DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014
CULVERT RE-WORKThe re-work of this under-penstock culvert was necessary due to previous installation not meeting specifications. To
meet this project’s critical design specs, the correct inlet/outlet elevation had to be exact to maintain slope ratios.
This allowed proper development of bowl sizes, culvert to penstock seperation, pipe coverage and finished road width.
Using a laser level from a 4 meter off-set stake, the crucial elevations for inlet/outlet were met within 1cm of specs
after the final check from our surveyor. With the water controlled, I was able to excavate and achieve ideal density
on our finished culvert invert grade. The bottom of the 48” HDPE (backfilled in the final pictures) had the required
20cm separation from the top of culvert. Finished pipe coverage called for 1.5 meters of structural fill, which after
our final spread of fine blast rock, fit the design perfectly.
MIKE PEDERSON
pederson.digs@gmail.com
(604) 966-4153
DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014
FINISHING EXAMPLES
DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014
PIONEER TO FINISH
DASQUE PENSTOCK
Ditching and install for 90” welded steel. Right of way and intake construction.
MIDDLE CREEK PENSTOCK
48” Ductile Iron - 48” HDPE.
MIDDLE CREEK INTAKEDiversion, seepage blanket, lock block wall and rock armouring.
WHISTLER, BC | 2012
LOT PREP
This lot prep began with the careful clearing, grubbing
and stripping between two existing residential lots. To
achieve proper bottom of footing elevations, 45 loads
of rock had to be hammered and removed from site.
Water and sani services were also hammered to depth
and installed. Once final grade for the footing base was
met and tested, the excavation was complete. This lot
prep surpassed clients expectations in both speed and
efficiency, as well as customer service.

More Related Content

What's hot

2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
Wes Plaisted
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project Profile
Dan MacDonald, P.Eng.
 
Case Study - Cellweb TRP - Keats Way (Extended CS)
Case Study - Cellweb TRP -  Keats Way (Extended CS)Case Study - Cellweb TRP -  Keats Way (Extended CS)
Case Study - Cellweb TRP - Keats Way (Extended CS)
Owen Hutchison
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck Resume
David Beck
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
Adib Ramli
 

What's hot (16)

2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green Roof
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project Profile
 
How to construct a swimming pool on an elevated floor
How to construct a swimming pool on an elevated floorHow to construct a swimming pool on an elevated floor
How to construct a swimming pool on an elevated floor
 
Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34
 
Case Study - Cellweb TRP - Keats Way (Extended CS)
Case Study - Cellweb TRP -  Keats Way (Extended CS)Case Study - Cellweb TRP -  Keats Way (Extended CS)
Case Study - Cellweb TRP - Keats Way (Extended CS)
 
David Beck Resume
David Beck ResumeDavid Beck Resume
David Beck Resume
 
Gadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer RepairsGadsen Drive Emergency Gravity Sewer Repairs
Gadsen Drive Emergency Gravity Sewer Repairs
 
Prfm Presentation
Prfm PresentationPrfm Presentation
Prfm Presentation
 
BIM Keeps Project on Track
BIM Keeps Project on TrackBIM Keeps Project on Track
BIM Keeps Project on Track
 
MatthewMV3.Resume
MatthewMV3.ResumeMatthewMV3.Resume
MatthewMV3.Resume
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
 
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration VDOT BMP Clearinghouse Specification 8- Infiltration
VDOT BMP Clearinghouse Specification 8- Infiltration
 
Curt Site Weave
Curt Site WeaveCurt Site Weave
Curt Site Weave
 

Viewers also liked

Viewers also liked (11)

Dia internaional de la mujer
Dia internaional de la mujerDia internaional de la mujer
Dia internaional de la mujer
 
Portfolio
Portfolio Portfolio
Portfolio
 
2015 onko
2015 onko2015 onko
2015 onko
 
Cambio organizacional equipo 1
Cambio organizacional equipo 1Cambio organizacional equipo 1
Cambio organizacional equipo 1
 
Management des communications du projet
Management des communications du projetManagement des communications du projet
Management des communications du projet
 
pelicula de la Guerra de fuego
pelicula de la Guerra de fuegopelicula de la Guerra de fuego
pelicula de la Guerra de fuego
 
La motivation au travail
La motivation au travailLa motivation au travail
La motivation au travail
 
Amazon Under X-rays (case study)
Amazon Under X-rays (case study)Amazon Under X-rays (case study)
Amazon Under X-rays (case study)
 
Simple Automatic Water Level Controller by using ic 555 timer.
Simple Automatic Water Level Controller by using ic 555 timer.Simple Automatic Water Level Controller by using ic 555 timer.
Simple Automatic Water Level Controller by using ic 555 timer.
 
Automatic solar LED street light automation by using RTC and I2C protocols d...
Automatic solar LED street light automation by using RTC and I2C protocols  d...Automatic solar LED street light automation by using RTC and I2C protocols  d...
Automatic solar LED street light automation by using RTC and I2C protocols d...
 
Les outils de management de la qualité du projet
Les outils de management de la qualité du projetLes outils de management de la qualité du projet
Les outils de management de la qualité du projet
 

Similar to Mike Pederson-RESUME (photos)_1

Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
Rakesh Sunari Magar
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
juwes
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
Remya Rajeev
 
Stormwater Magazine-NYSDOT Sept 2014
Stormwater Magazine-NYSDOT Sept 2014Stormwater Magazine-NYSDOT Sept 2014
Stormwater Magazine-NYSDOT Sept 2014
Colin Melton
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
MEL3360
 

Similar to Mike Pederson-RESUME (photos)_1 (20)

Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
ABTS 4th year pdf
ABTS 4th year pdfABTS 4th year pdf
ABTS 4th year pdf
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
044_PHPD_NOV16[1]
044_PHPD_NOV16[1]044_PHPD_NOV16[1]
044_PHPD_NOV16[1]
 
Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fastenings
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Foundation Repair Systems & Forensic Repairs
Foundation Repair Systems & Forensic RepairsFoundation Repair Systems & Forensic Repairs
Foundation Repair Systems & Forensic Repairs
 
Stormwater Magazine-NYSDOT Sept 2014
Stormwater Magazine-NYSDOT Sept 2014Stormwater Magazine-NYSDOT Sept 2014
Stormwater Magazine-NYSDOT Sept 2014
 
Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)Stripping of liners from pipes using hdd technology (2007)
Stripping of liners from pipes using hdd technology (2007)
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 

Mike Pederson-RESUME (photos)_1

  • 1. DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014 CULVERT RE-WORKThe re-work of this under-penstock culvert was necessary due to previous installation not meeting specifications. To meet this project’s critical design specs, the correct inlet/outlet elevation had to be exact to maintain slope ratios. This allowed proper development of bowl sizes, culvert to penstock seperation, pipe coverage and finished road width. Using a laser level from a 4 meter off-set stake, the crucial elevations for inlet/outlet were met within 1cm of specs after the final check from our surveyor. With the water controlled, I was able to excavate and achieve ideal density on our finished culvert invert grade. The bottom of the 48” HDPE (backfilled in the final pictures) had the required 20cm separation from the top of culvert. Finished pipe coverage called for 1.5 meters of structural fill, which after our final spread of fine blast rock, fit the design perfectly. MIKE PEDERSON pederson.digs@gmail.com (604) 966-4153
  • 2. DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014 FINISHING EXAMPLES
  • 3. DASQUE/MIDDLE CREEK HYDRO-ELECTRIC | 2014 PIONEER TO FINISH
  • 4. DASQUE PENSTOCK Ditching and install for 90” welded steel. Right of way and intake construction. MIDDLE CREEK PENSTOCK 48” Ductile Iron - 48” HDPE.
  • 5. MIDDLE CREEK INTAKEDiversion, seepage blanket, lock block wall and rock armouring.
  • 6. WHISTLER, BC | 2012 LOT PREP This lot prep began with the careful clearing, grubbing and stripping between two existing residential lots. To achieve proper bottom of footing elevations, 45 loads of rock had to be hammered and removed from site. Water and sani services were also hammered to depth and installed. Once final grade for the footing base was met and tested, the excavation was complete. This lot prep surpassed clients expectations in both speed and efficiency, as well as customer service.