SlideShare a Scribd company logo
1 of 5
Download to read offline
PER
Prese
Cont
E-ma
Skyp
Driv
Pass
Lang
Cont
Refe
Reas
ACA
PRO
CAR
I
w
p
c
S
k
R
DUT


RSONAL INF
ent Position
tact Number
ail Address
pe ID
ving License
port No.
guage Known
tact Address
erences
son for Leavin
ADEMIC QU
OFESSION Q
RRIER OBJE
have 14 year
work well und
priorities. Team
colleagues. Fa
System, Manp
kind of daily
RASGAS. Thi
TIES & RESP
Configura
Design &
Weekly M
FORMATION
: Docum
: +974 7
: mysk2
: mysk2
: Valid
: C2678
: Englis
: P.O. B
: Ahme
ng : New
UALIFICATI
 High
 Seco
QUALIFICAI
 Com
 Softw
ECTIVES.
rs of compreh
der pressure an
m player, full
ast learner, en
power monthly
routine work
is database is w
PONSIBILIT
ation, Impleme
Develop the
Month reports a
N.
ment Controll
70078545, 666
2727@yahoo.c
28yo
Qatari Drivin
8520
sh, Urdu, Arab
Box 2280, Al
ed Barakat – Q
Challenges.
ION
her Secondary
ondary Schoo
ITON.
mputer Diplom
ware’s
hensive progra
nd meet deadl
supportive an
nergetic, self-s
y Time sheet
into Databas
working succe
TIES:
entation and s
Document C
and summarie
ler
614325
com
ng License
bic
Jaber Enginee
Quality Engine
y School (Coll
ol Certificate
ma
amming exper
lines in a dem
nd cooperativ
starter and po
, Inventory C
se system. Pr
essfully since
tartup of Syst
Control System
es.
ering, Doha, Q
eering Adviso
lage) : Mathe
: Mathe
: 2 Year
: MS Wo
: AutoC
: MP2 D
rience in the a
manding, dynam
e with all staf
ossessing exte
Control, Subco
rivately I mad
last Three ye
tem according
m (DCS) whi
Qatar.
or at RasGas.
ematics, Statis
ematics, Chem
rs Diploma in
ord, MS Exce
CAD (for print
DataStream, T
areas of Docu
mic, fast pace
ff and Manage
ensive knowle
ontractors Cos
de Quality D
ars.
g to Project Re
ich provides u
stics & Geogra
mistry, Physics
Computer So
el, MS Power
ting), Aconex
Typing with E
ument Control
ed environmen
ers, share info
edge of Docu
st, Crusher R
atabase Syste
equirement’s
updated Log R
aphy
s & Biology
ftware’s from
Point, Databa
x
xcellent Spee
l and Manage
nt with multip
ormation with
ument Manag
Reports etc. I c
em for Qualit
Register, filter
Page 1
m PETROMAN
ase programmi
d.
ement. Ability
ple and changi
and assist oth
ement Databa
can convert a
ty Engineering
ring System, D
1 of 5
N.
ing
y to
ing
her
ase
any
g -
Daily
Page 2 of 5
 Link all staff with Document Control System for latest Documents updates.
 Implementation of Document Control Procedures which includes the preparation of Plans, Document Numbering
Procedure, Process Flows, folder structure, filing index, etc and ensure its effective use to facilitate and support business
objectives.
 Develop a distribution matrix to handle distribution of information to team members and external sources as determined
by the approved matrix.
 Supervise daily operations and ensure that all documents and drawings received are properly checked, circulated per
distribution matrix, recorded/update Database (DCS), file per project filing system (hard and electronic copies) and
continuous tracking of submittals progress to ensure compliance with the required review process and time table.
 Preparing Weekly / Monthly Reports of design & construction submittals
 Generate regular reports for information and management for action by the concerned disciplines on their
ending/outstanding document/drawings submittals.
 Provide guidance and training to all staff and have responsibilities for solving problems arising from the set up of the
Document Control System on the project.
 Ensure the correct stamping all documents or drawings in accordance with the prevailing document control procedures
 Recording all incoming and outgoing correspondence, drawings, specifications, minutes of meetings, NCRs, RFIs,
Reports, Transmittals, Drawings, Safety & Quality related documents. and other project documentation and filing &
loading into Document Control System (DCS) accordingly and distribution.
 Backup done either electronically or through extra hard copies of a document.
EXPERIENCE DETAILS.
COMPANY : AL JABER ENGINEERING COMPANY DOHA – QATAR.
Position : Document Controller
Period : 11 February, 2011 to till now. ( 5 years )
PROJECT SCOPE : ROADS AND INFRASTRUCTURE IN WADI ABA SELEEL, ADVANCE GRADING AND
TEMPORARY ROADS
Period : Dec 2014 Till date
Client : Ashghal Pupublic Works Authorities ( PWA )
Consultant : AECOM Middle East..
COMPLETED PROJECTS.
PROJECT : SUPPLY, LAYING & TESTING OF 1200: 1600 MM DIA DI PIPES (LENGTH = 160KM) &
FITTINGS INCLUDING ALL COATINGS, WRAPPINGS AND JOINTING WORKS.
Period : July 2014– Dec 2014
Client : Kahramaa ( Qatar General Electricity & Water Corporation )
Project Management : Energoprojekt Entel Ltd.
Consultant : Hyder Consulting Middle East Limited
PROJECT : INFRASTRUCTURE WORKS OF EARLY ENABLING WORKS FOR COMMERCIAL
BOULEVARD.
Period : December 2013 to July 2014
Client : Lusail Real Estate Development Company (W.L.L.) LREDC
Project Management : Parsons International Limited
Consultant : Dorsch Qatar
Page 3 of 5
PROJECT :THE ISLAND PROJECT BRIDGE WORKS.
Period :Dec-2012 to Dec-2013
Client :Sogreh Groupe Artelia
Main Contractor :Urbcon General Contracting
PROJECT :EPIC FOR SOUTHERN PERIMETER INDUSTRIAL fence security patrol access
and other roads in ras laffan.
Period :Apr-2012 to Nov-2012
Owner :Qatar Petroleum, Engineering Dept. Ras Laffan (EDR)
Client :Qatar Petroleum
Consultant : White Young – Qatar.
PROJECT :EPIC FOR WET UTILITIES DISTRIBUTION NETWORK FOR SUPPORT SERVICES AREA
PHASE I & II AND MAINS NETWORK FOR ONGOING DEVELOPMENTS.
Period :Feb-2011 to Mar-2012
Owner :Qatar Petroleum, Engineering Dept. Ras Laffan (EDR)
Client :Qatar Petroleum.
Consultant : Penspen International..
COMPANY :SAUDI BINLADIN GROUP – SAUDI ARABIA.
Period :Oct-1998 to Dec-2003 ( 5 years )
Position :Document Controller / Planner / Programmer.
Project : Prince Naif Bin Abdullah Palace, Jeddah - Saudi Arab.
DUTIES & RESPONSIBILITIES:
 MP2 Database System for Daily, weekly, monthly, quarterly and yearly maintenance plane
 Developed Cost Monitoring System which contain following information :
 Manpower Information
 Manpower monthly Time Sheet
 Manpower monthly cost.
 Complete Inventory Transactions detail.
 Subcontractors Cost, Petty Cash cost.
COMPANY : CHAMAN INTERNATIONAL – LAHORE PAKISTAN.
Position : Incharge Computer Section
Period : 1994 to 1998
DUTIES & RESPONSIBILITIES:
 Developed DATABASE SYSTEM for Toyota Genuine Parts.
 Typing all kind of correspondence, reports, forms
 Maintain all manual filing System & records & incoming and outgoing mail.
 Prepare daily, weekly and monthly reports of scheduled and unscheduled tasks.
 Responsible for maintaining office records by keeping an up to date filing system.
 Daily Office Works, clerical and other jobs.
PRIV
COM
Peri
Depa
Data
Featu
VATE SOFT
MPANY
od
artment
abase
ures
TWARE DE
: RASG
: 2013
: Opera
: Quali
: D
 C
 N
 P
 P
 P
 D
 R
DCO
ESIGN.
GAS COMPA
till date.
ations Projects
ity Database S
Daily Inspectio
Corrective Act
Non confirmat
Procurement S
Positive & Neg
Punch List Item
Daily / Weekly
Reports and Su
QU
UMENT MA
ANY LIMITE
s Department
System
on Report.
tion Request (
tion Report (N
Surveillance, Q
gative Observ
ms.
y / Monthly /
ummaries.
UALITY DAT
ANAGEMEN
ED.
(OPD)
( CAR ), Prev
NCR), Quality
Quality Assura
vations.
Quarterly and
TABASE SYS
NT SYSTEM –
ventive Action
y Walk About.
ance
d Yearly Repo
STEM - RAS
– AL JABER
n Request ( PA
.
orts with Graph
SGAS
R ENGINEER
AR )
hs.
RING.
Page 44 of 5
Page 5 of 5
COST MONITORING SYSTEM – SAUDI BINLADING GROUP – SAUDI ARABIA

More Related Content

What's hot

CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistAtif Masroor
 
JSM Document Controller CV
JSM Document Controller CVJSM Document Controller CV
JSM Document Controller CVJacqueline Mapoy
 
Senior Document Controller & Admin Support
Senior Document Controller & Admin SupportSenior Document Controller & Admin Support
Senior Document Controller & Admin SupportSyed Jameel Ahmed Razvi
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017Sajid Akhtar
 
CV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document ControllerCV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document ControllerSudheesh Narayanan
 
Manzur c v_document_controller
Manzur c v_document_controllerManzur c v_document_controller
Manzur c v_document_controllermanzurjob
 
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...Satish Brahmbhatt
 
Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)mohammed ilias
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveSanthosh Prabhakaran
 
Document Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq UllahDocument Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq UllahSyed Sadiq Ullah
 
Syed iftekharuddin cv - for dc
Syed iftekharuddin   cv - for dcSyed iftekharuddin   cv - for dc
Syed iftekharuddin cv - for dcsyediftekharuddin2
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QSWAQAR AZEEM
 
essam nasr cv document controller.DOC
essam nasr cv document controller.DOCessam nasr cv document controller.DOC
essam nasr cv document controller.DOCEssamnasro essam
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)Abdul Mannan Sajeed
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Abdulkader Sayed
 

What's hot (20)

CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / Specialist
 
JSM Document Controller CV
JSM Document Controller CVJSM Document Controller CV
JSM Document Controller CV
 
Senior Document Controller & Admin Support
Senior Document Controller & Admin SupportSenior Document Controller & Admin Support
Senior Document Controller & Admin Support
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
 
CV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document ControllerCV - Sudheesh - Senior Document Controller
CV - Sudheesh - Senior Document Controller
 
Manzur c v_document_controller
Manzur c v_document_controllerManzur c v_document_controller
Manzur c v_document_controller
 
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...
CV - Sr. Document Controller - Aconex - Passport - Mr. Satishkumar Brahmbhatt...
 
Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
 
CV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._ControllerCV_-_V._Chalapati__Doc._Controller
CV_-_V._Chalapati__Doc._Controller
 
Document Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq UllahDocument Controller - Syed Sadiq Ullah
Document Controller - Syed Sadiq Ullah
 
Anup.CV
Anup.CVAnup.CV
Anup.CV
 
Syed iftekharuddin cv - for dc
Syed iftekharuddin   cv - for dcSyed iftekharuddin   cv - for dc
Syed iftekharuddin cv - for dc
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
Manoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOCManoj Kumar_ Resume.DOC
Manoj Kumar_ Resume.DOC
 
essam nasr cv document controller.DOC
essam nasr cv document controller.DOCessam nasr cv document controller.DOC
essam nasr cv document controller.DOC
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)CV - Abdul Mannan Document Controller (QA-QC)
CV - Abdul Mannan Document Controller (QA-QC)
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 

Viewers also liked

James Walton - Lighting Design Research MH2S04
James Walton - Lighting Design Research MH2S04James Walton - Lighting Design Research MH2S04
James Walton - Lighting Design Research MH2S04James Walton
 
Museo de-sitio-del-campo-de-la-alianza
Museo de-sitio-del-campo-de-la-alianzaMuseo de-sitio-del-campo-de-la-alianza
Museo de-sitio-del-campo-de-la-alianzaFiorella Blanco
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Bill Bearnson
 
James Walton - The Development of Lighting Protocols
James Walton - The Development of Lighting ProtocolsJames Walton - The Development of Lighting Protocols
James Walton - The Development of Lighting ProtocolsJames Walton
 
MUSEO DE SITIO DEL CAMPO DE LA ALIANZA
MUSEO DE SITIO DEL CAMPO DE LA ALIANZAMUSEO DE SITIO DEL CAMPO DE LA ALIANZA
MUSEO DE SITIO DEL CAMPO DE LA ALIANZAFiorella Blanco
 
Dicas úteis para sua recolocação
Dicas úteis para sua recolocaçãoDicas úteis para sua recolocação
Dicas úteis para sua recolocaçãoTania Klein
 

Viewers also liked (11)

James Walton - Lighting Design Research MH2S04
James Walton - Lighting Design Research MH2S04James Walton - Lighting Design Research MH2S04
James Walton - Lighting Design Research MH2S04
 
Museo de-sitio-del-campo-de-la-alianza
Museo de-sitio-del-campo-de-la-alianzaMuseo de-sitio-del-campo-de-la-alianza
Museo de-sitio-del-campo-de-la-alianza
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015
 
James Walton - The Development of Lighting Protocols
James Walton - The Development of Lighting ProtocolsJames Walton - The Development of Lighting Protocols
James Walton - The Development of Lighting Protocols
 
MUSEO DE SITIO DEL CAMPO DE LA ALIANZA
MUSEO DE SITIO DEL CAMPO DE LA ALIANZAMUSEO DE SITIO DEL CAMPO DE LA ALIANZA
MUSEO DE SITIO DEL CAMPO DE LA ALIANZA
 
ikt_muhely_2014
ikt_muhely_2014ikt_muhely_2014
ikt_muhely_2014
 
Obstrucción intestinal
Obstrucción intestinalObstrucción intestinal
Obstrucción intestinal
 
TLG - GHG Report
TLG - GHG ReportTLG - GHG Report
TLG - GHG Report
 
Dicas úteis para sua recolocação
Dicas úteis para sua recolocaçãoDicas úteis para sua recolocação
Dicas úteis para sua recolocação
 
Presentation - Startup U
Presentation - Startup UPresentation - Startup U
Presentation - Startup U
 
Startup U - Apresentação do programa
Startup U - Apresentação do programaStartup U - Apresentação do programa
Startup U - Apresentação do programa
 

Similar to Muhammad Younus Suleman

CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016Marjorie Anne Abulon
 
Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay P
 
JC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJ.C. Lago
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CVVenkatesh -
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali
 
Jahidul Hassan _Resume
Jahidul Hassan _ResumeJahidul Hassan _Resume
Jahidul Hassan _ResumeJahidul Hassan
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...satish kumar
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
Amjad - Planning Manager
Amjad - Planning ManagerAmjad - Planning Manager
Amjad - Planning ManagerAmjad Nawaz
 

Similar to Muhammad Younus Suleman (20)

CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016CV - Marjorie Anne Abulon updated 2016
CV - Marjorie Anne Abulon updated 2016
 
Jundel Panopio_CV
Jundel Panopio_CVJundel Panopio_CV
Jundel Panopio_CV
 
Nisar_CV New
Nisar_CV NewNisar_CV New
Nisar_CV New
 
Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015
 
JC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMC
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
JOSEPH CV
JOSEPH CVJOSEPH CV
JOSEPH CV
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
Engr. Khalid Ghazi C.V
Engr. Khalid Ghazi C.V Engr. Khalid Ghazi C.V
Engr. Khalid Ghazi C.V
 
Prasanth PV Nambiar
Prasanth PV NambiarPrasanth PV Nambiar
Prasanth PV Nambiar
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CV
 
Husham hasan
Husham hasanHusham hasan
Husham hasan
 
Jahidul Hassan _Resume
Jahidul Hassan _ResumeJahidul Hassan _Resume
Jahidul Hassan _Resume
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
HAROLD GARCIA-CV
HAROLD GARCIA-CVHAROLD GARCIA-CV
HAROLD GARCIA-CV
 
Amjad - Planning Manager
Amjad - Planning ManagerAmjad - Planning Manager
Amjad - Planning Manager
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 

Muhammad Younus Suleman

  • 1. PER Prese Cont E-ma Skyp Driv Pass Lang Cont Refe Reas ACA PRO CAR I w p c S k R DUT   RSONAL INF ent Position tact Number ail Address pe ID ving License port No. guage Known tact Address erences son for Leavin ADEMIC QU OFESSION Q RRIER OBJE have 14 year work well und priorities. Team colleagues. Fa System, Manp kind of daily RASGAS. Thi TIES & RESP Configura Design & Weekly M FORMATION : Docum : +974 7 : mysk2 : mysk2 : Valid : C2678 : Englis : P.O. B : Ahme ng : New UALIFICATI  High  Seco QUALIFICAI  Com  Softw ECTIVES. rs of compreh der pressure an m player, full ast learner, en power monthly routine work is database is w PONSIBILIT ation, Impleme Develop the Month reports a N. ment Controll 70078545, 666 2727@yahoo.c 28yo Qatari Drivin 8520 sh, Urdu, Arab Box 2280, Al ed Barakat – Q Challenges. ION her Secondary ondary Schoo ITON. mputer Diplom ware’s hensive progra nd meet deadl supportive an nergetic, self-s y Time sheet into Databas working succe TIES: entation and s Document C and summarie ler 614325 com ng License bic Jaber Enginee Quality Engine y School (Coll ol Certificate ma amming exper lines in a dem nd cooperativ starter and po , Inventory C se system. Pr essfully since tartup of Syst Control System es. ering, Doha, Q eering Adviso lage) : Mathe : Mathe : 2 Year : MS Wo : AutoC : MP2 D rience in the a manding, dynam e with all staf ossessing exte Control, Subco rivately I mad last Three ye tem according m (DCS) whi Qatar. or at RasGas. ematics, Statis ematics, Chem rs Diploma in ord, MS Exce CAD (for print DataStream, T areas of Docu mic, fast pace ff and Manage ensive knowle ontractors Cos de Quality D ars. g to Project Re ich provides u stics & Geogra mistry, Physics Computer So el, MS Power ting), Aconex Typing with E ument Control ed environmen ers, share info edge of Docu st, Crusher R atabase Syste equirement’s updated Log R aphy s & Biology ftware’s from Point, Databa x xcellent Spee l and Manage nt with multip ormation with ument Manag Reports etc. I c em for Qualit Register, filter Page 1 m PETROMAN ase programmi d. ement. Ability ple and changi and assist oth ement Databa can convert a ty Engineering ring System, D 1 of 5 N. ing y to ing her ase any g - Daily
  • 2. Page 2 of 5  Link all staff with Document Control System for latest Documents updates.  Implementation of Document Control Procedures which includes the preparation of Plans, Document Numbering Procedure, Process Flows, folder structure, filing index, etc and ensure its effective use to facilitate and support business objectives.  Develop a distribution matrix to handle distribution of information to team members and external sources as determined by the approved matrix.  Supervise daily operations and ensure that all documents and drawings received are properly checked, circulated per distribution matrix, recorded/update Database (DCS), file per project filing system (hard and electronic copies) and continuous tracking of submittals progress to ensure compliance with the required review process and time table.  Preparing Weekly / Monthly Reports of design & construction submittals  Generate regular reports for information and management for action by the concerned disciplines on their ending/outstanding document/drawings submittals.  Provide guidance and training to all staff and have responsibilities for solving problems arising from the set up of the Document Control System on the project.  Ensure the correct stamping all documents or drawings in accordance with the prevailing document control procedures  Recording all incoming and outgoing correspondence, drawings, specifications, minutes of meetings, NCRs, RFIs, Reports, Transmittals, Drawings, Safety & Quality related documents. and other project documentation and filing & loading into Document Control System (DCS) accordingly and distribution.  Backup done either electronically or through extra hard copies of a document. EXPERIENCE DETAILS. COMPANY : AL JABER ENGINEERING COMPANY DOHA – QATAR. Position : Document Controller Period : 11 February, 2011 to till now. ( 5 years ) PROJECT SCOPE : ROADS AND INFRASTRUCTURE IN WADI ABA SELEEL, ADVANCE GRADING AND TEMPORARY ROADS Period : Dec 2014 Till date Client : Ashghal Pupublic Works Authorities ( PWA ) Consultant : AECOM Middle East.. COMPLETED PROJECTS. PROJECT : SUPPLY, LAYING & TESTING OF 1200: 1600 MM DIA DI PIPES (LENGTH = 160KM) & FITTINGS INCLUDING ALL COATINGS, WRAPPINGS AND JOINTING WORKS. Period : July 2014– Dec 2014 Client : Kahramaa ( Qatar General Electricity & Water Corporation ) Project Management : Energoprojekt Entel Ltd. Consultant : Hyder Consulting Middle East Limited PROJECT : INFRASTRUCTURE WORKS OF EARLY ENABLING WORKS FOR COMMERCIAL BOULEVARD. Period : December 2013 to July 2014 Client : Lusail Real Estate Development Company (W.L.L.) LREDC Project Management : Parsons International Limited Consultant : Dorsch Qatar
  • 3. Page 3 of 5 PROJECT :THE ISLAND PROJECT BRIDGE WORKS. Period :Dec-2012 to Dec-2013 Client :Sogreh Groupe Artelia Main Contractor :Urbcon General Contracting PROJECT :EPIC FOR SOUTHERN PERIMETER INDUSTRIAL fence security patrol access and other roads in ras laffan. Period :Apr-2012 to Nov-2012 Owner :Qatar Petroleum, Engineering Dept. Ras Laffan (EDR) Client :Qatar Petroleum Consultant : White Young – Qatar. PROJECT :EPIC FOR WET UTILITIES DISTRIBUTION NETWORK FOR SUPPORT SERVICES AREA PHASE I & II AND MAINS NETWORK FOR ONGOING DEVELOPMENTS. Period :Feb-2011 to Mar-2012 Owner :Qatar Petroleum, Engineering Dept. Ras Laffan (EDR) Client :Qatar Petroleum. Consultant : Penspen International.. COMPANY :SAUDI BINLADIN GROUP – SAUDI ARABIA. Period :Oct-1998 to Dec-2003 ( 5 years ) Position :Document Controller / Planner / Programmer. Project : Prince Naif Bin Abdullah Palace, Jeddah - Saudi Arab. DUTIES & RESPONSIBILITIES:  MP2 Database System for Daily, weekly, monthly, quarterly and yearly maintenance plane  Developed Cost Monitoring System which contain following information :  Manpower Information  Manpower monthly Time Sheet  Manpower monthly cost.  Complete Inventory Transactions detail.  Subcontractors Cost, Petty Cash cost. COMPANY : CHAMAN INTERNATIONAL – LAHORE PAKISTAN. Position : Incharge Computer Section Period : 1994 to 1998 DUTIES & RESPONSIBILITIES:  Developed DATABASE SYSTEM for Toyota Genuine Parts.  Typing all kind of correspondence, reports, forms  Maintain all manual filing System & records & incoming and outgoing mail.  Prepare daily, weekly and monthly reports of scheduled and unscheduled tasks.  Responsible for maintaining office records by keeping an up to date filing system.  Daily Office Works, clerical and other jobs.
  • 4. PRIV COM Peri Depa Data Featu VATE SOFT MPANY od artment abase ures TWARE DE : RASG : 2013 : Opera : Quali : D  C  N  P  P  P  D  R DCO ESIGN. GAS COMPA till date. ations Projects ity Database S Daily Inspectio Corrective Act Non confirmat Procurement S Positive & Neg Punch List Item Daily / Weekly Reports and Su QU UMENT MA ANY LIMITE s Department System on Report. tion Request ( tion Report (N Surveillance, Q gative Observ ms. y / Monthly / ummaries. UALITY DAT ANAGEMEN ED. (OPD) ( CAR ), Prev NCR), Quality Quality Assura vations. Quarterly and TABASE SYS NT SYSTEM – ventive Action y Walk About. ance d Yearly Repo STEM - RAS – AL JABER n Request ( PA . orts with Graph SGAS R ENGINEER AR ) hs. RING. Page 44 of 5
  • 5. Page 5 of 5 COST MONITORING SYSTEM – SAUDI BINLADING GROUP – SAUDI ARABIA