SlideShare a Scribd company logo
1 of 8
Winter ’15/ Spring ‘16
1
Assembly Area and Process Engineering
Since Last Presentation…
2
• Slightly modified and
manufactured
• Manufactured and built
• Future: Producing more…
Work Instructions & Time Studies
3
• Napkin Dispenser
• 120V & 230V carts (cirrus/visante)
• Avanta cart
Floor Layouts
• New Welding
Layout
• Updated
Production Floor
Layout
• Front Office
Layout
4
Training
• Part Number Creation & Doc.
• Routing Documentation
• Formula’s for Paint Step & Laser Step
• RFC’s- Implementation &
Documentation
• Laser Programming
5
6
Fixtures
• Always ongoing
• Think outside
the box
• Staying up-to-date
• Tool #’s
7
Assembly Area
• Improvements • Before:
• After:
8
Process Engineering
• CI Team Project
Shadow Boards
Bringing UWM and Internship together
Design Aspects
• Electrical Safety Documentation
General, higher level guidelines
Hazards, safety zone, industry standards
• Astro Documentation
Summer long project
• 13485 Audit
Research
• Forming Set-Up Sheets
Collaborating w/ Paul
• Quoting Sheets

More Related Content

Similar to Winter '15 & Spring '16

Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015
Rex Spencer
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
Fides Sales
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
melanie_bissonnette
 
1017191EE 200 Electrical Engineering Design Project.docx
1017191EE 200 Electrical Engineering Design Project.docx1017191EE 200 Electrical Engineering Design Project.docx
1017191EE 200 Electrical Engineering Design Project.docx
aulasnilda
 
Projects Only 4 7 2016
Projects Only 4 7 2016Projects Only 4 7 2016
Projects Only 4 7 2016
Mason Patton
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
Bill Rogers
 
Ash Abel End of Semester Presentation
Ash Abel End of Semester PresentationAsh Abel End of Semester Presentation
Ash Abel End of Semester Presentation
Ash Abel
 

Similar to Winter '15 & Spring '16 (20)

Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015
 
The Four Pillars of PCB Design for Creating a Successful IoT Product
The Four Pillars of PCB Design for Creating a Successful IoT ProductThe Four Pillars of PCB Design for Creating a Successful IoT Product
The Four Pillars of PCB Design for Creating a Successful IoT Product
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
 
1017191EE 200 Electrical Engineering Design Project.docx
1017191EE 200 Electrical Engineering Design Project.docx1017191EE 200 Electrical Engineering Design Project.docx
1017191EE 200 Electrical Engineering Design Project.docx
 
BIT-UCSC Final Project
BIT-UCSC Final ProjectBIT-UCSC Final Project
BIT-UCSC Final Project
 
Projects Only 4 7 2016
Projects Only 4 7 2016Projects Only 4 7 2016
Projects Only 4 7 2016
 
How to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofHow to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoof
 
How to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoofHow to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoof
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
Utilizing heart rate data to improve swimmers’ performance: A conversation wi...
Utilizing heart rate data to improve swimmers’ performance: A conversation wi...Utilizing heart rate data to improve swimmers’ performance: A conversation wi...
Utilizing heart rate data to improve swimmers’ performance: A conversation wi...
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Introduction to Agile Hardware
Introduction to Agile Hardware Introduction to Agile Hardware
Introduction to Agile Hardware
 
Ash Abel End of Semester Presentation
Ash Abel End of Semester PresentationAsh Abel End of Semester Presentation
Ash Abel End of Semester Presentation
 
suresh_CV
suresh_CVsuresh_CV
suresh_CV
 
Introduction to casting industry
Introduction to casting industryIntroduction to casting industry
Introduction to casting industry
 
CSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsCSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of Us
 

Winter '15 & Spring '16

  • 1. Winter ’15/ Spring ‘16 1 Assembly Area and Process Engineering
  • 2. Since Last Presentation… 2 • Slightly modified and manufactured • Manufactured and built • Future: Producing more…
  • 3. Work Instructions & Time Studies 3 • Napkin Dispenser • 120V & 230V carts (cirrus/visante) • Avanta cart
  • 4. Floor Layouts • New Welding Layout • Updated Production Floor Layout • Front Office Layout 4
  • 5. Training • Part Number Creation & Doc. • Routing Documentation • Formula’s for Paint Step & Laser Step • RFC’s- Implementation & Documentation • Laser Programming 5
  • 6. 6 Fixtures • Always ongoing • Think outside the box • Staying up-to-date • Tool #’s
  • 7. 7 Assembly Area • Improvements • Before: • After:
  • 8. 8 Process Engineering • CI Team Project Shadow Boards Bringing UWM and Internship together Design Aspects • Electrical Safety Documentation General, higher level guidelines Hazards, safety zone, industry standards • Astro Documentation Summer long project • 13485 Audit Research • Forming Set-Up Sheets Collaborating w/ Paul • Quoting Sheets