2. friend house 1. initial site study 2. new site analysis existing site plan grass area wooded area paved / improved existing structure 1 2
3.
4.
5.
6.
7. friend house plan with landscape adjustments foot path grass area wooded area paved / improved existing structure site plan shows the massing of the proposed maintenance complex without regulating lines so the site interventions can be better understood. the new complex is situated along topography lines to minimize the excavation needed to create a dual level operating surface for FW staff. new foot and vehicle paths are created to provide safer access to SR381 existing parking to be utilized for staff vehicles view sheds maintained for friend house office space and work area courtyard
8.
9.
10.
11. friend house site study working model working topographical study model shows exaggerated terrain features and proposed site mitigation tan areas indicate areas where earth was removed or added to accommodate the new function of the site new roads and pathways are not yet shown