Disclaimer The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries (collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the accuracy, fairness, or completeness of this information. This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views and/or expectations of the Company and its management with respect to its performance, business and future events. Forward looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including investors) for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages.  This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever. Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard. The market and competitive position data, including market forecasts, used throughout this presentation were obtained from internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe that any of this information or these reports are inaccurate in any material respect, we have not independently verified the competitive position, market share, market size, market growth or other data provided by third parties or by industry or other publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such information. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MPX’s prior written consent. .
MPX: a diversified energy company with the largest portfolio of integrated projects in South America .   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MPX Highlights ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],.
Steady and predictable cash flows from fully contracted power generation plants .   Figures adjusted considering MPX’s stake in each project Notes: 1. TPP Energia Pecém is a partnership between MPX (50%) and EDP (50%); 2 . TPP Maranhão III, IV and V + Free market are partnerships between MPX (70%) and Petra (30%);  3. Capacity Payments are escalated annually by the IPCA inflation index (Figures as September, 2011).  CAGR: 73% Minimum Guaranteed Gross Revenues 3 Installed Capacity  R$ 551 MM R$ 1,460 MM CAGR: 40% 720 MW 1,558 MW 2,157 MW R$ 1,520 MM R$ 1,286 MM TPP Energia Pecém 1 TPP Itaqui TPP Pec é m II TPP Maranhão IV and V (Bertin)+ Free Market  2 TPP Maranhão III   (A-3  Auction )  2
.   EPC Progress EPC Progress  TPP Energia Pecém (720 MW) TPP Itaqui (365 MW) TPPs Energia Pecém and Itaqui will start-up in 1H2012
In 2013, TPP Pecém II and the Parnaíba Thermoelectric Complex also begin to generate power .   EPC Progress TPP Pecém II (360 MW) UTE Maranhão IV + V (676 MW) EPC Progress
And in 2014, the Parnaíba Thermoelectric Complex will reach a total capacity of 1.5 GW .   ,[object Object],[object Object],Integrated gas supply = monetization of MPX’s 23% stake in the E&P business in the Parnaíba Basin  Capacity (MW) Energy sold (avg MW) Annual Capacity Payment  2 Start up TPP Maranhão IV+V (Parnaíba)   1 676 450 R$ 278 million 2013 MPX Parnaíba  (Free Market)  1 338 230 R$ 203 million 2014 TPP Maranhão III  (Parnaíba)  1 517 450 R$ 233 million 2014 Total 1,531 1,130 R$  714 million
With a total licensed capacity of 3.7 GW, Parnaíba will be an important growth platform for MPX in coming years MPX (70%) + Petra (30%) ,[object Object],[object Object],[object Object],[object Object],.
MPX will also have an additional cash flows from gas E&P business, integrated to the power generation complex .   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Paranaíba Complex Project 1  1 st  gas: 2H12 23 production wells Gavião Real Gavião Azul
Parnaíba Basin Drilling Campaign Update .   Well Block Accumulation Rig Net Pay Status 1 OGX-16 PN-T-68 California QG-1 Devonian: Gas shows, 23m & 25m (column) Concluded 2 OGX-22 PN-T-68 Fazenda São José QG-1 Upper Devonian: 49m  Lower Devonian: 47m Concluded 3 OGX-34 PN-T-68 Bom Jesus QG-1 Devonian: 23m Concluded 4 OGX-38 PN-T-68 Fazenda São José BCH-05 Devonian: 43m Concluded 5 OGX-46D PN-T-68 California – D QG-1 Devonian:15m Concluded 6 OGX-51DP PN-T-68 California – 2DP QG-1 Devonian: 8m Concluded 7 OGX-49 PN-T-68 Fazenda São José BCH-05 - Concluded 8 OGX-57 PN-T-68 Fazenda São José - 2 QG-1 - Concluded 9 OGX-59 PN-T-49 Fazenda Torrão BCH-05 Devonian: 9m Concluded 10 GVRX-1D PN-T-68 Gavião Real QG-1 In progress since 9/05 11 OGX-66 PN-T-67 Angical BCH-05 In progress since 10/25
In Colombia, MPX is also developing a world-class coal company (CCX) ,[object Object],[object Object],[object Object],[object Object],[object Object],.   PROJECT SITE PORT SITE PROPOSED 150KM RAIL
With an extensive drilling campaign ongoing to evaluate underground potential resources .   ,[object Object],[object Object],[object Object]
MPX is also planning 2D seismic in additional areas to guide expansion plans .   2D SEISMIC  Total:  390.78 Km
MPX will supply its own power plants in Brazil and Chile and will be an important player in the growing seaborne market .   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Assuming an average dispatch rate of 65% for Energia Pecém, Pecém II e Itaqui; 70% for Açu plant and 100% for Castilla plant.
MPX Castilla is the largest licensed greenfield power plant in Chile ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],.
Strategically located in a region with significant pent-up demand for energy and water .   Potential   demand from miners surpasses 1,500 MW Mining Project MW  Region Start-up Ore Developer Casale 266 Atacama  2015 Au  -  Relincho 230 Atacama  2017 Cu  -  Xstrata el Morro 170 Atacama  2015 Cu  -  Caserones 150 Atacama  2013 Cu  Endesa  Pascua Lama 115 Atacama  2013 Au  Guacolda  MMX 100 Atacama  2014 H  -  Marte Lobo 82 Atacama  2015 Cu  -  Enami Delta  Pan de Azucar 7 Coquimbo  2012 Cu  -  Codelco Ventanas 70 Valparaiso  2014 Cu  Gener  Expansión Andina 20 Valparaiso  2014 Cu  Colbun  Tres Valle  14 Valparaiso  2012 Cu  Pacific Hydro  Expansión El Soldado 11 Valparaiso  2012 Cu  Colbun  Los Bronces 95 Metropolitana  2012 Cu  Colbun Codelco Teniente  (Nuevo Nivel)  200 O´Higgiins  2015 Cu  Colbun
MPX Açu is a licensed 5.4 GW greenfield generation complex in Southeastern Brazil ,[object Object],[object Object],[object Object],[object Object],[object Object],Located in one of the most important port-industrial complexes in Latin America .
Close to natural gas accumulations discovered in the Campos Basin ,[object Object],Campos Basin  85% of Brazil’s Oil Production .
In the South of Brazil, MPX Sul and MPX Seival add up to 1.3 GW ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],.   ,[object Object]
www.mpx.com.br  www.ebx.com.br     www.descubraebx.com.br  www.youtube/grupoebx www.eikebatista.com.br www.flickr.com/photos/grupoebx

More Related Content

What's hot

Presentation Results 4Q11
Presentation Results 4Q11Presentation Results 4Q11
Presentation Results 4Q11MPX_RI
 
4Q11 Results Presentation
4Q11 Results Presentation4Q11 Results Presentation
4Q11 Results PresentationMPX_RI
 
Algonquin Power 2008 Progress Report
Algonquin Power 2008 Progress ReportAlgonquin Power 2008 Progress Report
Algonquin Power 2008 Progress ReportTMX Equicom
 
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Resurgent India
 
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionSpectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionMarcellus Drilling News
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...ank_
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryUKTI2014
 
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleList of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleMarcellus Drilling News
 
LFG Strategic Plan v9 - Final
LFG Strategic Plan v9 - FinalLFG Strategic Plan v9 - Final
LFG Strategic Plan v9 - FinalWill Dickinson
 
Corporate Presentation CPFL Energia - August 2017
Corporate Presentation CPFL Energia - August 2017Corporate Presentation CPFL Energia - August 2017
Corporate Presentation CPFL Energia - August 2017CPFL RI
 
1Q17 Results Presentation - CPFL Energia
1Q17 Results Presentation - CPFL Energia1Q17 Results Presentation - CPFL Energia
1Q17 Results Presentation - CPFL EnergiaCPFL RI
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencefinance20
 
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Marcellus Drilling News
 
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Marcellus Drilling News
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentationsorschak
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017CPFL RI
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Gurparvesh kaur
 
Transnational Trade of Electricity
Transnational Trade of ElectricityTransnational Trade of Electricity
Transnational Trade of ElectricityIPPAI
 

What's hot (20)

Presentation Results 4Q11
Presentation Results 4Q11Presentation Results 4Q11
Presentation Results 4Q11
 
4Q11 Results Presentation
4Q11 Results Presentation4Q11 Results Presentation
4Q11 Results Presentation
 
Algonquin Power 2008 Progress Report
Algonquin Power 2008 Progress ReportAlgonquin Power 2008 Progress Report
Algonquin Power 2008 Progress Report
 
Be
BeBe
Be
 
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
 
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionSpectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th January
 
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica ShaleList of Economic Development Projects in Eastern Ohio Related to Utica Shale
List of Economic Development Projects in Eastern Ohio Related to Utica Shale
 
LFG Strategic Plan v9 - Final
LFG Strategic Plan v9 - FinalLFG Strategic Plan v9 - Final
LFG Strategic Plan v9 - Final
 
Corporate Presentation CPFL Energia - August 2017
Corporate Presentation CPFL Energia - August 2017Corporate Presentation CPFL Energia - August 2017
Corporate Presentation CPFL Energia - August 2017
 
1Q17 Results Presentation - CPFL Energia
1Q17 Results Presentation - CPFL Energia1Q17 Results Presentation - CPFL Energia
1Q17 Results Presentation - CPFL Energia
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConference
 
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
 
TGI Results and Key Development 2015
TGI Results and Key Development 2015 TGI Results and Key Development 2015
TGI Results and Key Development 2015
 
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)Bricker & Eckler Shale Economic Development Overview (Fall 2014)
Bricker & Eckler Shale Economic Development Overview (Fall 2014)
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentation
 
Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017Corporate Presentation CPFL Energia - May 2017
Corporate Presentation CPFL Energia - May 2017
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Transnational Trade of Electricity
Transnational Trade of ElectricityTransnational Trade of Electricity
Transnational Trade of Electricity
 

Similar to Mpx corp presentation eng_v2

MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX_RI
 
Mpx corporate presentation (august)
Mpx corporate presentation (august)Mpx corporate presentation (august)
Mpx corporate presentation (august)MPX_RI
 
MPX Corporate Presentation - May 2013
MPX Corporate Presentation - May 2013MPX Corporate Presentation - May 2013
MPX Corporate Presentation - May 2013MPX_RI
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX_RI
 
2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation2Q13 Earnings Release Presentation
2Q13 Earnings Release PresentationMPX_RI
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseLeonardo ENERGY
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWLeonardo ENERGY
 
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docxhyacinthshackley2629
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaAlex Pischalnikov
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate PresentationMPX_RI
 
Gasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryGasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryErnesto Linares
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencefinance20
 
Eng apresentação de resultados v.final
Eng apresentação de resultados v.finalEng apresentação de resultados v.final
Eng apresentação de resultados v.finalersa_ri
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Nieza Noordin
 

Similar to Mpx corp presentation eng_v2 (20)

MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX Corporate Presentation (September)
MPX Corporate Presentation (September)
 
Mpx corporate presentation (august)
Mpx corporate presentation (august)Mpx corporate presentation (august)
Mpx corporate presentation (august)
 
MPX Corporate Presentation - May 2013
MPX Corporate Presentation - May 2013MPX Corporate Presentation - May 2013
MPX Corporate Presentation - May 2013
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)
 
2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Magma presentation-nov17
Magma presentation-nov17Magma presentation-nov17
Magma presentation-nov17
 
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
1000-1250 wordsTable of ContentsAbstract2Introduction3.docx
 
Sunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in GhanaSunpowerd - Distributed Solar in Ghana
Sunpowerd - Distributed Solar in Ghana
 
Magma presentation-jan 2011
Magma presentation-jan 2011Magma presentation-jan 2011
Magma presentation-jan 2011
 
Magma presentation-mar 2011
Magma presentation-mar 2011Magma presentation-mar 2011
Magma presentation-mar 2011
 
Energy Malaysia Volume 2.pdf
Energy Malaysia Volume 2.pdfEnergy Malaysia Volume 2.pdf
Energy Malaysia Volume 2.pdf
 
Magma Presentation April 2011
Magma Presentation April 2011Magma Presentation April 2011
Magma Presentation April 2011
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate Presentation
 
Gasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en CalgaryGasoducto Sur Peruano en Calgary
Gasoducto Sur Peruano en Calgary
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConference
 
Business case BFE.pdf
Business case BFE.pdfBusiness case BFE.pdf
Business case BFE.pdf
 
Eng apresentação de resultados v.final
Eng apresentação de resultados v.finalEng apresentação de resultados v.final
Eng apresentação de resultados v.final
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)
 

More from MPX_RI

MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX_RI
 
Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)MPX_RI
 
Apresentação de Resultados 2T13
Apresentação de Resultados 2T13Apresentação de Resultados 2T13
Apresentação de Resultados 2T13MPX_RI
 
MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX_RI
 
Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013MPX_RI
 
1Q13 Results Presentation
1Q13 Results Presentation1Q13 Results Presentation
1Q13 Results PresentationMPX_RI
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13MPX_RI
 
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...MPX_RI
 
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 Definitive Agreements between the Controlling Shareholder and E.ON, and Capi... Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...MPX_RI
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX ResultsMPX_RI
 
4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPXMPX_RI
 
MPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX_RI
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroMPX_RI
 
MPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX_RI
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroMPX_RI
 
Apresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroApresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroMPX_RI
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5MPX_RI
 
Mpx 4 t12_port_v5
Mpx 4 t12_port_v5Mpx 4 t12_port_v5
Mpx 4 t12_port_v5MPX_RI
 
Teleconference 4Q12
Teleconference 4Q12Teleconference 4Q12
Teleconference 4Q12MPX_RI
 
Teleconferência 4T12
Teleconferência 4T12Teleconferência 4T12
Teleconferência 4T12MPX_RI
 

More from MPX_RI (20)

MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)
 
Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)
 
Apresentação de Resultados 2T13
Apresentação de Resultados 2T13Apresentação de Resultados 2T13
Apresentação de Resultados 2T13
 
MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)
 
Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013
 
1Q13 Results Presentation
1Q13 Results Presentation1Q13 Results Presentation
1Q13 Results Presentation
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13
 
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
 
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 Definitive Agreements between the Controlling Shareholder and E.ON, and Capi... Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX Results
 
4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX
 
MPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX Corporate Presentation February
MPX Corporate Presentation February
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - Fevereiro
 
MPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiro
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - Fevereiro
 
Apresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroApresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiro
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5
 
Mpx 4 t12_port_v5
Mpx 4 t12_port_v5Mpx 4 t12_port_v5
Mpx 4 t12_port_v5
 
Teleconference 4Q12
Teleconference 4Q12Teleconference 4Q12
Teleconference 4Q12
 
Teleconferência 4T12
Teleconferência 4T12Teleconferência 4T12
Teleconferência 4T12
 

Recently uploaded

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 

Recently uploaded (20)

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 

Mpx corp presentation eng_v2

  • 2. Disclaimer The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries (collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the accuracy, fairness, or completeness of this information. This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views and/or expectations of the Company and its management with respect to its performance, business and future events. Forward looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including investors) for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages. This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever. Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard. The market and competitive position data, including market forecasts, used throughout this presentation were obtained from internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe that any of this information or these reports are inaccurate in any material respect, we have not independently verified the competitive position, market share, market size, market growth or other data provided by third parties or by industry or other publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such information. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MPX’s prior written consent. .
  • 3.
  • 4.
  • 5. Steady and predictable cash flows from fully contracted power generation plants . Figures adjusted considering MPX’s stake in each project Notes: 1. TPP Energia Pecém is a partnership between MPX (50%) and EDP (50%); 2 . TPP Maranhão III, IV and V + Free market are partnerships between MPX (70%) and Petra (30%); 3. Capacity Payments are escalated annually by the IPCA inflation index (Figures as September, 2011). CAGR: 73% Minimum Guaranteed Gross Revenues 3 Installed Capacity R$ 551 MM R$ 1,460 MM CAGR: 40% 720 MW 1,558 MW 2,157 MW R$ 1,520 MM R$ 1,286 MM TPP Energia Pecém 1 TPP Itaqui TPP Pec é m II TPP Maranhão IV and V (Bertin)+ Free Market 2 TPP Maranhão III (A-3 Auction ) 2
  • 6. . EPC Progress EPC Progress TPP Energia Pecém (720 MW) TPP Itaqui (365 MW) TPPs Energia Pecém and Itaqui will start-up in 1H2012
  • 7. In 2013, TPP Pecém II and the Parnaíba Thermoelectric Complex also begin to generate power . EPC Progress TPP Pecém II (360 MW) UTE Maranhão IV + V (676 MW) EPC Progress
  • 8.
  • 9.
  • 10.
  • 11. Parnaíba Basin Drilling Campaign Update . Well Block Accumulation Rig Net Pay Status 1 OGX-16 PN-T-68 California QG-1 Devonian: Gas shows, 23m & 25m (column) Concluded 2 OGX-22 PN-T-68 Fazenda São José QG-1 Upper Devonian: 49m Lower Devonian: 47m Concluded 3 OGX-34 PN-T-68 Bom Jesus QG-1 Devonian: 23m Concluded 4 OGX-38 PN-T-68 Fazenda São José BCH-05 Devonian: 43m Concluded 5 OGX-46D PN-T-68 California – D QG-1 Devonian:15m Concluded 6 OGX-51DP PN-T-68 California – 2DP QG-1 Devonian: 8m Concluded 7 OGX-49 PN-T-68 Fazenda São José BCH-05 - Concluded 8 OGX-57 PN-T-68 Fazenda São José - 2 QG-1 - Concluded 9 OGX-59 PN-T-49 Fazenda Torrão BCH-05 Devonian: 9m Concluded 10 GVRX-1D PN-T-68 Gavião Real QG-1 In progress since 9/05 11 OGX-66 PN-T-67 Angical BCH-05 In progress since 10/25
  • 12.
  • 13.
  • 14. MPX is also planning 2D seismic in additional areas to guide expansion plans . 2D SEISMIC Total: 390.78 Km
  • 15.
  • 16.
  • 17. Strategically located in a region with significant pent-up demand for energy and water . Potential demand from miners surpasses 1,500 MW Mining Project MW Region Start-up Ore Developer Casale 266 Atacama 2015 Au - Relincho 230 Atacama 2017 Cu - Xstrata el Morro 170 Atacama 2015 Cu - Caserones 150 Atacama 2013 Cu Endesa Pascua Lama 115 Atacama 2013 Au Guacolda MMX 100 Atacama 2014 H - Marte Lobo 82 Atacama 2015 Cu - Enami Delta Pan de Azucar 7 Coquimbo 2012 Cu - Codelco Ventanas 70 Valparaiso 2014 Cu Gener Expansión Andina 20 Valparaiso 2014 Cu Colbun Tres Valle 14 Valparaiso 2012 Cu Pacific Hydro Expansión El Soldado 11 Valparaiso 2012 Cu Colbun Los Bronces 95 Metropolitana 2012 Cu Colbun Codelco Teniente (Nuevo Nivel) 200 O´Higgiins 2015 Cu Colbun
  • 18.
  • 19.
  • 20.
  • 21. www.mpx.com.br www.ebx.com.br www.descubraebx.com.br www.youtube/grupoebx www.eikebatista.com.br www.flickr.com/photos/grupoebx