Introduction to “IRIS”
Integrated Reporting for Inspection System
1. To improve the measurement of
components received within the company
2. Ensure that parts comply with the
specification
3. To lay a foundation for subsequent
component/supplier analysis
Objectives
Templates are
generated by
SolidWorks macro and
can be incorporated
into ePDM on release
of a drawing.
Process Outline
Inspection
Template
Inspection
Report
Inspection
Report
Inspection
Report
Reports are generated
from the template on
and “as and when”
basis by an inspector.
The current stock
holding is generated
for the report.
Principal areas:
1. Header
2. Dimensions and
tolerances
3. Measurements
and comments
4. Designed as a
continuous form with a
header on each page
5. Watermark to show the
status (lifecycle)
Inspection Template
Template (Header)
• Data exported from SolidWorks
includes:
• Drawing, Revision, Part number,
Status, Description & last
modification. Includes hyperlink to
drawing in ePDM!
• File Properties
• Material & manufacturing data
• Default drawing / manufacturing
tolerances
• Part attributes
• Image with hyperlink
• Purchasing/Quality
• Approvals
Template (Dimensions & Tolerances)
• Dimensions imported
view-by-view and show:
1. Grouped by Drawing/View
Dimension name, XY
location & layer.
2. Min, Nom & Max values.
3. Prefix & suffix.
4. Units.
• Tolerances taken from
drawing in line with the
chosen manufacturing route.
• Modified GN’s template
editor - all fields are now
controlled by a database
(“SolidWorks settings.mdb” in O: drive)
Template (Measurements & Comments)
• Measurements can only be
entered in to
coloured cells
• Error values are calculated
and conditionally formatted
to clearly display non-
conformity.
• Comments can be added for
any row of data.
• Errors are collated for each
batch & overall and includes
“Inspection” dimensions.
• Generated from ePDM via
a right-mouse click on the
selected drawing(s)
• Multiply select via query.
• All other file types other
than drawings are ignored.
• Can be generated directly
from SolidWorks via a
macro with UI
• Separate sub-directory of
the templates.
• Name of:
“Inspection Template – “ & PN; Rev
Generating a Template
• On entering the
template the purchasing
data is added by the
system:
1. Quantity in stock
2. Last received date
3. Quantity on order
4. Demand/month
5. Calculates priority.
• The following is required
from the user:
• Supplier & Order Number
(potentially obtained ERP system?)
Generating a Report
Saving a Report
• The system saves a file automatically upon
generation of the report.
• Separate sub-directory
• Name of:
• “Inspection Report – “ & PN; Rev_YYYYmmDD
(Assumes no more than 1 batch/day/part)
• A database has been
created to manage all
reports.
• Scheduling
• Reporting
• Supplier analysis
Database integration
Inspection
Report
Access
• Buttons are provided to
allow the inspector to
commence a workflow
after collating the data
• Traffic light system
• Workflow states
• “Unapproved” (Default)
• “Pending ”
• Reject, Concess or Accept
• “Accepted”
• “Rejected”
• “Concessed”
Typical workflow
Reject Concess Accept
Typical workflow
• On each change of state
an entry is made in the
database to record
decision
1. Sent to recipients with a link
to the file on the server.
2. File is sealed against change
3. Decision recorded in database
Access
• 800432
• Complicated drawing
• Multipage
• Stock
• Prefix/Suffix
• Layering?
• GN’s property pane
• Modified to include drop-
downs of all fields.
Demonstrations
• 800389
 Manual dimension
• 801922
• Sheet-Metal
• Colour
• Properties highlighted
Pre introduction
• Dimensioning protocol
1. A numbering system has
been introduced (catered
for) but could further
improve by:
a. Using a layering
convention to colour code
importance / frequency of
inspection?
b. Catered for by the system
(Demo)
To be discussed?
Post introduction
• Workflow:
1. Incorporate into ePDM?
2. Reject, Concess or
Approve?
3. Notifications?
4. Supplier analysis?
• Generate templates for
all released drawings on
ePDM?
To be discussed?

More Related Content

What's hot

ControlSystemsAutogenBrochure
ControlSystemsAutogenBrochureControlSystemsAutogenBrochure
ControlSystemsAutogenBrochure
Tony Simeonov
 

What's hot (13)

Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
Solution Manager Technical Monitoring - SAP NW BW on HANA Setup Part 2 of 3 (...
 
Your notes DNA
Your notes DNAYour notes DNA
Your notes DNA
 
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
 
ControlSystemsAutogenBrochure
ControlSystemsAutogenBrochureControlSystemsAutogenBrochure
ControlSystemsAutogenBrochure
 
R12 d49656 gc10-apps dba 17
R12 d49656 gc10-apps dba 17R12 d49656 gc10-apps dba 17
R12 d49656 gc10-apps dba 17
 
Performance testing for integrated healthcare suite
Performance testing for integrated healthcare suitePerformance testing for integrated healthcare suite
Performance testing for integrated healthcare suite
 
Project Management for Information System Development
Project Management for Information System DevelopmentProject Management for Information System Development
Project Management for Information System Development
 
Sure Outputs
Sure OutputsSure Outputs
Sure Outputs
 
Product Information - Fuse Management Central 1.0.0
Product Information - Fuse Management Central 1.0.0Product Information - Fuse Management Central 1.0.0
Product Information - Fuse Management Central 1.0.0
 
Sure BDCs
Sure BDCsSure BDCs
Sure BDCs
 
Getting Started with IBM i Security: Event Auditing
Getting Started with IBM i Security: Event AuditingGetting Started with IBM i Security: Event Auditing
Getting Started with IBM i Security: Event Auditing
 
Improving the Traceability and Reliability of CRM Implementations with TFS
Improving the Traceability and Reliability of CRM Implementations with TFSImproving the Traceability and Reliability of CRM Implementations with TFS
Improving the Traceability and Reliability of CRM Implementations with TFS
 
KIA
KIAKIA
KIA
 

Viewers also liked

Reformer tube life_assessment_thepetrostreet
Reformer tube life_assessment_thepetrostreetReformer tube life_assessment_thepetrostreet
Reformer tube life_assessment_thepetrostreet
Joshi Davies
 

Viewers also liked (8)

Iris DVR Videoscope
Iris DVR VideoscopeIris DVR Videoscope
Iris DVR Videoscope
 
Report on Tubular Non-Destructive Techniques ( Remote Field testing and Inter...
Report on Tubular Non-Destructive Techniques ( Remote Field testing and Inter...Report on Tubular Non-Destructive Techniques ( Remote Field testing and Inter...
Report on Tubular Non-Destructive Techniques ( Remote Field testing and Inter...
 
Automation of Eddy Current Processes for NDT
Automation of Eddy Current Processes for NDTAutomation of Eddy Current Processes for NDT
Automation of Eddy Current Processes for NDT
 
Reformer tube life_assessment_thepetrostreet
Reformer tube life_assessment_thepetrostreetReformer tube life_assessment_thepetrostreet
Reformer tube life_assessment_thepetrostreet
 
Tubular Non Destructive techniques (Remote field testing and Internal Rotary ...
Tubular Non Destructive techniques (Remote field testing and Internal Rotary ...Tubular Non Destructive techniques (Remote field testing and Internal Rotary ...
Tubular Non Destructive techniques (Remote field testing and Internal Rotary ...
 
Heat-exchanger-manual
Heat-exchanger-manualHeat-exchanger-manual
Heat-exchanger-manual
 
Theory and Practice of Steam Reforming
Theory and Practice of Steam ReformingTheory and Practice of Steam Reforming
Theory and Practice of Steam Reforming
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 

Similar to IRIS

CIE AS Level Applied ICT Unit 4 - Systems Life Cycle
CIE AS Level Applied ICT Unit 4 - Systems Life CycleCIE AS Level Applied ICT Unit 4 - Systems Life Cycle
CIE AS Level Applied ICT Unit 4 - Systems Life Cycle
Mr G
 
Using the Corporate Geographic Data Model with Subversion
Using the Corporate Geographic Data Model with SubversionUsing the Corporate Geographic Data Model with Subversion
Using the Corporate Geographic Data Model with Subversion
Debbie Wilson
 

Similar to IRIS (20)

SFDC Other Platform Features
SFDC Other Platform FeaturesSFDC Other Platform Features
SFDC Other Platform Features
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
 
Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"Heuristic Test Strategy Model For "Soda Co"
Heuristic Test Strategy Model For "Soda Co"
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptx
 
CIE AS Level Applied ICT Unit 4 - Systems Life Cycle
CIE AS Level Applied ICT Unit 4 - Systems Life CycleCIE AS Level Applied ICT Unit 4 - Systems Life Cycle
CIE AS Level Applied ICT Unit 4 - Systems Life Cycle
 
03 part 1_requirement_elicitation
03 part 1_requirement_elicitation03 part 1_requirement_elicitation
03 part 1_requirement_elicitation
 
Compliance in PLM Webinar 2
Compliance in PLM Webinar 2Compliance in PLM Webinar 2
Compliance in PLM Webinar 2
 
Server and application monitoring webinars [Applications Manager] - Part 4
Server and application monitoring webinars [Applications Manager] - Part 4Server and application monitoring webinars [Applications Manager] - Part 4
Server and application monitoring webinars [Applications Manager] - Part 4
 
System design
System designSystem design
System design
 
Service quality monitoring system architecture
Service quality monitoring system architectureService quality monitoring system architecture
Service quality monitoring system architecture
 
Using the Corporate Geographic Data Model with Subversion
Using the Corporate Geographic Data Model with SubversionUsing the Corporate Geographic Data Model with Subversion
Using the Corporate Geographic Data Model with Subversion
 
Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)Project Management Practical 01 - 04 (Mumbai University)
Project Management Practical 01 - 04 (Mumbai University)
 
Software Configuration Management.pptx
Software Configuration Management.pptxSoftware Configuration Management.pptx
Software Configuration Management.pptx
 
Oracle BI Publsiher Using Data Template
Oracle BI Publsiher Using Data TemplateOracle BI Publsiher Using Data Template
Oracle BI Publsiher Using Data Template
 
Deep-Dive to Application Insights
Deep-Dive to Application Insights Deep-Dive to Application Insights
Deep-Dive to Application Insights
 
Cloud monitoring with Applications Manager
Cloud monitoring with Applications ManagerCloud monitoring with Applications Manager
Cloud monitoring with Applications Manager
 
Oracle APEX
Oracle APEXOracle APEX
Oracle APEX
 
Continuous validation of office 365
Continuous validation of office 365Continuous validation of office 365
Continuous validation of office 365
 
Building information systems
Building information systemsBuilding information systems
Building information systems
 
Plant check Mobile Operator Rounds English
Plant check Mobile Operator Rounds EnglishPlant check Mobile Operator Rounds English
Plant check Mobile Operator Rounds English
 

IRIS

  • 1. Introduction to “IRIS” Integrated Reporting for Inspection System
  • 2. 1. To improve the measurement of components received within the company 2. Ensure that parts comply with the specification 3. To lay a foundation for subsequent component/supplier analysis Objectives
  • 3. Templates are generated by SolidWorks macro and can be incorporated into ePDM on release of a drawing. Process Outline Inspection Template Inspection Report Inspection Report Inspection Report Reports are generated from the template on and “as and when” basis by an inspector. The current stock holding is generated for the report.
  • 4. Principal areas: 1. Header 2. Dimensions and tolerances 3. Measurements and comments 4. Designed as a continuous form with a header on each page 5. Watermark to show the status (lifecycle) Inspection Template
  • 5. Template (Header) • Data exported from SolidWorks includes: • Drawing, Revision, Part number, Status, Description & last modification. Includes hyperlink to drawing in ePDM! • File Properties • Material & manufacturing data • Default drawing / manufacturing tolerances • Part attributes • Image with hyperlink • Purchasing/Quality • Approvals
  • 6. Template (Dimensions & Tolerances) • Dimensions imported view-by-view and show: 1. Grouped by Drawing/View Dimension name, XY location & layer. 2. Min, Nom & Max values. 3. Prefix & suffix. 4. Units. • Tolerances taken from drawing in line with the chosen manufacturing route. • Modified GN’s template editor - all fields are now controlled by a database (“SolidWorks settings.mdb” in O: drive)
  • 7. Template (Measurements & Comments) • Measurements can only be entered in to coloured cells • Error values are calculated and conditionally formatted to clearly display non- conformity. • Comments can be added for any row of data. • Errors are collated for each batch & overall and includes “Inspection” dimensions.
  • 8. • Generated from ePDM via a right-mouse click on the selected drawing(s) • Multiply select via query. • All other file types other than drawings are ignored. • Can be generated directly from SolidWorks via a macro with UI • Separate sub-directory of the templates. • Name of: “Inspection Template – “ & PN; Rev Generating a Template
  • 9. • On entering the template the purchasing data is added by the system: 1. Quantity in stock 2. Last received date 3. Quantity on order 4. Demand/month 5. Calculates priority. • The following is required from the user: • Supplier & Order Number (potentially obtained ERP system?) Generating a Report
  • 10. Saving a Report • The system saves a file automatically upon generation of the report. • Separate sub-directory • Name of: • “Inspection Report – “ & PN; Rev_YYYYmmDD (Assumes no more than 1 batch/day/part)
  • 11. • A database has been created to manage all reports. • Scheduling • Reporting • Supplier analysis Database integration Inspection Report Access
  • 12. • Buttons are provided to allow the inspector to commence a workflow after collating the data • Traffic light system • Workflow states • “Unapproved” (Default) • “Pending ” • Reject, Concess or Accept • “Accepted” • “Rejected” • “Concessed” Typical workflow Reject Concess Accept
  • 13. Typical workflow • On each change of state an entry is made in the database to record decision 1. Sent to recipients with a link to the file on the server. 2. File is sealed against change 3. Decision recorded in database Access
  • 14. • 800432 • Complicated drawing • Multipage • Stock • Prefix/Suffix • Layering? • GN’s property pane • Modified to include drop- downs of all fields. Demonstrations • 800389  Manual dimension • 801922 • Sheet-Metal • Colour • Properties highlighted
  • 15. Pre introduction • Dimensioning protocol 1. A numbering system has been introduced (catered for) but could further improve by: a. Using a layering convention to colour code importance / frequency of inspection? b. Catered for by the system (Demo) To be discussed?
  • 16. Post introduction • Workflow: 1. Incorporate into ePDM? 2. Reject, Concess or Approve? 3. Notifications? 4. Supplier analysis? • Generate templates for all released drawings on ePDM? To be discussed?