SlideShare a Scribd company logo
1 of 15
Proprietary and Confidential
Increasing Efficiency at the
Workplace
Ryder Rewards Program
Plainfield, Indiana; 7/5/16
1
Proprietary and Confidential
Agenda
• Time Study Element Validation
• MOST Time Study Analysis Summary
• Manual Pack Standard
• Standard Calculation Example
• Work Sampling
• Observations/Recommendations
2
Proprietary and Confidential
Time Study Element Validation
.Time studies are a direct and continuous observation of a task,
using a timekeeping device, to record the time taken to
accomplish a task
3
asdfas
dfsadf
ad
*95% Confidence Interval*
Proprietary and Confidential
MP MOST Element Analysis
4
• Maynard Operation Sequence Technique (MOST) is a predetermined motion time system
that is used primarily in industrial settings to set the standard time in which a worker
should perform a task.
• The task is broken down into individual motion elements, and each is assigned a
numerical time value in units known as time measurement units, or TMUs, where
100,000 TMUs is equivalent to 1 hour.
Proprietary and Confidential
Manual Pack Standard
5
Proprietary and Confidential
Standard Calculation Example
6
Proprietary and Confidential
Work Sampling
•Work Sampling is the statistical technique for determining the
proportion of time spent by workers in various defined categories
of activity
7
N=289
Estimated Annual Impact of
Avoidable Delay ~ $111,449
*95% Confidence Interval*
Proprietary and Confidential
8
Proprietary and Confidential
9
•Avoidable Delay For Both = Talking to co-
worker/standing around
*95%
Confidence
Interval*
*95%
Confidence
Interval*
N=211 N=201
Pie Graph: Stock Handler & Water Spider
Estimated Annual Impact of
Avoidable Delay ~ $35,773
Estimated Annual Impact of
Avoidable Delay ~ $18,781
Proprietary and Confidential
Observations/Recommendations
1. Fan disrupts Bubble Wrap
and Labels
2. Label Hanger only on One
Side
3. Frequent Tape Machine
Malfunctions
4. Batching
5. Employee Satisfaction
6. Utilize the space under the
Table More
10
1. Move Fan to Center of Station
or Get Grounded Fan
2. Get Label Hangers for both
sides of the Table
3. Better Tape Machines or
additional tape machine at
table.
4. Send Supervisors. More
Awareness that it’s quicker to
go box by box
5. Bonding Activities. (Ice
Cream). More Teamwork in
Shift 2 than Shift 1 > Increased
Productivity.
6. Keep a trashcan or additional
supplies under table
Proprietary and Confidential
1
1
The Fan
Proprietary and Confidential
The Fan Moved to Center
12
Proprietary and Confidential
Label Handles on Both Sides
13
Using Label from TableLeft side Right side = No Label
Handle
Proprietary and Confidential
Tape Machine
1
4
Proprietary and Confidential
Utilize Bottom of Table Better
15

More Related Content

What's hot

Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMSBabasab Patil
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollyRicky Smith CMRP, CMRT
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
2016 Kata Summit: Kata in Office/Service Presentation
2016 Kata Summit: Kata in Office/Service Presentation2016 Kata Summit: Kata in Office/Service Presentation
2016 Kata Summit: Kata in Office/Service PresentationBeth Carrington
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Scheduling
SchedulingScheduling
Schedulingjaya_22
 
Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metricskaskerrigan
 
Mark Lamanna Resume Final
Mark Lamanna Resume FinalMark Lamanna Resume Final
Mark Lamanna Resume FinalMark Lamanna
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance managementsmumbahelp
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 

What's hot (20)

Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
scheduling
schedulingscheduling
scheduling
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Stock accuracy
Stock accuracyStock accuracy
Stock accuracy
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
2016 Kata Summit: Kata in Office/Service Presentation
2016 Kata Summit: Kata in Office/Service Presentation2016 Kata Summit: Kata in Office/Service Presentation
2016 Kata Summit: Kata in Office/Service Presentation
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Mpc sequencing
Mpc   sequencingMpc   sequencing
Mpc sequencing
 
Scheduling
SchedulingScheduling
Scheduling
 
Maintenance Metrics
Maintenance MetricsMaintenance Metrics
Maintenance Metrics
 
SMED Final
SMED FinalSMED Final
SMED Final
 
Mark Lamanna Resume Final
Mark Lamanna Resume FinalMark Lamanna Resume Final
Mark Lamanna Resume Final
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance management
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
 
michaels resume
michaels resumemichaels resume
michaels resume
 
smed
smedsmed
smed
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 

Similar to Ryder- Final Presentation

Similar to Ryder- Final Presentation (20)

Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
23 timestudy
23 timestudy23 timestudy
23 timestudy
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Ch11
Ch11Ch11
Ch11
 
Management tools
Management toolsManagement tools
Management tools
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
Process analysis
Process analysisProcess analysis
Process analysis
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)7. cqia (kaizen, 5 s, tpm)
7. cqia (kaizen, 5 s, tpm)
 
TQM TPM
TQM TPMTQM TPM
TQM TPM
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
SMED
SMEDSMED
SMED
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Maintenance
Maintenance Maintenance
Maintenance
 

Ryder- Final Presentation