Summer ‘16
1
C.I. Team Project:
• Shadow Boards for Assembly Area
- Design
- Outside Resources
2
Electrical Safety Documentation:
Higher Level Guidelines
• Work Area
• Testing Procedures
- Hipot Testing, Ground Bond Testing, Line
Leakage Testing
• Employee Training
3
Audit Procedures:
4
So far…
• Research
- FDA’s “Guide to Inspections of Medical
Device Manufacturers”
- Code of Federal Regulation, Title 21
- Quality Systems/ Good Manufacturing
Practices Regulation (QS/GMP regulation)
• Meetings
• Exhibit Log
- Overview of Audit, Checklists, Procedure
upon Arrival, Notification List (flow chart)
What’s to come…
• Revising Exhibit Log
• Establishing Staff Training
5
Small Assembly Workbench Shelves:
Astro Documentation:
• Convert documentation from binders to providex.
• Minor kinks to work out with new program.
- communicated with Amada’s Product Specialist and Software Engineer
6
7
Conclusion:
• Overall…
- Project Deadlines
- Manufacturing Issues & Resolutions -> Medtronic & Zeiss Re-work
- Research -> Audit Procedures & Voltage Safety Procedures
- Problem Solving Skills
- Time Management
- Understanding Manufacturing Process
• Going Forward…
- Astro Documentation
- FDA/OSHA Official Booklet &
- School Schedule & Availability Fall ‘16
• On going…
- W.I. and time studies when requested
- Assisting in production issues
- RFC Implementation
- Fixtures, tools, and all around help in
Assembly area

More Related Content

Similar to Summer '16

Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016
Jake Essig
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&V
melmaan
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
Sam Najmi
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
TEST Huddle
 
Essentials of Project Management
Essentials of Project ManagementEssentials of Project Management
Essentials of Project Management
Living Online
 

Similar to Summer '16 (20)

Spm lecture-3
Spm lecture-3Spm lecture-3
Spm lecture-3
 
Lect3
Lect3Lect3
Lect3
 
Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016
 
Process Mining and Predictive Process Monitoring
Process Mining and Predictive Process MonitoringProcess Mining and Predictive Process Monitoring
Process Mining and Predictive Process Monitoring
 
Session 25 - Documentation
Session 25 - DocumentationSession 25 - Documentation
Session 25 - Documentation
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&V
 
Documentation
DocumentationDocumentation
Documentation
 
Hazid & hazops
Hazid & hazopsHazid & hazops
Hazid & hazops
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
Risk based conceptual design delivery
Risk based conceptual design deliveryRisk based conceptual design delivery
Risk based conceptual design delivery
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Analyst360 2
Analyst360 2Analyst360 2
Analyst360 2
 
Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360Business analyst| Murex training at Analyst360
Business analyst| Murex training at Analyst360
 
Mg6088 spm unit-2
Mg6088 spm unit-2Mg6088 spm unit-2
Mg6088 spm unit-2
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
Concurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silosConcurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silos
 
Essentials of Project Management
Essentials of Project ManagementEssentials of Project Management
Essentials of Project Management
 
Design control FDA requirements
Design control FDA requirementsDesign control FDA requirements
Design control FDA requirements
 

Summer '16

  • 2. C.I. Team Project: • Shadow Boards for Assembly Area - Design - Outside Resources 2
  • 3. Electrical Safety Documentation: Higher Level Guidelines • Work Area • Testing Procedures - Hipot Testing, Ground Bond Testing, Line Leakage Testing • Employee Training 3
  • 4. Audit Procedures: 4 So far… • Research - FDA’s “Guide to Inspections of Medical Device Manufacturers” - Code of Federal Regulation, Title 21 - Quality Systems/ Good Manufacturing Practices Regulation (QS/GMP regulation) • Meetings • Exhibit Log - Overview of Audit, Checklists, Procedure upon Arrival, Notification List (flow chart) What’s to come… • Revising Exhibit Log • Establishing Staff Training
  • 6. Astro Documentation: • Convert documentation from binders to providex. • Minor kinks to work out with new program. - communicated with Amada’s Product Specialist and Software Engineer 6
  • 7. 7 Conclusion: • Overall… - Project Deadlines - Manufacturing Issues & Resolutions -> Medtronic & Zeiss Re-work - Research -> Audit Procedures & Voltage Safety Procedures - Problem Solving Skills - Time Management - Understanding Manufacturing Process • Going Forward… - Astro Documentation - FDA/OSHA Official Booklet & - School Schedule & Availability Fall ‘16 • On going… - W.I. and time studies when requested - Assisting in production issues - RFC Implementation - Fixtures, tools, and all around help in Assembly area