SlideShare a Scribd company logo
1 of 51
Download to read offline
REHABILITATION OF
NRJ SIBAGAT - ESPERANZA ROAD
Republic of the Philippines
Provincial Government of
Agusan Del Sur
PHILIPPINES PROVINCIAL ROADS MANAGEMENT FACILITY
Republic of the Philippines
Provincial Government of Agusan Del Sur
PWS - ADS -
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
B KEY MAP
A KEY MAP
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
SITE DEVELOPMENT PLAN
AND LOCATION MAP
G-02
5
B VICINITY MAP
C LOCATION MAP
SUMMARY OF QUANTITIES
G-03
5
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
4.0 HORIZONTAL CONTROL
5.0 VERTICAL CONTROL
14.0 CONCRETE
13.0 RIGHT-OF-WAY
12.0 PAVEMENT MARKINGS
15.0 REINFORCING STEEL
CLASS
10.0 MISCELLANEOUS STRUCTURES
9.0 ROAD SIGNS
8.0 DRAINAGE STRUCTURE
3.0 STATIONING
2.0 DIMENSIONS
1.0 SPECIFICATIONS
17.0 OTHERS
NOTES :
STRENGTH
28 DAYS CYLINDER
MPa PSi
AGGREGATE
mm (in)
OF COARSE
MAX.SIZE
MINIMUM CLEAR
COVER, mm(in)
( ROADS, DRAINAGE AND STRUCTURES )
16.0 TREE PLANTING
11.0 REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION
7.0 ROAD CONNECTIONS
6.0 ELEVATIONS AND GRADES
STATION NORTHING EASTING ELL. HEIGHT
(ROADS, DRAINAGE AND STRUCTURE)
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
ABBREVIATION AND SYMBOLS
EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES
LEGEND
LEGENDS, ABBREVIATIONS,
AND SYMBOLS
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
STATION LIMITS
TYPICAL ROAD SECTION ON FILL
NOT DRAWN TO SCALE
1
TYPICAL ROAD SECTION ON CUT
NOT DRAWN TO SCALE
2
TYPICAL ROAD SECTION(SUPERELEVATED)
NOT DRAWN TO SCALE
3
MASONRY RETAINING WALL BOTHSIDES
NOT DRAWN TO SCALE
4
TYPICAL ROAD SECTION WITH
TYPICAL ROAD SECTIONS
R-01
27
GROUTED RIPRAP (CLASS A) RIGHT SIDE ONLY
NOT DRAWN TO SCALE
6
TYPICAL ROAD SECTION WITH STANDARD
GROUTED RIPRAP DITCH BOTHSIDES
NOT DRAWN TO SCALE
9
TYPICAL ROAD SECTION WITH RECTANGULAR
WITH TRIANGULAR EARTH DITCH
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
STANDARD GROUTED RIPRAP(CLASS B)
NOT DRAWN TO SCALE
8
TYPICAL ROAD SECTION WITH
MASONRY RETAINING WALL (LEFT SIDE)
NOT DRAWN TO SCALE
5
TYPICAL ROAD SECTION WITH
GROUTED RIPRAP (CLASS A) LEFT SIDE ONLY
NOT DRAWN TO SCALE
7
TYPICAL ROAD SECTION WITH STANDARD
GROUTED RIPRAP DITCH (RIGHT SIDE)
NOT DRAWN TO SCALE
10
TYPICAL ROAD SECTION WITH RECTANGULAR
GROUTED RIPRAP DITCH (LEFT SIDE)
NOT DRAWN TO SCALE
11
TYPICAL ROAD SECTION WITH RECTANGULAR
RIPRAP DITCH AND GROUTED RIPRAP (CLASS A)
NOT DRAWN TO SCALE
12
TYPICAL ROAD SECTION WITH RECTANGULAR GROUTED
NOT DRAWN TO SCALE
13 TYPICAL ROAD SECTION ON CUT ONLY
SCHEDULE OF RC GUARDRAILS
TOTAL 727.71 215.00 48.00
SCHEDULE OF RIPRAP SLOPE PROTECTION
TOTAL 120.00 130.00
SCHEDULE OF MASONRY RETAINING WALL
TOTAL 61.00 20.00
SCHEDULE OF DUMPED STONE
TOTAL - 3.00
SCHEDULE OF GUARDRAILS
AND SLOPE PROTECTION
R-02
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 0+000 - 0+700
R-03
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 0+700 - 1+400
R-04
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 1+400 - 2+100
R-05
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 2+100 - 2+800
R-06
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 2+800 - 3+600
R-07
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PLAN AND PROFILE
STA. 3+600 - 4+000
R-08
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 0+020 - 0+160
R-09
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 0+180 - 0+380
R-10
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 0+400 - 0+540
R-11
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 0+560 - 0+760
R-12
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 0+780 - 1+000
R-13
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 1+020 - 1+280
R-14
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 1+300 - 1+520
R-15
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 1+540 - 1+760
R-16
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 1+780 - 1+940
R-17
27
CROSS SECTION
STA. 1+960 - 2+160
R-18
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 2+180 - 2+340
R-19
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 2+360 - 2+620
R-20
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 2+640 - 2+820
R-21
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 2+840 - 3+080
R-22
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 3+100 - 3+280
R-23
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 3+300 - 3+520
R-24
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 3+540 - 3+740
R-25
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 3+760 - 3+900
R-26
27
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
CROSS SECTION
STA. 3+920 - 4+000
R-27
27
GEOMETRIC DESIGN STANDARD
(HORIZONTAL AND VERTICAL)
RS-01
6
1 HORIZONTAL CURVE (CIRCULAR)
2 SYMMETRICAL VERTICAL PARABOLIC CURVE
3 UNSYMMETRICAL VERTICAL PARABOLIC CURVE
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
1 SUPERELEVATION
GEOMETRIC DESIGN STANDARD
(SUPERELEVATION)
RS-02
6
1a TRANSITION : STRAIGHT-CIRCULAR CURVE CASE 1
1b TRANSITION : CIRCULAR CURVE-STRAIGHT-CIRCULAR CURVE CASE 2
1c TRANSITION : CIRCULAR CURVE-MINIMUM STRAIGHT-CIRCULAR CURVE CASE 3
1d TRANSITION : CIRCULAR CURVE-CIRCULAR CURVE CASE 4
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
REGULATORY SIGNS
5T
WARNING AND REGULATORY SCHEDULE
STANDARD WARNING
AND REGULATORY SIGNS
AND SCHEDULE
RS-03
6
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
1 STANDARD FLEX-BEAM GUARDRAIL
STANDARD
FLEX-BEAM GUARDRAIL
RS-04
6
1a PLAN
1b ELEVATION
1c SECTION
1d ELEVATION OF POST
1e FLEX BEAM DETAIL
1f SECTION OF POST 1g FLEX-BEAM END DETAIL
1i GUARDRAILS ALONG BOX CULVERT & BRIDGE APPROACHES1h BEAM TYPE GUARDRAIL ON RETAINING WALL
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
1a INSTALLATION DETAIL (TYPE II)
1c DETAIL OF STEEL CLAMP
1b PLAN (STEEL CLAMP MOUNTING)
INFORMATORY SIGNS/MOUNTING
DETAILS
RS-05
6
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
a. WITHOUT BENCHING (H<4.0m) b. WITH BENCHING (H>4.0m)
a. WITHOUT BENCHING (H<4.0m) b. WITH BENCHING (H>4.0m)
TABLE
BULDGE AND PAYMENTS
WORKING LINES FOR
SECTION SHOWING
TABLE
1 GROUTED RIPRAP SLOPE PROTECTION
3 GABIONS/MATTRESS
1b CLASS "B" S E C T I O N
1a CLASS "A" S E C T I O N
2 DETAILS OF WEEPHOLES
STANDARD GROUTED RIPRAP, WEEPHOLES
DETAILS, STONE MASONRY RETAINING WALL
AND GABIONS / MATTRESS
RS-06
6
4 MASONRY RETAINING WALL
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
TYPES OF PROTECTION WORKS AT CULVERT OUTLET
SCALE AS SHOWN
TYPES OF PROTECTION WORKS
DS-01
7
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
S
ISOMETRIC
FLARED TYPE HEADWALL (SINGLE PIPE)
TABLE C ( ONE L-TYPE HEADWALL)
DIMENSIONS
DS-05
3A
N T
(mm)
SCALE
DIA. & THICKNESS
DS-05
1
DS-05
1A
AS
(mm)
P L A N
N T S
TO SCALEDS-05 NOT
1B ELEVATION
SINGLE PIPE
STRAIGHT TYPE HEADWALL
STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC
TABLE A ( ONE FLARED TYPE HEADWALL 1.5:1 )
TABLE C ( ONE STRAIGHT TYPE HEADWALL )
DS-053B
L-TYPE HEADWALL
NOTDS-05
3
AS
DS-05 SCALENOT TO
SHOWN
S E C T I O N3B SINGLE PIPE
DS-05 NOT
4A
DS-05SCALETO
DS-05
4
NOT
4B
FLARED TYPE HEADWALL (DOUBLE PIPE)
SCALESHOWN DS-05
SINGLE PIPE
2
P L A N
DS-05 N
2A
AS
ST
DS-052E
DS-05 TO SCALENOT
ELEVATION2B
DIAMETER & THICKNESS
SHOWN
(mm)
DIMENSIONS
(mm)
NOT
S E C T I O N
DIAMETER & THICKNESS
(mm)
DS-05
2C
(mm)
DIMENSIONS
TO SCALE
SCALETONOT
AS SHOWN
S E C T I O N
DS-05 SCALETONOT
4C DOUBLE PIPE
TO
S E C T I O N
DOUBLE PIPE
SCALE
WINGWALL SECTION
DOUBLE PIPE
NOT
SINGLE PIPE
DS-05
2D
TO
2E
DS-05 NOT SCALE
DS-05
2C
DS-05
2E
STANDARD REINFORCED
CONCRETE HEADWALL FOR RCPC
DS-02PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
REINFORCED CONCRETE PIPE CULVERT
DETAILS AND TABLE
DS-03
7
6 TYPICAL BEDDING FOR PROJECTING CONDUITS
7 CONNECTION DETAILS OF RCP EXTENSION
5 CLASSIFICATION OF TYPICAL DRAINAGE
ONE LINE OF CIRCULAR
4 REINFORCEMENT (SECTION)
ONE LINE OF ELLIPTICAL
3 REINFORCEMENT (SECTION)
TWO LINES OF CIRCULAR
2 REINFORCEMENT (SECTION)
1b TWO LINES OF CIRCULAR REINFORCEMENT
5 CLASSIFICATION OF TYPICAL DRAINAGE
ONE LINE OF CIRCULAR OR
1a ELLIPTICAL REINFORCEMENT
6b EXCAVATION FOR PIPE
6a METHODS OF PIPE INSTALLATION
6c CONCRETE CRADLE BEDDING 6d FIRST CLASS BEDDING 6e ORDINARY BEDDING
7a P L A N 7a S E C T I O N
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
SLO
PE1/1
SLO
PE1/1
GROUTED RIPRAP HEADWALL
WINGWALL
FOR NORMAL INSTALLATION (Gr-HW)
DS-04
7
HEADWALL FOR SINGLE BARREL
1 PIPE CULVERTS TYPE A1 (SQUARE)
1a SECTION
1c SECTION
1b SECTION
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
REINFORCED CONCRETE BOX CULVERT
SINGLE BARREL DETAILS
DS-05
7
2 BAR BENDING DIAGRAM - SINGLE BARREL1 SECTION-SINGLE BARREL
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
1 GENERAL PLANS AND DETAILS
REINFORCED CONCRETE BOX CULVERT
SLAB DETAILS
DS-06
7
1e
1c DETAIL
1b PART SECTION ALONG L OF CULVERT
1a TYPICAL ROAD CROSS SECTION
1f
1d DETAIL
1g
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
REINFORCED CONCRETE BOX CULVERT
WINGWALL DETAIL
DS-07
7
2 WINGWALL ELEVATION
1 WINGWALL PLAN
3 SECTION
4 RCBC WINGWALL DETAILS
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
DRAINAGE AND DITCH SCHEDULE
DC-01
4
RECTANGULAR GROUTED RIPRAP DITCH(TYPE A) CASE 1 RECTANGULAR GROUTED RIPRAP DITCH(TYPE A) CASE 2
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
DRAINAGE CROSS SECTIONS
DC-02
4
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
DRAINAGE CROSS SECTIONS
DC-03
4
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
DRAINAGE CROSS SECTIONS
DC-04
4
PROVINCIAL GOVERNMENT
OF AGUSAN DEL SUR
REHABILITATION OF
NRJ - SIBAGAT - ESPERANZA ROAD
PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)

More Related Content

What's hot

Valuation Format
Valuation FormatValuation Format
Valuation FormatRohit Digra
 
Dynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfDynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfahsansaeed78
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fslAditya Mistry
 
Quality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline constructionQuality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline constructionSuresh Zanwar
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirementwael el ariny
 
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions Manual
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions ManualHydrology And Floodplain Analysis 5th Edition Bedient Solutions Manual
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions ManualHerrods
 
Keyboard khmer-limon
Keyboard khmer-limonKeyboard khmer-limon
Keyboard khmer-limontheara nabee
 
137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cagesUlhas kamat
 
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...ssuser217c6f
 
Design of rectangular beam by USD
Design of rectangular beam by USDDesign of rectangular beam by USD
Design of rectangular beam by USDSadia Mahjabeen
 
Design of high embankment official report
Design of high embankment official reportDesign of high embankment official report
Design of high embankment official reportsungadi
 
Design of torsion reinforcement
 Design of torsion reinforcement Design of torsion reinforcement
Design of torsion reinforcementMuskanDeura
 
Procedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodProcedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodeSAT Journals
 
Analysis, Design and Estimation of Basement +G+2 Residential Building
Analysis, Design and Estimation of Basement +G+2 Residential BuildingAnalysis, Design and Estimation of Basement +G+2 Residential Building
Analysis, Design and Estimation of Basement +G+2 Residential BuildingIRJET Journal
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingDavid H Moloney
 
WATER RESOURCES ENGINEERING MODULE 1 NOTES
WATER RESOURCES ENGINEERING MODULE 1 NOTESWATER RESOURCES ENGINEERING MODULE 1 NOTES
WATER RESOURCES ENGINEERING MODULE 1 NOTESReshmaMRaju
 
Highway construction
Highway constructionHighway construction
Highway constructionSBSSTC
 

What's hot (20)

Valuation Format
Valuation FormatValuation Format
Valuation Format
 
Dynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdfDynamics of Structures - A K Chopra - Solutions Manual.pdf
Dynamics of Structures - A K Chopra - Solutions Manual.pdf
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Quality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline constructionQuality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline construction
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
 
Section 200
Section 200Section 200
Section 200
 
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions Manual
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions ManualHydrology And Floodplain Analysis 5th Edition Bedient Solutions Manual
Hydrology And Floodplain Analysis 5th Edition Bedient Solutions Manual
 
Keyboard khmer-limon
Keyboard khmer-limonKeyboard khmer-limon
Keyboard khmer-limon
 
Ch8 retaining-walls
Ch8 retaining-wallsCh8 retaining-walls
Ch8 retaining-walls
 
137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages137153804 pip-stf05501-fixed-ladders-and-cages
137153804 pip-stf05501-fixed-ladders-and-cages
 
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...
PREPARE RATE ANALYSIS OF PAINTING WORK USING OBD , PLASTIC EMULSION OIL PAINT...
 
Design of rectangular beam by USD
Design of rectangular beam by USDDesign of rectangular beam by USD
Design of rectangular beam by USD
 
Design of high embankment official report
Design of high embankment official reportDesign of high embankment official report
Design of high embankment official report
 
Design of torsion reinforcement
 Design of torsion reinforcement Design of torsion reinforcement
Design of torsion reinforcement
 
Procedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodProcedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing method
 
Analysis, Design and Estimation of Basement +G+2 Residential Building
Analysis, Design and Estimation of Basement +G+2 Residential BuildingAnalysis, Design and Estimation of Basement +G+2 Residential Building
Analysis, Design and Estimation of Basement +G+2 Residential Building
 
7 losses in prestress
7 losses in prestress7 losses in prestress
7 losses in prestress
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 
WATER RESOURCES ENGINEERING MODULE 1 NOTES
WATER RESOURCES ENGINEERING MODULE 1 NOTESWATER RESOURCES ENGINEERING MODULE 1 NOTES
WATER RESOURCES ENGINEERING MODULE 1 NOTES
 
Highway construction
Highway constructionHighway construction
Highway construction
 

Viewers also liked

Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer methodcoolidiot07
 
MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015SURAJ CHOUDHARY
 
23262630 unit-derivation-cost-agri-infra
23262630 unit-derivation-cost-agri-infra23262630 unit-derivation-cost-agri-infra
23262630 unit-derivation-cost-agri-infraimaduddin91
 
Construction info 2015
Construction info 2015Construction info 2015
Construction info 2015Dex Bautista
 
0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)bhattbhai
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Chad Henry
 
Module 4 module 2 structural layout & details
Module 4   module 2 structural layout & detailsModule 4   module 2 structural layout & details
Module 4 module 2 structural layout & detailsGilbert Bautista
 
Module 3 module 1 architecural layout & details
Module 3   module 1 architecural layout & detailsModule 3   module 1 architecural layout & details
Module 3 module 1 architecural layout & detailsGilbert Bautista
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
Blueprint Reading- Introduction
Blueprint Reading- IntroductionBlueprint Reading- Introduction
Blueprint Reading- Introductionflrbc1avtech
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission LineSURESH GOPAL
 

Viewers also liked (17)

Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015
 
23262630 unit-derivation-cost-agri-infra
23262630 unit-derivation-cost-agri-infra23262630 unit-derivation-cost-agri-infra
23262630 unit-derivation-cost-agri-infra
 
Industrial building Structural plans.
Industrial building Structural plans.Industrial building Structural plans.
Industrial building Structural plans.
 
Presentation1 excel
Presentation1 excelPresentation1 excel
Presentation1 excel
 
Construction info 2015
Construction info 2015Construction info 2015
Construction info 2015
 
0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)0018 p 1.3 plumbing notes details and schedule(1)
0018 p 1.3 plumbing notes details and schedule(1)
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13
 
Drafting technology y3
Drafting technology y3Drafting technology y3
Drafting technology y3
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
Module 4 module 2 structural layout & details
Module 4   module 2 structural layout & detailsModule 4   module 2 structural layout & details
Module 4 module 2 structural layout & details
 
Module 3 module 1 architecural layout & details
Module 3   module 1 architecural layout & detailsModule 3   module 1 architecural layout & details
Module 3 module 1 architecural layout & details
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
Blueprint Reading- Introduction
Blueprint Reading- IntroductionBlueprint Reading- Introduction
Blueprint Reading- Introduction
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 

REHABILITATION OF SIBAGAT-ESPERANZA_ROAD

  • 1. REHABILITATION OF NRJ SIBAGAT - ESPERANZA ROAD Republic of the Philippines Provincial Government of Agusan Del Sur PHILIPPINES PROVINCIAL ROADS MANAGEMENT FACILITY Republic of the Philippines Provincial Government of Agusan Del Sur PWS - ADS -
  • 2. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 3. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 4. B KEY MAP A KEY MAP PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) SITE DEVELOPMENT PLAN AND LOCATION MAP G-02 5 B VICINITY MAP C LOCATION MAP
  • 5. SUMMARY OF QUANTITIES G-03 5 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 6. 4.0 HORIZONTAL CONTROL 5.0 VERTICAL CONTROL 14.0 CONCRETE 13.0 RIGHT-OF-WAY 12.0 PAVEMENT MARKINGS 15.0 REINFORCING STEEL CLASS 10.0 MISCELLANEOUS STRUCTURES 9.0 ROAD SIGNS 8.0 DRAINAGE STRUCTURE 3.0 STATIONING 2.0 DIMENSIONS 1.0 SPECIFICATIONS 17.0 OTHERS NOTES : STRENGTH 28 DAYS CYLINDER MPa PSi AGGREGATE mm (in) OF COARSE MAX.SIZE MINIMUM CLEAR COVER, mm(in) ( ROADS, DRAINAGE AND STRUCTURES ) 16.0 TREE PLANTING 11.0 REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION 7.0 ROAD CONNECTIONS 6.0 ELEVATIONS AND GRADES STATION NORTHING EASTING ELL. HEIGHT (ROADS, DRAINAGE AND STRUCTURE) PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 7. ABBREVIATION AND SYMBOLS EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES LEGEND LEGENDS, ABBREVIATIONS, AND SYMBOLS PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 8. STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS STATION LIMITS TYPICAL ROAD SECTION ON FILL NOT DRAWN TO SCALE 1 TYPICAL ROAD SECTION ON CUT NOT DRAWN TO SCALE 2 TYPICAL ROAD SECTION(SUPERELEVATED) NOT DRAWN TO SCALE 3 MASONRY RETAINING WALL BOTHSIDES NOT DRAWN TO SCALE 4 TYPICAL ROAD SECTION WITH TYPICAL ROAD SECTIONS R-01 27 GROUTED RIPRAP (CLASS A) RIGHT SIDE ONLY NOT DRAWN TO SCALE 6 TYPICAL ROAD SECTION WITH STANDARD GROUTED RIPRAP DITCH BOTHSIDES NOT DRAWN TO SCALE 9 TYPICAL ROAD SECTION WITH RECTANGULAR WITH TRIANGULAR EARTH DITCH PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) STANDARD GROUTED RIPRAP(CLASS B) NOT DRAWN TO SCALE 8 TYPICAL ROAD SECTION WITH MASONRY RETAINING WALL (LEFT SIDE) NOT DRAWN TO SCALE 5 TYPICAL ROAD SECTION WITH GROUTED RIPRAP (CLASS A) LEFT SIDE ONLY NOT DRAWN TO SCALE 7 TYPICAL ROAD SECTION WITH STANDARD GROUTED RIPRAP DITCH (RIGHT SIDE) NOT DRAWN TO SCALE 10 TYPICAL ROAD SECTION WITH RECTANGULAR GROUTED RIPRAP DITCH (LEFT SIDE) NOT DRAWN TO SCALE 11 TYPICAL ROAD SECTION WITH RECTANGULAR RIPRAP DITCH AND GROUTED RIPRAP (CLASS A) NOT DRAWN TO SCALE 12 TYPICAL ROAD SECTION WITH RECTANGULAR GROUTED NOT DRAWN TO SCALE 13 TYPICAL ROAD SECTION ON CUT ONLY
  • 9. SCHEDULE OF RC GUARDRAILS TOTAL 727.71 215.00 48.00 SCHEDULE OF RIPRAP SLOPE PROTECTION TOTAL 120.00 130.00 SCHEDULE OF MASONRY RETAINING WALL TOTAL 61.00 20.00 SCHEDULE OF DUMPED STONE TOTAL - 3.00 SCHEDULE OF GUARDRAILS AND SLOPE PROTECTION R-02 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 10. PLAN AND PROFILE STA. 0+000 - 0+700 R-03 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 11. PLAN AND PROFILE STA. 0+700 - 1+400 R-04 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 12. PLAN AND PROFILE STA. 1+400 - 2+100 R-05 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 13. PLAN AND PROFILE STA. 2+100 - 2+800 R-06 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 14. PLAN AND PROFILE STA. 2+800 - 3+600 R-07 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 15. PLAN AND PROFILE STA. 3+600 - 4+000 R-08 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 16. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 0+020 - 0+160 R-09 27
  • 17. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 0+180 - 0+380 R-10 27
  • 18. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 0+400 - 0+540 R-11 27
  • 19. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 0+560 - 0+760 R-12 27
  • 20. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 0+780 - 1+000 R-13 27
  • 21. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 1+020 - 1+280 R-14 27
  • 22. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 1+300 - 1+520 R-15 27
  • 23. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 1+540 - 1+760 R-16 27
  • 24. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 1+780 - 1+940 R-17 27
  • 25. CROSS SECTION STA. 1+960 - 2+160 R-18 27 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 26. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 2+180 - 2+340 R-19 27
  • 27. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 2+360 - 2+620 R-20 27
  • 28. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 2+640 - 2+820 R-21 27
  • 29. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 2+840 - 3+080 R-22 27
  • 30. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 3+100 - 3+280 R-23 27
  • 31. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 3+300 - 3+520 R-24 27
  • 32. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 3+540 - 3+740 R-25 27
  • 33. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 3+760 - 3+900 R-26 27
  • 34. PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF) CROSS SECTION STA. 3+920 - 4+000 R-27 27
  • 35. GEOMETRIC DESIGN STANDARD (HORIZONTAL AND VERTICAL) RS-01 6 1 HORIZONTAL CURVE (CIRCULAR) 2 SYMMETRICAL VERTICAL PARABOLIC CURVE 3 UNSYMMETRICAL VERTICAL PARABOLIC CURVE PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 36. 1 SUPERELEVATION GEOMETRIC DESIGN STANDARD (SUPERELEVATION) RS-02 6 1a TRANSITION : STRAIGHT-CIRCULAR CURVE CASE 1 1b TRANSITION : CIRCULAR CURVE-STRAIGHT-CIRCULAR CURVE CASE 2 1c TRANSITION : CIRCULAR CURVE-MINIMUM STRAIGHT-CIRCULAR CURVE CASE 3 1d TRANSITION : CIRCULAR CURVE-CIRCULAR CURVE CASE 4 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 37. REGULATORY SIGNS 5T WARNING AND REGULATORY SCHEDULE STANDARD WARNING AND REGULATORY SIGNS AND SCHEDULE RS-03 6 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 38. 1 STANDARD FLEX-BEAM GUARDRAIL STANDARD FLEX-BEAM GUARDRAIL RS-04 6 1a PLAN 1b ELEVATION 1c SECTION 1d ELEVATION OF POST 1e FLEX BEAM DETAIL 1f SECTION OF POST 1g FLEX-BEAM END DETAIL 1i GUARDRAILS ALONG BOX CULVERT & BRIDGE APPROACHES1h BEAM TYPE GUARDRAIL ON RETAINING WALL PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 39. 1a INSTALLATION DETAIL (TYPE II) 1c DETAIL OF STEEL CLAMP 1b PLAN (STEEL CLAMP MOUNTING) INFORMATORY SIGNS/MOUNTING DETAILS RS-05 6 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 40. a. WITHOUT BENCHING (H<4.0m) b. WITH BENCHING (H>4.0m) a. WITHOUT BENCHING (H<4.0m) b. WITH BENCHING (H>4.0m) TABLE BULDGE AND PAYMENTS WORKING LINES FOR SECTION SHOWING TABLE 1 GROUTED RIPRAP SLOPE PROTECTION 3 GABIONS/MATTRESS 1b CLASS "B" S E C T I O N 1a CLASS "A" S E C T I O N 2 DETAILS OF WEEPHOLES STANDARD GROUTED RIPRAP, WEEPHOLES DETAILS, STONE MASONRY RETAINING WALL AND GABIONS / MATTRESS RS-06 6 4 MASONRY RETAINING WALL PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 41. TYPES OF PROTECTION WORKS AT CULVERT OUTLET SCALE AS SHOWN TYPES OF PROTECTION WORKS DS-01 7 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 42. S ISOMETRIC FLARED TYPE HEADWALL (SINGLE PIPE) TABLE C ( ONE L-TYPE HEADWALL) DIMENSIONS DS-05 3A N T (mm) SCALE DIA. & THICKNESS DS-05 1 DS-05 1A AS (mm) P L A N N T S TO SCALEDS-05 NOT 1B ELEVATION SINGLE PIPE STRAIGHT TYPE HEADWALL STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC TABLE A ( ONE FLARED TYPE HEADWALL 1.5:1 ) TABLE C ( ONE STRAIGHT TYPE HEADWALL ) DS-053B L-TYPE HEADWALL NOTDS-05 3 AS DS-05 SCALENOT TO SHOWN S E C T I O N3B SINGLE PIPE DS-05 NOT 4A DS-05SCALETO DS-05 4 NOT 4B FLARED TYPE HEADWALL (DOUBLE PIPE) SCALESHOWN DS-05 SINGLE PIPE 2 P L A N DS-05 N 2A AS ST DS-052E DS-05 TO SCALENOT ELEVATION2B DIAMETER & THICKNESS SHOWN (mm) DIMENSIONS (mm) NOT S E C T I O N DIAMETER & THICKNESS (mm) DS-05 2C (mm) DIMENSIONS TO SCALE SCALETONOT AS SHOWN S E C T I O N DS-05 SCALETONOT 4C DOUBLE PIPE TO S E C T I O N DOUBLE PIPE SCALE WINGWALL SECTION DOUBLE PIPE NOT SINGLE PIPE DS-05 2D TO 2E DS-05 NOT SCALE DS-05 2C DS-05 2E STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC DS-02PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 43. REINFORCED CONCRETE PIPE CULVERT DETAILS AND TABLE DS-03 7 6 TYPICAL BEDDING FOR PROJECTING CONDUITS 7 CONNECTION DETAILS OF RCP EXTENSION 5 CLASSIFICATION OF TYPICAL DRAINAGE ONE LINE OF CIRCULAR 4 REINFORCEMENT (SECTION) ONE LINE OF ELLIPTICAL 3 REINFORCEMENT (SECTION) TWO LINES OF CIRCULAR 2 REINFORCEMENT (SECTION) 1b TWO LINES OF CIRCULAR REINFORCEMENT 5 CLASSIFICATION OF TYPICAL DRAINAGE ONE LINE OF CIRCULAR OR 1a ELLIPTICAL REINFORCEMENT 6b EXCAVATION FOR PIPE 6a METHODS OF PIPE INSTALLATION 6c CONCRETE CRADLE BEDDING 6d FIRST CLASS BEDDING 6e ORDINARY BEDDING 7a P L A N 7a S E C T I O N PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 44. SLO PE1/1 SLO PE1/1 GROUTED RIPRAP HEADWALL WINGWALL FOR NORMAL INSTALLATION (Gr-HW) DS-04 7 HEADWALL FOR SINGLE BARREL 1 PIPE CULVERTS TYPE A1 (SQUARE) 1a SECTION 1c SECTION 1b SECTION PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 45. REINFORCED CONCRETE BOX CULVERT SINGLE BARREL DETAILS DS-05 7 2 BAR BENDING DIAGRAM - SINGLE BARREL1 SECTION-SINGLE BARREL PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 46. 1 GENERAL PLANS AND DETAILS REINFORCED CONCRETE BOX CULVERT SLAB DETAILS DS-06 7 1e 1c DETAIL 1b PART SECTION ALONG L OF CULVERT 1a TYPICAL ROAD CROSS SECTION 1f 1d DETAIL 1g PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 47. REINFORCED CONCRETE BOX CULVERT WINGWALL DETAIL DS-07 7 2 WINGWALL ELEVATION 1 WINGWALL PLAN 3 SECTION 4 RCBC WINGWALL DETAILS PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 48. DRAINAGE AND DITCH SCHEDULE DC-01 4 RECTANGULAR GROUTED RIPRAP DITCH(TYPE A) CASE 1 RECTANGULAR GROUTED RIPRAP DITCH(TYPE A) CASE 2 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 49. DRAINAGE CROSS SECTIONS DC-02 4 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 50. DRAINAGE CROSS SECTIONS DC-03 4 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)
  • 51. DRAINAGE CROSS SECTIONS DC-04 4 PROVINCIAL GOVERNMENT OF AGUSAN DEL SUR REHABILITATION OF NRJ - SIBAGAT - ESPERANZA ROAD PROVINCIAL ROAD MANAGEMENT FACILITY (PRMF)