SlideShare a Scribd company logo
1 of 2
MICHELLE LYNN SIGLERMICHELLE LYNN SIGLER
9516 Julie Ann Drive 52205 • (319)432-8755
Michelle.sigler@rockwellcollins.com
SUMMARY OF QUALIFICATIONSSUMMARY OF QUALIFICATIONS
Dedicated professional who focuses on building trust while capitilizaing on synergies in
everday working relationships.
 Able to prioritize and manage needs of diverse work force making solid business
decisions in fast-paced environment.
 Expertise in quality management, cost controls, purchasing, and cross-functional
team leadership.
 Strong analytical and strategic problem solving skills.
 Experienced with evaluating and determining right sizing of teams by utilizing data
driven metrics.
 Inspired and lead low cost country cost strategy utilizing Rockwell Collins Mexicali
partners
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
Rockwell Collins
Senior Procurement Manager 2013-Present
• Right sized Richardson procurement team utilizing employees’ strengths and attributes resulting $1.3M in annual savings
• Implemented low cost country strategy by moving tactical activities to Mexicali, reduction head count by 2 and reduction in
budget by 15%
• Partnered with manufacturing on inventory and PPV goal
• Lead revitalization of vendor managed Material Related Overhead (MRO) project streamlining logistic flow by 25%
• Was instrumental in moving 70% of passive commodity to distribution yielding a $1.5M improvement in cost and 2.3M in
inventory reduction
2012-2013
Senior Commodity Manager/Senior Strategy Manager
• Lead Strategic Value Add Partnership to develop a process that would significantly reduce manual touch time
• Promoted supplier engagement to align goals and strategies and exchange knowledge and processes
• Co-lead lean event on cut over process from one contract to another to gain efficiencies utilizing the Rockwell Collins MRP
system
2011-2012
Senior Commodity Specialist
 Negotiated 56 contracts, $70M spend and saved $3.1M
 Eliminated non performing suppliers after full capability and capacity analysis and increased supplier performance by 15%
 Reduced inventory by $100K and reduced minimum shipment requirements and achieved $350K of cost reduction per
year
Caterpillar, Mossville, Illinois 2008, 2010-Present
Project Lead
 Directed project involving supplemental payment of $1M per month to boost development of key supplier, project saved
$2.8M year-to-date with anticipated savings of $3.5M by year end.
 Facilitated process of transitioning parts from one supplier to another in order to save costs without sacrificing quality or
jeopardizing manufacturing schedule.
 Achieved $1.5M in annual savings for two part numbers by working with international suppliers
EDUCATIONEDUCATION
Lean
SAP
MRP Systems
Industry Standard Operations
Microsoft Office
AS 9100
Dardis-Executive Presentation
Training
MBA, Mount Mercy University 2014
B.B.A., Finance, Columbia College 2005

More Related Content

What's hot

Michael Mohar Resume
Michael Mohar ResumeMichael Mohar Resume
Michael Mohar ResumeMichael Mohar
 
Gregory J. Morgan- Resume
Gregory J. Morgan- ResumeGregory J. Morgan- Resume
Gregory J. Morgan- ResumeGregory Morgan
 
Pharmaceutical sales manager kpi
Pharmaceutical sales manager kpiPharmaceutical sales manager kpi
Pharmaceutical sales manager kpiketkenni
 
Manufacturing kpi dashboard
Manufacturing kpi dashboardManufacturing kpi dashboard
Manufacturing kpi dashboardcangurumiller
 
2William+E.+Pardue_Resume_2015
2William+E.+Pardue_Resume_20152William+E.+Pardue_Resume_2015
2William+E.+Pardue_Resume_2015Bill Pardue
 
Maximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsMaximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsBrandon Olson
 
Value of Project Management
Value of Project ManagementValue of Project Management
Value of Project ManagementBrandon Olson
 
Anita Poole Resume - 12-26-2016
Anita Poole Resume - 12-26-2016Anita Poole Resume - 12-26-2016
Anita Poole Resume - 12-26-2016Anita L. Poole
 
SandFil Associate Partner Programme
SandFil Associate Partner ProgrammeSandFil Associate Partner Programme
SandFil Associate Partner Programmewilsonten
 
Key performance indicator for millenials examples kpi for hr supervisor
Key performance indicator for millenials   examples kpi for hr supervisorKey performance indicator for millenials   examples kpi for hr supervisor
Key performance indicator for millenials examples kpi for hr supervisorVera Rachmayati
 
20140924 michael ryan s&op summit - keeping s&op alive
20140924 michael ryan   s&op summit - keeping s&op alive20140924 michael ryan   s&op summit - keeping s&op alive
20140924 michael ryan s&op summit - keeping s&op aliveMichael Ryan
 

What's hot (20)

KRA & KPI
KRA & KPIKRA & KPI
KRA & KPI
 
Michael Mohar Resume
Michael Mohar ResumeMichael Mohar Resume
Michael Mohar Resume
 
Kpi of hr manager
Kpi of hr managerKpi of hr manager
Kpi of hr manager
 
Kpi formula
Kpi formulaKpi formula
Kpi formula
 
Gregory J. Morgan- Resume
Gregory J. Morgan- ResumeGregory J. Morgan- Resume
Gregory J. Morgan- Resume
 
Recruitment kpi
Recruitment kpiRecruitment kpi
Recruitment kpi
 
Tqm Sample
Tqm SampleTqm Sample
Tqm Sample
 
Template kpi
Template kpiTemplate kpi
Template kpi
 
Pharmaceutical sales manager kpi
Pharmaceutical sales manager kpiPharmaceutical sales manager kpi
Pharmaceutical sales manager kpi
 
Manufacturing kpi dashboard
Manufacturing kpi dashboardManufacturing kpi dashboard
Manufacturing kpi dashboard
 
KPI
KPIKPI
KPI
 
Employee kpi template
Employee kpi templateEmployee kpi template
Employee kpi template
 
2William+E.+Pardue_Resume_2015
2William+E.+Pardue_Resume_20152William+E.+Pardue_Resume_2015
2William+E.+Pardue_Resume_2015
 
Kpi for training
Kpi for trainingKpi for training
Kpi for training
 
Maximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsMaximizing the Impact of Your Projects
Maximizing the Impact of Your Projects
 
Value of Project Management
Value of Project ManagementValue of Project Management
Value of Project Management
 
Anita Poole Resume - 12-26-2016
Anita Poole Resume - 12-26-2016Anita Poole Resume - 12-26-2016
Anita Poole Resume - 12-26-2016
 
SandFil Associate Partner Programme
SandFil Associate Partner ProgrammeSandFil Associate Partner Programme
SandFil Associate Partner Programme
 
Key performance indicator for millenials examples kpi for hr supervisor
Key performance indicator for millenials   examples kpi for hr supervisorKey performance indicator for millenials   examples kpi for hr supervisor
Key performance indicator for millenials examples kpi for hr supervisor
 
20140924 michael ryan s&op summit - keeping s&op alive
20140924 michael ryan   s&op summit - keeping s&op alive20140924 michael ryan   s&op summit - keeping s&op alive
20140924 michael ryan s&op summit - keeping s&op alive
 

Viewers also liked

Dizzywood Downloads
Dizzywood DownloadsDizzywood Downloads
Dizzywood Downloadsguesta1935e
 
Scanned from a Xerox Multifunction Printer (1)
Scanned from a Xerox Multifunction Printer (1)Scanned from a Xerox Multifunction Printer (1)
Scanned from a Xerox Multifunction Printer (1)Valentina Putrino
 
Gerencia de proyectos
Gerencia de proyectosGerencia de proyectos
Gerencia de proyectosSonya Torres
 
UCS Automation through the use of API's and UCS PowerTool
UCS Automation through the use of API's and UCS PowerToolUCS Automation through the use of API's and UCS PowerTool
UCS Automation through the use of API's and UCS PowerToolCisco Canada
 
Présentation Outils Collaboratifs Open Source au S2LQ 2015
Présentation Outils Collaboratifs Open Source au S2LQ 2015Présentation Outils Collaboratifs Open Source au S2LQ 2015
Présentation Outils Collaboratifs Open Source au S2LQ 2015Michel-Marie Maudet
 
Saleem Raza Channa (saleemrazachanna85@gmail.com).
Saleem Raza Channa (saleemrazachanna85@gmail.com).Saleem Raza Channa (saleemrazachanna85@gmail.com).
Saleem Raza Channa (saleemrazachanna85@gmail.com).Saleem Raza Channa
 
Secure collab on premise
Secure collab on premiseSecure collab on premise
Secure collab on premiseCisco Canada
 

Viewers also liked (9)

Jago kluruk
Jago klurukJago kluruk
Jago kluruk
 
Presentation1
Presentation1Presentation1
Presentation1
 
Dizzywood Downloads
Dizzywood DownloadsDizzywood Downloads
Dizzywood Downloads
 
Scanned from a Xerox Multifunction Printer (1)
Scanned from a Xerox Multifunction Printer (1)Scanned from a Xerox Multifunction Printer (1)
Scanned from a Xerox Multifunction Printer (1)
 
Gerencia de proyectos
Gerencia de proyectosGerencia de proyectos
Gerencia de proyectos
 
UCS Automation through the use of API's and UCS PowerTool
UCS Automation through the use of API's and UCS PowerToolUCS Automation through the use of API's and UCS PowerTool
UCS Automation through the use of API's and UCS PowerTool
 
Présentation Outils Collaboratifs Open Source au S2LQ 2015
Présentation Outils Collaboratifs Open Source au S2LQ 2015Présentation Outils Collaboratifs Open Source au S2LQ 2015
Présentation Outils Collaboratifs Open Source au S2LQ 2015
 
Saleem Raza Channa (saleemrazachanna85@gmail.com).
Saleem Raza Channa (saleemrazachanna85@gmail.com).Saleem Raza Channa (saleemrazachanna85@gmail.com).
Saleem Raza Channa (saleemrazachanna85@gmail.com).
 
Secure collab on premise
Secure collab on premiseSecure collab on premise
Secure collab on premise
 

Similar to Sigler, Michelle - Rockwell_Collins 2.8.16 3

Bob McDonald Resume
Bob McDonald ResumeBob McDonald Resume
Bob McDonald ResumeBob McDonald
 
WilliamJWeinstein Resume.FLDS.pdf
WilliamJWeinstein Resume.FLDS.pdfWilliamJWeinstein Resume.FLDS.pdf
WilliamJWeinstein Resume.FLDS.pdfWilliam Weinstein
 
Sharath's Resume-Project Manager-V5 30th May'15
Sharath's Resume-Project Manager-V5 30th May'15Sharath's Resume-Project Manager-V5 30th May'15
Sharath's Resume-Project Manager-V5 30th May'15Sharath Sri Karan
 
Doug Nagle Jan-2016
Doug Nagle  Jan-2016Doug Nagle  Jan-2016
Doug Nagle Jan-2016Doug Nagle
 
Jeff's_Resume 2016
Jeff's_Resume 2016Jeff's_Resume 2016
Jeff's_Resume 2016Jeff Jentsch
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar
 
535463_Turnbull Roberts_Resume_CIM -Quest
535463_Turnbull Roberts_Resume_CIM -Quest535463_Turnbull Roberts_Resume_CIM -Quest
535463_Turnbull Roberts_Resume_CIM -QuestCassandra Roberts
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceAlan LeBihan
 
CHERYL_L_Gipfel - June
CHERYL_L_Gipfel - JuneCHERYL_L_Gipfel - June
CHERYL_L_Gipfel - JuneCheryl Gipfel
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chainJ. Keith Hubbard
 
Resume_2015 - NLeone
Resume_2015 - NLeoneResume_2015 - NLeone
Resume_2015 - NLeoneNancy Leone
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott Bean
 
Magill thomas projects 2013
Magill thomas projects 2013Magill thomas projects 2013
Magill thomas projects 2013TomMagill
 
Magill, Thomas Resume Pmo Process 2010
Magill, Thomas Resume Pmo Process 2010Magill, Thomas Resume Pmo Process 2010
Magill, Thomas Resume Pmo Process 2010TomMagill
 
Patrick Lillard Resume
Patrick Lillard Resume Patrick Lillard Resume
Patrick Lillard Resume patalillard
 
Rich Green Resume 2016
Rich Green Resume 2016Rich Green Resume 2016
Rich Green Resume 2016Green Richard
 

Similar to Sigler, Michelle - Rockwell_Collins 2.8.16 3 (20)

Bob McDonald Resume
Bob McDonald ResumeBob McDonald Resume
Bob McDonald Resume
 
WilliamJWeinstein Resume.FLDS.pdf
WilliamJWeinstein Resume.FLDS.pdfWilliamJWeinstein Resume.FLDS.pdf
WilliamJWeinstein Resume.FLDS.pdf
 
Sharath's Resume-Project Manager-V5 30th May'15
Sharath's Resume-Project Manager-V5 30th May'15Sharath's Resume-Project Manager-V5 30th May'15
Sharath's Resume-Project Manager-V5 30th May'15
 
Palicka steven 4 3
Palicka steven 4 3Palicka steven 4 3
Palicka steven 4 3
 
Doug Nagle Jan-2016
Doug Nagle  Jan-2016Doug Nagle  Jan-2016
Doug Nagle Jan-2016
 
Jeff's_Resume 2016
Jeff's_Resume 2016Jeff's_Resume 2016
Jeff's_Resume 2016
 
Jake Stenner Resume
Jake Stenner ResumeJake Stenner Resume
Jake Stenner Resume
 
201611 pdf3_1BethSorenson
201611 pdf3_1BethSorenson201611 pdf3_1BethSorenson
201611 pdf3_1BethSorenson
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager Resume
 
535463_Turnbull Roberts_Resume_CIM -Quest
535463_Turnbull Roberts_Resume_CIM -Quest535463_Turnbull Roberts_Resume_CIM -Quest
535463_Turnbull Roberts_Resume_CIM -Quest
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and Experience
 
CHERYL_L_Gipfel - June
CHERYL_L_Gipfel - JuneCHERYL_L_Gipfel - June
CHERYL_L_Gipfel - June
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chain
 
Resume_2015 - NLeone
Resume_2015 - NLeoneResume_2015 - NLeone
Resume_2015 - NLeone
 
Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016
 
Arnie Esquivel Resume
Arnie Esquivel Resume Arnie Esquivel Resume
Arnie Esquivel Resume
 
Magill thomas projects 2013
Magill thomas projects 2013Magill thomas projects 2013
Magill thomas projects 2013
 
Magill, Thomas Resume Pmo Process 2010
Magill, Thomas Resume Pmo Process 2010Magill, Thomas Resume Pmo Process 2010
Magill, Thomas Resume Pmo Process 2010
 
Patrick Lillard Resume
Patrick Lillard Resume Patrick Lillard Resume
Patrick Lillard Resume
 
Rich Green Resume 2016
Rich Green Resume 2016Rich Green Resume 2016
Rich Green Resume 2016
 

Sigler, Michelle - Rockwell_Collins 2.8.16 3

  • 1. MICHELLE LYNN SIGLERMICHELLE LYNN SIGLER 9516 Julie Ann Drive 52205 • (319)432-8755 Michelle.sigler@rockwellcollins.com SUMMARY OF QUALIFICATIONSSUMMARY OF QUALIFICATIONS Dedicated professional who focuses on building trust while capitilizaing on synergies in everday working relationships.  Able to prioritize and manage needs of diverse work force making solid business decisions in fast-paced environment.  Expertise in quality management, cost controls, purchasing, and cross-functional team leadership.  Strong analytical and strategic problem solving skills.  Experienced with evaluating and determining right sizing of teams by utilizing data driven metrics.  Inspired and lead low cost country cost strategy utilizing Rockwell Collins Mexicali partners PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE Rockwell Collins Senior Procurement Manager 2013-Present • Right sized Richardson procurement team utilizing employees’ strengths and attributes resulting $1.3M in annual savings • Implemented low cost country strategy by moving tactical activities to Mexicali, reduction head count by 2 and reduction in budget by 15% • Partnered with manufacturing on inventory and PPV goal • Lead revitalization of vendor managed Material Related Overhead (MRO) project streamlining logistic flow by 25% • Was instrumental in moving 70% of passive commodity to distribution yielding a $1.5M improvement in cost and 2.3M in inventory reduction 2012-2013 Senior Commodity Manager/Senior Strategy Manager • Lead Strategic Value Add Partnership to develop a process that would significantly reduce manual touch time • Promoted supplier engagement to align goals and strategies and exchange knowledge and processes • Co-lead lean event on cut over process from one contract to another to gain efficiencies utilizing the Rockwell Collins MRP system 2011-2012 Senior Commodity Specialist  Negotiated 56 contracts, $70M spend and saved $3.1M  Eliminated non performing suppliers after full capability and capacity analysis and increased supplier performance by 15%  Reduced inventory by $100K and reduced minimum shipment requirements and achieved $350K of cost reduction per year Caterpillar, Mossville, Illinois 2008, 2010-Present Project Lead  Directed project involving supplemental payment of $1M per month to boost development of key supplier, project saved $2.8M year-to-date with anticipated savings of $3.5M by year end.  Facilitated process of transitioning parts from one supplier to another in order to save costs without sacrificing quality or jeopardizing manufacturing schedule.  Achieved $1.5M in annual savings for two part numbers by working with international suppliers EDUCATIONEDUCATION Lean SAP MRP Systems Industry Standard Operations Microsoft Office AS 9100 Dardis-Executive Presentation Training
  • 2. MBA, Mount Mercy University 2014 B.B.A., Finance, Columbia College 2005