SlideShare a Scribd company logo
1 of 7
Download to read offline
The S Curves Made easy with Oracle Primavera P6
1. Introduction
The first time most project managers become aware of the existence of S Curves is when
they are requested by the client or senior management to include one in their next progress report.
These S Curve are made just clicks away for Oracle Primavera P6 users.
Before getting into implementing such S Curves in Primavera P6 Lets get to know what a S Curve is?
A S Curve is defined as "a display of cumulative costs, labour hours or other quantities
plotted against time. The name derives from the S-like shape of the curve, flatter at the beginning
and end and steeper in the middle, which is typical of most projects. The beginning represents a
slow, deliberate but accelerating start, while the end represents a deceleration as the work runs
out."Source: Wideman Comparative Glossary of Common Project Management Terms v2.1
Copyright R. Max Wideman, May 2001
2. Generating S curves with Oracle Primavera P6
2.1 Analysis of the project Activity wise
In addition to the copulatives’ described in the definition of S-Curve Primavera P6 helps
design a lot more Curves which are essential to Project Management. Here are the steps to get into
the Activity usage profile window to do the analysis activity vise and generate curves for activities.
Select and open the project you want to do the S Curve analysis on. Make sure you are in
the activity tab. Now in the menu bar choose View-> show on bottom -> Activity usage Profile.
Now you get a new view at the right bottom of your Window. Here is where you get all your S
Curves.
Right click on the Activity usage profile window and choose -> activity usage profile options
If you have followed along close you would be getting this window in the middle of your
Screen, yes of-course without those blue markers and with some checkboxes clicked enabled by
default.
Fig 1 : Activity Usage profile window
As per the definition for S Curve(cumulative costs, labour hours or other quantities plotted
against time) shown in the beginning of this article.
To show the Cumulative cost S curves select the 1. Cost Radio button and enable the
check box from 18. To 22. to show the cumulative of all the defined variables.
Selecting check box from 23. to 25. Shows the Earned value cost curves.
To show the Cumulative labor hours S curves select the 2. Units Radio button and
enable the check box from 18. To 22. to show the cumulative of all the defined
variables. Selecting check boxes from 23. to 25 shows the Earned value curves in
terms of labor units.
2.2 Analysis of the project Resource wise
Select and open the project you want to do the S Curve analysis on. Make sure you are in
the activity tab. Now in the menu bar choose View-> show on bottom ->Resource usage Profile.
Now you get a new view at the right bottom of your Window. Here is where you get all your
S Curves.
Right click on the Resource usage profile window and choose ->Resource usage profile options
Fig 2 : Resource Usage profile window
To show the cumulative curves for resources in terms of cost and labor units , tick
the checkbox from 8. through 11.By checking radio button 1. Or 2. For units and cost respectively.
Click on apply to have a preview of the resource curve according to your settings in the
Activity usage profile option /Resource usage profile option window. And click on OK to close the
Activity usage profile option /Resource usage profile option window.
Now we are half way done. You would now have your S curves ready to show it to your
clients / senior management. The S Curve generated would look like something below.
Fig 3 Sample S Curve
Review those curves and various analysis could be made with your project such as
determining growth , determining Slippage ,determining Progress and many more.
3. Analysis made from S Curves
3.1 Determining Growth
Comparison of the Baseline and Target S-curves quickly reveals if the project has grown
(Target S-curve finishes above Baseline S-curve) or contracted (Target S-curve finishes below
Baseline S-curve) in scope. A change in the project's scopes implies a re-allocation of resources
(increase or decrease), and the very possible requirement to raise contract variations. If the
resources are fixed, then the duration of the project will increase (finish later) or decrease (finish
earlier), possibly leading to the need to submit an extension of time claim.
Figure 4: Calculating Project Growth using S-curves
3.2 Determining Slippage
Slippage is defined as:
"The amount of time a task has been delayed from its original baseline schedule. The
slippage is the difference between the scheduled start or finish date for a task and the baseline
start or finish date. Slippage can occur when a baseline plan is set and the actual dates
subsequently entered for tasks are later than the baseline dates or the actual durations are longer
than the baseline schedule durations".
Comparison of the Baseline S-curve and Target S-curve quickly reveals any project slippage (i.e. the
Target S-curve finishes to the right of the Baseline S-curve). Additional resources will need to be
allocated or additional hours worked in order to eliminate (or at least reduce) the slippage. An
extension of time claim may need to be submitted if the slippage cannot be eliminated or reduced
to an acceptable level.
Figure 5: Calculating Project Slippage using S-curves
3.3 Determining Progress
Comparison of the Target S-curve and Actual S-curve reveals the progress of the project
over time. In most cases, the Actual S-curve will sit below the Target S-curve for the majority of the
project (due to many factors, including delays in updating the production schedule). Only towards
the end of the project will the curves converge and finally meet. The Actual S-curve can never finish
above the Target S-curve. If the Actual S-curve sits above the Target S-curve at the Cut Off Date, the
Production Schedule should be examined to determine if the project is truly ahead of schedule, or
if the Production Schedule contains unrealistic percentage complete values for ongoing tasks.
Figure 6: Calculating Project Progress using S-curves
4. Publishing S Curves as Print or as Web page
Now comes the very important stage in generating S Curves. Yes of course , showing it to
the management /clients who have asked for it. Primavera P6 provides option to print high quality
images or to convert the S Curves into html pages so that you can directly embed those in your
webpage. You just have to make the following settings in the page setup for printing in primavera.
Fig 7. Page setup window
After making the above settings go to print preview option to ensure you get the required
curves. From this you could either print the S curves, save them as Image files or publish them as
Html files.
References:
1. http://www.planningplanet.com/forums/planning-scheduling-programming-
discussion/416820/develop-s-curve-primavera-p6
2. http://www.planningplanet.com/forums/planning-scheduling-programming-
discussion/502846/what-s-curve-and-how-do-calculate-work-prog
3. http://www.maxwideman.com/guests/s-curve/using.htm

More Related Content

Viewers also liked (17)

The origins of the s curve in business functions
The origins of the s curve in business functionsThe origins of the s curve in business functions
The origins of the s curve in business functions
 
73
7373
73
 
1005.2122
1005.21221005.2122
1005.2122
 
4267
42674267
4267
 
Jce 64 2012_8_3_1036_en
Jce 64 2012_8_3_1036_enJce 64 2012_8_3_1036_en
Jce 64 2012_8_3_1036_en
 
Scurve231 m en
Scurve231 m enScurve231 m en
Scurve231 m en
 
Pras s curve final
Pras s curve finalPras s curve final
Pras s curve final
 
1005.2122
1005.21221005.2122
1005.2122
 
The mysterious s_curve
The mysterious s_curveThe mysterious s_curve
The mysterious s_curve
 
Isarc2007 4.3 2-065
Isarc2007 4.3 2-065Isarc2007 4.3 2-065
Isarc2007 4.3 2-065
 
73
7373
73
 
Jce 64 2012_8_3_1036_en
Jce 64 2012_8_3_1036_enJce 64 2012_8_3_1036_en
Jce 64 2012_8_3_1036_en
 
Accenture jumping the_s_curve
Accenture jumping the_s_curveAccenture jumping the_s_curve
Accenture jumping the_s_curve
 
Exploring the limits_of_the_technology_s-curve
Exploring the limits_of_the_technology_s-curveExploring the limits_of_the_technology_s-curve
Exploring the limits_of_the_technology_s-curve
 
Gartner maturity and adoption 1
Gartner maturity and adoption 1Gartner maturity and adoption 1
Gartner maturity and adoption 1
 
S curve
S curveS curve
S curve
 
S curve1
S curve1S curve1
S curve1
 

Similar to Pras s curve final

Project management
Project managementProject management
Project managementervinod
 
© SAP SE CASE STUDY .docx
 © SAP SE   CASE STUDY .docx © SAP SE   CASE STUDY .docx
© SAP SE CASE STUDY .docxmayank272369
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM Divante
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM Mati Polak
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides SlideTeam
 
Odoo 13 project management
Odoo 13 project managementOdoo 13 project management
Odoo 13 project managementPlanetOdoo
 
Budgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteBudgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteDivante
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsInSync Conference
 
Discovering dashboards with the Low Code PROIV platform
Discovering dashboards with the Low Code PROIV platformDiscovering dashboards with the Low Code PROIV platform
Discovering dashboards with the Low Code PROIV platformMark Fuller
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013Ong-Art Sanpinit
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingSHAZEBALIKHAN1
 
100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps100632 p6 v7 tricks and traps
100632 p6 v7 tricks and trapsInSync Conference
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouCA Technologies
 
SAP CPM-BW Solution Overview
SAP CPM-BW Solution OverviewSAP CPM-BW Solution Overview
SAP CPM-BW Solution OverviewNaresh Raghavan
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Mihai Buta
 

Similar to Pras s curve final (20)

S curves
S curvesS curves
S curves
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
 
Project management
Project managementProject management
Project management
 
© SAP SE CASE STUDY .docx
 © SAP SE   CASE STUDY .docx © SAP SE   CASE STUDY .docx
© SAP SE CASE STUDY .docx
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
Odoo 13 project management
Odoo 13 project managementOdoo 13 project management
Odoo 13 project management
 
Budgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteBudgeting in SCRUM by Divante
Budgeting in SCRUM by Divante
 
Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and Traps
 
Discovering dashboards with the Low Code PROIV platform
Discovering dashboards with the Low Code PROIV platformDiscovering dashboards with the Low Code PROIV platform
Discovering dashboards with the Low Code PROIV platform
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps100632 p6 v7 tricks and traps
100632 p6 v7 tricks and traps
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for You
 
SAP CPM-BW Solution Overview
SAP CPM-BW Solution OverviewSAP CPM-BW Solution Overview
SAP CPM-BW Solution Overview
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]
 
Introduction, development and analysis of banana curve in project management....
Introduction, development and analysis of banana curve in project management....Introduction, development and analysis of banana curve in project management....
Introduction, development and analysis of banana curve in project management....
 

More from Muhammad Sadiq Aftab (20)

Tsc
TscTsc
Tsc
 
Technology s curves-in_renewable_energies
Technology s curves-in_renewable_energiesTechnology s curves-in_renewable_energies
Technology s curves-in_renewable_energies
 
Scurve231 m en
Scurve231 m enScurve231 m en
Scurve231 m en
 
Tcf2007 dk rdg
Tcf2007 dk rdgTcf2007 dk rdg
Tcf2007 dk rdg
 
S curve1
S curve1S curve1
S curve1
 
S curve tutorial1
S curve tutorial1S curve tutorial1
S curve tutorial1
 
S curve
S curveS curve
S curve
 
Innovation lifecycles
Innovation lifecyclesInnovation lifecycles
Innovation lifecycles
 
Gartner maturity and adoption 1
Gartner maturity and adoption 1Gartner maturity and adoption 1
Gartner maturity and adoption 1
 
Ga2000 gp25(3) enz
Ga2000 gp25(3) enzGa2000 gp25(3) enz
Ga2000 gp25(3) enz
 
Exploring the limits_of_the_technology_s-curve
Exploring the limits_of_the_technology_s-curveExploring the limits_of_the_technology_s-curve
Exploring the limits_of_the_technology_s-curve
 
Easec13 e-3-1
Easec13 e-3-1Easec13 e-3-1
Easec13 e-3-1
 
Brice dattee
Brice datteeBrice dattee
Brice dattee
 
Bowden 0
Bowden 0Bowden 0
Bowden 0
 
2007 02t
2007 02t2007 02t
2007 02t
 
109 bahmani oskooee
109 bahmani oskooee109 bahmani oskooee
109 bahmani oskooee
 
Tsc
TscTsc
Tsc
 
The mysterious s_curve
The mysterious s_curveThe mysterious s_curve
The mysterious s_curve
 
Technology s curves-in_renewable_energies
Technology s curves-in_renewable_energiesTechnology s curves-in_renewable_energies
Technology s curves-in_renewable_energies
 
Tcf2007 dk rdg
Tcf2007 dk rdgTcf2007 dk rdg
Tcf2007 dk rdg
 

Recently uploaded

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Pras s curve final

  • 1. The S Curves Made easy with Oracle Primavera P6 1. Introduction The first time most project managers become aware of the existence of S Curves is when they are requested by the client or senior management to include one in their next progress report. These S Curve are made just clicks away for Oracle Primavera P6 users. Before getting into implementing such S Curves in Primavera P6 Lets get to know what a S Curve is? A S Curve is defined as "a display of cumulative costs, labour hours or other quantities plotted against time. The name derives from the S-like shape of the curve, flatter at the beginning and end and steeper in the middle, which is typical of most projects. The beginning represents a slow, deliberate but accelerating start, while the end represents a deceleration as the work runs out."Source: Wideman Comparative Glossary of Common Project Management Terms v2.1 Copyright R. Max Wideman, May 2001 2. Generating S curves with Oracle Primavera P6 2.1 Analysis of the project Activity wise In addition to the copulatives’ described in the definition of S-Curve Primavera P6 helps design a lot more Curves which are essential to Project Management. Here are the steps to get into the Activity usage profile window to do the analysis activity vise and generate curves for activities. Select and open the project you want to do the S Curve analysis on. Make sure you are in the activity tab. Now in the menu bar choose View-> show on bottom -> Activity usage Profile. Now you get a new view at the right bottom of your Window. Here is where you get all your S Curves. Right click on the Activity usage profile window and choose -> activity usage profile options If you have followed along close you would be getting this window in the middle of your Screen, yes of-course without those blue markers and with some checkboxes clicked enabled by default.
  • 2. Fig 1 : Activity Usage profile window As per the definition for S Curve(cumulative costs, labour hours or other quantities plotted against time) shown in the beginning of this article. To show the Cumulative cost S curves select the 1. Cost Radio button and enable the check box from 18. To 22. to show the cumulative of all the defined variables. Selecting check box from 23. to 25. Shows the Earned value cost curves. To show the Cumulative labor hours S curves select the 2. Units Radio button and enable the check box from 18. To 22. to show the cumulative of all the defined variables. Selecting check boxes from 23. to 25 shows the Earned value curves in terms of labor units.
  • 3. 2.2 Analysis of the project Resource wise Select and open the project you want to do the S Curve analysis on. Make sure you are in the activity tab. Now in the menu bar choose View-> show on bottom ->Resource usage Profile. Now you get a new view at the right bottom of your Window. Here is where you get all your S Curves. Right click on the Resource usage profile window and choose ->Resource usage profile options Fig 2 : Resource Usage profile window To show the cumulative curves for resources in terms of cost and labor units , tick the checkbox from 8. through 11.By checking radio button 1. Or 2. For units and cost respectively.
  • 4. Click on apply to have a preview of the resource curve according to your settings in the Activity usage profile option /Resource usage profile option window. And click on OK to close the Activity usage profile option /Resource usage profile option window. Now we are half way done. You would now have your S curves ready to show it to your clients / senior management. The S Curve generated would look like something below. Fig 3 Sample S Curve Review those curves and various analysis could be made with your project such as determining growth , determining Slippage ,determining Progress and many more. 3. Analysis made from S Curves 3.1 Determining Growth Comparison of the Baseline and Target S-curves quickly reveals if the project has grown (Target S-curve finishes above Baseline S-curve) or contracted (Target S-curve finishes below Baseline S-curve) in scope. A change in the project's scopes implies a re-allocation of resources (increase or decrease), and the very possible requirement to raise contract variations. If the resources are fixed, then the duration of the project will increase (finish later) or decrease (finish earlier), possibly leading to the need to submit an extension of time claim.
  • 5. Figure 4: Calculating Project Growth using S-curves 3.2 Determining Slippage Slippage is defined as: "The amount of time a task has been delayed from its original baseline schedule. The slippage is the difference between the scheduled start or finish date for a task and the baseline start or finish date. Slippage can occur when a baseline plan is set and the actual dates subsequently entered for tasks are later than the baseline dates or the actual durations are longer than the baseline schedule durations". Comparison of the Baseline S-curve and Target S-curve quickly reveals any project slippage (i.e. the Target S-curve finishes to the right of the Baseline S-curve). Additional resources will need to be allocated or additional hours worked in order to eliminate (or at least reduce) the slippage. An extension of time claim may need to be submitted if the slippage cannot be eliminated or reduced to an acceptable level.
  • 6. Figure 5: Calculating Project Slippage using S-curves 3.3 Determining Progress Comparison of the Target S-curve and Actual S-curve reveals the progress of the project over time. In most cases, the Actual S-curve will sit below the Target S-curve for the majority of the project (due to many factors, including delays in updating the production schedule). Only towards the end of the project will the curves converge and finally meet. The Actual S-curve can never finish above the Target S-curve. If the Actual S-curve sits above the Target S-curve at the Cut Off Date, the Production Schedule should be examined to determine if the project is truly ahead of schedule, or if the Production Schedule contains unrealistic percentage complete values for ongoing tasks. Figure 6: Calculating Project Progress using S-curves
  • 7. 4. Publishing S Curves as Print or as Web page Now comes the very important stage in generating S Curves. Yes of course , showing it to the management /clients who have asked for it. Primavera P6 provides option to print high quality images or to convert the S Curves into html pages so that you can directly embed those in your webpage. You just have to make the following settings in the page setup for printing in primavera. Fig 7. Page setup window After making the above settings go to print preview option to ensure you get the required curves. From this you could either print the S curves, save them as Image files or publish them as Html files. References: 1. http://www.planningplanet.com/forums/planning-scheduling-programming- discussion/416820/develop-s-curve-primavera-p6 2. http://www.planningplanet.com/forums/planning-scheduling-programming- discussion/502846/what-s-curve-and-how-do-calculate-work-prog 3. http://www.maxwideman.com/guests/s-curve/using.htm