SlideShare a Scribd company logo
1 of 1
Download to read offline
Page 18. Master Builders Winners
Alba Projects P/L is a construction company that has over 22 years experience
in the industry. It is a modern building company that operates on a simple
formula: building with integrity & experience and achieving excellence. Key
essential characteristics of the team are high standards, common sense, good
communication and efficient and timely work performance. Together, this
makes for a competent building company that is able to produce results that
speak for themselves.
Colin Brown 0439 641 683 www.albaprojects.com.au
BSA 1117 947
3347910aa
QLD/NSW/VIC/ACT www.sthilliers.com.au
Building
projects that
set benchmarks
in construction
excellence.
Meridan State College -
Stage 3
Winner
Health & Education Facilities
$4 million - $15 million
MASTER BUILDERSHousing & Construction 2010 Awards Winners
Advertising Feature
within the wildlife corridor and
gutterless roofs shed water
patterns into the waterfalls
below.
The 5.4 hectare site could
only be accessed by one 400m
internal road which required
fulltime traffic control.
With limited space for site
parking and restricted parking
in surrounding streets, Matrix
Projects implemented a bus
service to transport more than
400 workers per day to and
from the site from the local
football ground.
Access on and around the
site was provided by narrow
corridors, which later formed
the permanent streets of the
Viridian Village.
To maintain stable access,
and provide a first class pro-
duct at handover, these tem-
porary roads were graded,
compacted and sealed 40mm
lower than the finished street
level, allowing a final asphalt
seal to be placed on comple-
tion.
It features large landscape
buffers that provide a green
zone within the complex
which, in turn, relate and
connect to the surrounding
National Park and greenbelt.
Matrix Projects appointed a
fulltime environmental manag-
er to continually monitor,
assess, document and custo-
mise environmental control
systems onsite.
Site run-off into the Noosa
River and surrounding fragile
ecosystem was managed by a
maze of construction swales,
bioretention basins and sedi-
ment ponds which contained
the massive quantities of
water and overland flow pro-
duced by extreme downpours,
in excess of 100mm per hour at
times.
Master Builders Sunshine
Coast regional manager Ste-
phen Robinson said, in some
respects, Viridian 3 resembled
an alpine village set in the
subtropics as much of the
development sat on stilts
A
5-STAR resort on
Noosa Hill has won
builder Matrix Projects
(Qld) the 2010 Master Builders
Sunshine Coast Regional
Project of the Year.
The Viridian Resort and Spa
comprises 39 luxury two- and
three-storey villas, 139 units,
16 penthouses, a health spa,
restaurant and a central facil-
ities complex servicing 11
multi-storey blocks.
With the idyllic Noosa Na-
tional Park as its backdrop, the
resort was a feat in engineer-
ing that overcame the con-
straints of a challenging ter-
rain while respecting the
natural environment.
Constructed from a selec-
tion of building materials, the
resort commands the highest
quality finish.
Viridian is a linear develop-
ment running along the valley
between Picture Point and
Noosa Hill. It covers an area as
long as Noosa’s Hastings
Street with a similar density.
Award-winner ‘alpine village

More Related Content

Viewers also liked

The social teachings of the catholic church
The social teachings of the catholic church The social teachings of the catholic church
The social teachings of the catholic church johnlorenz540
 
EJERCICIOS DE REDES
EJERCICIOS DE REDES EJERCICIOS DE REDES
EJERCICIOS DE REDES cr-peinado
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_PlanningSuraj Namdeo
 
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...Zhulkeflee Ismail
 
Como crear un blog.pptx
Como crear un blog.pptxComo crear un blog.pptx
Como crear un blog.pptxIrene Lara
 
Client Intake Form 2015 with outline
Client Intake Form 2015 with outlineClient Intake Form 2015 with outline
Client Intake Form 2015 with outlinePatrice Diana
 

Viewers also liked (8)

The social teachings of the catholic church
The social teachings of the catholic church The social teachings of the catholic church
The social teachings of the catholic church
 
EJERCICIOS DE REDES
EJERCICIOS DE REDES EJERCICIOS DE REDES
EJERCICIOS DE REDES
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_Planning
 
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...
[Slideshare] tafaqqahu-#4(january-2016)-lesson-#1c -introduction-to-module-(6...
 
Vertebrados
VertebradosVertebrados
Vertebrados
 
Como crear un blog.pptx
Como crear un blog.pptxComo crear un blog.pptx
Como crear un blog.pptx
 
Client Intake Form 2015 with outline
Client Intake Form 2015 with outlineClient Intake Form 2015 with outline
Client Intake Form 2015 with outline
 
Application of geographical information systems in climate change for sustain...
Application of geographical information systems in climate change for sustain...Application of geographical information systems in climate change for sustain...
Application of geographical information systems in climate change for sustain...
 

Similar to Veridian Resort Noosa p1

Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMenasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMiron Construction
 
03391_DS_CAFlats_NA_11FEB15
03391_DS_CAFlats_NA_11FEB1503391_DS_CAFlats_NA_11FEB15
03391_DS_CAFlats_NA_11FEB15Dawn Legg
 
Consolidated Water Investor Presentation
Consolidated Water Investor PresentationConsolidated Water Investor Presentation
Consolidated Water Investor PresentationJeremy Keyser
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon CapabilityDamien Allen
 
Blu Diamond Capital Properties Profile 2016
Blu Diamond Capital Properties Profile 2016Blu Diamond Capital Properties Profile 2016
Blu Diamond Capital Properties Profile 2016Stephanie Ardrey
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination ProjectRick Nabett
 
MODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQMODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQRhonan OBrien
 
Project profile brownfield
Project profile brownfieldProject profile brownfield
Project profile brownfieldShannonCrook
 
Investor presentation nov 30 2015 (1)
Investor presentation   nov 30 2015 (1)Investor presentation   nov 30 2015 (1)
Investor presentation nov 30 2015 (1)Jeremy Keyser
 
RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115Bernadette Grafton
 
MODE_Sector-Brochure_Sports&Recreation_V1_LQ
MODE_Sector-Brochure_Sports&Recreation_V1_LQMODE_Sector-Brochure_Sports&Recreation_V1_LQ
MODE_Sector-Brochure_Sports&Recreation_V1_LQRhonan OBrien
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
Net Impact Case Competition Urban Infrastructure Strategy
Net Impact Case Competition Urban Infrastructure StrategyNet Impact Case Competition Urban Infrastructure Strategy
Net Impact Case Competition Urban Infrastructure StrategyYoni Sarason
 
2021 Annual Report: Progress Toward a Sustainable Future
2021 Annual Report: Progress Toward a Sustainable Future2021 Annual Report: Progress Toward a Sustainable Future
2021 Annual Report: Progress Toward a Sustainable FutureMichelleKramer16
 
Green Building - Site selection and development
Green Building - Site selection and developmentGreen Building - Site selection and development
Green Building - Site selection and developmentChaitanya Jadkar
 
Investor presentation june 9, 2015(print)
Investor presentation   june 9, 2015(print)Investor presentation   june 9, 2015(print)
Investor presentation june 9, 2015(print)Jeremy Keyser
 
Investor presentation june 9, 2015(print)
Investor presentation   june 9, 2015(print)Investor presentation   june 9, 2015(print)
Investor presentation june 9, 2015(print)Jeremy Keyser
 

Similar to Veridian Resort Noosa p1 (20)

Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMenasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
 
03391_DS_CAFlats_NA_11FEB15
03391_DS_CAFlats_NA_11FEB1503391_DS_CAFlats_NA_11FEB15
03391_DS_CAFlats_NA_11FEB15
 
Consolidated Water Investor Presentation
Consolidated Water Investor PresentationConsolidated Water Investor Presentation
Consolidated Water Investor Presentation
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
Blu Diamond Capital Properties Profile 2016
Blu Diamond Capital Properties Profile 2016Blu Diamond Capital Properties Profile 2016
Blu Diamond Capital Properties Profile 2016
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
MODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQMODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQ
 
Project profile brownfield
Project profile brownfieldProject profile brownfield
Project profile brownfield
 
Investor presentation nov 30 2015 (1)
Investor presentation   nov 30 2015 (1)Investor presentation   nov 30 2015 (1)
Investor presentation nov 30 2015 (1)
 
RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115
 
Diridon_Brochure-2
Diridon_Brochure-2Diridon_Brochure-2
Diridon_Brochure-2
 
SOME OF MY WORK
SOME OF MY WORKSOME OF MY WORK
SOME OF MY WORK
 
MODE_Sector-Brochure_Sports&Recreation_V1_LQ
MODE_Sector-Brochure_Sports&Recreation_V1_LQMODE_Sector-Brochure_Sports&Recreation_V1_LQ
MODE_Sector-Brochure_Sports&Recreation_V1_LQ
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Net Impact Case Competition Urban Infrastructure Strategy
Net Impact Case Competition Urban Infrastructure StrategyNet Impact Case Competition Urban Infrastructure Strategy
Net Impact Case Competition Urban Infrastructure Strategy
 
2021 Annual Report: Progress Toward a Sustainable Future
2021 Annual Report: Progress Toward a Sustainable Future2021 Annual Report: Progress Toward a Sustainable Future
2021 Annual Report: Progress Toward a Sustainable Future
 
Green Building - Site selection and development
Green Building - Site selection and developmentGreen Building - Site selection and development
Green Building - Site selection and development
 
RESUME EN (SB)
RESUME EN (SB)RESUME EN (SB)
RESUME EN (SB)
 
Investor presentation june 9, 2015(print)
Investor presentation   june 9, 2015(print)Investor presentation   june 9, 2015(print)
Investor presentation june 9, 2015(print)
 
Investor presentation june 9, 2015(print)
Investor presentation   june 9, 2015(print)Investor presentation   june 9, 2015(print)
Investor presentation june 9, 2015(print)
 

Veridian Resort Noosa p1

  • 1. Page 18. Master Builders Winners Alba Projects P/L is a construction company that has over 22 years experience in the industry. It is a modern building company that operates on a simple formula: building with integrity & experience and achieving excellence. Key essential characteristics of the team are high standards, common sense, good communication and efficient and timely work performance. Together, this makes for a competent building company that is able to produce results that speak for themselves. Colin Brown 0439 641 683 www.albaprojects.com.au BSA 1117 947 3347910aa QLD/NSW/VIC/ACT www.sthilliers.com.au Building projects that set benchmarks in construction excellence. Meridan State College - Stage 3 Winner Health & Education Facilities $4 million - $15 million MASTER BUILDERSHousing & Construction 2010 Awards Winners Advertising Feature within the wildlife corridor and gutterless roofs shed water patterns into the waterfalls below. The 5.4 hectare site could only be accessed by one 400m internal road which required fulltime traffic control. With limited space for site parking and restricted parking in surrounding streets, Matrix Projects implemented a bus service to transport more than 400 workers per day to and from the site from the local football ground. Access on and around the site was provided by narrow corridors, which later formed the permanent streets of the Viridian Village. To maintain stable access, and provide a first class pro- duct at handover, these tem- porary roads were graded, compacted and sealed 40mm lower than the finished street level, allowing a final asphalt seal to be placed on comple- tion. It features large landscape buffers that provide a green zone within the complex which, in turn, relate and connect to the surrounding National Park and greenbelt. Matrix Projects appointed a fulltime environmental manag- er to continually monitor, assess, document and custo- mise environmental control systems onsite. Site run-off into the Noosa River and surrounding fragile ecosystem was managed by a maze of construction swales, bioretention basins and sedi- ment ponds which contained the massive quantities of water and overland flow pro- duced by extreme downpours, in excess of 100mm per hour at times. Master Builders Sunshine Coast regional manager Ste- phen Robinson said, in some respects, Viridian 3 resembled an alpine village set in the subtropics as much of the development sat on stilts A 5-STAR resort on Noosa Hill has won builder Matrix Projects (Qld) the 2010 Master Builders Sunshine Coast Regional Project of the Year. The Viridian Resort and Spa comprises 39 luxury two- and three-storey villas, 139 units, 16 penthouses, a health spa, restaurant and a central facil- ities complex servicing 11 multi-storey blocks. With the idyllic Noosa Na- tional Park as its backdrop, the resort was a feat in engineer- ing that overcame the con- straints of a challenging ter- rain while respecting the natural environment. Constructed from a selec- tion of building materials, the resort commands the highest quality finish. Viridian is a linear develop- ment running along the valley between Picture Point and Noosa Hill. It covers an area as long as Noosa’s Hastings Street with a similar density. Award-winner ‘alpine village