SlideShare a Scribd company logo
1 of 45
Download to read offline
Research & Development @ JSW
Six Sigma Methodology & its applications
Presentation Layout
 Six Sigma: An overview
 Why Six Sigma?
 Six Sigma Levels
 Six Sigma Methodology and Management
 Key Roles for Six Sigma
 Tools for Six Sigma
Six Sigma overview
 The term “Six Sigma” was
coined by Bill Smith, an
engineer with Motorola
 Late 1970s - Motorola started
experimenting with problem
solving through statistical
analysis
 1987- Motorola officially
launched it’s Six Sigma
program
Sigma :
• A Greek term used in statistics to
represent standard deviation from
mean value, an indicator of the
degree of variation in a process.
• Sigma measures how far a given
process deviates from perfection.
• Sigma Level is a metric that
indicates how well that process is
performing.
What is Six Sigma?
 Six Sigma - A highly disciplined
process that enables organizations
deliver nearly perfect products and
services.
 The figure of six arrived statistically
from current average maturity of
most business enterprises
 It is a Quality Philosophy and the
way of improving performance by
knowing where you are and where
you could be.
Sigma Level
( Process
Capability)
Defects per
Million
Opportunities
2 308,537
3 66,807
4 6,210
5 233
6 3.4
99. 99966% accuracy
Six sigma methodology
 DMAIC : Six Sigma Improvement Methodology
 Used for improving quality and service problems; reducing
variation, process optimization
(Define, Measure, Analyse, Improve, Control)
• Define specific goals to achieve outcomes
• Measure reduction of defects
• Analyze problems, cause and effects must be
considered
• Improve process on bases of measurements and
analysis
• Control process to minimize defects
QUICK WINS
QUICK WINS
Sr.
No.
Source
Concerns/
Issues
Potential Quick
win opportunity
(solution)
Easy to
implement
Fast to
implement
Cheap
Within the
team
control
Easy
reversi
ble
1
Process
walk
through
1 Yes Yes Yes Yes Yes
2
Process
walk
through
2 Yes Yes Yes Yes Yes
3
Process
walk
through
3 Yes Yes Yes Yes Yes
Tools & Techniques
 7QC tools
 Check Sheets (collect data to make improvements)
 Pareto Charts (define problem and frequency)
 Cause and effect diagram (Identify possible causes to
solve problem)
 Histogram (Bar charts of accumulated data to evaluate
distribution of data)
 Scatter diagram (plots many data points and pattern
between two variables)
 Flow Chart (Identify unwanted steps)
 Control charts (Control limits around mean value)
Two basic types of Data
 Discrete Data
– Has only a finite or countable set of values
– Examples: zip codes, counts, or the set of words in a collection of documents
– Often represented as integer variables.
– Examples: Pass/Fail or Small/Medium/Large
 Continuous Data
– Has real numbers as attribute values
– Examples: temperature, height, or weight.
– Practically, real values can only be measured and represented using a finite
number of digits.
– Continuous attributes are typically represented as floating-point variables.
Check Sheets
 Data collection methodology
 Simple data collection form which help determine how often
something occurs
Sampling
 Using a sample of data, we draw conclusions about the entire
population of data.
 Sampling
 saves cost and time
 provides a good alternative to collecting all the data
Important elements of basic statistics (continuous data)
 Location
 Spread
 Shape (Normal Distribution)
of a set of numbers
Measures of Location
 Mean (average of data)
 Median (50th percentile / middle of data)
– not influenced by outlier
 Example
Measure of Spread
 Range ‘R’ = Max – Min
 Variance & Standard deviation
 Interquartile Range (IQR) = difference between the 75th
percentile point and the 25th percentile point
 Find IQR for 2 ,5, 7, 9, 3, 5, 10, 6, 12
1
)
( 2




n
x
xi


1
)
( 2




n
x
xi


Normal Distribution – Measure of Shape
Sigma =  = Deviation
( Square root of variance )
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
Axis graduated in Sigma
68.27 %
95.45 %
99.73 %
99.9937 %
99.999943 %
99.9999998 %
result: 317300 ppm outside
(deviation)
45500 ppm
2700 ppm
63 ppm
0.57 ppm
0.002 ppm
between + / - 1
between + / - 2
between + / - 3
between + / - 4
between + / - 5
between + / - 6

Control Chart
 The control chart is a graph used to study how a
process changes over time. Data are plotted in time
order.
 A control chart always has a central line for the average,
an upper line for the upper control limit and a lower line
for the lower control limit.
 Lines are determined from historical data. By comparing
current data to these lines, you can draw conclusions
about whether the process variation is consistent (in
control) or is unpredictable (out of control, affected by
special causes of variation).
Control Limits
General model for a control chart
–UCL = μ + kσ
–CL = μ
–LCL = μ – kσ
where μ is the mean of the variable, and σ is the standard deviation
of the variable. UCL=upper control limit; LCL = lower control limit;
CL = center line. where k is the distance of the control limits from the
center line, expressed in terms of standard deviation units. When k
is set to 3, we speak of 3-sigma control charts. Historically, k = 3 has
become an accepted standard in industry.
USL & LSL = Voice of customer
Control Chart Example
Control Chart Examples
UCL
LCL
USL
LSL
Process not capable, not as per customer specifications
Control Chart Examples
UCL
LCL
USL
LSL
Process is out of control, but capable as per customer specifications
Process Capability
Process capability =
Tolerable (allowed) variation / Process (actual) variation
Cp = (USL-LSL) / (UCL-LCL)
- indicator of variation
 
Example
Upper specification = 30 minutes
Upper specification = 30 minutes
Lower specification = 20 minutes
Lower specification = 20 minutes
Average service = 26.2 minutes
Average service = 26.2 minutes

 = 1.35 minutes
= 1.35 minutes
The Aditya care lab process has an average turnaround time of 26.2
minutes and a standard deviation of 1.35 minutes.
The upper specification limit of 30 minutes and a lower specification
limit of 20 minutes.
The administrator of the lab wants to have three-sigma performance
for the lab. Is the lab process capable of this level of performance?
Cpk = Minimum of
Upper specification – x
3
x – Lower specification
3 ,
Upper specification = 30 minutes
Lower specification = 20 minutes
Average service = 26.2 minutes
 = 1.35 minutes
Assessing Process Capability
C
Cpk
pk =
= Minimum of
Minimum of
26.2
26.2 –
– 20.0
20.0
3(
3(1.35
1.35)
)
,
,
30.0
30.0 –
– 26.2
26.2
3(
3(1.35
1.35)
)
C
Cpk
pk =
= Minimum of 1.53, 0.94
Minimum of 1.53, 0.94 = 0.94
= 0.94 Process
Capability Index
Cp =
=
Upper specification - Lower specification
6
Cp
p =
=
30 - 20
6(1.35)
= 1.23 Process Capability Ratio
Upper specification = 30.0 minutes Lower specification = 20.0 minutes
Average service = 26.2 minutes
 = 1.35 minutes Cpk = 0.94 C
Cp
p = 1.23
Assessing Process Capability
Does not meet 3 (1.00 Cpk
pk) target
due to a shift in mean (Note variability is ok since Cp
p is over 1.0)
Scatter Diagram
 In actual practice, it is often essential to study the relation
of two corresponding variables.
 To study the relation of 2 variables such as the speed of the
bike & the fuel efficiency, scatter diagram is used.
Regression Analysis
 While correlations tells us only about the direction of association, it
does not throw much light on degree of association in one variable
with respect to association in another.
 Regression of ‘Y’ on ‘X’ results in a transfer function equation that can
be used to predict the value of ‘Y’ for given values
» Simple linear regression is for one X
» Multiple linear regression is for more than one X’s
 Simple linear regression:
Y = A + B X + C A = intercept of fitted line on Y axis
B = regression coefficient / slope
C = Error in the model
Simple Linear Regression Example
 R&D Dept. of a company wishes to predict the relationship between
amount spent on R&D and annual profit generated. It collects the data for
last 6 years and wants to sanction R&D budget accordingly for 2016.
» Company profit target for 2016 = 32 Cr. How much should be spent on
R&D in 2016?
R&D Expense,
Crores
Annual profit,
Crores
2010 2 20
2011 3 25
2012 5 34
2013 4 30
2014 11 40
2015 5 31
Regression Analysis Results
Coefficients Standard Error P-value
Intercept 20.0 2.65 0.002
R&D Expense 2.0 0.46 0.012
Regression Statistics
Multiple R 0.9091
R Square 0.8264
Adjusted R Square 0.7831
Observations 6
The regression equation is
Profit = 20.0 + 2.0 * R&D Expense
• 82.64% of linear variation in Y is explained by X in this fitted model.
P-value < 0.05
Coefficient of
determination
Multiple Regression Analysis
Y = A + B1X1 + B2X2 + C
• Suppose we are trying to predict rent of an apartment based on the no. of rooms
& its distance from the main market. The following information is collected.
• If you are looking for a two-bedroom apartment, 2km from the main market, what
rent should you expect to pay ?
Rent No. of rooms Distance (km)
3600 2 1
10000 6 2
4500 3 2
5250 4 3
3500 2 10
3000 1 4
Multiple Regression Analysis Results
Rent = 852 + 1381* No. of rooms
» Expected rent for 2-bed room = 3614
Distance is not seeming as an important factor as its P-value is more than 0.05.
Regression Statistics
Multiple R 0.9565
R Square 0.9149
Adjusted R Square 0.8581
Observations 6
Coefficients Standard Error P-value
Intercept 852.04 1146.27 0.511
No. of rooms 1380.97 259.50 0.013
Distance -5.44 142.13 0.972
Points to remember in Regression
 Don’t extrapolate beyond the range.
 Don’t assume causation. Regression predicts the statistical
relation. Theoretical/ Logical relation should be there.
 No. of schools vs. Incidents of Crime
 Regression may not give a good R2
– If X’s chosen are not the ‘real’ ones
– If X’s have intercations
– In case of multiple X’s having a curvilinear relationship with ‘Y’
THANK YOU

More Related Content

What's hot

Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
CSCJournals
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributes
Buddy Krishna
 
Byungchul Yea (Project)
Byungchul Yea (Project)Byungchul Yea (Project)
Byungchul Yea (Project)
Byung Chul Yea
 
Industrial quality management
Industrial quality managementIndustrial quality management
Industrial quality management
selinasimpson0701
 

What's hot (19)

X Bar And S Charts Mini Tutorial
X Bar And S Charts Mini TutorialX Bar And S Charts Mini Tutorial
X Bar And S Charts Mini Tutorial
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
 
Spc la
Spc laSpc la
Spc la
 
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
 
Seasonal ARIMA
Seasonal ARIMASeasonal ARIMA
Seasonal ARIMA
 
Variable control chart
Variable control chartVariable control chart
Variable control chart
 
Statistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementStatistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality Management
 
Time Series - Auto Regressive Models
Time Series - Auto Regressive ModelsTime Series - Auto Regressive Models
Time Series - Auto Regressive Models
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributes
 
Lesson 5 arima
Lesson 5 arimaLesson 5 arima
Lesson 5 arima
 
Arima model
Arima modelArima model
Arima model
 
Time Series Forecasting Modeling CMG12
Time Series Forecasting Modeling CMG12Time Series Forecasting Modeling CMG12
Time Series Forecasting Modeling CMG12
 
Isen 614 project presentation
Isen 614 project presentationIsen 614 project presentation
Isen 614 project presentation
 
Demand time series analysis and forecasting
Demand time series analysis and forecastingDemand time series analysis and forecasting
Demand time series analysis and forecasting
 
The Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control ChartsThe Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control Charts
 
Byungchul Yea (Project)
Byungchul Yea (Project)Byungchul Yea (Project)
Byungchul Yea (Project)
 
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet MahanaArima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
Arima Forecasting - Presentation by Sera Cresta, Nora Alosaimi and Puneet Mahana
 
Lesson 2 stationary_time_series
Lesson 2 stationary_time_seriesLesson 2 stationary_time_series
Lesson 2 stationary_time_series
 
Industrial quality management
Industrial quality managementIndustrial quality management
Industrial quality management
 

Similar to Six sigma

Stochastic Process
Stochastic ProcessStochastic Process
Stochastic Process
knksmart
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
jsembiring
 
supplement-6-e28093-spc.ppt- SPC_ Operation Management
supplement-6-e28093-spc.ppt- SPC_ Operation Managementsupplement-6-e28093-spc.ppt- SPC_ Operation Management
supplement-6-e28093-spc.ppt- SPC_ Operation Management
Ranjeet338208
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
ceutics1315
 
Hızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses KontrolHızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses Kontrol
metallicaslayer
 

Similar to Six sigma (20)

Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysis
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
Stochastic Process
Stochastic ProcessStochastic Process
Stochastic Process
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
 
supplement-6-e28093-spc.ppt- SPC_ Operation Management
supplement-6-e28093-spc.ppt- SPC_ Operation Managementsupplement-6-e28093-spc.ppt- SPC_ Operation Management
supplement-6-e28093-spc.ppt- SPC_ Operation Management
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
WEI_ZHENGTAI_SPC
WEI_ZHENGTAI_SPCWEI_ZHENGTAI_SPC
WEI_ZHENGTAI_SPC
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Hızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses KontrolHızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses Kontrol
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Operations Management VTU BE Mechanical 2015 Solved paper
Operations Management VTU BE Mechanical 2015 Solved paperOperations Management VTU BE Mechanical 2015 Solved paper
Operations Management VTU BE Mechanical 2015 Solved paper
 
SPC Training by D&H Engineers
SPC Training by D&H EngineersSPC Training by D&H Engineers
SPC Training by D&H Engineers
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
API Governance and Monetization - The evolution of API governance
API Governance and Monetization -  The evolution of API governanceAPI Governance and Monetization -  The evolution of API governance
API Governance and Monetization - The evolution of API governance
 
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
TEST BANK For Principles of Anatomy and Physiology, 16th Edition by Gerard J....
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 

Six sigma

  • 1. Research & Development @ JSW Six Sigma Methodology & its applications
  • 2. Presentation Layout  Six Sigma: An overview  Why Six Sigma?  Six Sigma Levels  Six Sigma Methodology and Management  Key Roles for Six Sigma  Tools for Six Sigma
  • 3. Six Sigma overview  The term “Six Sigma” was coined by Bill Smith, an engineer with Motorola  Late 1970s - Motorola started experimenting with problem solving through statistical analysis  1987- Motorola officially launched it’s Six Sigma program Sigma : • A Greek term used in statistics to represent standard deviation from mean value, an indicator of the degree of variation in a process. • Sigma measures how far a given process deviates from perfection. • Sigma Level is a metric that indicates how well that process is performing.
  • 4. What is Six Sigma?  Six Sigma - A highly disciplined process that enables organizations deliver nearly perfect products and services.  The figure of six arrived statistically from current average maturity of most business enterprises  It is a Quality Philosophy and the way of improving performance by knowing where you are and where you could be. Sigma Level ( Process Capability) Defects per Million Opportunities 2 308,537 3 66,807 4 6,210 5 233 6 3.4 99. 99966% accuracy
  • 5. Six sigma methodology  DMAIC : Six Sigma Improvement Methodology  Used for improving quality and service problems; reducing variation, process optimization (Define, Measure, Analyse, Improve, Control) • Define specific goals to achieve outcomes • Measure reduction of defects • Analyze problems, cause and effects must be considered • Improve process on bases of measurements and analysis • Control process to minimize defects
  • 6. QUICK WINS QUICK WINS Sr. No. Source Concerns/ Issues Potential Quick win opportunity (solution) Easy to implement Fast to implement Cheap Within the team control Easy reversi ble 1 Process walk through 1 Yes Yes Yes Yes Yes 2 Process walk through 2 Yes Yes Yes Yes Yes 3 Process walk through 3 Yes Yes Yes Yes Yes
  • 7. Tools & Techniques  7QC tools  Check Sheets (collect data to make improvements)  Pareto Charts (define problem and frequency)  Cause and effect diagram (Identify possible causes to solve problem)  Histogram (Bar charts of accumulated data to evaluate distribution of data)  Scatter diagram (plots many data points and pattern between two variables)  Flow Chart (Identify unwanted steps)  Control charts (Control limits around mean value)
  • 8. Two basic types of Data  Discrete Data – Has only a finite or countable set of values – Examples: zip codes, counts, or the set of words in a collection of documents – Often represented as integer variables. – Examples: Pass/Fail or Small/Medium/Large  Continuous Data – Has real numbers as attribute values – Examples: temperature, height, or weight. – Practically, real values can only be measured and represented using a finite number of digits. – Continuous attributes are typically represented as floating-point variables.
  • 9. Check Sheets  Data collection methodology  Simple data collection form which help determine how often something occurs Sampling  Using a sample of data, we draw conclusions about the entire population of data.  Sampling  saves cost and time  provides a good alternative to collecting all the data
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Important elements of basic statistics (continuous data)  Location  Spread  Shape (Normal Distribution) of a set of numbers Measures of Location  Mean (average of data)  Median (50th percentile / middle of data) – not influenced by outlier  Example
  • 17. Measure of Spread  Range ‘R’ = Max – Min  Variance & Standard deviation  Interquartile Range (IQR) = difference between the 75th percentile point and the 25th percentile point  Find IQR for 2 ,5, 7, 9, 3, 5, 10, 6, 12 1 ) ( 2     n x xi  
  • 18. 1 ) ( 2     n x xi   Normal Distribution – Measure of Shape Sigma =  = Deviation ( Square root of variance ) -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 Axis graduated in Sigma 68.27 % 95.45 % 99.73 % 99.9937 % 99.999943 % 99.9999998 % result: 317300 ppm outside (deviation) 45500 ppm 2700 ppm 63 ppm 0.57 ppm 0.002 ppm between + / - 1 between + / - 2 between + / - 3 between + / - 4 between + / - 5 between + / - 6 
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Control Chart  The control chart is a graph used to study how a process changes over time. Data are plotted in time order.  A control chart always has a central line for the average, an upper line for the upper control limit and a lower line for the lower control limit.  Lines are determined from historical data. By comparing current data to these lines, you can draw conclusions about whether the process variation is consistent (in control) or is unpredictable (out of control, affected by special causes of variation).
  • 26. Control Limits General model for a control chart –UCL = μ + kσ –CL = μ –LCL = μ – kσ where μ is the mean of the variable, and σ is the standard deviation of the variable. UCL=upper control limit; LCL = lower control limit; CL = center line. where k is the distance of the control limits from the center line, expressed in terms of standard deviation units. When k is set to 3, we speak of 3-sigma control charts. Historically, k = 3 has become an accepted standard in industry. USL & LSL = Voice of customer
  • 28. Control Chart Examples UCL LCL USL LSL Process not capable, not as per customer specifications
  • 29. Control Chart Examples UCL LCL USL LSL Process is out of control, but capable as per customer specifications
  • 30. Process Capability Process capability = Tolerable (allowed) variation / Process (actual) variation Cp = (USL-LSL) / (UCL-LCL) - indicator of variation  
  • 31. Example Upper specification = 30 minutes Upper specification = 30 minutes Lower specification = 20 minutes Lower specification = 20 minutes Average service = 26.2 minutes Average service = 26.2 minutes   = 1.35 minutes = 1.35 minutes The Aditya care lab process has an average turnaround time of 26.2 minutes and a standard deviation of 1.35 minutes. The upper specification limit of 30 minutes and a lower specification limit of 20 minutes. The administrator of the lab wants to have three-sigma performance for the lab. Is the lab process capable of this level of performance?
  • 32. Cpk = Minimum of Upper specification – x 3 x – Lower specification 3 , Upper specification = 30 minutes Lower specification = 20 minutes Average service = 26.2 minutes  = 1.35 minutes Assessing Process Capability C Cpk pk = = Minimum of Minimum of 26.2 26.2 – – 20.0 20.0 3( 3(1.35 1.35) ) , , 30.0 30.0 – – 26.2 26.2 3( 3(1.35 1.35) ) C Cpk pk = = Minimum of 1.53, 0.94 Minimum of 1.53, 0.94 = 0.94 = 0.94 Process Capability Index
  • 33. Cp = = Upper specification - Lower specification 6 Cp p = = 30 - 20 6(1.35) = 1.23 Process Capability Ratio Upper specification = 30.0 minutes Lower specification = 20.0 minutes Average service = 26.2 minutes  = 1.35 minutes Cpk = 0.94 C Cp p = 1.23 Assessing Process Capability Does not meet 3 (1.00 Cpk pk) target due to a shift in mean (Note variability is ok since Cp p is over 1.0)
  • 34. Scatter Diagram  In actual practice, it is often essential to study the relation of two corresponding variables.  To study the relation of 2 variables such as the speed of the bike & the fuel efficiency, scatter diagram is used.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. Regression Analysis  While correlations tells us only about the direction of association, it does not throw much light on degree of association in one variable with respect to association in another.  Regression of ‘Y’ on ‘X’ results in a transfer function equation that can be used to predict the value of ‘Y’ for given values » Simple linear regression is for one X » Multiple linear regression is for more than one X’s  Simple linear regression: Y = A + B X + C A = intercept of fitted line on Y axis B = regression coefficient / slope C = Error in the model
  • 40. Simple Linear Regression Example  R&D Dept. of a company wishes to predict the relationship between amount spent on R&D and annual profit generated. It collects the data for last 6 years and wants to sanction R&D budget accordingly for 2016. » Company profit target for 2016 = 32 Cr. How much should be spent on R&D in 2016? R&D Expense, Crores Annual profit, Crores 2010 2 20 2011 3 25 2012 5 34 2013 4 30 2014 11 40 2015 5 31
  • 41. Regression Analysis Results Coefficients Standard Error P-value Intercept 20.0 2.65 0.002 R&D Expense 2.0 0.46 0.012 Regression Statistics Multiple R 0.9091 R Square 0.8264 Adjusted R Square 0.7831 Observations 6 The regression equation is Profit = 20.0 + 2.0 * R&D Expense • 82.64% of linear variation in Y is explained by X in this fitted model. P-value < 0.05 Coefficient of determination
  • 42. Multiple Regression Analysis Y = A + B1X1 + B2X2 + C • Suppose we are trying to predict rent of an apartment based on the no. of rooms & its distance from the main market. The following information is collected. • If you are looking for a two-bedroom apartment, 2km from the main market, what rent should you expect to pay ? Rent No. of rooms Distance (km) 3600 2 1 10000 6 2 4500 3 2 5250 4 3 3500 2 10 3000 1 4
  • 43. Multiple Regression Analysis Results Rent = 852 + 1381* No. of rooms » Expected rent for 2-bed room = 3614 Distance is not seeming as an important factor as its P-value is more than 0.05. Regression Statistics Multiple R 0.9565 R Square 0.9149 Adjusted R Square 0.8581 Observations 6 Coefficients Standard Error P-value Intercept 852.04 1146.27 0.511 No. of rooms 1380.97 259.50 0.013 Distance -5.44 142.13 0.972
  • 44. Points to remember in Regression  Don’t extrapolate beyond the range.  Don’t assume causation. Regression predicts the statistical relation. Theoretical/ Logical relation should be there.  No. of schools vs. Incidents of Crime  Regression may not give a good R2 – If X’s chosen are not the ‘real’ ones – If X’s have intercations – In case of multiple X’s having a curvilinear relationship with ‘Y’