NITIN SHINGANE
HUL NASIK ICD Factory
Jan 2014 TO July 2015
NETWORKING - PROJECT
Key statistics
General
 81244 Square Meter , 20% Built up area
 Rs. 170 Cr GBV
 2014 Expected t/o of Rs 500 Cr
Manpower
 8 Managers, 27 Executives, 8 Office Asst, 499 Workmen
Manufacturing
 3 Production units, 3 Categories Served ( Ice cream, Spread &
Savory ), 550 tons of Weekly Production
 9 Processing Lines , 14 Packing Machines
 5.8 MVA Connected Load, 2 Boilers (4 TPH), 3 Air Compressors
(Total @ 800 CFM)
 2 HVAC Systems on R-134 (Total @ 300 TR)
 1 VAM for ICD (150 TR)
 2 DG Sets (Total @ 2250 KVA), and 1 Water Treatment Plant (60
m3/hr)
 800 TR Refrigeration Capacity
 1 Effluent Treatment Plants (Total Capacity @ 420TPD)
Logistics
 110 SKUs, 300 RM/PM , 2 Outside job-work location
 10-20 trucks/day for Inbound Material movements
Shashank Jain
Factory Manager
Mfg Manager
ICD
Chaitra
Quality
Manager
Himadri Maiti
Mfg Manager
CPD/Savory
Manoj Yadav
Commercial
Manager
Saurabh Mittal
HR Manager
Radhika
Manufacturing EngineeringManufacturing Commercial HR Quality
Nasik Management Team
Factory
Engineer
Ashish Bajpai
Safety
Safety
Manager
Manish Patel
PROJECT- RE-STRUCTURE NETWORKING
NITIN SHINGANE
NASIK FACTORY
FRIDAY, MARCH 25, 2016
OLD LAN STRACTURE QA SWITCH RACK
WESTAGE LAN
CONNECTION
ADMIN LOCATIONSECURITY GATE SWITCH
Before
Networking
condition
SERVER RACK SERVER ROOM SERVER ROOM
Before
networking
condition
Before: QA DEPT SWITCH After: QA DEPT SWITCH
ICD Rollo – Machine Cleaning
Before: OLD CABLE
STRUTURE
After: NEW CABLE
STURTURE
Before: Security Gate Switch After: Security gate Switch
Before: Server Room
Cabling
After: Server Room Cabling
Before: Server Room Switch After: Server Room Switch
AWARDS FOR BEST JOBS 2014 &
2015
HUl Networking  Project- Nitin Shingane

More Related Content

Viewers also liked

Viewers also liked (9)

Open sap ui51_week0_all_slides
Open sap ui51_week0_all_slidesOpen sap ui51_week0_all_slides
Open sap ui51_week0_all_slides
 
speakyourhealingfinalwoackwithwebsites333
speakyourhealingfinalwoackwithwebsites333speakyourhealingfinalwoackwithwebsites333
speakyourhealingfinalwoackwithwebsites333
 
Diplomna FINAL
Diplomna FINALDiplomna FINAL
Diplomna FINAL
 
Amplificador
AmplificadorAmplificador
Amplificador
 
Mariel slide
Mariel slideMariel slide
Mariel slide
 
Evaluation Q1 Media Draft
Evaluation Q1 Media DraftEvaluation Q1 Media Draft
Evaluation Q1 Media Draft
 
McLeod Home Solutions
McLeod Home SolutionsMcLeod Home Solutions
McLeod Home Solutions
 
Writing Sample 5
Writing Sample 5Writing Sample 5
Writing Sample 5
 
Russell westbrook
Russell westbrookRussell westbrook
Russell westbrook
 

Similar to HUl Networking Project- Nitin Shingane

Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma
 
Fly ash brick industry deepak tijare
Fly ash brick industry deepak tijareFly ash brick industry deepak tijare
Fly ash brick industry deepak tijareANIKET KULKARNI
 
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)CV Ade Heri Suheri - Teknik Kimia UNSRI (13)
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)Ade Heri Suheri
 
Mango pulp industry v chandana dipthi
Mango pulp industry v chandana dipthiMango pulp industry v chandana dipthi
Mango pulp industry v chandana dipthiANIKET KULKARNI
 
Business Proposal; Budget Plan for Dairy farm
Business Proposal; Budget Plan for Dairy farmBusiness Proposal; Budget Plan for Dairy farm
Business Proposal; Budget Plan for Dairy farmKanika Verma
 
Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep guptaANIKET KULKARNI
 
Packaged drinking water mineral water
Packaged drinking water mineral waterPackaged drinking water mineral water
Packaged drinking water mineral waterEKrantipvtltd
 
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Singh Kakkar
 
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...IRJET Journal
 
Project Feasibility Report
Project Feasibility ReportProject Feasibility Report
Project Feasibility Reportanilappu05
 
Production&operation cycle.mcb
Production&operation cycle.mcbProduction&operation cycle.mcb
Production&operation cycle.mcbChand Basha Mcb
 
Sourav_Grover_1_ (2)
Sourav_Grover_1_ (2)Sourav_Grover_1_ (2)
Sourav_Grover_1_ (2)sourav grover
 
Ntpc information
Ntpc informationNtpc information
Ntpc informationNTPC
 

Similar to HUl Networking Project- Nitin Shingane (20)

hariom
hariomhariom
hariom
 
Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)Dilip Sharma (Production Planner)
Dilip Sharma (Production Planner)
 
Fly ash brick industry deepak tijare
Fly ash brick industry deepak tijareFly ash brick industry deepak tijare
Fly ash brick industry deepak tijare
 
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)CV Ade Heri Suheri - Teknik Kimia UNSRI (13)
CV Ade Heri Suheri - Teknik Kimia UNSRI (13)
 
Mango pulp industry v chandana dipthi
Mango pulp industry v chandana dipthiMango pulp industry v chandana dipthi
Mango pulp industry v chandana dipthi
 
Business Proposal; Budget Plan for Dairy farm
Business Proposal; Budget Plan for Dairy farmBusiness Proposal; Budget Plan for Dairy farm
Business Proposal; Budget Plan for Dairy farm
 
Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep gupta
 
Packaged drinking water mineral water
Packaged drinking water mineral waterPackaged drinking water mineral water
Packaged drinking water mineral water
 
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
 
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...
Case Study of Compressed Bio Gas Plant Installed at Hingoniya Gaushala, Jaipu...
 
Project Feasibility Report
Project Feasibility ReportProject Feasibility Report
Project Feasibility Report
 
Farrukh cv
Farrukh cvFarrukh cv
Farrukh cv
 
Production&operation cycle.mcb
Production&operation cycle.mcbProduction&operation cycle.mcb
Production&operation cycle.mcb
 
hariom
hariomhariom
hariom
 
Sourav_Grover_1_ (2)
Sourav_Grover_1_ (2)Sourav_Grover_1_ (2)
Sourav_Grover_1_ (2)
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
 
Ntpc information
Ntpc informationNtpc information
Ntpc information
 
Sornaboopathi Resume
Sornaboopathi ResumeSornaboopathi Resume
Sornaboopathi Resume
 
Bakery Industries
Bakery IndustriesBakery Industries
Bakery Industries
 
Industrial attachment of APS group ltd
Industrial attachment of APS group ltdIndustrial attachment of APS group ltd
Industrial attachment of APS group ltd
 

HUl Networking Project- Nitin Shingane

  • 1. FRIDAY, MARCH 25, 2016 NITIN SHINGANE HUL NASIK ICD Factory Jan 2014 TO July 2015 NETWORKING - PROJECT
  • 2. Key statistics General  81244 Square Meter , 20% Built up area  Rs. 170 Cr GBV  2014 Expected t/o of Rs 500 Cr Manpower  8 Managers, 27 Executives, 8 Office Asst, 499 Workmen Manufacturing  3 Production units, 3 Categories Served ( Ice cream, Spread & Savory ), 550 tons of Weekly Production  9 Processing Lines , 14 Packing Machines  5.8 MVA Connected Load, 2 Boilers (4 TPH), 3 Air Compressors (Total @ 800 CFM)  2 HVAC Systems on R-134 (Total @ 300 TR)  1 VAM for ICD (150 TR)  2 DG Sets (Total @ 2250 KVA), and 1 Water Treatment Plant (60 m3/hr)  800 TR Refrigeration Capacity  1 Effluent Treatment Plants (Total Capacity @ 420TPD) Logistics  110 SKUs, 300 RM/PM , 2 Outside job-work location  10-20 trucks/day for Inbound Material movements
  • 3. Shashank Jain Factory Manager Mfg Manager ICD Chaitra Quality Manager Himadri Maiti Mfg Manager CPD/Savory Manoj Yadav Commercial Manager Saurabh Mittal HR Manager Radhika Manufacturing EngineeringManufacturing Commercial HR Quality Nasik Management Team Factory Engineer Ashish Bajpai Safety Safety Manager Manish Patel
  • 4. PROJECT- RE-STRUCTURE NETWORKING NITIN SHINGANE NASIK FACTORY FRIDAY, MARCH 25, 2016
  • 5. OLD LAN STRACTURE QA SWITCH RACK WESTAGE LAN CONNECTION ADMIN LOCATIONSECURITY GATE SWITCH Before Networking condition
  • 6. SERVER RACK SERVER ROOM SERVER ROOM Before networking condition
  • 7. Before: QA DEPT SWITCH After: QA DEPT SWITCH ICD Rollo – Machine Cleaning
  • 9. Before: Security Gate Switch After: Security gate Switch
  • 10. Before: Server Room Cabling After: Server Room Cabling
  • 11. Before: Server Room Switch After: Server Room Switch
  • 12.
  • 13.
  • 14. AWARDS FOR BEST JOBS 2014 & 2015