A project of Krister Pettersson, M.Sc. contracted as Adviser and Resident Engineer to Lactogal SA.
!
Independent civil engineering consultant Krister
Pettersson was contracted as an advisor, project
co-ordinator and resident engineer by the dairy
cooperative organization Lactogal SA, for the
realization of a large dairy plant project close to
Oporto, Portugal, finished in 2004. The largest
dairy plant project in Europe, the plant is of 50
000 m2 and processes 1,6 million liters of UHT
milk daily. Process suppliers were Tetra Pak with
Siemens Dematic for the automatic high storage.
During four years, virtually all aspects of dairy
plant design and building construction were
penetrated. Cross-cultural and multi-disciplinary
understanding helped the introduction of
substantial improvements.
MODIFICATIONS-IMPROVEMENTS
As can be imagined from the photos, a number of
modifications to the design and function of the
new dairy plant were introduced as initialized by
Krister Pettersson. A few of them were:
!BUILDINGS
Joint-free ceramic flooring
The higher part on the right of the building
complex is the two-storied process area. The
heavy loaded upper floor area here, about 27 x
130 m, is completely free of joints in the ceramic
flooring on a concrete structure. This could be
/1 2H Krister Pettersson, M.Sc,Lactogal SA, Modivas Portugal
BEFORE AFTER
The mock-up from 1999 of the intended new dairy
plant for Lactogal SA at Modivas, Vila do Conde,
some 20 km to the North of Oporto, Portugal
This photo from 2003 shows the dairy plant about to be
finished. Some changes in relation to original plant design are
described in the text. Below the latest design drawing, facade
and plan, of the realized dairy plant.
Text
achieved by casting the heavy-duty concrete slab with a methodology avoiding the need of expansion or
construction joints producing only micro-cracks in the concrete. Then a combination of ceramic tiles and
fixing compound was carefully chosen for certain flexibility with the aim of resisting the small movements
in the micro-cracks of the concrete.
The resulting joint-free flooring is
highly appreciated for hygiene,
resistance and easy maintenance.
!Building shell
Apart from the new color (Swedish
Falu-red was such a fresh contrast to
the surrounding green nature, said the
architect, Mr. Brito) the photos show
that the inclinations of the various
roofs have been increased and some
of the height differences between
building parts eliminated. Much of
the roof drainage is centralized to one
single, large roof drainage canal
This means that the risk for rain-
water leakage has been reduced and
maintenance facilitated, as a number
of risky joints and water
accumulations on the roofs have
disappeared.
!EXTERNALAREAS
Water supply for the dairy plant
processes is mainly obtained from
own, drilled wells on the land, also a
few below the proper buildings.
!Large amounts of rainwater from the
roofs and hardened areas must be led
away to recipients. Originally, very
large diameter drainage pipes were
planned for this purpose.
!Krister could, however, introduce a
more environmentally friendly design
by building three large rain-water
dams on the ground to serve the
double purpose of reservoirs and
infiltration dams.
!With these reservoir dams, rainwater
pipe dimensions could be much
reduced. A certain infiltration of rain
and superficial water would help
replenish groundwater wells and the
dams would serve also for watering
and fire water supply. Finally an
environmentally healthier and more
diversified landscaping would be more
agreeable to both beast and man.
kp@gransloskompetens.se +46 76 2797885 Krister Pettersson
/2 2H Krister Pettersson, M.Sc,Lactogal SA, Modivas Portugal

More Related Content

What's hot (9)

Concrete
ConcreteConcrete
Concrete
 
Henri Kylä-Utsuri: Use of recycled concrete
Henri Kylä-Utsuri: Use  of recycled concreteHenri Kylä-Utsuri: Use  of recycled concrete
Henri Kylä-Utsuri: Use of recycled concrete
 
Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1
 
Fly ash bricks
Fly ash bricks Fly ash bricks
Fly ash bricks
 
CLAY BRICK FEASIBILITY REPORT
CLAY BRICK FEASIBILITY REPORTCLAY BRICK FEASIBILITY REPORT
CLAY BRICK FEASIBILITY REPORT
 
SmartSlope Evolution
SmartSlope EvolutionSmartSlope Evolution
SmartSlope Evolution
 
Commercialisation of geopolymer concrete as part of FP7 SUS-CON project
Commercialisation of geopolymer concrete as part of FP7 SUS-CON projectCommercialisation of geopolymer concrete as part of FP7 SUS-CON project
Commercialisation of geopolymer concrete as part of FP7 SUS-CON project
 
Retaining Wall Drainage System- Nilex
Retaining Wall Drainage System- NilexRetaining Wall Drainage System- Nilex
Retaining Wall Drainage System- Nilex
 
Maxit Leca on Linked In
Maxit Leca on Linked InMaxit Leca on Linked In
Maxit Leca on Linked In
 

Similar to Dairy Plant Modivas KP Project LQ

MNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressedMNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressed
Maria Nikolousi
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio Sample
Noah Gardiner
 
140401_ce_ofen_a4_8s_gb_low
140401_ce_ofen_a4_8s_gb_low140401_ce_ofen_a4_8s_gb_low
140401_ce_ofen_a4_8s_gb_low
Henning Küll
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
mnociforo
 
Bcm ppt
Bcm pptBcm ppt
Bcm ppt
svrp7
 

Similar to Dairy Plant Modivas KP Project LQ (20)

ECOnomic Housing For Angola II
ECOnomic Housing For Angola IIECOnomic Housing For Angola II
ECOnomic Housing For Angola II
 
Floating Technology
Floating TechnologyFloating Technology
Floating Technology
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Pozzocrete
PozzocretePozzocrete
Pozzocrete
 
Exeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final WebExeed Litecrete Brochure Final Web
Exeed Litecrete Brochure Final Web
 
A South African Housing Innovation - Hennie Botes - CEO moladi
A South African Housing Innovation - Hennie Botes - CEO moladiA South African Housing Innovation - Hennie Botes - CEO moladi
A South African Housing Innovation - Hennie Botes - CEO moladi
 
Modern-Brick-Construction-Third-Edition-3.pdf
Modern-Brick-Construction-Third-Edition-3.pdfModern-Brick-Construction-Third-Edition-3.pdf
Modern-Brick-Construction-Third-Edition-3.pdf
 
Flyash Bricks
Flyash BricksFlyash Bricks
Flyash Bricks
 
The amphibious structure
The amphibious structureThe amphibious structure
The amphibious structure
 
MNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressedMNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressed
 
Noah Gardiner Portfolio Sample
Noah Gardiner Portfolio SampleNoah Gardiner Portfolio Sample
Noah Gardiner Portfolio Sample
 
Build 2 2016_eng_original_singlepage
Build 2 2016_eng_original_singlepageBuild 2 2016_eng_original_singlepage
Build 2 2016_eng_original_singlepage
 
140401_ce_ofen_a4_8s_gb_low
140401_ce_ofen_a4_8s_gb_low140401_ce_ofen_a4_8s_gb_low
140401_ce_ofen_a4_8s_gb_low
 
Les eco logis-en
Les eco logis-enLes eco logis-en
Les eco logis-en
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
 
Portfolio Light Version
Portfolio Light VersionPortfolio Light Version
Portfolio Light Version
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
 
Bcm ppt
Bcm pptBcm ppt
Bcm ppt
 
Triumphant star turban
Triumphant star turbanTriumphant star turban
Triumphant star turban
 
BP Glass Concrete
BP Glass ConcreteBP Glass Concrete
BP Glass Concrete
 

Dairy Plant Modivas KP Project LQ

  • 1. LACTOGAL - DAIRY PLANT AT MODIVAS, VILA DO CONDE, PORTUGAL 1999-2003 A project of Krister Pettersson, M.Sc. contracted as Adviser and Resident Engineer to Lactogal SA. ! Independent civil engineering consultant Krister Pettersson was contracted as an advisor, project co-ordinator and resident engineer by the dairy cooperative organization Lactogal SA, for the realization of a large dairy plant project close to Oporto, Portugal, finished in 2004. The largest dairy plant project in Europe, the plant is of 50 000 m2 and processes 1,6 million liters of UHT milk daily. Process suppliers were Tetra Pak with Siemens Dematic for the automatic high storage. During four years, virtually all aspects of dairy plant design and building construction were penetrated. Cross-cultural and multi-disciplinary understanding helped the introduction of substantial improvements. MODIFICATIONS-IMPROVEMENTS As can be imagined from the photos, a number of modifications to the design and function of the new dairy plant were introduced as initialized by Krister Pettersson. A few of them were: !BUILDINGS Joint-free ceramic flooring The higher part on the right of the building complex is the two-storied process area. The heavy loaded upper floor area here, about 27 x 130 m, is completely free of joints in the ceramic flooring on a concrete structure. This could be /1 2H Krister Pettersson, M.Sc,Lactogal SA, Modivas Portugal BEFORE AFTER The mock-up from 1999 of the intended new dairy plant for Lactogal SA at Modivas, Vila do Conde, some 20 km to the North of Oporto, Portugal This photo from 2003 shows the dairy plant about to be finished. Some changes in relation to original plant design are described in the text. Below the latest design drawing, facade and plan, of the realized dairy plant. Text
  • 2. achieved by casting the heavy-duty concrete slab with a methodology avoiding the need of expansion or construction joints producing only micro-cracks in the concrete. Then a combination of ceramic tiles and fixing compound was carefully chosen for certain flexibility with the aim of resisting the small movements in the micro-cracks of the concrete. The resulting joint-free flooring is highly appreciated for hygiene, resistance and easy maintenance. !Building shell Apart from the new color (Swedish Falu-red was such a fresh contrast to the surrounding green nature, said the architect, Mr. Brito) the photos show that the inclinations of the various roofs have been increased and some of the height differences between building parts eliminated. Much of the roof drainage is centralized to one single, large roof drainage canal This means that the risk for rain- water leakage has been reduced and maintenance facilitated, as a number of risky joints and water accumulations on the roofs have disappeared. !EXTERNALAREAS Water supply for the dairy plant processes is mainly obtained from own, drilled wells on the land, also a few below the proper buildings. !Large amounts of rainwater from the roofs and hardened areas must be led away to recipients. Originally, very large diameter drainage pipes were planned for this purpose. !Krister could, however, introduce a more environmentally friendly design by building three large rain-water dams on the ground to serve the double purpose of reservoirs and infiltration dams. !With these reservoir dams, rainwater pipe dimensions could be much reduced. A certain infiltration of rain and superficial water would help replenish groundwater wells and the dams would serve also for watering and fire water supply. Finally an environmentally healthier and more diversified landscaping would be more agreeable to both beast and man. kp@gransloskompetens.se +46 76 2797885 Krister Pettersson /2 2H Krister Pettersson, M.Sc,Lactogal SA, Modivas Portugal