SlideShare a Scribd company logo
1 of 26
Download to read offline
Introduction
To
LTE KPIs
Prepared by : Mradul Nagpal
Contents :-
 Introduction to Primary KPIs
 Accessibility KPIs
 Retainability KPIs
 Integrity KPIs
 Mobility KPIs
Introduction of Primary KPIs
Domain Area Node Primary KPILTERAN
Accessibility
eNB
Session Setup Success rate(%) [24 hrs.]
RRC Connection Success Rate (%) [24 hrs.]
S1 Establish Success Rate (%) [24 hrs.]
ERAB Established Success Rate(%) [24hrs.]
Retainability Call Drop Rate (%) [24hrs.]
Integrity Avg. MAC Uplink Throughput(kbps) [24hrs.]
Avg. MAC DownlinkThroughput(kbps)
Mobility LTE Handover success rate (%)
Intra eNB Handover Success Rate (%)
Inter X2 out Success rate (%)
Inter S1out Success rate (%)
Accessibility KPIs
 Accessibility KPIs are used to measure how
successfully user is able to access the network
 It is generally divided in 3 segments i.e., RRC*
setup, S1 setup and ERAB** setup.
*Radio Resource Control
**E-UTRAN Radio Access Bearer
RRC Setup Success Rate (Service)
 According to Reference, the RRC connection setup procedure is triggered by
various different causes as identified by the “establishment Cause” field in RRC
Connection Request message: emergency, high Priority Access, MT (Mobile
terminating)-Access, MO(Mobile Originating)-Signalling, and MO-Data.
 The UE sets the establishment Cause in accordance with the information
received from upper layers. Causes except mo-signaling are categorized as
service-related ones. The mo-signaling cause is a signalling-related cause. This
KPI evaluates the RRC setup success rate with service-related causes in a cell
or cluster Involved.
 The KPI is calculated based on the counters measured at eNodeB when the
eNodeB receives an RRC Connection Request from the UE.
 The number of RRC Connection attempts is collected by the eNodeB at
measurement point A and the number of successful RRC connection is
counted at measurement point C.
Measurement point for RRC connection setup
RRC setup success rate (service)
KPI Name
Measurement
scope
RRC Setup Success Rate (service)
Cell / Cluster
Formula
RRCS_SRservice = RRC Connection Success
Associated
Counters
Unit Percentage (%)
RRC Connection Attempts
X 100
RRC Setup Success Rate (Signalling)
 This KPI evaluates the RRC setup success rate of the
signalling-related cause (mo-signaling) in a cell or a
cluster.
 Like the RRC Setup Success Rate (service), this KPI is
used to calculate the RRC setup success rate only when
the “establishment Cause” field is set to mo-signaling in
a cell or a cluster.
KPI Name
Measurement
scope
RRC Setup Success Rate (Signalling)
Cell / Cluster
Formula
RRCS_SRservice = RRC Connection Success
Associated
Counters
Unit Percentage (%)
RRC Connection Attempts
X 100
ERAB Setup Success Rate (All)
Number of ERAB Connection setup attempts is collected by the eNodeB at
measurement point A and the number of successful ERAB connections is
counted at measurement point B, as shown in Figures. Note that the eNodeB
needs to specify the Quality of Service (QoS) Class Identifier (QCI) forVoIP in
the ERAB setup message.
The voice service can be identified by the QoS information, in particular the
QCI in the ERAB Setup Request message. In general, QCI 1 is assigned to the
voice service.
This KPI can be used to evaluate the ERAB setup success rate of all services
including theVoIP service in a cell or a cluster.This KPI is calculated based on
the counters (both the ERAB setup attempts (All) and the successful ERAB
setup (All) counters) measured at the eNodeB.
Measurement point for MME-initiated ERAB setup
Measurement point for UE-triggered ERAB setup
ERAB setup success rate.
KPI Name ERAB Setup Success Rate
Measurement
Scope
Cell / Cluster
Formula
Associated
Counter
ERABS_SR =
Unit Percentage (%)
Success ERABSetup
Attempt ERABSetup
X 100
Call Setup Success Rate
 This KPI can be used to evaluate the call setup success rate of all
services including the VoIP service in a cell or a cluster. This KPI is
calculated based on the KPI of RRC Setup Success Rate (Service)
and the KPI of ERAB Setup Success Rate (All).
 The KPI is calculated base on multiplying the KPI of RRC Setup
Success Rate (Service) and the KPI of ERAB Setup Success Rate
(All)
Call Setup Success Rate
KPI Name Call Setup Success Rate
Measurement
Scope
Cell / Cluster
Formula
Associated
Counter
CSSR =
Unit Percentage (%)
RRCConnectionSuccess
X
RRCConnectionAttempt
ERABSetupSuccess
X100
ERABSetupAttempt
Retainability KPIs
 Retainability KPIs are used to evaluate the network capability to
retain services requested by a user for a desired duration once the user
is connected to the services. These counters can be calculated per cell
or per cluster. The KPIs at the cluster level can be calculated by
aggregating all the cell counters. Retainability KPIs are important in
evaluating whether the system can maintain the service quality at
certain level.
 The call drop statistics are on the calls that are connected
successfully but abnormally dropped due to eNB failure, by the MME
or any other reason.
Call Drop rate(%)
ERAB Drop Rate (%)
Calculations
KPI Name Formula
Call Drop Rate (%) [Call Drop(All type id sum) / (EstabInitSuccNbr+
InterX2InSucc + InterS1InSucc)] * 100
ERAB Drop Rate(%) RelActive/ (EstabInitSuccNbr+ EstabAddSuccNbr) * 100
Integrity KPIs
 These statistics collects data for cell throughput of downlink/uplink transport
blocks the ENB MAC allocated to UE.
KPI Name Formula
Cell MAC Downlink Effective
Throughput (kbps)
[(AirMacByteDl*8)/AirMacTtiDl]*1000
Cell MAC Uplink EffectiveThroughput
(kbps)
[(AirMacByteUl* 8)/AirMacTtiUl]*1000
Mobility KPIs
 Mobility KPIs includes Inter ENB Handover, X2 &
S1 handover KPIs.
 Overall Handover success rate is the combination
of all 3 types of HO procedures.
 X2 & S1 handover will depends on the
configuration of the interfaces.
Calculations
Intra eNB Handover Success Rate (%)
 Intra ENB HO is between different cells of same
ENBs.
 All the Handover procedures are divided in 2
phases, Preparation phase & Execution phase.
Inter X2 Out Success Rate (%)
X2 HO is between 2 cells of different ENBs, which are
connected with X2 interface.
Inter S1 Out Success Rate (%)
S1 HO is between 2 cells of different ENBs, which are not
connected with X2 interface, in actual network it will be
between inter MME mainly.

More Related Content

What's hot

Optimisation guide line ver1.1
Optimisation guide line ver1.1Optimisation guide line ver1.1
Optimisation guide line ver1.1Chandra Deria
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOpaulo_campolina
 
RSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIRSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIFaraz Husain
 
Lte irat-troubleshooting-guide
Lte irat-troubleshooting-guideLte irat-troubleshooting-guide
Lte irat-troubleshooting-guideDenmark Wilson
 
LTE Interference troubleshooting guide
LTE Interference troubleshooting guideLTE Interference troubleshooting guide
LTE Interference troubleshooting guideKlajdi Husi
 
Lte principle
Lte principleLte principle
Lte principleHatim100
 
Ericsson important optimization parameters
Ericsson important optimization parametersEricsson important optimization parameters
Ericsson important optimization parametersPagla Knight
 
Layer 3 messages
Layer 3 messagesLayer 3 messages
Layer 3 messagesJohn Samir
 
Lte kpis, counters & amp; timers
Lte kpis, counters & amp; timers Lte kpis, counters & amp; timers
Lte kpis, counters & amp; timers Abhishek Jena
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoringKlajdi Husi
 
1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjilSatish Jadav
 
Huawei_LTE_KPI_Optimization.pdf
Huawei_LTE_KPI_Optimization.pdfHuawei_LTE_KPI_Optimization.pdf
Huawei_LTE_KPI_Optimization.pdfSangram Sahoo
 

What's hot (20)

Lte kpis
Lte kpisLte kpis
Lte kpis
 
Optimisation guide line ver1.1
Optimisation guide line ver1.1Optimisation guide line ver1.1
Optimisation guide line ver1.1
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HO
 
Cs fallback feature
Cs fallback featureCs fallback feature
Cs fallback feature
 
2G Handover Details (Huawei)
2G Handover Details (Huawei)2G Handover Details (Huawei)
2G Handover Details (Huawei)
 
RSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIRSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQI
 
Lte irat-troubleshooting-guide
Lte irat-troubleshooting-guideLte irat-troubleshooting-guide
Lte irat-troubleshooting-guide
 
LTE Interference troubleshooting guide
LTE Interference troubleshooting guideLTE Interference troubleshooting guide
LTE Interference troubleshooting guide
 
Lte principle
Lte principleLte principle
Lte principle
 
Lte1841
Lte1841Lte1841
Lte1841
 
63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization63077585 idle-mode-parameter-optimization
63077585 idle-mode-parameter-optimization
 
Ericsson important optimization parameters
Ericsson important optimization parametersEricsson important optimization parameters
Ericsson important optimization parameters
 
Lte drive test parameters
Lte drive test parametersLte drive test parameters
Lte drive test parameters
 
Layer 3 messages
Layer 3 messagesLayer 3 messages
Layer 3 messages
 
Lte kpis, counters & amp; timers
Lte kpis, counters & amp; timers Lte kpis, counters & amp; timers
Lte kpis, counters & amp; timers
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 
gsm-kpi-optimization
 gsm-kpi-optimization gsm-kpi-optimization
gsm-kpi-optimization
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoring
 
1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil1.training lte ran kpi & counters rjil
1.training lte ran kpi & counters rjil
 
Huawei_LTE_KPI_Optimization.pdf
Huawei_LTE_KPI_Optimization.pdfHuawei_LTE_KPI_Optimization.pdf
Huawei_LTE_KPI_Optimization.pdf
 

Similar to LTE KPI Guide for Accessibility, Retainability, Integrity & Mobility

04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio networkDani Indra Kumara
 
KPI in LTE Radio Network-2016-pdf.pdf
KPI in LTE Radio Network-2016-pdf.pdfKPI in LTE Radio Network-2016-pdf.pdf
KPI in LTE Radio Network-2016-pdf.pdfVahidZibakalam3
 
VoLTE KPI Performance Explained
VoLTE KPI Performance ExplainedVoLTE KPI Performance Explained
VoLTE KPI Performance ExplainedVikas Shokeen
 
VoLTE KPI Performance
VoLTE KPI PerformanceVoLTE KPI Performance
VoLTE KPI PerformanceVikas Shokeen
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.pptMohamedShabana37
 
Performance analysis of wireless mobile network
Performance analysis of wireless mobile networkPerformance analysis of wireless mobile network
Performance analysis of wireless mobile networkBode Idowu-Bismark
 
LTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfLTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfVahidZibakalam3
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)derejew
 
Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Assim Mubder
 
108401 2727+ijet-ijens
108401 2727+ijet-ijens108401 2727+ijet-ijens
108401 2727+ijet-ijensHatim100
 
University of benin gra 15082012
University of benin gra 15082012University of benin gra 15082012
University of benin gra 15082012Ogundiran Joseph
 
Itu m.3400 function groups by area and layer
Itu m.3400 function groups by area and layerItu m.3400 function groups by area and layer
Itu m.3400 function groups by area and layerFrederick Mensah-Burobey
 
Key Performance Indicators (KPI)
Key Performance Indicators (KPI)Key Performance Indicators (KPI)
Key Performance Indicators (KPI)Yogender Singh Rana
 
Developing service metrics
Developing service metricsDeveloping service metrics
Developing service metricscsk selva
 

Similar to LTE KPI Guide for Accessibility, Retainability, Integrity & Mobility (20)

04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
 
KPI in LTE Radio Network-2016-pdf.pdf
KPI in LTE Radio Network-2016-pdf.pdfKPI in LTE Radio Network-2016-pdf.pdf
KPI in LTE Radio Network-2016-pdf.pdf
 
Kpi info
Kpi info Kpi info
Kpi info
 
VoLTE KPI Performance Explained
VoLTE KPI Performance ExplainedVoLTE KPI Performance Explained
VoLTE KPI Performance Explained
 
VoLTE KPI Performance
VoLTE KPI PerformanceVoLTE KPI Performance
VoLTE KPI Performance
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt
 
Performance analysis of wireless mobile network
Performance analysis of wireless mobile networkPerformance analysis of wireless mobile network
Performance analysis of wireless mobile network
 
LTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdfLTE KPI and PI Formula_NOKIA.pdf
LTE KPI and PI Formula_NOKIA.pdf
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
Drive procedure
Drive procedureDrive procedure
Drive procedure
 
Drive testing in mobile networks
Drive testing in mobile networksDrive testing in mobile networks
Drive testing in mobile networks
 
Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)Zd n2010 son-in_4g_mobile_networks (1)
Zd n2010 son-in_4g_mobile_networks (1)
 
Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting Call Setup Success Rate Definition and Troubleshooting
Call Setup Success Rate Definition and Troubleshooting
 
2 g dt and mapinfo
2 g dt and mapinfo2 g dt and mapinfo
2 g dt and mapinfo
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
 
108401 2727+ijet-ijens
108401 2727+ijet-ijens108401 2727+ijet-ijens
108401 2727+ijet-ijens
 
University of benin gra 15082012
University of benin gra 15082012University of benin gra 15082012
University of benin gra 15082012
 
Itu m.3400 function groups by area and layer
Itu m.3400 function groups by area and layerItu m.3400 function groups by area and layer
Itu m.3400 function groups by area and layer
 
Key Performance Indicators (KPI)
Key Performance Indicators (KPI)Key Performance Indicators (KPI)
Key Performance Indicators (KPI)
 
Developing service metrics
Developing service metricsDeveloping service metrics
Developing service metrics
 

Recently uploaded

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 

Recently uploaded (20)

Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 

LTE KPI Guide for Accessibility, Retainability, Integrity & Mobility

  • 2. Contents :-  Introduction to Primary KPIs  Accessibility KPIs  Retainability KPIs  Integrity KPIs  Mobility KPIs
  • 3. Introduction of Primary KPIs Domain Area Node Primary KPILTERAN Accessibility eNB Session Setup Success rate(%) [24 hrs.] RRC Connection Success Rate (%) [24 hrs.] S1 Establish Success Rate (%) [24 hrs.] ERAB Established Success Rate(%) [24hrs.] Retainability Call Drop Rate (%) [24hrs.] Integrity Avg. MAC Uplink Throughput(kbps) [24hrs.] Avg. MAC DownlinkThroughput(kbps) Mobility LTE Handover success rate (%) Intra eNB Handover Success Rate (%) Inter X2 out Success rate (%) Inter S1out Success rate (%)
  • 4. Accessibility KPIs  Accessibility KPIs are used to measure how successfully user is able to access the network  It is generally divided in 3 segments i.e., RRC* setup, S1 setup and ERAB** setup. *Radio Resource Control **E-UTRAN Radio Access Bearer
  • 5.
  • 6. RRC Setup Success Rate (Service)  According to Reference, the RRC connection setup procedure is triggered by various different causes as identified by the “establishment Cause” field in RRC Connection Request message: emergency, high Priority Access, MT (Mobile terminating)-Access, MO(Mobile Originating)-Signalling, and MO-Data.  The UE sets the establishment Cause in accordance with the information received from upper layers. Causes except mo-signaling are categorized as service-related ones. The mo-signaling cause is a signalling-related cause. This KPI evaluates the RRC setup success rate with service-related causes in a cell or cluster Involved.  The KPI is calculated based on the counters measured at eNodeB when the eNodeB receives an RRC Connection Request from the UE.  The number of RRC Connection attempts is collected by the eNodeB at measurement point A and the number of successful RRC connection is counted at measurement point C.
  • 7. Measurement point for RRC connection setup
  • 8. RRC setup success rate (service) KPI Name Measurement scope RRC Setup Success Rate (service) Cell / Cluster Formula RRCS_SRservice = RRC Connection Success Associated Counters Unit Percentage (%) RRC Connection Attempts X 100
  • 9. RRC Setup Success Rate (Signalling)  This KPI evaluates the RRC setup success rate of the signalling-related cause (mo-signaling) in a cell or a cluster.  Like the RRC Setup Success Rate (service), this KPI is used to calculate the RRC setup success rate only when the “establishment Cause” field is set to mo-signaling in a cell or a cluster.
  • 10. KPI Name Measurement scope RRC Setup Success Rate (Signalling) Cell / Cluster Formula RRCS_SRservice = RRC Connection Success Associated Counters Unit Percentage (%) RRC Connection Attempts X 100
  • 11. ERAB Setup Success Rate (All) Number of ERAB Connection setup attempts is collected by the eNodeB at measurement point A and the number of successful ERAB connections is counted at measurement point B, as shown in Figures. Note that the eNodeB needs to specify the Quality of Service (QoS) Class Identifier (QCI) forVoIP in the ERAB setup message. The voice service can be identified by the QoS information, in particular the QCI in the ERAB Setup Request message. In general, QCI 1 is assigned to the voice service. This KPI can be used to evaluate the ERAB setup success rate of all services including theVoIP service in a cell or a cluster.This KPI is calculated based on the counters (both the ERAB setup attempts (All) and the successful ERAB setup (All) counters) measured at the eNodeB.
  • 12. Measurement point for MME-initiated ERAB setup
  • 13. Measurement point for UE-triggered ERAB setup
  • 14. ERAB setup success rate. KPI Name ERAB Setup Success Rate Measurement Scope Cell / Cluster Formula Associated Counter ERABS_SR = Unit Percentage (%) Success ERABSetup Attempt ERABSetup X 100
  • 15. Call Setup Success Rate  This KPI can be used to evaluate the call setup success rate of all services including the VoIP service in a cell or a cluster. This KPI is calculated based on the KPI of RRC Setup Success Rate (Service) and the KPI of ERAB Setup Success Rate (All).  The KPI is calculated base on multiplying the KPI of RRC Setup Success Rate (Service) and the KPI of ERAB Setup Success Rate (All)
  • 16. Call Setup Success Rate KPI Name Call Setup Success Rate Measurement Scope Cell / Cluster Formula Associated Counter CSSR = Unit Percentage (%) RRCConnectionSuccess X RRCConnectionAttempt ERABSetupSuccess X100 ERABSetupAttempt
  • 17. Retainability KPIs  Retainability KPIs are used to evaluate the network capability to retain services requested by a user for a desired duration once the user is connected to the services. These counters can be calculated per cell or per cluster. The KPIs at the cluster level can be calculated by aggregating all the cell counters. Retainability KPIs are important in evaluating whether the system can maintain the service quality at certain level.  The call drop statistics are on the calls that are connected successfully but abnormally dropped due to eNB failure, by the MME or any other reason. Call Drop rate(%) ERAB Drop Rate (%)
  • 18. Calculations KPI Name Formula Call Drop Rate (%) [Call Drop(All type id sum) / (EstabInitSuccNbr+ InterX2InSucc + InterS1InSucc)] * 100 ERAB Drop Rate(%) RelActive/ (EstabInitSuccNbr+ EstabAddSuccNbr) * 100
  • 19. Integrity KPIs  These statistics collects data for cell throughput of downlink/uplink transport blocks the ENB MAC allocated to UE. KPI Name Formula Cell MAC Downlink Effective Throughput (kbps) [(AirMacByteDl*8)/AirMacTtiDl]*1000 Cell MAC Uplink EffectiveThroughput (kbps) [(AirMacByteUl* 8)/AirMacTtiUl]*1000
  • 20. Mobility KPIs  Mobility KPIs includes Inter ENB Handover, X2 & S1 handover KPIs.  Overall Handover success rate is the combination of all 3 types of HO procedures.  X2 & S1 handover will depends on the configuration of the interfaces.
  • 22. Intra eNB Handover Success Rate (%)  Intra ENB HO is between different cells of same ENBs.  All the Handover procedures are divided in 2 phases, Preparation phase & Execution phase.
  • 23.
  • 24.
  • 25. Inter X2 Out Success Rate (%) X2 HO is between 2 cells of different ENBs, which are connected with X2 interface.
  • 26. Inter S1 Out Success Rate (%) S1 HO is between 2 cells of different ENBs, which are not connected with X2 interface, in actual network it will be between inter MME mainly.