NIKUNJ GANDHI nik120792@gmail.com | +91-7383387700
B/3/10 Panchratna Apts., Bodakdev, Ahmedabad, Gujarat.
SUMMARY
 One year of experience in state power distribution company.
 Managed and mentored a team of 30 line-staff for operation and maintenance of distribution system
 Was recognised to solve customers’ problems with minimum resources and time.
 Constantly looking out for challenging projects with new technologies and process that refine my skills and
knowledge.
ACADEMIC QUALIFICATIONS
B.E., Electrical Engineering, Gujarat Technological University 8.67/10.00 2013
HSC, GSHSEB, Gujarat 77.8 % 2009
PROFESSIONAL EXPERIENCE
 Junior Engineer at UGVCL(For 1 year)
At this position as a design engineer I was doing the survey, design and installation work of 11kv overhead HT
feeders as well as 440V overhead LT distribution lines. As a field engineer I had to handle the work of erection of
new 11kv feeders, maintenance of existing feeders, releasing new single/three phase Industrial, commercial and
residential connections, checking of electrical meter installations in consumers’ premises and attending faults of
distribution lines. My actions were also concerned with reducing the T&D losses of the distribution lines as well as
ensuring the safe, reliable and quality power supply to the every consumer.
 Graduate Engineering Trainee at GETRI
This training was mainly aimed at providing the in-depth idea about different practices that is currently being
practiced in power distribution sector. It also focused on imparting the knowledge of current trends in power sector
like power trading, GIS mapping, energy conservation and auditing, SCADA implementation in Distribution system
as well as latest technologies in Distribution system.
 Engineering Trainee at ELECTROTHERM (INDIA) LTD.
This training was mainly focused on gaining in-depth knowledge on “INDUCTION MELTING FURNACE” which is
the prime product manufactured by the company. Detailed sessions about functioning of different parts of
Induction Melting Furnace like thyristor based power supply unit, crucible, DM unit, capacitor rack section, DC
choke section, Changeover switch section and Hydraulic unit. Visit to every station of the manufacturing process
from designing to dispatch made me familiar with the processes involved in furnace manufacturing and
development.
 Engineering Trainee at WANAKBORI THERMAL POWER STATION
This training was mainly aimed on learning the processes involved in Power Generation and Transmission. During
this training, detailed visits at different sections of the thermal power plant like boiler section, coal handling plant,
turbine section, generator section, transformer section, switchyard section, control room section, DM water section
and condenser section.
PROJECT ENDEAVORS
 33KV PROPOSED TRACTION SYSTEM:
Final year project aimed at developing a traction system so as to reduce the number of traction substations in the
existing INDIAN RAILWAYS TRACTION SYSTEM. In order to achieve this task we have proposed a 33 kV
traction system in which an AC to AC voltage controller is used in the supply circuit, output of which is controlled
by sensing the load and giving microcontroller based triggering. In order to simulate its practicality we designed a
working model at 15 V. By implementing this project we can save approximately 15 Crore INR from the existing
Indian Railway Traction System.
 Two – Way Intercom With Indicator:
My goal in this project was to establish duplex (two way) communication between two remote stations. I designed
the system by acquiring analog signal from microphone and sending it to the operational amplifiers (Op-Amp) and
then transmitting it to the destination. The system was also capable of acting in the exact opposite manner.-
CURRICULAR ACTIVITIES
 Industrial visit to BHESTAN TRACTION SUBSTATION where I learned how they energize the railway tracks and
entire electric functioning of Indian Railway Traction System.
 Industrial visit to STATE LOAD DISPATCH CENTRE , GUJARAT where I learned about the optimum scheduling
and dispatch of electricity with state, intrastate transmission system and real time operations for grid control.
 Industrial Visit to GAS INSULATED SUBSTATION at Sardar Sarovar Hydro Power Plant where I learned the
technical aspects of the gas insulated switch gears and their installations.

More Related Content

What's hot

Morpal mehara 2016- cv
Morpal mehara 2016- cvMorpal mehara 2016- cv
Morpal mehara 2016- cvMorpal Mehara
 
AtulBhatt-2 - Copy
AtulBhatt-2 - CopyAtulBhatt-2 - Copy
AtulBhatt-2 - CopyAtul Bhatt
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016subhankar saha
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
Two stage power conversion architecture suitable for wide range input voltage
Two stage power conversion architecture suitable for wide range input voltageTwo stage power conversion architecture suitable for wide range input voltage
Two stage power conversion architecture suitable for wide range input voltageLeMeniz Infotech
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitaeVenkatesh D
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)C.P Singh
 
High step up quasi-z source dc-dc converter
High step up quasi-z source dc-dc converterHigh step up quasi-z source dc-dc converter
High step up quasi-z source dc-dc converterAsoka Technologies
 
An f p q droop control in cascaded-type microgrid
An f p q droop control in cascaded-type microgridAn f p q droop control in cascaded-type microgrid
An f p q droop control in cascaded-type microgridAsoka Technologies
 
Reliability evaluation of conventional and interleaved dc–dc boost converters
Reliability evaluation of conventional and interleaved dc–dc boost convertersReliability evaluation of conventional and interleaved dc–dc boost converters
Reliability evaluation of conventional and interleaved dc–dc boost convertersLeMeniz Infotech
 

What's hot (20)

CV Solar
CV SolarCV Solar
CV Solar
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Morpal mehara 2016- cv
Morpal mehara 2016- cvMorpal mehara 2016- cv
Morpal mehara 2016- cv
 
AtulBhatt-2 - Copy
AtulBhatt-2 - CopyAtulBhatt-2 - Copy
AtulBhatt-2 - Copy
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
Resume
ResumeResume
Resume
 
Kishore resume
Kishore resumeKishore resume
Kishore resume
 
CV Vijay_Vora
CV Vijay_VoraCV Vijay_Vora
CV Vijay_Vora
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Asif
AsifAsif
Asif
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
Two stage power conversion architecture suitable for wide range input voltage
Two stage power conversion architecture suitable for wide range input voltageTwo stage power conversion architecture suitable for wide range input voltage
Two stage power conversion architecture suitable for wide range input voltage
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Santhu CV Resume.
Santhu CV Resume.Santhu CV Resume.
Santhu CV Resume.
 
new-2-2 (1)
new-2-2 (1)new-2-2 (1)
new-2-2 (1)
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)
 
rony resume update july16.
rony resume update july16.rony resume update july16.
rony resume update july16.
 
High step up quasi-z source dc-dc converter
High step up quasi-z source dc-dc converterHigh step up quasi-z source dc-dc converter
High step up quasi-z source dc-dc converter
 
An f p q droop control in cascaded-type microgrid
An f p q droop control in cascaded-type microgridAn f p q droop control in cascaded-type microgrid
An f p q droop control in cascaded-type microgrid
 
Reliability evaluation of conventional and interleaved dc–dc boost converters
Reliability evaluation of conventional and interleaved dc–dc boost convertersReliability evaluation of conventional and interleaved dc–dc boost converters
Reliability evaluation of conventional and interleaved dc–dc boost converters
 

Similar to CV _Nikunj Gandhi (20)

Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
vijay new resume[1].DOC
vijay new resume[1].DOCvijay new resume[1].DOC
vijay new resume[1].DOC
 
Janardhan resume
Janardhan resumeJanardhan resume
Janardhan resume
 
chiranjeevi_resumlatest-2016.new
chiranjeevi_resumlatest-2016.newchiranjeevi_resumlatest-2016.new
chiranjeevi_resumlatest-2016.new
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resume
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
ShrihariB
ShrihariBShrihariB
ShrihariB
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume_Vishal
Resume_VishalResume_Vishal
Resume_Vishal
 
dharma cv . Ts
dharma cv . Tsdharma cv . Ts
dharma cv . Ts
 
utsav cv
utsav cvutsav cv
utsav cv
 
CV_Ashok Jain
CV_Ashok JainCV_Ashok Jain
CV_Ashok Jain
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Dipak_CV
Dipak_CVDipak_CV
Dipak_CV
 
SOUMEN-RESUME
SOUMEN-RESUMESOUMEN-RESUME
SOUMEN-RESUME
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 

CV _Nikunj Gandhi

  • 1. NIKUNJ GANDHI nik120792@gmail.com | +91-7383387700 B/3/10 Panchratna Apts., Bodakdev, Ahmedabad, Gujarat. SUMMARY  One year of experience in state power distribution company.  Managed and mentored a team of 30 line-staff for operation and maintenance of distribution system  Was recognised to solve customers’ problems with minimum resources and time.  Constantly looking out for challenging projects with new technologies and process that refine my skills and knowledge. ACADEMIC QUALIFICATIONS B.E., Electrical Engineering, Gujarat Technological University 8.67/10.00 2013 HSC, GSHSEB, Gujarat 77.8 % 2009 PROFESSIONAL EXPERIENCE  Junior Engineer at UGVCL(For 1 year) At this position as a design engineer I was doing the survey, design and installation work of 11kv overhead HT feeders as well as 440V overhead LT distribution lines. As a field engineer I had to handle the work of erection of new 11kv feeders, maintenance of existing feeders, releasing new single/three phase Industrial, commercial and residential connections, checking of electrical meter installations in consumers’ premises and attending faults of distribution lines. My actions were also concerned with reducing the T&D losses of the distribution lines as well as ensuring the safe, reliable and quality power supply to the every consumer.  Graduate Engineering Trainee at GETRI This training was mainly aimed at providing the in-depth idea about different practices that is currently being practiced in power distribution sector. It also focused on imparting the knowledge of current trends in power sector like power trading, GIS mapping, energy conservation and auditing, SCADA implementation in Distribution system as well as latest technologies in Distribution system.  Engineering Trainee at ELECTROTHERM (INDIA) LTD. This training was mainly focused on gaining in-depth knowledge on “INDUCTION MELTING FURNACE” which is the prime product manufactured by the company. Detailed sessions about functioning of different parts of Induction Melting Furnace like thyristor based power supply unit, crucible, DM unit, capacitor rack section, DC choke section, Changeover switch section and Hydraulic unit. Visit to every station of the manufacturing process from designing to dispatch made me familiar with the processes involved in furnace manufacturing and development.  Engineering Trainee at WANAKBORI THERMAL POWER STATION This training was mainly aimed on learning the processes involved in Power Generation and Transmission. During this training, detailed visits at different sections of the thermal power plant like boiler section, coal handling plant, turbine section, generator section, transformer section, switchyard section, control room section, DM water section and condenser section. PROJECT ENDEAVORS  33KV PROPOSED TRACTION SYSTEM: Final year project aimed at developing a traction system so as to reduce the number of traction substations in the existing INDIAN RAILWAYS TRACTION SYSTEM. In order to achieve this task we have proposed a 33 kV traction system in which an AC to AC voltage controller is used in the supply circuit, output of which is controlled by sensing the load and giving microcontroller based triggering. In order to simulate its practicality we designed a working model at 15 V. By implementing this project we can save approximately 15 Crore INR from the existing Indian Railway Traction System.  Two – Way Intercom With Indicator: My goal in this project was to establish duplex (two way) communication between two remote stations. I designed the system by acquiring analog signal from microphone and sending it to the operational amplifiers (Op-Amp) and then transmitting it to the destination. The system was also capable of acting in the exact opposite manner.- CURRICULAR ACTIVITIES  Industrial visit to BHESTAN TRACTION SUBSTATION where I learned how they energize the railway tracks and entire electric functioning of Indian Railway Traction System.  Industrial visit to STATE LOAD DISPATCH CENTRE , GUJARAT where I learned about the optimum scheduling and dispatch of electricity with state, intrastate transmission system and real time operations for grid control.  Industrial Visit to GAS INSULATED SUBSTATION at Sardar Sarovar Hydro Power Plant where I learned the technical aspects of the gas insulated switch gears and their installations.