SlideShare a Scribd company logo
1 of 3
Michael Atkins
Objective Locating employment beneficial to my Employer and myself in a difficult job
market
Experience
05/12 – Present: MG Construction, Inc Salt Lake City, UT
Project Manager/Sales
 Perform project sales and management
1/11 – 12/11 Avery Enterprizes/Steed Trucking Stanley, ND
Oil Field Specialist
 Independent contractor transporting oil field materials in North Dakota, Montana Wyoming
 Currently hold Idaho issued CDL
05/09 – 02/10 Dan Hola Construction Salt Lake City, UT
Project Lead
Manage 2 story 7000sqft commercial project from slab to completion
11/05 – 11/08 Thomas Brooke Construction Modesto, CA
Project Manager/Sales
Perform outside sales, manage projects, 1.2m in gross sales
07/01 – 10/05 Atkins Construction Rohnert Park, CA
Remodel Specialist
Estimate, repair, renovate, construct residential projects
09/00 – 05/01 Confab, Inc. Layton, UT
Production Supervisor
Manage/train personnel, develop/maintain schedules, inventory & payroll
04/00 – 09/00 James Fowler Construction, Inc. Dallas, OR
Operations Lead
Manage structural carpenters and laborers crews. Storm/sewer drainage installation.
Site safety supervisor, draft hazard analysis. Weekly payroll crew accounting
03/99 – 01/00 Wasatch Constructors, Inc Salt Lake City, UT
Operations/Equipment Foreman
Manage installation underground fiber optics/traffic management. Production of minor drainage
systems. Hazmat, Environmental team member. First responder certified
03/98 – 12/98 Wasatch Constructors, Inc Salt Lake City, UT
General Carpenter Foreman
Managed construction of all segment minor structures. Perform daily/weekly payroll accounting.
Manage 20 + union crew
209-404-0483
mgaca@live.com
1108 East 1150 South
Clearfield, UT84015
12/95 – 02/98 Grover Construction, Inc Salt Lake City, UT
Limited Partner
Perform all functions in residential construction. Manage payroll, equipment, crews
01/94 – 11/95 Ore-Ida Foods, Inc Burley, ID
Manufacturing/Packaging Supervisor
Team Leader of Packaging Waste with direct cost savings of over $75K per year
Direct supervision of 50+ hourly employees in an multi-product union environment
01/91 – 01/94 Utah Medical Products, Inc Salt Lake City, UT
Manufacturing Supervisor II
Manage 45+ hourly employees in high volume multi-product cleanroom environment
Member of JIT, SPC, new product process implementation and production system controls
07/86 – 05/89 Lin Data/Nashua Computer Corporation Santa Clara, CA
Sr. Line Maintenance Technician III/Supervisor
Assnt Team Chair SOP, SPC, Quality Control and employee training systems (production)
Supervise/Train Jr. and intermediate technicians, maintain thin film processing and support equipment.
Assist equip design/modification. Perform facility maintenance.
Perform Electo-Mechanical repair from system to component level on vacuum processing and support
equipment
03/85 – 05/86 Phase II Automation Redwood City, CA
Sr. Manufacturing Technician III
Elecro-Mechanical assembly from blueprints on cleanroom robotic work cells
Complete blueprint manufacturing updates
Full system testing of completed cells
06/84 – 03/85 Westinghouse Marine Division Sunnyvale, CA
Mechanical Assembler II
Assembly of Trident steam turbine power plants from detailed blueprints
Use of extreme precision assembly tools, measuring equipment and
Held classified security clearance
04/82 – 06/84 EM Systems, Inc Sunnyvale, CA
Lead Sr. Electro/Mechanical Assembler III
Perform component to full mechanical system assembly of US Military Electronic Defense Systems
Assemble/stuff/solder electronic PC boards, wire harnessing, semi-rigid microwave fabrication, PC
board repair to mil-spec standards
Special Elecro-Mechanical technician assignment for NATO System used during Falklands war
Issued temporary Secret security clearance
06/81 – 05/82 San Jose State University San Jose, CA
Sr. Equipment Technician II, Mechanical
Repair/Maintain Division of Technology lab equipment. Prepare lab samples for Professors
Installation of new lab equipment
07/79 – 04/81 Ford Aerospace & Communications, Inc Palo Alto, CA
Mechanical Assemble Satellite Integration/Equipment Operator II
Assemble Intelsat V / Classified satellites in class 1000 cleanroom using blueprints and direction from
system engineers
Operation of in-house sheet metal and machine shop manufacturing equipment from blueprints
Use of precision measurement tools and equipment
10/78 – 07/79 Watkins-Johnson Company Palo Alto, CA
Clerical Draftsman-Plant Engineering
Maintain plant engineering utility usage and floor space records. Plan department moves
Keep all site blueprints up to date
Education:
West Valley College - G.E., Production Time Management
Foothill College - Business Management, Computer Science
San Jose State Univ. - Industrial Technology, Material Management, Quality Control
Many specialized seminars and vendor equipment training courses
Proficient in manufacturing, construction and computer equipment
Served 2 year Religious Mission – Michigan 1976 to 1978
Eagle Scout with 2 eagle palms

More Related Content

What's hot

What's hot (17)

Jeremiah Rogers Resume 11-1-2016
Jeremiah Rogers Resume 11-1-2016Jeremiah Rogers Resume 11-1-2016
Jeremiah Rogers Resume 11-1-2016
 
Resume Don Worthington III
Resume Don Worthington IIIResume Don Worthington III
Resume Don Worthington III
 
Matthew Lake Resume 1(1) updated
Matthew Lake Resume 1(1) updatedMatthew Lake Resume 1(1) updated
Matthew Lake Resume 1(1) updated
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
RAMON B PONSARAN JR
RAMON B  PONSARAN JRRAMON B  PONSARAN JR
RAMON B PONSARAN JR
 
frederick-d.-werner-resume
frederick-d.-werner-resumefrederick-d.-werner-resume
frederick-d.-werner-resume
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
ESV CV-764 (new)
ESV CV-764 (new)ESV CV-764 (new)
ESV CV-764 (new)
 
skip
skipskip
skip
 
resume CIP 1
resume CIP 1resume CIP 1
resume CIP 1
 
general work resume
general work resumegeneral work resume
general work resume
 
CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
Jeremy Owen resume
Jeremy Owen resume Jeremy Owen resume
Jeremy Owen resume
 
Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104
 
DHavens Resume 2015
DHavens Resume 2015DHavens Resume 2015
DHavens Resume 2015
 
David Resume Updated 1-13-15
David Resume Updated 1-13-15David Resume Updated 1-13-15
David Resume Updated 1-13-15
 
Sm group peb presentation
Sm group peb presentationSm group peb presentation
Sm group peb presentation
 

Viewers also liked

Co-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesCo-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesShannonRathod
 
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...Megan Stefkovich
 
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, Namibia
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, NamibiaNörtemann et al - Mineralogy of the Navachab Skarn deposit, Namibia
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, NamibiaMarkus Franz Noertemann
 
mvitelli_ee367_final_report
mvitelli_ee367_final_reportmvitelli_ee367_final_report
mvitelli_ee367_final_reportMatt Vitelli
 
開業支援(日本配食サービス協会)
開業支援(日本配食サービス協会)開業支援(日本配食サービス協会)
開業支援(日本配食サービス協会)haisyoku2015
 
Global work force 2020
Global work force 2020Global work force 2020
Global work force 2020A.P. Prejish
 
Co-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesCo-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesShannonRathod
 
How to Create a Landing Page by Growth Triggers Online
How to Create a Landing Page by Growth Triggers OnlineHow to Create a Landing Page by Growth Triggers Online
How to Create a Landing Page by Growth Triggers OnlineNerissa Marcos
 
Reverse engineering
Reverse engineeringReverse engineering
Reverse engineeringdspokale25
 
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...Nerissa Marcos
 

Viewers also liked (13)

Co-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesCo-Constructing Digital Pedagogies
Co-Constructing Digital Pedagogies
 
Listening Log 2
Listening Log 2Listening Log 2
Listening Log 2
 
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...
Lab Meeting 2nd Semester- Investigating genes involved in root growth respons...
 
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, Namibia
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, NamibiaNörtemann et al - Mineralogy of the Navachab Skarn deposit, Namibia
Nörtemann et al - Mineralogy of the Navachab Skarn deposit, Namibia
 
mvitelli_ee367_final_report
mvitelli_ee367_final_reportmvitelli_ee367_final_report
mvitelli_ee367_final_report
 
SWCV
SWCVSWCV
SWCV
 
開業支援(日本配食サービス協会)
開業支援(日本配食サービス協会)開業支援(日本配食サービス協会)
開業支援(日本配食サービス協会)
 
Global work force 2020
Global work force 2020Global work force 2020
Global work force 2020
 
Co-Constructing Digital Pedagogies
Co-Constructing Digital PedagogiesCo-Constructing Digital Pedagogies
Co-Constructing Digital Pedagogies
 
Mike's presentation
Mike's presentationMike's presentation
Mike's presentation
 
How to Create a Landing Page by Growth Triggers Online
How to Create a Landing Page by Growth Triggers OnlineHow to Create a Landing Page by Growth Triggers Online
How to Create a Landing Page by Growth Triggers Online
 
Reverse engineering
Reverse engineeringReverse engineering
Reverse engineering
 
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...
How to Create a Website Launch Campaign Using Thunderclap by Growth Triggers ...
 

Similar to Res2015

Similar to Res2015 (20)

J. Denton Resume 11.17.14
J. Denton Resume 11.17.14J. Denton Resume 11.17.14
J. Denton Resume 11.17.14
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resume
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Updated Resume' A
Updated Resume' AUpdated Resume' A
Updated Resume' A
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resume
 
2013 Resume
2013 Resume2013 Resume
2013 Resume
 
Armindo G Fonseca
Armindo G FonsecaArmindo G Fonseca
Armindo G Fonseca
 
David Mendoza
David MendozaDavid Mendoza
David Mendoza
 
updated resume may mechanical
updated resume may mechanicalupdated resume may mechanical
updated resume may mechanical
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016
 
Jason's Resume1
Jason's Resume1Jason's Resume1
Jason's Resume1
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
Resume for Joshua Miller 1
Resume for Joshua Miller 1Resume for Joshua Miller 1
Resume for Joshua Miller 1
 
Seth Resume 2016.01.15
Seth Resume 2016.01.15Seth Resume 2016.01.15
Seth Resume 2016.01.15
 
CraigColeResume
CraigColeResumeCraigColeResume
CraigColeResume
 
INL_Resume
INL_ResumeINL_Resume
INL_Resume
 
Mark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark_Peterson_Jr_resume
Mark_Peterson_Jr_resume
 
RES-Philip.Harper
RES-Philip.HarperRES-Philip.Harper
RES-Philip.Harper
 
G Sharpe Resume 2-15
G Sharpe Resume 2-15G Sharpe Resume 2-15
G Sharpe Resume 2-15
 

Res2015

  • 1. Michael Atkins Objective Locating employment beneficial to my Employer and myself in a difficult job market Experience 05/12 – Present: MG Construction, Inc Salt Lake City, UT Project Manager/Sales  Perform project sales and management 1/11 – 12/11 Avery Enterprizes/Steed Trucking Stanley, ND Oil Field Specialist  Independent contractor transporting oil field materials in North Dakota, Montana Wyoming  Currently hold Idaho issued CDL 05/09 – 02/10 Dan Hola Construction Salt Lake City, UT Project Lead Manage 2 story 7000sqft commercial project from slab to completion 11/05 – 11/08 Thomas Brooke Construction Modesto, CA Project Manager/Sales Perform outside sales, manage projects, 1.2m in gross sales 07/01 – 10/05 Atkins Construction Rohnert Park, CA Remodel Specialist Estimate, repair, renovate, construct residential projects 09/00 – 05/01 Confab, Inc. Layton, UT Production Supervisor Manage/train personnel, develop/maintain schedules, inventory & payroll 04/00 – 09/00 James Fowler Construction, Inc. Dallas, OR Operations Lead Manage structural carpenters and laborers crews. Storm/sewer drainage installation. Site safety supervisor, draft hazard analysis. Weekly payroll crew accounting 03/99 – 01/00 Wasatch Constructors, Inc Salt Lake City, UT Operations/Equipment Foreman Manage installation underground fiber optics/traffic management. Production of minor drainage systems. Hazmat, Environmental team member. First responder certified 03/98 – 12/98 Wasatch Constructors, Inc Salt Lake City, UT General Carpenter Foreman Managed construction of all segment minor structures. Perform daily/weekly payroll accounting. Manage 20 + union crew 209-404-0483 mgaca@live.com 1108 East 1150 South Clearfield, UT84015
  • 2. 12/95 – 02/98 Grover Construction, Inc Salt Lake City, UT Limited Partner Perform all functions in residential construction. Manage payroll, equipment, crews 01/94 – 11/95 Ore-Ida Foods, Inc Burley, ID Manufacturing/Packaging Supervisor Team Leader of Packaging Waste with direct cost savings of over $75K per year Direct supervision of 50+ hourly employees in an multi-product union environment 01/91 – 01/94 Utah Medical Products, Inc Salt Lake City, UT Manufacturing Supervisor II Manage 45+ hourly employees in high volume multi-product cleanroom environment Member of JIT, SPC, new product process implementation and production system controls 07/86 – 05/89 Lin Data/Nashua Computer Corporation Santa Clara, CA Sr. Line Maintenance Technician III/Supervisor Assnt Team Chair SOP, SPC, Quality Control and employee training systems (production) Supervise/Train Jr. and intermediate technicians, maintain thin film processing and support equipment. Assist equip design/modification. Perform facility maintenance. Perform Electo-Mechanical repair from system to component level on vacuum processing and support equipment 03/85 – 05/86 Phase II Automation Redwood City, CA Sr. Manufacturing Technician III Elecro-Mechanical assembly from blueprints on cleanroom robotic work cells Complete blueprint manufacturing updates Full system testing of completed cells 06/84 – 03/85 Westinghouse Marine Division Sunnyvale, CA Mechanical Assembler II Assembly of Trident steam turbine power plants from detailed blueprints Use of extreme precision assembly tools, measuring equipment and Held classified security clearance 04/82 – 06/84 EM Systems, Inc Sunnyvale, CA Lead Sr. Electro/Mechanical Assembler III Perform component to full mechanical system assembly of US Military Electronic Defense Systems Assemble/stuff/solder electronic PC boards, wire harnessing, semi-rigid microwave fabrication, PC board repair to mil-spec standards Special Elecro-Mechanical technician assignment for NATO System used during Falklands war Issued temporary Secret security clearance 06/81 – 05/82 San Jose State University San Jose, CA Sr. Equipment Technician II, Mechanical Repair/Maintain Division of Technology lab equipment. Prepare lab samples for Professors Installation of new lab equipment 07/79 – 04/81 Ford Aerospace & Communications, Inc Palo Alto, CA Mechanical Assemble Satellite Integration/Equipment Operator II Assemble Intelsat V / Classified satellites in class 1000 cleanroom using blueprints and direction from system engineers
  • 3. Operation of in-house sheet metal and machine shop manufacturing equipment from blueprints Use of precision measurement tools and equipment 10/78 – 07/79 Watkins-Johnson Company Palo Alto, CA Clerical Draftsman-Plant Engineering Maintain plant engineering utility usage and floor space records. Plan department moves Keep all site blueprints up to date Education: West Valley College - G.E., Production Time Management Foothill College - Business Management, Computer Science San Jose State Univ. - Industrial Technology, Material Management, Quality Control Many specialized seminars and vendor equipment training courses Proficient in manufacturing, construction and computer equipment Served 2 year Religious Mission – Michigan 1976 to 1978 Eagle Scout with 2 eagle palms