1
Design For Manufacturing/Assembly (DFM, DFA, DFMA)
Much of the early and significant work on DFM and DFA was done in the early 1970s by
Boothroyd and Dewhurst. Traditionally, product development was essentially done in
several stages. The designer(s) (who usually had very good knowledge of materials,
mechanisms, etc.) would design the product, and sometimes would construct working
prototypes. Once the prototype was tested and approved, the manufacturing team would
then construct manufacturing plans for the product, including the tooling etc. Often,
different materials (e.g. different thickness or type of sheet metal), and different
components (e.g. different sized screws etc), would be substituted by the manufacturing
team. Their goal was to achieve the same functionality, but make mass production more
efficient. However, the majority of the design remained unchanged, since the
manufacturing engineers could never be sure whether a change would affect some
functional requirement.
Two things changed in the 1970’s:
(i) Many new types of plastics were developed, and injection moulding technology
became widely available, resulting in the possibility of low cost plastic
components. An advantage of these new plastic materials was that they provided
different material behaviour (e.g. many cycles of large elastic deformations
without failure – a property useful in making snap-fit mating components). Thus
pats that had to be made form metal and screwed together could just be made out
of plastic and snap fitted. This reduced assembly time, assembly components, and
production costs.
(ii) Several companies were trying to bring their products to the market faster. One
problem with the earlier method of doing things was that each time there was a
design change made by the manufacturing engineer, product development was
held up, waiting for the engineering change notice (ECN) to be approved by the
designer. Often, this process introduced delays because the design engineer
would be busy with other tasks, or unavailable. To avoid this, the concept of
concurrent engineering (CE) became popular. The idea here was that a
combined team of engineers and management would be assigned to each new
product. This team may consist of mechanical designers, electrical engineers,
software engineers, production engineers, marketing and sales, and management.
Thus, as the design was being generated by the designers, the production people
would give feedback about feasibility to manufacture, more economical
alternatives etc. At the same time, sales people would negotiate of product
outlook and features, and so on. The biggest advantage of CE was that the
2
product was designed in a way that manufacturing cost and time would be low
during production.
At this time, working with many different companies, Boothroyd’s team analysed existing
designs of hundreds of products, and suggested design improvements based on
manufacturing and assembly ease. Using the experience of these projects, they then
developed a very large set of guidelines on how to estimate whether a design was
designed well (from a manufacturing point of view), and potential methods to improve
the designs.
In subsequent years, the idea of DFM and DFA were extended to include other aspects of
better designs – including design for maintenance, design for environment, design for
cost, etc. Often, this application of CE is referred to as DFX, where X is a variable
selected from the set {manufacture, assembly, …}. We shall restrict our study of
manufacturing decisions to those related to fabrication and assembly.
Manufacturing
Fabrication Operations Assembly Operations
Material Geometry Tolerance
Figure 1. Effects of design (materials, geometry, tolerances) on manufacturing
Effects of Tolerance on Fabrication
Tight tolerances will require
More care to be taken during machining Î larger processing time
Higher reject rates
More expensive measurement/inspection systems
Restricted set of machine tools ( so ... ?)
Effects of Geometry on Fabrication
Different geometry (due to different design of product/part) will mean:
Different process plans
Different raw material costs (why ?)
Different processing costs
3
Example:
[source: Boothroyd 91]
Figure 2. Different components have different production costs
Effect of Material on Fabrication
Different materials of designed part implies:
Different process plans
Different fabrication processes
Examples ?
Effects of Geometry, Material, Tolerance effects on Assembly
Boothroyd et. al studied many of these to compose a systematic methodology. The
emphasis was to relate Product design, Assembly operations, and Assembly Method to
the single decision factor: the cost. We shall study the Boothroyd method in detail. Note
that there are other systems based on very similar principals: The Hitachi Assembly
Evaluation Method, developed at Hitachi in Japan, used very similar ideas.
Basic idea: reduction of cost of a product through simplification of its design.
How ?
- Reduction of number of components
- Ensuring that parts are easy to assemble
- Increasing the use of standardized parts across entire product range
- Designing with widest possible tolerances
- Material selection must consider manufacturing also, not just function.
4
Why do these ideas work ?
Fewer components in a design imply:
Manual assembly:
Fewer assembly operations Æ fewer assembly workers
Automated assembly:
Reduction of one entire section of Assembly station
Fewer fixtures/jigs, feeders, etc.
Also, fewer parts usually mean smaller stacked tolerances, and therefore lead to better
functioning of the assemblies, and fewer rejects (why ?)
The Boothroyd-Dewhurst method includes:
Preliminary (rough) design
Selection of Assembly Method (manual, robotic, or high-speed automated)
Design/Redesign of product for selected method
The selection of assembly method must be done at an early stage in the product design
process (why?). One factor that affects this decision is the production volume (that is,
forecast demand).
Low volume (< 1000 parts per year) => manual assembly
High volume (> million parts per year) => high-speed automated assembly
Somewhere in between these limits, and based on some other considerations (labour
costs, technical requirements, e.g. in spray painting) robotic assembly may be optimal.
Typical hardware involved in each method, and its characteristics are listed below.
Manual Assembly:
Benches or simple conveyors
Assembly station has bins with un-oriented parts
Simple jigs and fixtures with manual clamping
Simple, light tools (manual/pneumatic/electric screwdrivers, solder irons etc.)
Inexpensive setup costs
Assembly costs are nearly constant, and independent of volume (why ?)
5
High-speed (Special Purpose) Transfer Assembly:
Machines are built to produce specific product.
Components:
Part feeders [indexed/asynchronous]
Single purpose workheads
Transfer devices (usually equipped with workheads)
Very expensive and time-consuming to build
Very high production rate
Down time due to defective parts may be a severe problem
[Example: defective part-mix in a bowl-feeder]
Implication: incoming QC must be stringent
Inflexible: changing hard-automation system requires fabrication of new
jigs/fixtures/machines and may take a long time and cost a lot.
Robotic Assembly
Similar to non-synchronous special purpose assembly stations, except robots replace the
single-purpose workheads.
Use of robots allows flexibility in product types and production rates.
Figure 3. Common assembly automation devices [source Boothroyd 91]
6
Design for Manual Assembly
The Boothroyd Dewhurst method provides a quantitative measure called the design
efficiency based on analysis of a product. The efficiency compares the total assembly
time for a product with the total assembly time for an ideal product (determined by a
method suggested by the authors). The efficiency can be used to compare various designs
in terms of their relative efficiencies (for manual assembly).
The design improvement is brought about by two considerations:
1. A decision is made as to whether the part can be considered a candidate for
elimination, or combination with other parts of the assembly
2. An estimation of the time taken to grasp, manipulate, and insert the part.
The procedure:
STEP 1. Obtain design details
Engineering drawings, or Exploded 3-D views, or Existing product, or Prototype
STEP 2.. Take assembly apart (or imagine doing so) -- assigning identification to each
part as it is removed.
Consider sub-assemblies as parts, and analyse them separately (recursively).
STEP 3. Begin re-assembly of the product. Start with the part with the highest
identification number, going all the way up to the part 1.
Fill up the assembly worksheet as you go along.
[note: the method requires that the product is assembled one part at a time. In reality,
assembly workers use both hands and often assemble two parts in a step. However, a
change in the assembly procedure will correspondingly change the assembly time for the
ideal product -- thereby keeping the efficiency constant.]
STEP 4. Compute the design efficiency, given as:
EM = 3 x NM / TM
7
We go through an example to see how the method works.
Figure 4. A piston-assembly design [source Boothroyd 91]
The computation is done by systematically completing the data in the following table.
The data requires several estimates for assembly efficiency of different components based
on their characteristics. This data is compiled empirically – by a large number of time-
motion studies conducted over may years. We will use the charts from Boothroyd
(handouts given in class).
8
c1 c2 c3 c4 c5 c6 c7 c8 c9
Part
ID
No
of
times
the
operation
is
carried
out
consecutively
Manual
handling
code
Manual
handling
time
per
part
Manual
insertion
code
manual
insertion
time
per
part
Operation
time
c2(
c4
+
c6)
Operation
cost
0.4
c7
Estimation
for
theoretical
minimum
parts
Name of
Assembly
Total:
TM CM NM
Design efficiency =
3 NM/TM =
Table 1. Table for computation of Design efficiency (Source: Boothroyd 91).
One of the key features of the Boothroyd-Dewhurst method is estimation of the ideal
product -- which translates to the method of filling up column 9 in the chart. They give
the following guidelines:
Rule 1. During operation of the product, does the part move relative to all other parts
already assembled?
Rule 2. Must the part be of a different material than the parts already assembled? [Only
fundamental reasons associated with material properties are acceptable.]
Rule 3. Must the part be separate from all parts already assembled (because otherwise
necessary assembly/disassembly of other parts would be impossible)?
If the answer to any of these questions is YES, a 1 is entered in column 9 (except if there
are multiple parts in column 2, in which case the minimum number of separate parts
required is entered in column 9.)
9
c1 c2 c3 c4 c5 c6 c7 c8 c9
Part
ID
No
of
times
the
operation
is
carried
out
consecutively
Manual
handling
code
Manual
handling
time
per
part
Manual
insertion
code
manual
insertion
time
per
part
Operation
time
c2(
c4
+
c6)
Operation
cost
0.4
c7
Estimation
for
theoretical
minimum
parts
Name of
Assembly
PNEUMATIC
PISTON
6 1 30 1.95 00 1.5 3.45 1.38 1 MAIN BLOCK
5 1 10 1.5 10 4.0 5.50 2.2 1 PISTON
4 1 10 1.5 00 1.5 3.00 1.2 1 PISTON STOP
3 1 05 1.84 00 1.5 3.34 1.34 1 SPRING
2 1 23 2.36 08 6.5 8.86 3.54 0 COVER
1 2 11 1.8 39 8.0 16.6 6.64 0 SCREW
40.75 16.3 4
Total:
TM CM NM
Design efficiency =
3 NM/TM = 0.29
Table 2. Evaluating the design efficiency of Piston
Improving the design:
The following considerations are important:
STEP 1. Is the number in column 9 < the number in column 2 ?
If yes, there is an opportunity for reduction in number of parts.
STEP 2. Examine columns 4 and 6. These figures indicate potential for assembly time
reduction.
Based on these ideas, a redesign of the piston assembly is presented below. Notice how
the new design presents a design efficiency of 90%.
10
Figure 5. An improved piston design [Source: Boothroyd 91]
c1 c2 c3 c4 c5 c6 c7 c8 c9
Part
ID
No
of
times
the
operation
is
carried
out
consecutively
Manual
handling
code
Manual
handling
time
per
part
Manual
insertion
code
manual
insertion
time
per
part
Operation
time
c2(
c4
+
c6)
Operation
cost
0.4
c7
Estimation
for
theoretical
minimum
parts
Name of
Assembly
NEW
PNEUMATIC
PISTON
4 1 30 1.95 00 1.5 3.45 1.38 1 MAIN BLOCK
3 1 10 1.5 00 1.5 3.00 1.2 1 PISTON
2 1 05 1.84 00 1.5 3.34 1.34 1 SPRING
1 1 10 1.5 30 2.0 3.50 1.40 1 COVER and STOP
13.29 5.32 4
Total:
TM CM NM
Design efficiency =
3 NM/TM = 0.90
Table 3. Evaluating the design efficiency of the re-designed piston
11
Guidelines for improving design (for assembly) of mechanical products:
1. Reduce Part Count and Part Types
Why ?
Lower material cost
Reduced jigs/fixtures cost
Improved quality
Less documentation
Small inventories
Fewer suppliers
Simplified production control
Fewer Inspections
Less rework
How ?
1. Check the need for the part’s existence (apply the three rules above).
2. Eliminate separate fasteners when possible.
3. Design multi-functional parts by maximum use of the capabilities of individual
manufacturing processes. For example, use near-net shape moulding and casting when
possible to reduce part count.
4. Eliminate product features that are of no value to the customer.
5. Do not over-use piece part producibility guidelines in early stages of design -- they lead
to simplified production of individual parts, but much higher part count.
Example: In figure 6, the single component design has potentially higher waste (since an
irregular shape must be cut out of the stock sheet; but the assembly cost for the second
design is much higher.
12
Figure 6a. Single component Figure 6b. Two-component sub-assembly
2. Try to Eliminate Adjustments
Why ?
Adjustments require decision making during assembly (so…?)
May lead to malfunctions after some usage by customer.
How ?
1. By elimination of parts.
Example:
2. Substitute electronic correction for mechanical adjustment.
3. Use kinematic analysis to guide design rather than gut feeling.
Examples (see figure 1)
3. Design Parts to be Self Locating and Aligning
Why?
Ease of assembly
13
Better performance of product close to breakdown (since parts tend to stay in
position rather than come out/off.)
Why Not?
Higher cost of manufacturing (more operations, in general)
How?
Figure 7. Some guidelines of design for ease of assembly
4. Consider Access and Visibility for Each Operation
Why ?
How?
14
1. Ensure adequate clearance for hands, tools, testing probes etc.
2. Ensure that the assembly worker has clear visibility of the mating features.
5. Consider Handling Part from Bulk
Why?
Some parts are easily handled when alone, but create a mess when mixed in large
numbers.
How?
1. On parts that mate using interlocking tapers, include features that prevent nesting.
2. On parts with combinations of holes, projections, gaps and cut-outs -- there is high
probability of tangling.
Close gaps; Enlarge projections; Use closed-end coil springs;
3. Avoid parts which are fragile or sharp, unless functionally necessary. If necessary,
include safe-handling features.
4. Avoid use of flexible parts -- if flexible parts are needed, try using those that retain
shape when handled.
5. Avoid parts that require special tools for the worker to perform assembly.
6. Design Parts that Cannot be Installed Incorrectly
Why?
Example: Styrofoam packing for TV/Stereo.
How?
(a) Provide projections that will disallow incorrect assembly.
15
(b) Make mating features asymmetrical.
(c) Make parts symmetrical so that orientation is unimportant.
(d) If two parts can be assembled incorrectly, ensure that assembly of some subsequent
part is impossible.
(e) If all fails, mark part with assembly markers for identification.
(f) Eliminate flexible parts that can almost always be assembled incorrectly.
7. Eliminate Need for Reorientation During Assembly
Why?
Reorientation is an operation that adds no value to the assembly.
How?
Design products with single axis of assembly (usually, Exclusive Vertical Insertion is the
ideal).
8. Maximize Part Symmetry, or Emphasize Asymmetry
Why?
1. Higher symmetry implies lower orientation time/effort
Example: Keys
2. If the part cannot be made symmetric, then emphasized asymmetry allows us to reach
the correct orientation faster.
Example ?
References:
Otto and Wood has a good chapter on DFMA
Product Design for Manufacture and Assembly, Geoffrey Boothroyd, Peter Dewhurst, Winston Knight, 2nd
Edition, Marcel Dekker, New York
Several figures in these notes are from the or1gonal Boothroyd and Dewhurst workbook:
Product Design for Assembly, Geoffrey Boothroyd and Peter Dewhurst, 1991, Boothroyd Dewhurst Inc.

More Related Content

Similar to Difference between DFM, DFA, DFMA with good explanation

Chapter 1 intr m dfina
Chapter 1 intr m dfinaChapter 1 intr m dfina
Chapter 1 intr m dfinaKhalil Alhatab
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design PrinciplesNIELITA
 
Introduction to rp
Introduction to rpIntroduction to rp
Introduction to rpGK Naidu
 
Chapter 1 intr m dfina
Chapter 1 intr m dfinaChapter 1 intr m dfina
Chapter 1 intr m dfinaKhalil Alhatab
 
Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical ProtekMedical
 
opm101chapter10_000.ppt
opm101chapter10_000.pptopm101chapter10_000.ppt
opm101chapter10_000.pptSociaLInfO1
 
opm101chapter10_000 (1).ppt
opm101chapter10_000 (1).pptopm101chapter10_000 (1).ppt
opm101chapter10_000 (1).pptssuser35af09
 
A Review on Design of a Fixture for Rear Cover
A Review on Design of a Fixture for Rear CoverA Review on Design of a Fixture for Rear Cover
A Review on Design of a Fixture for Rear Coverijsrd.com
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionJayavendhanJ
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing arivumani ravanan
 
Engineering Design Notes
Engineering Design NotesEngineering Design Notes
Engineering Design NotesSead Spuzic
 
Design and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to ProductDesign and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to ProductNaseel Ibnu Azeez
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant MustafaElAkkad
 
Introduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxIntroduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxAhmedYounis676020
 
(a) (i) Re-organising the existing facility is an expensive exercise.pdf
(a) (i) Re-organising the existing facility is an expensive exercise.pdf(a) (i) Re-organising the existing facility is an expensive exercise.pdf
(a) (i) Re-organising the existing facility is an expensive exercise.pdfarhamgarmentsdelhi
 

Similar to Difference between DFM, DFA, DFMA with good explanation (20)

Chapter 1 intr m dfina
Chapter 1 intr m dfinaChapter 1 intr m dfina
Chapter 1 intr m dfina
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design Principles
 
Introduction to rp
Introduction to rpIntroduction to rp
Introduction to rp
 
Chapter 1 intr m dfina
Chapter 1 intr m dfinaChapter 1 intr m dfina
Chapter 1 intr m dfina
 
Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical Demystifying Designing for ‘X’ by ProTek Medical
Demystifying Designing for ‘X’ by ProTek Medical
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
Chapter 1 design stages
Chapter 1  design stagesChapter 1  design stages
Chapter 1 design stages
 
opm101chapter10_000.ppt
opm101chapter10_000.pptopm101chapter10_000.ppt
opm101chapter10_000.ppt
 
opm101chapter10_000 (1).ppt
opm101chapter10_000 (1).pptopm101chapter10_000 (1).ppt
opm101chapter10_000 (1).ppt
 
A Review on Design of a Fixture for Rear Cover
A Review on Design of a Fixture for Rear CoverA Review on Design of a Fixture for Rear Cover
A Review on Design of a Fixture for Rear Cover
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing
 
Engineering Design Notes
Engineering Design NotesEngineering Design Notes
Engineering Design Notes
 
Design and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to ProductDesign and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to Product
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 
Design and Development of Stamping Bracket of Snowmobile Using Computer Aided...
Design and Development of Stamping Bracket of Snowmobile Using Computer Aided...Design and Development of Stamping Bracket of Snowmobile Using Computer Aided...
Design and Development of Stamping Bracket of Snowmobile Using Computer Aided...
 
Introduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxIntroduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptx
 
(a) (i) Re-organising the existing facility is an expensive exercise.pdf
(a) (i) Re-organising the existing facility is an expensive exercise.pdf(a) (i) Re-organising the existing facility is an expensive exercise.pdf
(a) (i) Re-organising the existing facility is an expensive exercise.pdf
 

Recently uploaded

VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 

Recently uploaded (20)

VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Difference between DFM, DFA, DFMA with good explanation

  • 1. 1 Design For Manufacturing/Assembly (DFM, DFA, DFMA) Much of the early and significant work on DFM and DFA was done in the early 1970s by Boothroyd and Dewhurst. Traditionally, product development was essentially done in several stages. The designer(s) (who usually had very good knowledge of materials, mechanisms, etc.) would design the product, and sometimes would construct working prototypes. Once the prototype was tested and approved, the manufacturing team would then construct manufacturing plans for the product, including the tooling etc. Often, different materials (e.g. different thickness or type of sheet metal), and different components (e.g. different sized screws etc), would be substituted by the manufacturing team. Their goal was to achieve the same functionality, but make mass production more efficient. However, the majority of the design remained unchanged, since the manufacturing engineers could never be sure whether a change would affect some functional requirement. Two things changed in the 1970’s: (i) Many new types of plastics were developed, and injection moulding technology became widely available, resulting in the possibility of low cost plastic components. An advantage of these new plastic materials was that they provided different material behaviour (e.g. many cycles of large elastic deformations without failure – a property useful in making snap-fit mating components). Thus pats that had to be made form metal and screwed together could just be made out of plastic and snap fitted. This reduced assembly time, assembly components, and production costs. (ii) Several companies were trying to bring their products to the market faster. One problem with the earlier method of doing things was that each time there was a design change made by the manufacturing engineer, product development was held up, waiting for the engineering change notice (ECN) to be approved by the designer. Often, this process introduced delays because the design engineer would be busy with other tasks, or unavailable. To avoid this, the concept of concurrent engineering (CE) became popular. The idea here was that a combined team of engineers and management would be assigned to each new product. This team may consist of mechanical designers, electrical engineers, software engineers, production engineers, marketing and sales, and management. Thus, as the design was being generated by the designers, the production people would give feedback about feasibility to manufacture, more economical alternatives etc. At the same time, sales people would negotiate of product outlook and features, and so on. The biggest advantage of CE was that the
  • 2. 2 product was designed in a way that manufacturing cost and time would be low during production. At this time, working with many different companies, Boothroyd’s team analysed existing designs of hundreds of products, and suggested design improvements based on manufacturing and assembly ease. Using the experience of these projects, they then developed a very large set of guidelines on how to estimate whether a design was designed well (from a manufacturing point of view), and potential methods to improve the designs. In subsequent years, the idea of DFM and DFA were extended to include other aspects of better designs – including design for maintenance, design for environment, design for cost, etc. Often, this application of CE is referred to as DFX, where X is a variable selected from the set {manufacture, assembly, …}. We shall restrict our study of manufacturing decisions to those related to fabrication and assembly. Manufacturing Fabrication Operations Assembly Operations Material Geometry Tolerance Figure 1. Effects of design (materials, geometry, tolerances) on manufacturing Effects of Tolerance on Fabrication Tight tolerances will require More care to be taken during machining Î larger processing time Higher reject rates More expensive measurement/inspection systems Restricted set of machine tools ( so ... ?) Effects of Geometry on Fabrication Different geometry (due to different design of product/part) will mean: Different process plans Different raw material costs (why ?) Different processing costs
  • 3. 3 Example: [source: Boothroyd 91] Figure 2. Different components have different production costs Effect of Material on Fabrication Different materials of designed part implies: Different process plans Different fabrication processes Examples ? Effects of Geometry, Material, Tolerance effects on Assembly Boothroyd et. al studied many of these to compose a systematic methodology. The emphasis was to relate Product design, Assembly operations, and Assembly Method to the single decision factor: the cost. We shall study the Boothroyd method in detail. Note that there are other systems based on very similar principals: The Hitachi Assembly Evaluation Method, developed at Hitachi in Japan, used very similar ideas. Basic idea: reduction of cost of a product through simplification of its design. How ? - Reduction of number of components - Ensuring that parts are easy to assemble - Increasing the use of standardized parts across entire product range - Designing with widest possible tolerances - Material selection must consider manufacturing also, not just function.
  • 4. 4 Why do these ideas work ? Fewer components in a design imply: Manual assembly: Fewer assembly operations Æ fewer assembly workers Automated assembly: Reduction of one entire section of Assembly station Fewer fixtures/jigs, feeders, etc. Also, fewer parts usually mean smaller stacked tolerances, and therefore lead to better functioning of the assemblies, and fewer rejects (why ?) The Boothroyd-Dewhurst method includes: Preliminary (rough) design Selection of Assembly Method (manual, robotic, or high-speed automated) Design/Redesign of product for selected method The selection of assembly method must be done at an early stage in the product design process (why?). One factor that affects this decision is the production volume (that is, forecast demand). Low volume (< 1000 parts per year) => manual assembly High volume (> million parts per year) => high-speed automated assembly Somewhere in between these limits, and based on some other considerations (labour costs, technical requirements, e.g. in spray painting) robotic assembly may be optimal. Typical hardware involved in each method, and its characteristics are listed below. Manual Assembly: Benches or simple conveyors Assembly station has bins with un-oriented parts Simple jigs and fixtures with manual clamping Simple, light tools (manual/pneumatic/electric screwdrivers, solder irons etc.) Inexpensive setup costs Assembly costs are nearly constant, and independent of volume (why ?)
  • 5. 5 High-speed (Special Purpose) Transfer Assembly: Machines are built to produce specific product. Components: Part feeders [indexed/asynchronous] Single purpose workheads Transfer devices (usually equipped with workheads) Very expensive and time-consuming to build Very high production rate Down time due to defective parts may be a severe problem [Example: defective part-mix in a bowl-feeder] Implication: incoming QC must be stringent Inflexible: changing hard-automation system requires fabrication of new jigs/fixtures/machines and may take a long time and cost a lot. Robotic Assembly Similar to non-synchronous special purpose assembly stations, except robots replace the single-purpose workheads. Use of robots allows flexibility in product types and production rates. Figure 3. Common assembly automation devices [source Boothroyd 91]
  • 6. 6 Design for Manual Assembly The Boothroyd Dewhurst method provides a quantitative measure called the design efficiency based on analysis of a product. The efficiency compares the total assembly time for a product with the total assembly time for an ideal product (determined by a method suggested by the authors). The efficiency can be used to compare various designs in terms of their relative efficiencies (for manual assembly). The design improvement is brought about by two considerations: 1. A decision is made as to whether the part can be considered a candidate for elimination, or combination with other parts of the assembly 2. An estimation of the time taken to grasp, manipulate, and insert the part. The procedure: STEP 1. Obtain design details Engineering drawings, or Exploded 3-D views, or Existing product, or Prototype STEP 2.. Take assembly apart (or imagine doing so) -- assigning identification to each part as it is removed. Consider sub-assemblies as parts, and analyse them separately (recursively). STEP 3. Begin re-assembly of the product. Start with the part with the highest identification number, going all the way up to the part 1. Fill up the assembly worksheet as you go along. [note: the method requires that the product is assembled one part at a time. In reality, assembly workers use both hands and often assemble two parts in a step. However, a change in the assembly procedure will correspondingly change the assembly time for the ideal product -- thereby keeping the efficiency constant.] STEP 4. Compute the design efficiency, given as: EM = 3 x NM / TM
  • 7. 7 We go through an example to see how the method works. Figure 4. A piston-assembly design [source Boothroyd 91] The computation is done by systematically completing the data in the following table. The data requires several estimates for assembly efficiency of different components based on their characteristics. This data is compiled empirically – by a large number of time- motion studies conducted over may years. We will use the charts from Boothroyd (handouts given in class).
  • 8. 8 c1 c2 c3 c4 c5 c6 c7 c8 c9 Part ID No of times the operation is carried out consecutively Manual handling code Manual handling time per part Manual insertion code manual insertion time per part Operation time c2( c4 + c6) Operation cost 0.4 c7 Estimation for theoretical minimum parts Name of Assembly Total: TM CM NM Design efficiency = 3 NM/TM = Table 1. Table for computation of Design efficiency (Source: Boothroyd 91). One of the key features of the Boothroyd-Dewhurst method is estimation of the ideal product -- which translates to the method of filling up column 9 in the chart. They give the following guidelines: Rule 1. During operation of the product, does the part move relative to all other parts already assembled? Rule 2. Must the part be of a different material than the parts already assembled? [Only fundamental reasons associated with material properties are acceptable.] Rule 3. Must the part be separate from all parts already assembled (because otherwise necessary assembly/disassembly of other parts would be impossible)? If the answer to any of these questions is YES, a 1 is entered in column 9 (except if there are multiple parts in column 2, in which case the minimum number of separate parts required is entered in column 9.)
  • 9. 9 c1 c2 c3 c4 c5 c6 c7 c8 c9 Part ID No of times the operation is carried out consecutively Manual handling code Manual handling time per part Manual insertion code manual insertion time per part Operation time c2( c4 + c6) Operation cost 0.4 c7 Estimation for theoretical minimum parts Name of Assembly PNEUMATIC PISTON 6 1 30 1.95 00 1.5 3.45 1.38 1 MAIN BLOCK 5 1 10 1.5 10 4.0 5.50 2.2 1 PISTON 4 1 10 1.5 00 1.5 3.00 1.2 1 PISTON STOP 3 1 05 1.84 00 1.5 3.34 1.34 1 SPRING 2 1 23 2.36 08 6.5 8.86 3.54 0 COVER 1 2 11 1.8 39 8.0 16.6 6.64 0 SCREW 40.75 16.3 4 Total: TM CM NM Design efficiency = 3 NM/TM = 0.29 Table 2. Evaluating the design efficiency of Piston Improving the design: The following considerations are important: STEP 1. Is the number in column 9 < the number in column 2 ? If yes, there is an opportunity for reduction in number of parts. STEP 2. Examine columns 4 and 6. These figures indicate potential for assembly time reduction. Based on these ideas, a redesign of the piston assembly is presented below. Notice how the new design presents a design efficiency of 90%.
  • 10. 10 Figure 5. An improved piston design [Source: Boothroyd 91] c1 c2 c3 c4 c5 c6 c7 c8 c9 Part ID No of times the operation is carried out consecutively Manual handling code Manual handling time per part Manual insertion code manual insertion time per part Operation time c2( c4 + c6) Operation cost 0.4 c7 Estimation for theoretical minimum parts Name of Assembly NEW PNEUMATIC PISTON 4 1 30 1.95 00 1.5 3.45 1.38 1 MAIN BLOCK 3 1 10 1.5 00 1.5 3.00 1.2 1 PISTON 2 1 05 1.84 00 1.5 3.34 1.34 1 SPRING 1 1 10 1.5 30 2.0 3.50 1.40 1 COVER and STOP 13.29 5.32 4 Total: TM CM NM Design efficiency = 3 NM/TM = 0.90 Table 3. Evaluating the design efficiency of the re-designed piston
  • 11. 11 Guidelines for improving design (for assembly) of mechanical products: 1. Reduce Part Count and Part Types Why ? Lower material cost Reduced jigs/fixtures cost Improved quality Less documentation Small inventories Fewer suppliers Simplified production control Fewer Inspections Less rework How ? 1. Check the need for the part’s existence (apply the three rules above). 2. Eliminate separate fasteners when possible. 3. Design multi-functional parts by maximum use of the capabilities of individual manufacturing processes. For example, use near-net shape moulding and casting when possible to reduce part count. 4. Eliminate product features that are of no value to the customer. 5. Do not over-use piece part producibility guidelines in early stages of design -- they lead to simplified production of individual parts, but much higher part count. Example: In figure 6, the single component design has potentially higher waste (since an irregular shape must be cut out of the stock sheet; but the assembly cost for the second design is much higher.
  • 12. 12 Figure 6a. Single component Figure 6b. Two-component sub-assembly 2. Try to Eliminate Adjustments Why ? Adjustments require decision making during assembly (so…?) May lead to malfunctions after some usage by customer. How ? 1. By elimination of parts. Example: 2. Substitute electronic correction for mechanical adjustment. 3. Use kinematic analysis to guide design rather than gut feeling. Examples (see figure 1) 3. Design Parts to be Self Locating and Aligning Why? Ease of assembly
  • 13. 13 Better performance of product close to breakdown (since parts tend to stay in position rather than come out/off.) Why Not? Higher cost of manufacturing (more operations, in general) How? Figure 7. Some guidelines of design for ease of assembly 4. Consider Access and Visibility for Each Operation Why ? How?
  • 14. 14 1. Ensure adequate clearance for hands, tools, testing probes etc. 2. Ensure that the assembly worker has clear visibility of the mating features. 5. Consider Handling Part from Bulk Why? Some parts are easily handled when alone, but create a mess when mixed in large numbers. How? 1. On parts that mate using interlocking tapers, include features that prevent nesting. 2. On parts with combinations of holes, projections, gaps and cut-outs -- there is high probability of tangling. Close gaps; Enlarge projections; Use closed-end coil springs; 3. Avoid parts which are fragile or sharp, unless functionally necessary. If necessary, include safe-handling features. 4. Avoid use of flexible parts -- if flexible parts are needed, try using those that retain shape when handled. 5. Avoid parts that require special tools for the worker to perform assembly. 6. Design Parts that Cannot be Installed Incorrectly Why? Example: Styrofoam packing for TV/Stereo. How? (a) Provide projections that will disallow incorrect assembly.
  • 15. 15 (b) Make mating features asymmetrical. (c) Make parts symmetrical so that orientation is unimportant. (d) If two parts can be assembled incorrectly, ensure that assembly of some subsequent part is impossible. (e) If all fails, mark part with assembly markers for identification. (f) Eliminate flexible parts that can almost always be assembled incorrectly. 7. Eliminate Need for Reorientation During Assembly Why? Reorientation is an operation that adds no value to the assembly. How? Design products with single axis of assembly (usually, Exclusive Vertical Insertion is the ideal). 8. Maximize Part Symmetry, or Emphasize Asymmetry Why? 1. Higher symmetry implies lower orientation time/effort Example: Keys 2. If the part cannot be made symmetric, then emphasized asymmetry allows us to reach the correct orientation faster. Example ? References: Otto and Wood has a good chapter on DFMA Product Design for Manufacture and Assembly, Geoffrey Boothroyd, Peter Dewhurst, Winston Knight, 2nd Edition, Marcel Dekker, New York Several figures in these notes are from the or1gonal Boothroyd and Dewhurst workbook: Product Design for Assembly, Geoffrey Boothroyd and Peter Dewhurst, 1991, Boothroyd Dewhurst Inc.