Activity Based Costing
Acct 310
Professor Rick S. Hayes, Ph.D., CPA
MicroMash CPE Course Example
• Make sure that costing done correctly, reduce
costs
• Direct labor and materials costs [prime costs]–
easy to trace to product
• Manufacturing overhead is indirect cost – hard
to trace, control – estimate, calculate cost per
unit
Traditional Unit Based Cost (UBC)
Accounting
• Standard costing is about assigning overhead costs
based upon one predetermined rate based on
volume
• Easier, less accurate; Works best with one
product;
• Could be misleading
• Standard costing – steps
1. Accumulate total overhead costs
2. Identify activity and total amount of activity that
best applies overhead costs to the product (base),
e.g. labor hours
3. Calculate application base rate
(total overhead/ total amount of the activity)
$20,000 total oh/ 1,000 labor hrs = $20 base rate
per hour worked
4. Apply overhead rate - Multiply base rate by total
base activity used for each product. A product
that takes 2 hours at $20 base rate would be
allocated $40 of overhead (2 x $20)
Standard Costing Method
Total manufacturing overhead $10,000,000
Direct labor hours 500,000
10,000,000/50,000 = $20/labor hour application base
rate
$20 * 2 hours per product to mfg. = $40 overhead cost
per unit
Product A = manufacturing overhead cost per unit- $40
Product B = manufacturing overhead cost per unit- $40
Product A = total manufacturing cost /unit - $150
Product B = total manufacturing cost/unit - $110
Standard Costing Method
A B
Direct Materials $90 $50
Direct Labor @ $10/hr $20 $20
Manufacturing OH $40 $40
Total per unit cost $150 $110
Standards costing example total
cost per unit
The organization is viewed as a pool of activities. Many of these
activities will cut across deparments with departments often
participating in many different activities
ABC costing – steps
1.Re-categorize overhead costs into activity pools
2.Calculate total costs and total physical base for each
activity
3.Calculate application base rate for each category (total
overhead/ total physical base)
4.Calculate proportion of physical base for each category
5.Multiply rate by base for each product
6.Calculate total overhead cost for each product
7.Divide total cost for each product by total products
manufactured = overhead cost per unit
8.Add overhead cost per unit to direct labor cost per unit
and direct material cost per unit = total cost per unit
Activity Based Costing
• Two stage allocation process
– Assign costs to pools, then assign to products using cost
drivers
• I.e. Sell 50,000 units – Product A, 200,000 units –
Product B = 250,000 units total
– Both require two direct labor hours to complete =
500,000 direct labor-hours
– Total manufacturing overhead = $10,000,000
ABC Costing
Table 1 Expected activity
Activity Center and Costs Costs Total Product A Product B
Labor related (labor hours) $800,000 500,000 100,000 400,000
Machine related (machine hours) $2,100,000 1,000,000 300,000 700,000
Machine setups (# of setups) $1,600,000 4,000 3,000 1,000
Production orders (# orders) $450,000 1,200 400 800
Material receipts (# of receipts) $1,000,000 5,000 1,800 3,200
Parts administration ( part types) $350,000 700 400 300
Product testing (# of tests) $1,700,000 20,000 16,000 4,000
General overhead (machine
hours) $2,000,000 1,000,000 300,000 700,000
Total $10,000,000
Table 2 Estimated
Total
Expected Overhead
Overhead
Costs Activity Rate
Labor related $800,000 500,000 $1.60
Machine related $2,100,000 1,000,000 $2.10
Machine setups $1,600,000 4,000 $400.00
Production orders $450,000 1,200 $375.00
Material receipts $1,000,000 5,000 $200.00
Parts administration $350,000 700 $500.00
Product testing $1,700,000 20,000 $85.00
General Factory $2,000,000 1,000,000 $2.00
Table 3 Product A Product B
Labor related Rate * activity $160,000 $640,000
Machine related $630,000 $1,470,000
Machine setups $1,200,000 $400,000
Production orders $150,000 $300,000
Material receipts $360,000 $640,000
Parts administration $200,000 $150,000
Product testing $1,360,000 $340,000
General Factory $600,000 $1,400,000
Total $4,660,000 $5,340,000
Units produced 50,000 200,000
Overhead per unit $93.20 $26.70
Product A - manufacturing overhead costs = $93.20
Product B - manufacturing overhead costs = $26.70
A B
Direct Materials $90 $50
Direct Labor @ $10/hr $20 $20
Manufacturing OH $93.20 $26.70
Total per unit cost $203.20 $96.70
QUESTIONS?
ABC Hierarchical Production Model
Facility Support Activities not ABC
Activity based costing approach

More Related Content

What's hot

Activity based costing
Activity based costingActivity based costing
Activity based costingsachdevkkapil
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing SystemAmar Keshari
 
ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)Sonu Bhai
 
Topic 7a activity based costing sem 2 1516
Topic 7a activity based costing sem 2 1516Topic 7a activity based costing sem 2 1516
Topic 7a activity based costing sem 2 1516Omar Ghiassi
 
Activity based costing
Activity based costingActivity based costing
Activity based costingKartik Bansal
 
Activity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationActivity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationRahul Dhiman
 
Costconcepts costclassificationandestimation
Costconcepts costclassificationandestimationCostconcepts costclassificationandestimation
Costconcepts costclassificationandestimationAira Nhaire Mecate
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costingRakesh Singh
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based CostingVikas Gupta
 

What's hot (18)

Traditional & Abc
Traditional & AbcTraditional & Abc
Traditional & Abc
 
ABC ANALYSIS
ABC ANALYSISABC ANALYSIS
ABC ANALYSIS
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
ABC costing
ABC costing ABC costing
ABC costing
 
Abc costing
Abc costingAbc costing
Abc costing
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Abc costig
Abc costigAbc costig
Abc costig
 
Activity based costing salah skaik
Activity based costing   salah skaikActivity based costing   salah skaik
Activity based costing salah skaik
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)
 
Topic 7a activity based costing sem 2 1516
Topic 7a activity based costing sem 2 1516Topic 7a activity based costing sem 2 1516
Topic 7a activity based costing sem 2 1516
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity-Based Costing System
Activity-Based Costing SystemActivity-Based Costing System
Activity-Based Costing System
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationActivity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim Corporation
 
Costconcepts costclassificationandestimation
Costconcepts costclassificationandestimationCostconcepts costclassificationandestimation
Costconcepts costclassificationandestimation
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costing
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 

Viewers also liked

Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.com
Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.comActivity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.com
Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.comPoweredTemplate.com
 
Activity Based Costing Arrow Diagram for PowerPoint
Activity Based Costing Arrow Diagram for PowerPointActivity Based Costing Arrow Diagram for PowerPoint
Activity Based Costing Arrow Diagram for PowerPointPoweredTemplate.com
 
Time Driven Activity Based Costing Tdabc Cost And Profitability October 2012
Time Driven Activity Based Costing   Tdabc   Cost And Profitability October 2012Time Driven Activity Based Costing   Tdabc   Cost And Profitability October 2012
Time Driven Activity Based Costing Tdabc Cost And Profitability October 2012Miguel Guimaraes
 
Activity based costing
Activity based costingActivity based costing
Activity based costingJessy Chong
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based CostingDavid Tracy
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTINGAKSHIT JAIN
 
Informàtica 4t exercici
Informàtica 4t exerciciInformàtica 4t exercici
Informàtica 4t exerciciJaume Vidal
 
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...Fajar Purnama
 
Goal-Setting, AAPT Facilitators Workshop
Goal-Setting, AAPT Facilitators WorkshopGoal-Setting, AAPT Facilitators Workshop
Goal-Setting, AAPT Facilitators WorkshopChristina Hendricks
 

Viewers also liked (14)

Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.com
Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.comActivity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.com
Activity Based Costing Donut Diagram for PowerPoint by PoweredTemplate.com
 
Activity Based Costing Arrow Diagram for PowerPoint
Activity Based Costing Arrow Diagram for PowerPointActivity Based Costing Arrow Diagram for PowerPoint
Activity Based Costing Arrow Diagram for PowerPoint
 
ABC for Telecom (Telecom Research Project of HKU, Feb 2002)
ABC for Telecom (Telecom Research Project of HKU, Feb 2002)ABC for Telecom (Telecom Research Project of HKU, Feb 2002)
ABC for Telecom (Telecom Research Project of HKU, Feb 2002)
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Time Driven Activity Based Costing Tdabc Cost And Profitability October 2012
Time Driven Activity Based Costing   Tdabc   Cost And Profitability October 2012Time Driven Activity Based Costing   Tdabc   Cost And Profitability October 2012
Time Driven Activity Based Costing Tdabc Cost And Profitability October 2012
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTING
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Informàtica 4t exercici
Informàtica 4t exerciciInformàtica 4t exercici
Informàtica 4t exercici
 
April Wiki Work
April Wiki WorkApril Wiki Work
April Wiki Work
 
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...
Rdiff and Rsync Implementation on Moodle's Backup and Restore Feature of Cour...
 
מצע מקוצר
מצע מקוצרמצע מקוצר
מצע מקוצר
 
Goal-Setting, AAPT Facilitators Workshop
Goal-Setting, AAPT Facilitators WorkshopGoal-Setting, AAPT Facilitators Workshop
Goal-Setting, AAPT Facilitators Workshop
 

Similar to Activity based costing approach

| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...Ahmad Hassan
 
Ch 4 Activity Based Costing.ppt
Ch  4 Activity Based Costing.pptCh  4 Activity Based Costing.ppt
Ch 4 Activity Based Costing.pptaanyavyas
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx1986anu
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costingJoseph Mary
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxbobbywlane695641
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designBeaDelaPenia1
 
Process Costing
Process CostingProcess Costing
Process Costingnarman1402
 
Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)Mvs Krishna
 
Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingYesica Adicondro
 
Activity Based Costing.ppt
Activity Based Costing.pptActivity Based Costing.ppt
Activity Based Costing.pptTheresaRuthDiano
 
ch5- Activity-Based Costing Systems.ppt
ch5- Activity-Based Costing Systems.pptch5- Activity-Based Costing Systems.ppt
ch5- Activity-Based Costing Systems.pptRagnaNexgen
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxObsaKamil
 
CA Ch.18-Process Costing-part 1-Nureni.pdf
CA Ch.18-Process Costing-part 1-Nureni.pdfCA Ch.18-Process Costing-part 1-Nureni.pdf
CA Ch.18-Process Costing-part 1-Nureni.pdfsandiibrahim3
 
Garrison18e_PPTch02A_ppt_Accessible.pptx
Garrison18e_PPTch02A_ppt_Accessible.pptxGarrison18e_PPTch02A_ppt_Accessible.pptx
Garrison18e_PPTch02A_ppt_Accessible.pptxhdbajhsdbasjh
 
A presentation on Activity Based Costing.pptx
A presentation on  Activity Based Costing.pptxA presentation on  Activity Based Costing.pptx
A presentation on Activity Based Costing.pptxSimmiAgrawal8
 

Similar to Activity based costing approach (20)

| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
 
Overhead-Costing
Overhead-Costing Overhead-Costing
Overhead-Costing
 
Ch04 m 06_09_10
Ch04 m 06_09_10Ch04 m 06_09_10
Ch04 m 06_09_10
 
Ch 4 Activity Based Costing.ppt
Ch  4 Activity Based Costing.pptCh  4 Activity Based Costing.ppt
Ch 4 Activity Based Costing.ppt
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costing
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docx
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service design
 
Product costing
Product costingProduct costing
Product costing
 
Process Costing
Process CostingProcess Costing
Process Costing
 
Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)
 
Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product Costing
 
Activity Based Costing.ppt
Activity Based Costing.pptActivity Based Costing.ppt
Activity Based Costing.ppt
 
ch5- Activity-Based Costing Systems.ppt
ch5- Activity-Based Costing Systems.pptch5- Activity-Based Costing Systems.ppt
ch5- Activity-Based Costing Systems.ppt
 
Absorption costing
Absorption costingAbsorption costing
Absorption costing
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 
CA Ch.18-Process Costing-part 1-Nureni.pdf
CA Ch.18-Process Costing-part 1-Nureni.pdfCA Ch.18-Process Costing-part 1-Nureni.pdf
CA Ch.18-Process Costing-part 1-Nureni.pdf
 
Process Costing
Process CostingProcess Costing
Process Costing
 
Garrison18e_PPTch02A_ppt_Accessible.pptx
Garrison18e_PPTch02A_ppt_Accessible.pptxGarrison18e_PPTch02A_ppt_Accessible.pptx
Garrison18e_PPTch02A_ppt_Accessible.pptx
 
A presentation on Activity Based Costing.pptx
A presentation on  Activity Based Costing.pptxA presentation on  Activity Based Costing.pptx
A presentation on Activity Based Costing.pptx
 

Recently uploaded

Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
New dynamic economic model with a digital footprint | European Business Review
New dynamic economic model with a digital footprint | European Business ReviewNew dynamic economic model with a digital footprint | European Business Review
New dynamic economic model with a digital footprint | European Business ReviewAntonis Zairis
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...Suhani Kapoor
 
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfvikashdidwania1
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 

Recently uploaded (20)

Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
New dynamic economic model with a digital footprint | European Business Review
New dynamic economic model with a digital footprint | European Business ReviewNew dynamic economic model with a digital footprint | European Business Review
New dynamic economic model with a digital footprint | European Business Review
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
 
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service
(TANVI) Call Girls Nanded City ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 

Activity based costing approach

  • 1. Activity Based Costing Acct 310 Professor Rick S. Hayes, Ph.D., CPA
  • 3.
  • 4. • Make sure that costing done correctly, reduce costs • Direct labor and materials costs [prime costs]– easy to trace to product • Manufacturing overhead is indirect cost – hard to trace, control – estimate, calculate cost per unit
  • 5.
  • 6. Traditional Unit Based Cost (UBC) Accounting
  • 7. • Standard costing is about assigning overhead costs based upon one predetermined rate based on volume • Easier, less accurate; Works best with one product; • Could be misleading
  • 8.
  • 9.
  • 10. • Standard costing – steps 1. Accumulate total overhead costs 2. Identify activity and total amount of activity that best applies overhead costs to the product (base), e.g. labor hours 3. Calculate application base rate (total overhead/ total amount of the activity) $20,000 total oh/ 1,000 labor hrs = $20 base rate per hour worked 4. Apply overhead rate - Multiply base rate by total base activity used for each product. A product that takes 2 hours at $20 base rate would be allocated $40 of overhead (2 x $20)
  • 11. Standard Costing Method Total manufacturing overhead $10,000,000 Direct labor hours 500,000 10,000,000/50,000 = $20/labor hour application base rate $20 * 2 hours per product to mfg. = $40 overhead cost per unit Product A = manufacturing overhead cost per unit- $40 Product B = manufacturing overhead cost per unit- $40 Product A = total manufacturing cost /unit - $150 Product B = total manufacturing cost/unit - $110
  • 12. Standard Costing Method A B Direct Materials $90 $50 Direct Labor @ $10/hr $20 $20 Manufacturing OH $40 $40 Total per unit cost $150 $110 Standards costing example total cost per unit
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. The organization is viewed as a pool of activities. Many of these activities will cut across deparments with departments often participating in many different activities
  • 20. ABC costing – steps 1.Re-categorize overhead costs into activity pools 2.Calculate total costs and total physical base for each activity 3.Calculate application base rate for each category (total overhead/ total physical base) 4.Calculate proportion of physical base for each category 5.Multiply rate by base for each product 6.Calculate total overhead cost for each product 7.Divide total cost for each product by total products manufactured = overhead cost per unit 8.Add overhead cost per unit to direct labor cost per unit and direct material cost per unit = total cost per unit
  • 21. Activity Based Costing • Two stage allocation process – Assign costs to pools, then assign to products using cost drivers • I.e. Sell 50,000 units – Product A, 200,000 units – Product B = 250,000 units total – Both require two direct labor hours to complete = 500,000 direct labor-hours – Total manufacturing overhead = $10,000,000
  • 22. ABC Costing Table 1 Expected activity Activity Center and Costs Costs Total Product A Product B Labor related (labor hours) $800,000 500,000 100,000 400,000 Machine related (machine hours) $2,100,000 1,000,000 300,000 700,000 Machine setups (# of setups) $1,600,000 4,000 3,000 1,000 Production orders (# orders) $450,000 1,200 400 800 Material receipts (# of receipts) $1,000,000 5,000 1,800 3,200 Parts administration ( part types) $350,000 700 400 300 Product testing (# of tests) $1,700,000 20,000 16,000 4,000 General overhead (machine hours) $2,000,000 1,000,000 300,000 700,000 Total $10,000,000
  • 23. Table 2 Estimated Total Expected Overhead Overhead Costs Activity Rate Labor related $800,000 500,000 $1.60 Machine related $2,100,000 1,000,000 $2.10 Machine setups $1,600,000 4,000 $400.00 Production orders $450,000 1,200 $375.00 Material receipts $1,000,000 5,000 $200.00 Parts administration $350,000 700 $500.00 Product testing $1,700,000 20,000 $85.00 General Factory $2,000,000 1,000,000 $2.00
  • 24. Table 3 Product A Product B Labor related Rate * activity $160,000 $640,000 Machine related $630,000 $1,470,000 Machine setups $1,200,000 $400,000 Production orders $150,000 $300,000 Material receipts $360,000 $640,000 Parts administration $200,000 $150,000 Product testing $1,360,000 $340,000 General Factory $600,000 $1,400,000 Total $4,660,000 $5,340,000 Units produced 50,000 200,000 Overhead per unit $93.20 $26.70 Product A - manufacturing overhead costs = $93.20 Product B - manufacturing overhead costs = $26.70
  • 25. A B Direct Materials $90 $50 Direct Labor @ $10/hr $20 $20 Manufacturing OH $93.20 $26.70 Total per unit cost $203.20 $96.70
  • 26.
  • 27.
  • 29.
  • 30.

Editor's Notes

  1. Revised 12 Oct 2011