR PR
  • 17. VIRGINIA WOOLF BUILDING LEVEL 1 DEPARTMENT GROUPING Pension Policy Institute (PPI) 14 Social Care Workforce Research Unit (SCWRU) 19 Humanitarian Futures Programme (HFP) 6 International Centre for Security Analysis (ICSA) 15 UK in a Changing Europe (ESRC) 8 Ramphal Institute 5 Media Standards Trust (MST) 6 King’s Policy Institute (KPI) – Core staff 13 International Centre for University Policy Research (ICUPR) 3 Professional Services 9 Visiting Fellows 8
  • 18. NORTH END VWB1 AGREED/APPROVED LAYOUT
  • 19. SOUTH END VWB1 AGREED/APPROVED LAYOUT
  • 20. STORAGES & SIDE FILLERS - TAYLOR MADE Side fillers and storages act as a cable management
  • 21. KITCHEN – SOCIAL GATHERING/INFORMAL MEETING/REST AREA
  • 22. ESRC, ICSA, HFP & SCWRU DEPARTMENTS
  • 23. ESRC, ICSA, HFP & SCWRU DEPARTMENTS
  • 24. INTERNATIONAL CENTRE & KPI DEPARTMENTS
  • 26. INTERNATIONAL CENTRE & KPI DEPARTMENTS
  • 27. INTERNATIONAL CENTRE & KPI DEPARTMENTS
  • 31. KPI, PROFESSIONAL SERVICES, ICUPR DEPARTMENTS & VISITING FELLOWS AREA
  • 32. MEETING ROOMS,KITCHEN, POD & MAIN RECEPTION
  • 33. ESRC, ICSA, HFP & SCWRU DEPARTMENTS
  • 34. PPI & SCWRU DEPARTMENTS, LIBRARY & KITCHEN
  • 35. OPEN PLAN OFFICE FOR ACADEMICS LESSONS LEARNED 1. Get the Decision Maker on your side 2. Understand your client, their needs and requirements 3. Define the need in order to find the solution quicker 4. Include Academics in your project • Design process • Decision making • Ask what they want to achieve • Values and priorities • Approval 5. Process is time consuming, cannot be rushed
  • 36. POST-OCUPANCY FEEDBACK Q&A’s 1. What is your personal opinion of the design process and of the final outcome? Excellent – the designer delivered the brief of creating an open, transparent, creative space. 2. How did your academic staff feel about the proposed scheme and how well did they settle into the new working environment? To begin with there was some uncertainty, but now people are settled in and there are no negative comments. 3. What are your favourite features? The space, light and colour scheme. 4. What could have been done better? The only thing that could have been improved is if everything could have been completed in a shorter time frame. 5. Do you have further comments on any aspect of the project? Overall the project went very well. We are all delighted with the outcome. Jonathan Grant Director & Professor of Public Policy The Policy Institute at King’s
  • 37. • King’s has acquired the Bush House Building (ex BBC World Service and 2 neighbouring buildings, providing approx 30,000 sqm NUA of space for expansion. • We are currently working with the faculties to ensure that lessons learned in this project are carried forward. NEXT STEPS
  • 38.