SlideShare a Scribd company logo
1 of 16
Download to read offline
2014 GRAA Winner for Design 
San Francisco-Oakland Bay Bridge New East Span 
T.Y. Lin International/Moffatt & Nichol, Joint Venture 
Photograph by Noah Berger 
For Professionals. 
By Professionals. 
2014 Global Road 
Achievement Awards 
Book of Winning Projects 
International Road Federation 
Better Roads. Better World.
1 
Table of Contents 
Chairman’s Message. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 
Construction Methodology 
Sheikh Zayed Street Tunnel 
Abu Dhabi Municipality and Parsons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 
Design 
The San Francisco-Oakland Bay Bridge New East Span 
T.Y. Lin International/Moffatt & Nichol, Joint Venture . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 
Environmental Mitigation 
Legacy Way 
Transcity Joint Venture. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 
Traffic Management & ITS 
Xerox Merge Dynamic Parking Pricing 
Xerox. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 
Program Management 
Ma-Wu Highway Construction Project 
Hubei Changjiang Road & Bridge Co., Ltd . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 
Project Finance 
11th Street Bridge Project 
Washington, D.C. District Department of Transportation. . . . . . . . . . . . . . . . . . . . . . . . . 7 
Quality Management 
Columbus Crossroads 
Delcan, a Parsons Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 
Safety 
Children Road Safety is a Shared Responsibility 
Roads and Transport Authority (Dubai) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 
Technology, Equipment & Manufacturing 
Smartphone IRI Data Collection 
Roadroid. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 
Columbus Crossroads
2 
Celebrating the 14th Year of the GRAA Program 
On behalf of the International Road Federation (IRF) and our international 
panel of judges, I would like to congratulate the winners of the 2014 
IRF Global Road Achievement Awards! This year’s winners represent 
of some the most forward-thinking and cutting edge organizations 
around the world. I invite you examine the groundbreaking projects 
listed in this book and learn from their outstanding accomplishments. 
Established in 2000, the IRF GRAA Program plays a significant role in 
IRF’s mission to gather global best practices and promote technology 
transfer, by seeking out innovative and successful organizations 
and highlighting their accomplishments to share with the global 
transportation community. By showcasing new technologies and 
creative solutions, we are able to learn from each other, and build on 
our successes. 
As we continue fulfilling IRF’s mission of encouraging and promoting 
better, safer and more sustainable roads through the continuous 
exchange of knowledge and best practices, I would also encourage 
leading companies and organizations to submit their exemplary 
projects to the 2015 GRAA Competition. 
Eng. Abdullah A. Al-Mogbel 
IRF Chairman 
“Better Roads. Better World.” 
CHAIRMAN’S MESSAGE
3 
Sheikh Zayed Street Tunnel 
Abu Dhabi Municipality and Parsons 
The Sheikh Zayed (formerly Al Salam) Street and Tunnel project is one of the largest road infrastructure 
projects undertaken in Abu Dhabi, United Arab Emirates. It was the biggest civil engineering project 
in the Gulf region in 2010. 
The project consisted of 4 separate contracts, which entailed setting up 4 contract teams. The US 
$1.3 billion, 14-km project was constructed over 5 years, during which the project team continuously 
addressed the technical, social and economic challenges associated with such a complex project. Each 
contract was completed and opened to traffic in stages. The largest of these contracts was the Sheikh 
Zayed Tunnel, which was opened to the public on December 5, 2012. 
The Sheikh Zayed corridor is a vital improvement to a highly developed area of Abu Dhabi, linking 
major existing, new and future developments, such as Saadiyat Island, Eastern Mangroves, Maryah 
Island, Lulu Island and Mina Zayed area. 
The project was designed and constructed to segregate local and through movement of traffic. 
Thus, the surface roads, underpass and tunnel accommodate 4 lanes in each direction. This design 
arrangement has doubled the current traffic capacity to 12,000 vehicles per hour in each direction, 
in and out of Abu Dhabi. In conjunction with the elimination of the signalized intersections along 
Sheikh Zayed Street, the travel time from the outskirts of the city to Cornice has been reduced from 
30 to 12 minutes. 
The Sheikh Zayed Street and Tunnel are compliant with the highest construction standards and 
provided state-of-the art functionalities in traffic operation and management, allowing capabilities 
for integration into the Abu Dhabi City Traffic Management Plan. The size and the complexity of this 
project required strategic planning and input for an extensive list of stakeholders. 
The design of the tunnel structure is based on a traditional cut and cover technique. The tunnel overall 
length is 3.6 km (box tunnel 2.4 km, depressed tunnel 1 km and approaches 0.2 km). 
The project includes 23 utility buildings with a 300 m separation and improved system redundancy, 
23 emergency sliding doors in the median wall spaced at 100 m with 2 shutter doors, 2 redundant 
tunnel control rooms linked with the Abu Dhabi Traffic Management Center. The tunnel is equipped 
with SCADA controlling and monitoring systems. 
A computerized maintenance management system was specifically designed for this project to keep 
up the high performance and operations requirements for this tunnel. 
The construction of the tunnel included, but was not limited to: 7 km of shoring system, 400,000 
square meters of asphalt, 1.7 million cubic meters of excavations, 0.5 million cubic meters of structural 
concrete, and 35 km of electrical cables. 
The 35 million labor hours required to construct the tunnel have created employment and business 
opportunities. At the peak of construction, over 5,000 laborers and 500 engineers were actively 
engaged in the administration and construction of the tunnel. 
The project teams successfully achieved the key objectives as set by the project owner: the project was 
successfully completed within budget; the ride-ability on the surface roads and within the tunnel is 
of a very high quality; the completion of the 3.6-km long tunnel in a dense urban environment with 
close proximity to buildings without damage to any of those buildings; the aesthetics of the tunnel is 
widely acknowledged as being the best in Abu Dhabi. 
The project serves as one of the vital elements to spur sustainable economic growth of Abu Dhabi. The 
tunnel is part of the Municipality’s strategic aim to meet the requirements of rapid development, as 
well as a response to the needs of the growing population. 
CONSTRUCTION METHODOLOGY 
Gary Adams // MEA President, Parsons | Todd Wager // Group President, Parsons 
“Parsons is honored to have been chosen for yet another award by the International 
Road Federation. Like many projects, the Sheikh Zayed Street and Tunnel project’s 
construction period was very challenging, so this award is a testimonial to the project’s 
success.” 
// Gary Adams 
“Sheikh Zayed Street and Tunnel is a crucial improvement to a highly urbanized city. The 
tunnel is designed to link with new major developments, including a future transport 
system, while improving connectivity between landmarks in Abu Dhabi and providing a 
gateway to more development opportunities.” 
// Todd Wager 
Sheikh Zayed Street Tunnel
4 
DESIGN 
Alvaro J. Piedrahita, P.E. // President and CEO, T.Y. Lin International 
“T.Y. Lin International, in a joint venture with Moffatt & Nichol, is extremely honored that 
our design for the San Francisco-Oakland Bay Bridge New East Span has been recognized 
by the International Road Federation. T.Y. Lin International has had the privilege of 
delivering some of the world’s most challenging and iconic infrastructure projects. The 
San Francisco-Oakland Bay Bridge New East Span is a seismically-resilient landmark bridge 
that has been designed to serve the people of California for decades to come.” 
The San Francisco-Oakland Bay Bridge New East Span 
T.Y. Lin International/Moffatt & Nichol, Joint Venture 
The San Francisco-Oakland Bay Bridge New East Span (East Span), one of the busiest toll 
bridges in the United States, is located in a high seismic zone within miles of two major faults 
capable of producing large earthquakes. T.Y. Lin International/Moffatt & Nichol, Joint Venture, 
working in conjunction with the California Department of Transportation, the Metropolitan 
Transportation Commission, and the California Transportation Commission, was charged 
with designing a signature bridge that met community demands while adhering to stringent 
seismic engineering requirements. 
Featuring state-of-the-art seismic technologies and engineering innovations designed to 
protect the bridge’s structural elements during an earthquake, the East Span is a designated 
Lifeline Structure that must be operational for emergency traffic shortly after the largest 
anticipated earthquake. Its design life was also set at 150 years, or twice the bridge standard 
at the time. 
The new East Span includes four interrelated components: the 624-meter-long Self-Anchored 
Suspension Span (SAS); the 1.9-kilometer-long Skyway that ascends to the SAS from the 
Oakland shoreline; the 1,289-meter-long Oakland Touchdown connecting the Skyway to 
Interstate 80; and the 470-meter-long Yerba Buena Island Transition Structure that links the 
SAS to Yerba Buena Island. 
The main architectural feature of the East Span is the single, 160-meter-tall SAS tower, which 
comprises four steel legs interconnected by fusible shear link beams. An industry first, shear 
link beams are designed to absorb seismic energy and allow the legs to move independently 
during an earthquake, protecting the structure. The SAS is also the first bridge on this scale to 
use a single, 1,387-meter-long suspension cable. Due to challenging geological conditions, the 
cable anchors in the superstructure itself rather than in the ground at either end. Rising up from 
the east end of the bridge deck to the cable saddle atop the tower, the cable descends and loops 
around the west bent. Designed to minimize the weight of the anchorage, the loop at the west 
bent is the first application of its kind in the world. The 408-metric ton cable saddle on top of 
the tower is the world’s largest for a suspension bridge. 
The longest portion of the East Span, the Skyway features parallel viaducts that carry five 
westbound and five eastbound lanes, and are pre-cast concrete segmental bridges, erected in 
balanced cantilever. Deck sections are connected by fusible hinge pipe beams and expansion 
joints that absorb seismic energy and allow movement during an earthquake. The Skyway’s 
452 pre-cast concrete segments are the largest of their kind ever cast, each weighing as much 
as 680 metric tons. The 2.4-meter diameter, rebar and concrete-filled steel pipe piles for the 
Skyway foundations were driven up to 91 meters below the water’s surface to anchor into 
stable soils, and at a slight batter (incline) to increase stability. While this method has been 
used to create secure foundations for offshore oil rigs, this is the first time this method has been 
used for bridge construction of this scale. The piles for the deepest foundations required the use 
of the largest hydraulic hammers in the world. 
The East Span opened to traffic on September 2, 2013 and carries 300,000 vehicles each day. 
To meet community demand for a signature structure, T.Y. Lin International/Moffatt & Nichol, 
Joint Venture, designed the bridge to have an elegant, aerodynamic profile, the design of which 
minimizes its visual mass and is marked by the dramatic single tower, the looped cable system, 
and the sweeping roadways of the Skyway. In order to meet the challenges of seismicity and the 
bay’s geological features, the project team advanced existing bridge design and engineering 
principles in order to provide the highest levels of seismic safety. The iconic East Span will serve 
the people of the San Francisco Bay Area and the State of California for generations to come. 
The New East Span of the San Francisco-Oakland Bay Bridge
5 
Legacy Way 
Transcity Joint Venture 
Brisbane is no stranger to large-scale infrastructure projects with the city at the center of South 
East Queensland, one of the fastest growing regions in Australia. 
As a result of this growth, all levels of government are seeking to combat congestion and 
cater for population growth through smart traffic connections and innovative road network 
schemes. 
The $1.5 billion Legacy Way is Brisbane City Council’s (Council) current flagship road project 
comprising twin, two lane tunnels, 4.6 kilometers in length, connecting the city’s western and 
northern suburbs. The delivery phase of the project has been underway since early 2011 and is 
due for completion in 2015. 
The project is being constructed by Transcity, a joint venture between Brisbane’s local experts 
BMD Constructions (BMD), Italian tunneling specialists Ghella, and Spanish tunneling and civil 
infrastructure giant Acciona Infrastructures. 
Transcity is responsible for the design, construction, operation and maintenance of Legacy Way. 
This project has been delivered with a strong focus on collaboration between Transcity and 
Council, designed to achieve outcomes that provide optimum benefits with minimal impacts. 
Legacy Way consists of two portals, including cut and cover tunnels, two mainline tunnels 
constructed by twin, double shield tunnel boring machines, six substations and 37 cross 
passages and impacts some of Brisbane’s most established inner-city communities. 
In total, this infrastructure project has interacted with 454 volumetrically resumed landowners, 
7,500 community members, six elected representatives and has inducted more than 7,500 
employees. 
Transcity’s Community and Stakeholder Relations team has conducted more than 18,000 
proactive events (door knocks, phone calls, emails, meetings, briefings and presentations) 
since 2011, with only seven per cent of total interactions being complaint driven. Having 
operated as a 24-hour construction site since 2012, the impact of the infrastructure project 
may have been significant when considering the individual interactions with stakeholders and 
urban setting of the construction sites. 
The project is bound by contractual requirements set by the client, Brisbane City Council, and 
strict project approval conditions from the Queensland Coordinator-General. 
Working within an urban environment makes mitigation of construction impacts paramount. 
Unlike any other tunnel in Brisbane, Legacy Way does not follow an existing road corridor or 
the Brisbane River, instead the project alignment lies beneath the Toowong Cemetery and 454 
private properties in some of Brisbane’s most established inner-western and inner-northern 
suburbs. 
Legacy Way is being delivered under a design and construct (D&C) contract. While traditionally 
a D&C contract is not considered the most receptive of environments to implement community 
decision making and changes, Council and Transcity established a working relationship from 
the outset, which allowed the project team to provide opportunities for impacted communities 
to make decisions. 
In practice, it meant that Transcity was not necessarily constrained to rigorous specification 
as with many other construction projects and Council could benefit from on-the-ground 
feedback. The relationship facilitated better outcomes that invariably come from technical 
innovation and inviting participation from impacted residents who knew their community 
better than the project team did. 
Throughout the delivery of the project, Transcity has aimed to go beyond compliance of project 
conditions to design and construct Legacy Way in a way that both protects and enhances both 
the surrounding social and natural environments. 
Transcity Joint Venture // Environmental Mitigation 
“Transcity Joint Venture is honored to have been awarded the 2014 IRF GRAA for 
Environmental Mitigation. The team have accomplished many innovations in safety, 
design, environment and construction since Transcity began in early 2011. The award pays 
tribute to the thousands who have worked tirelessly on this project and demonstrates 
how large infrastructure projects can be constructed with high levels of environmental 
compliance within an urban environment.” 
The Legacy Way Team Celebrates 
ENVIRONMENTAL MITIGATION
6 
TRAFFIC MANAGEMENT & ITS 
Richard Harris // Solution Director, Xerox 
“With Merge the authorities now have a policy adaptive on-street parking system 
allowing them to influence behavior and to make adjustments according to their policy 
objectives. We are delighted that the Merge parking system has been recognized by the 
IRF with this prestigious award. We are long time admirers and supporters of the IRF and 
appreciate the outstanding work that it does in spreading best practice worldwide.” 
Xerox Merge Dynamic Parking Pricing 
Xerox 
The innovative Xerox Merge system sets new standards in on-street parking. It uses big 
data and analytics to provide improved services to users. Harnessing existing and technical 
innovation including a dynamic pricing algorithm, it manages the complexity of on-street 
parking and provides a comprehensive management dashboard for the authorities. It 
addresses social and economic concerns and reduces congestion and pollution and is a policy 
adaptive tool for cities. Proven in Los Angeles (increased convenience, management and 
control, more efficient use of existing spaces, reduced circling traffic by 10% and revenue 
increase of 2%) it is now ready for deployment elsewhere. 
The Xerox Merge parking system is a first-of-its-kind, city-wide sensor based, smart parking 
solution. It is a smart grid for parking. It enables guided parking, predictive enforcement, 
meter and pay-by-cell management, demand based pricing – all layered with analytics. 
Because of its cloud delivery and open architecture platform it can be deployed both in green-field 
deployments and existing paid parking systems. 
It is deployed in downtown Los Angeles as part of the LA Express Park project. It uses the data 
from smart meters, off-street parking lots and over 6,000 on-street parking sensors to get a 
complete view of parking demand and behavior in a 6 square mile area. The Merge system 
feeds this data in real-time to smart phone applications and a vehicle’s navigation system 
to provide guided parking, i.e. to provide motorists with actual parking rates and guidance 
to available spaces. A pay-by-cell system allows drivers to pay for, and top up their parking 
meters using a cell phone or smart phone. The enforcement systems are automatically 
updated so that mobile payments are automatically visible to enforcement officers. The 
overlay of parking data and occupancy data allows for optimized enforcement routes and the 
monitoring of special parking permits. 
Demand based pricing allows rates to be set to better match the observed demand. Merge’s 
smart pricing algorithms use the parking sensor data to make parking patterns insightful to 
parking managers using dashboard capabilities, and to refine rates based on demand. This is 
done at one-month intervals for time-of-day pricing and in 30 minute intervals for real-time 
dynamic pricing (in operation in small zones since December 2013). Blocks that are often full 
see their rates increased; blocks that are often underutilized see their rates decreased. The 
result is that drivers get an incentive to use a different mode, or to park slightly further away 
to help reduce congestion. When rates are set appropriately there is a high probability that 
spaces are available in every block, this reduces the need to circle around looking for parking 
resulting in less time lost, reduced congestion, safer driving and better access to shops. 
The Los Angeles implementation was focused on achieving two overarching goals, saving 
time, and improving traffic flow. Time is a valuable asset that is wasted in congestion, looking 
for spaces, and figuring out how to pay meters. Merge® seeks to give time back to citizens 
through parking guidance and increased payment options. Merge® also improves the flow of 
traffic with parking guidance and demand based pricing, which is often referred to as dynamic 
pricing. 
Guided parking has a clear advantage to motorists looking for parking spaces since they spend 
less time and energy finding a space. But since the need to circle around looking for parking 
is reduced it also benefits general traffic and citizens by reducing congestion and pollution. 
Studies have shown that 30% of urban congestion is attributed to drivers looking for parking. 
Demand based rates ensure that scarce parking resources are better used, and also that 
it is easier for drivers to find a spot, again implying a reduction of cars circling to find 
spaces. Demand based pricing will automatically detect the optimal rates where such local 
optimizations take place. They also reduce the inefficiencies that are inherent of maximum 
durations. 
Xerox Merge Dynamic Parking Pricing Model
7 
Ma-Wu Highway Construction Project // Hubei Changjiang Road & Bridge Co., Ltd. 
“The Construction Project rose above the challenges and accomplished the Project on 
time. According to the Hubei Department of Transportation, the acceptance rate of 
the construction quality was 100% and more than 95% of the construction was rated 
‘Excellent’. We are honored to receive the 2014 Global Road Achievement Award in the 
category of Program Management, which helps us promote our international business. 
Many thanks to the IRF for this opportunity!” 
Ma-Wu Highway Construction Project 
Hubei Changjiang Road & Bridge Co., Ltd. 
The Ma-Wu Highway is an important section of the National Highway G42, 
located in Hubei Province, China, connecting Macheng — the hometown of 
more than 200 Generals — 
and Wuhan, the capital city of Hubei Province. 
Within two and one half years, the Ma-Wu Highway Construction Project 
completed a total mileage of 101.387 kilometers, including 82 bridges 
(15,138m), five tunnels (7,705m), five interchanges, two service centers, one 
parking center and one traffic management center. 
The Ma-Wu Highway Construction Project has been a model of project 
management with two records: 
• The smallest management team for such a project scale: only 18 staff 
members; and 
• The least average investment cost: approximately US $60 million was 
saved due to excellent construction management. 
The Ma-Wu Highway Construction Project had the following challenges: 
• Construction challenge. The Ma-Wu Highway runs through Dabie 
Mountain and three river systems, where the relative elevation 
difference is 912 meters and unfavorable geological areas are located. 
The total earth work of the entire project was 12.24 million cubic 
meters. The longest tunnel is 4,901 meters. The largest bridge span 
is 120 meters, and the highest bridge pier is 95 meters. Bridges and 
tunnels account for 22.5% of the total mileage. All construction must be 
completed within two and half years. 
• Coordination challenge. This highway connects 11 towns and crosses 
two major railways and the National Highway G45. The Construction 
Project requisitioned land of 5.678 million square meters, relocated 
410 residential houses and removed 378 power hubs and pipelines. 
Significant coordination efforts were made to assure the on schedule 
completion of the Construction Project. 
• Sustainability challenge. This Construction Project was required to: 
1) maximize the efficiency of resource utilization, i.e. “zero waste 
of resource”; and 2) minimize the interference of environment and 
ecological system, i.e. “zero interference of environment”. With the 
assurance of construction quality, the Construction Project saved 8,562 
tons of steel, 227,000 tons of cement, 748,000 cubic meters of stone, and 
956,000 cubic meters of earth work. The Construction Project planted 
green areas of 406,000 square meters, and accordingly reduced masonry 
areas of 108,000 square meters. All these achievements contributed a 
total saving of 201,000 tons of carbon dioxide emission. 
PROGRAM MANAGEMENT 
Ma-Wu Highway Construction Project
8 
PROJECT FINANCE 
Ravindra D. Ganvir, PE // Deputy Chief Engineer, Anacostia Waterfront Initiative, 
District Department of Transportation 
“The District’s Department of Transportation and its decade of innovative transportation 
solutions make the District of Columbia a national leader in sustainable, sensible, 
economical transportation measures. The 11th Street Bridge project, a part of the $10B 
Anacostia Waterfront Initiative, is a monumental DDOT accomplishment and we are 
excited that it is not only being acknowledged nationally as such, but internationally, as 
well.” 
11th Street Bridge Project 
Washington, D.C. District Department of Transportation 
By far the largest DDOT project to date, 11th Street Bridge Replacement project was critical 
to improving travel and achieving the larger vision of the Anacostia Waterfront Initiative. The 
project goals were as follows: 
• Create freeway continuity through the corridor by providing for the missing freeway 
connections to DC-295, 
• Replace aging and structurally deficient infrastructure, 
• Separate local and freeway traffic, creating a multi-modal local bridge, 
• Create an additional evacuation route from the Nation’s Capital, and 
• Provide environmental investments that improve drainage and treat all storm water 
runoff within the project area. 
The 11th Street Bridge was part of an incomplete freeway system that remained unbuilt from 
the early 1960’s. Because of the discontinuity of the freeway network, commuters and local 
residents did not have direct connection between the freeways east and west of the Anacostia 
River and neighborhood streets east of the Anacostia River were used as cut-through routes 
for commuters accessing job centers in Capitol Hill and downtown Washington, DC. The 
project created these missing connections, removed commuters from neighborhood streets 
and provided the network continuity missing for so many years. The project not only 
corrected these deficits, but also provided the additional evacuation route, improved multi-modal 
mobility and improved the overall environmental health of the river by treating storm 
water runoff. 
The project provides the missing direct connections between DC-295 (Anacostia Freeway) and 
I-695 (SE/SW Freeway), diverting traffic from local roads and keeping neighborhood streets 
free of cut-through commuter traffic. By separating freeway and local traffic, it creates 
a direct connection between the neighborhoods of Capitol Hill and Historic Anacostia for 
motorists, bicyclists and pedestrians, and accommodates future streetcar infrastructure. The 
project also replaces the structurally deficient spans and provides an additional emergency 
evacuation route from the Nation’s Capital. By using low-impact development that captures 
and treats all storm water runoff before it enters the water-body, environmental health of the 
river is improved. 
Due to the rapidly deteriorating conditions of the existing 11th Street Bridges, DDOT needed 
to move quickly to begin the project. The project had six major funding sources, 
• DC General Obligation Bonds 
• DOT Pilot funds 
• DC Dedicated Parking Tax revenue 
• Federal funds derived from funds earmarked for the project 
• FHWA Program Funds 
• Grant Anticipation Revenue Vehicle (GARVEE) Bonds. 
Because DDOT provided funds in excess of the required local match, FHWA allowed an 
innovative Tapered Match for Phase II of the project, which applied the excess local funding in 
Phase I to apply to the non-Federal share of GARVEE debt service. Therefore, FHWA provides 
100% funding for debt service for Phase II of the project. 
The project had financial constraints, with the EIS proposed cost of $459 million but only 
$300 million available, DDOT encouraged contractors to develop innovative ways to deliver 
the project efficiently. Ultimately, DDOT collaborated with HNTB Corporation, the 11th 
Street Bridge Construction Manager, to use a design-build to budget procurement. This 
procurement method not only significantly reduced the cost of the project, but also allowed 
DDOT to accelerate the construction schedule by five (5) months. Using design-build-to-budget 
procurement, success management and aggressive contract management, DDOT 
delivered 80 percent of the project for 60 percent of the cost. 
11st Street Bridge Project
9 
Columbus Crossroads 
Delcan, a Parsons Company 
Delcan, a Parsons Company, led the development and deployment of a Quality Assurance 
Oversight Program for Columbus Crossroads, one of the most highly traveled sections of Ohio’s 
Interstate system within the urban limits of the City of Columbus. The project, including 
quality management, saved the Ohio Department of Transportation (ODOT) $41 million over 
original estimates and was substantially complete 7½ months ahead of schedule. Delcan 
developed several new technologies within their innovative QMost system for this complex 
urban interchange project. The high performance of quality achieved is a result of a number of 
key factors, including accurately verifying conformance and clearly depicting performance to 
all stakeholders. 
As a member of the Kokosing Design-Build team, Delcan fulfilled the role of the Independent 
Quality Firm (IQF) and was responsible for development and deployment of the quality 
acceptance program leading the effort to identify key contract requirements. A unique 
attribute of this project organization, the IQF team worked fully independent of the design 
build team’s Quality Control (QC) efforts and reported all recorded findings jointly to the ODOT 
and Design-Build Project Managers. 
Valued at $200 Million, the project covers the full reconstruction of the I-670/I-71 interchange 
within the urban boundary of the City of Columbus. The Interstate to Interstate interchange 
includes the demolition and reconstruction of 22 roadway bridge structures including two 
curved steel beam fly overs and a cut and cover tunnel, over 22 MSE retaining walls, a 6 
segment storm water micro-tunnel and reconstruction of eight adjacent City of Columbus 
surface streets. The project is the first phase of its reconstruction of the I-70/71 South 
Innerbelt Corridor, which has been under study for more than nine years, and is the largest 
project ever performed by ODOT District 6, including completion of a community goal by 
reconnecting the culturally significant King Lincoln District to central downtown Columbus. 
Further, Delcan supported ODOT, along with the City of Columbus, by supporting their 
“Complete Streets” philosophy to provide multimodal options and green urban avenues to 
enhance sustainability and aesthetics. 
The Delcan led IQF team was tasked with completing a full review of the design, 
inspection and testing of all construction efforts to verify that the work conforms to 
contract requirements. To assist with this effort, Delcan teamed with two local firms, 
Richland Engineering and Resource International. Delcan led the development of a Quality 
Management Plan that was a living document used by all members of the delivery team to 
produce good work, solid evidence of high performance that resulted in a strong confidence 
of the stakeholders that the work met their defined expectations. This plan included an 
innovative Quality Management approach that systematically identified each stakeholder 
defined contract requirement and then collected accurate objective evidence that those 
requirements were fulfilled. 
Further, Delcan deployed a tailored version of its unique QMost system to facilitate the 
capture and verification of contract requirements. QMost provides consistent and practical 
information, helping ODOT and the design-build team meet specific project requirements, on 
time and within budget. QMost includes a full suite of data management processes that allow 
the program management staff to capture and classify quality records, reports, and to track 
progress toward contract final acceptance. 
Deployment of the QMost program allowed for collection of all requirement verification 
data to be in a fully digital format, complete with GPS tagging of field data using ruggedized 
tablets. The governing requirements of the constructed work were each ‘risk profiled’. Each 
requirement was evaluated through an adaptation of ‘Failure Mode and Effect Analysis’ 
(FMEA) to arrive at a ‘Risk Priority Number’ (RPN). Having the risk level incorporated into the 
verification effort allowed for efficient use of specialized field inspection staff, along with 
a significant reduction in the field verification staff needed, and a noticeable increase in 
the valuable data collected relative to the higher risk elements of the work. By collecting a 
significant volume of verification data points, the observed performance of each element of 
the work was determined and allowed the project management team to efficiently target for 
improvement those aspects of the work at lower performance rates. 
Brian Stearman // Vice President, Delcan, a Parsons Company 
“The IRF is a prestigious world class organization. When it endorses a process or project through its Global 
Road Achievement Program, it is viewed by those of us in the industry as a “BIG DEAL”. Winning these 
Awards is an endorsement of what most of us strive to be…“the best at what we do. To that end, we are 
both pleased and honored that our Columbus Crossroads project in Ohio received the 2014 Award for 
Quality Management. This is the sixth time in the past nine years that a project using our QMost (Quality 
Management Oversight System for Transportation) process has been recognized by the IRF as the Quality 
Management winner in the Global Road Achievement Awards Program. We view these awards as significant 
contributions to us achieving our goal of being “the best at what we do” in the area of Quality Management.” 
QUALITY MANAGEMENT 
Columbus Crossroads
10 
Children Road Safety is a Shared Responsibility // Roads & Transport Authority (Dubai) 
“As a result of this project, Dubai witnessed a systematic decrease in child fatalities 
— reduced to 7 in 2012 from 23 in 2008, a reduction of almost 70%. The most 
significant achievement is ZERO fatalities between 2010 and 2012 around schools 
for ages 3 to 18. This project has significantly contributed to the Dubai Road Safety 
Strategy, and the Roads & Tranport Authority of Dubai is extremely grateful for the 
IRF’s recognition of this meaningful and life-saving project.” 
Children Road Safety is a Shared Responsibility 
Roads and Transport Authority (Dubai) 
Introduction: In 2009, the Dubai Roads and Transport Authority (RTA) has set a target to 
reduce road fatalities by 30% by 2014. As a result a project was developed to reduce child 
fatalities caused by road accidents by: 
1. Providing suitable engineering measures. 
2. Providing state of the art technologies to train school bus drivers and monitors. 
3. Providing supporting legislation and law enforcement. 
4. Raising awareness and educate students, children, teachers and parents 
This project was initiated to address the increasing trends in child fatality age 1 – 18 years 
old as a result of road accidents through a government agencies partnership consolidation 
of resources to improve traffic safety within Dubai by developing and policies, technical and 
social programs to improve road safety for school children. 
The project reached over 21,000 child over its three-year life. School bus drivers, teachers, 
parents and mothers were also targeted through communication mediums. A multifaceted 
innovative approach was taken covering education, training, change in legislation/policies 
and infrastructure enhancements in the form of 1,086 traffic calming measures installed 
around 247 schools in Dubai. As a result a 41% decrease in fatal road accidents for ages 
between 1 and 18 year old, a 64% decrease in fatal accidents caused by women drivers and 
46% decrease in school buses accidents were realized. A significant Zero fatalities have been 
achieved around schools for ages 3 -18. 
Complexity: A number of complex challenges had to be overcome to reach the intended 
goal. Dubai is a multinational multicultural society with an increasing population of diverse 
levels of education and road safety awareness. The road safety legislation related to child 
seat and seatbelt was not comprehensive. Delivering the project through a partnership of 
government agencies that have conflicting priorities. 
RTA initiated this project in partnership with Dubai Police, Dubai Health Authority and 
Emirates Transport with support from the Ministry of Interior, The Ministry of Social Affairs, 
Ministry of Education. In addition the project was sponsored by UNICEF, Safe Kids and private 
companies. 
Replication Capability and Contribution to Social Concerns: The foundation has been 
laid to easily replicate and expand the project to other segments of the society. All required 
procedures, organizational structure and communication lines are in place to facilitate that. 
The Partnership intends to roll out the project to universities and social groups. 
Cost And Efficiency Consideration and Contribution to Economic Concerns: Financial 
responsibilities and purpose were identified and agreed in the early stages of the project 
which guaranteed financial efficiency by avoiding duplication and the utilization of current 
organizations’ supply chain. The cost of the project was $2,050,000 of which $260,000 was 
through sponsorships. $500,000 was spent on engineering measures such as pedestrian 
crossings and traffic calming measures around schools. 
Innovation: A multi-prong approach was taken on this project with innovation at the 
heart of it. Both public and private sectors social network channels were utilized to promote 
traffic safety messages. Stationary LED screens and those on public transport were utilized 
to support the project’s campaign. State of the art technologies such as a roll over vehicle 
simulator, a crash impact simulator and the “Safety Bus” were utilized to train drivers and 
educate children, teachers and parents. 
Surpassing the Regulatory Requirements: As a result of this project a child seat law will 
be in effect by the end of 2014. 
SAFETY 
Part of the Dubai RTA’s Children Road Safety is a Shared Responsibility Campaign
11 
Smartphone IRI Data Collection 
Roadroid 
Roadroid is a road survey system using the accelerometer and GPS in modern 
smartphones to measure IRI at IQL3. 
This opens new application areas, for an objective data collection on low volume 
roads – but also for monitoring system performance on high end roads. We are 
involved in projects at different road class levels in countries such as Myanmar, 
Afghanistan, Peru and Papua New Guinea, as well as in Sweden, New Zealand, South 
Africa and the USA. 
For low income countries and on low volume roads, important advantages are: 
• Simplicity: Train local teams to do large objective surveys. 
• Portability: Bring anywhere, and you do not need a specific vehicle 
• Objectivity: Replace ocular surveys with objective data, saving time and 
increase quality 
• Accessibility: Share data through cloud services, with experts and sponsors 
anywhere 
• Durability: No expensive or rare spare parts 
On high-volume roads with a high standard there are different benefits. The most 
important is the possibility to make continuous (daily) data collection 
• Roadroid completes the laser profile-meters. Smartphones will never replace 
these accurate (but expensive) survey trucks. The survey trucks collect allot of 
fundamental data for pavement management; ground radar, rutting, cracks 
etc. 
• Detailed surveys are expensive and can’t be done often. Even if you can 
estimate wear, climate factors as frost heave, heat buckles, earth movements 
and heavy rains deteriorates the roads in unpredictable ways. Same with heavy 
traffic loads. 
• Imagine daily IRI values and dynamic assets management systems, new types 
of Key Performance Indexes and follow ups on performance based contracts. 
Early warning systems that tells you that something is changing - and you 
can guide direct actions or more accurate surveys to find out exactly what is 
happening. 
In Sweden, 100,000 km of roads has been monitored voluntarily by a motorist club, 
in Myanmar four local survey teams has gathered most of the country’s roads and 
in USA a newspaper surveys counties in Pennsylvania. Road survey apps will be 
available to download for crowdsourcing, enabling to share your roughness data on 
social media. For sure this will mean new inputs to your assets management. 
And, it is not only about bitumen; Roadroid can provide a dynamic and comfort based 
route guidance and traffic information. Many road users are interested to avoid 
poor road parts if they can drive a few miles extra. Motorcyclists, freight companies, 
ambulances and owners of new and expensive cars with high expectations. 
Roadroid’s Smartphone IRI Data Collection 
TECHNOLOGY, EQUIPMENT & MANUFACTURING 
Lars Forslof // CEO & Founder, Roadroid 
“Winning the GRAA is a great proof for Roadroid, especially as we still are a small 
startup company. This field is not always the most dynamic and progressive to enter, 
as heavy investments, existing knowledge and standards and long term procurements 
makes work for startup innovators sometimes quite difficult. The GRAA is confirmation 
and proof we are on the right path and encourages us to continue! IRF congresses are 
also a very important arena, with the possibilities to present papers and network with 
the right people.”
12 
2015 GRAA APPLICATION PROCESS 
Application Process 
The application package must include: 
1. A completed application form 
2. A project summary (<500 words) 
3. An explanation of how the project meets the criteria of the category in which it has been submitted 
(~100 words) 
4. Microsoft PowerPoint® presentation (.ppt or .pptx) including but not limited to slides, photographs, 
drawings, diagrams, videos, or additional explanatory materials. (Presentations should be limited to 30 
slides or less). 
• If completing a paper application, please compress all your files into a single ZIP archive and send 
the files via email (if <5MB) or a file-sharing service (if ≥5MB) such as Dropbox, WeTransfer, ShareFile 
or other like service. 
OR 
• Complete our online application, which includes built in file uploading (https://irf.wufoo.com/ 
forms/2015-graa-application/) 
Incomplete applications will not be considered. All materials must clearly identify the name of the project, the 
award category, and contact information of the submitting applicant. 
Please note: 
The submission of copyrighted material to IRF for the Global Road Achievement Awards shall constitute a 
general grant of permission to IRF to use the materials for promotional purposes. 
Each application package must be accompanied by a non-refundable entry fee of $300 for IRF Member, 
$875 for non-members. A separate application package (accompanied by payment of the entry fee) must be 
submitted for each project entered in each category. 
Entry packages must be received by the IRF, at the address listed below, by 5:00pm EST on May 2, 2015. 
Entries must be addressed to: 
Global Road Achievement Awards 
c/o International Road Federation 
500 Montgomery Street. 
5th Floor 
Alexandria, VA 22314 USA 
For further information, please contact: 
communications@IRFnews.org 
Tel: +1 703 535 1001
2015 GRAA APPLICATION 
q Environmental Mitigation q Safety q Construction Methodology 
q Design q Quality Management q Program Management 
q Project Finance & Economics q Maintenance Management q Research 
q Traffic Management and Intelligent 
Transportation Systems 
q Technology, Equipment & 
Manufacturing 
q Application Form 
q Application Fee: US $300 for IRF Members, US $875 for non-members 
q Brief project summary (<500 words) 
q Explanation of how project meets category-specific award criteria (~100 words) 
q PowerPoint™ presentation 
Entry Category (Select ONE): 
Application Package Checklist (Each application package must contain the following): 
2015 IRF Global Road Achievement Awards 
q Please invoice 
q I wish to pay by credit card 
q I wish to pay by check (make payable to: International Road Federation) 
q I wish to pay by wire transfer (contact Maha Halaby at mhalaby@IRFnews.org) 
Credit Card q VISA q MasterCard qAMEX Card Number:____________________________________________________________ 
Cardholder’s name (as written on the card):__________________________________________________________________________ 
Expiration date (MM/YY): _ _________________ Amount agreed to be charged:_______________________________________________ 
Signature:______________________________________ Date (MM/DD/YYYY): ____________________________ 
Fax the completed application form to the IRF at +1 703 535 1007 or email to melabyad@IRFnews.org 
Payment 
Submitting Organization:_ _______________________________________________________________________________________ 
Project Name:__________________________________________________________________________________________________ 
Contact Name (Individual):_ ______________________________________________________________________________________ 
Address:_ _____________________________________________________________________________________________________ 
Address continued:_ ____________________________________________________________________________________________ 
City:__________________________________________ State / Province: ______________________________________ 
Zip / Postal Code: _______________________________ Country: ____________________________________________ 
Tel (with country code): +__________________________ Fax (with country code): +________________________________ 
Email Address:_ ________________________________________________________________________________________________
KNOWLEDGE • SOLUTIONS • EDUCATION 
BUSINESS OPPORTUNITIES • BEST PRACTICES 
Madison Place 
500 Montgomery Street, Suite 525 
Alexandria, VA 22314 USA 
Telephone: +1 703 535 1001 Facsimile: +1 703 535 1007 
International Road Federation 
BUILDING 
INDUSTRY PARTNERSHIPS 
Better Roads. Better World. 
www.IRFnews.org 
FOR PROFESSIONALS. 
BY PROFESSIONALS.

More Related Content

What's hot

Transportation Engineering Presentation
Transportation Engineering PresentationTransportation Engineering Presentation
Transportation Engineering PresentationSanduli Weerasekara
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017RJ Sajeeb
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030DRatal2505
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineeringKHUSHBU SHAH
 
Introduction to Transportation Engineering
Introduction to Transportation EngineeringIntroduction to Transportation Engineering
Introduction to Transportation EngineeringRazasanjrani
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshRituSaha3
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - FletcherJade Keswick
 
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone AreasGuidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone AreasPhani Mohan K
 
Project Research Proposal Design of 4.5km road
Project Research Proposal  Design of 4.5km  roadProject Research Proposal  Design of 4.5km  road
Project Research Proposal Design of 4.5km roadSyed Hazoor Ali Shah
 
Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddahKhalid Ibrahim
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
Transportation and highway engineering part 1
Transportation and highway engineering part 1 Transportation and highway engineering part 1
Transportation and highway engineering part 1 GEOMIND
 
China road construction industry report, 2010
China road construction industry report, 2010China road construction industry report, 2010
China road construction industry report, 2010ResearchInChina
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14iain_cameron
 

What's hot (20)

Transportation Engineering Presentation
Transportation Engineering PresentationTransportation Engineering Presentation
Transportation Engineering Presentation
 
padma bridge presention
padma bridge presentionpadma bridge presention
padma bridge presention
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
road construction project
road construction projectroad construction project
road construction project
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Introduction to Transportation Engineering
Introduction to Transportation EngineeringIntroduction to Transportation Engineering
Introduction to Transportation Engineering
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
Practical Work Report - Fletcher
Practical Work Report - FletcherPractical Work Report - Fletcher
Practical Work Report - Fletcher
 
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone AreasGuidelines for Planning and Construction of Roads in cyclone Prone Areas
Guidelines for Planning and Construction of Roads in cyclone Prone Areas
 
Project Research Proposal Design of 4.5km road
Project Research Proposal  Design of 4.5km  roadProject Research Proposal  Design of 4.5km  road
Project Research Proposal Design of 4.5km road
 
Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddah
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
Transportation and highway engineering part 1
Transportation and highway engineering part 1 Transportation and highway engineering part 1
Transportation and highway engineering part 1
 
July 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual WorkshopJuly 14, 2021 FTAC Virtual Workshop
July 14, 2021 FTAC Virtual Workshop
 
China road construction industry report, 2010
China road construction industry report, 2010China road construction industry report, 2010
China road construction industry report, 2010
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14
 
CV - Mouhamad al Mouallem
CV - Mouhamad al MouallemCV - Mouhamad al Mouallem
CV - Mouhamad al Mouallem
 

Viewers also liked

Integrating Quick Test Pro and Hammer – Experience Report
Integrating Quick Test Pro and Hammer – Experience ReportIntegrating Quick Test Pro and Hammer – Experience Report
Integrating Quick Test Pro and Hammer – Experience ReportBrett Leonard
 
El rostro-de-simon-bolivar-3 d
El rostro-de-simon-bolivar-3 dEl rostro-de-simon-bolivar-3 d
El rostro-de-simon-bolivar-3 d~syrya~ ~ymajyca~
 
Discurso fúnebre pericles
Discurso fúnebre periclesDiscurso fúnebre pericles
Discurso fúnebre periclesgeoibero
 
Orientaciones sobre los videojuegos de Jesús Jarque
Orientaciones sobre los videojuegos de Jesús JarqueOrientaciones sobre los videojuegos de Jesús Jarque
Orientaciones sobre los videojuegos de Jesús Jarquecristinatesti
 
Kalle. confesiones de un asesino en serie
Kalle. confesiones  de un asesino en serieKalle. confesiones  de un asesino en serie
Kalle. confesiones de un asesino en serierastafari2709
 
Bibliothek 2.0 Sozial Software in Bibliotheken
Bibliothek 2.0 Sozial Software in BibliothekenBibliothek 2.0 Sozial Software in Bibliotheken
Bibliothek 2.0 Sozial Software in BibliothekenPatrick Danowski
 
Revista de la Fundación Exportar #3
Revista de la Fundación Exportar #3Revista de la Fundación Exportar #3
Revista de la Fundación Exportar #3Noticias de Exportar
 
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17Universidad de Oviedo
 
TYPO3 and Magento together to manage Panini Stickers
TYPO3 and Magento together to manage Panini StickersTYPO3 and Magento together to manage Panini Stickers
TYPO3 and Magento together to manage Panini StickersMauro Lorenzutti
 
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...Javier Rezola
 
Taller 6 basico
Taller 6 basicoTaller 6 basico
Taller 6 basicoHUGOMALES
 
stores design
stores designstores design
stores designBRIO
 
La importancia de las palabras clave
La importancia de las palabras claveLa importancia de las palabras clave
La importancia de las palabras claveSMOing
 
SSI Software Services GmbH - Mobile Applications - Juli 2015
SSI Software Services GmbH - Mobile Applications - Juli 2015SSI Software Services GmbH - Mobile Applications - Juli 2015
SSI Software Services GmbH - Mobile Applications - Juli 2015Bernhard Schimunek
 

Viewers also liked (20)

China motorcycle market report sample pages
China motorcycle market report   sample pagesChina motorcycle market report   sample pages
China motorcycle market report sample pages
 
Integrating Quick Test Pro and Hammer – Experience Report
Integrating Quick Test Pro and Hammer – Experience ReportIntegrating Quick Test Pro and Hammer – Experience Report
Integrating Quick Test Pro and Hammer – Experience Report
 
El rostro-de-simon-bolivar-3 d
El rostro-de-simon-bolivar-3 dEl rostro-de-simon-bolivar-3 d
El rostro-de-simon-bolivar-3 d
 
Synopsis copy
Synopsis   copySynopsis   copy
Synopsis copy
 
Discurso fúnebre pericles
Discurso fúnebre periclesDiscurso fúnebre pericles
Discurso fúnebre pericles
 
Orientaciones sobre los videojuegos de Jesús Jarque
Orientaciones sobre los videojuegos de Jesús JarqueOrientaciones sobre los videojuegos de Jesús Jarque
Orientaciones sobre los videojuegos de Jesús Jarque
 
Kalle. confesiones de un asesino en serie
Kalle. confesiones  de un asesino en serieKalle. confesiones  de un asesino en serie
Kalle. confesiones de un asesino en serie
 
Firmenauskunft Asien
Firmenauskunft Asien Firmenauskunft Asien
Firmenauskunft Asien
 
Jack White
Jack WhiteJack White
Jack White
 
Bibliothek 2.0 Sozial Software in Bibliotheken
Bibliothek 2.0 Sozial Software in BibliothekenBibliothek 2.0 Sozial Software in Bibliotheken
Bibliothek 2.0 Sozial Software in Bibliotheken
 
Revista de la Fundación Exportar #3
Revista de la Fundación Exportar #3Revista de la Fundación Exportar #3
Revista de la Fundación Exportar #3
 
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17
Efectos Magnetovolúmico y Magnetocalórico en el compuesto Nd2Fe17
 
TYPO3 and Magento together to manage Panini Stickers
TYPO3 and Magento together to manage Panini StickersTYPO3 and Magento together to manage Panini Stickers
TYPO3 and Magento together to manage Panini Stickers
 
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...
Seguimiento durante 25 años de la incidencia y dx cáncer mama programa screen...
 
Taller 6 basico
Taller 6 basicoTaller 6 basico
Taller 6 basico
 
Cv pedromanuelcaldas 2013
Cv pedromanuelcaldas 2013Cv pedromanuelcaldas 2013
Cv pedromanuelcaldas 2013
 
stores design
stores designstores design
stores design
 
La importancia de las palabras clave
La importancia de las palabras claveLa importancia de las palabras clave
La importancia de las palabras clave
 
SSI Software Services GmbH - Mobile Applications - Juli 2015
SSI Software Services GmbH - Mobile Applications - Juli 2015SSI Software Services GmbH - Mobile Applications - Juli 2015
SSI Software Services GmbH - Mobile Applications - Juli 2015
 
Memoria cpx 2015d
Memoria cpx 2015dMemoria cpx 2015d
Memoria cpx 2015d
 

Similar to 2014 IRF GRAA Winners

Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
Right Angle GUlf Engineering News Clips 2009
Right Angle GUlf Engineering News Clips 2009Right Angle GUlf Engineering News Clips 2009
Right Angle GUlf Engineering News Clips 2009Anup Jalan
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Soumalya Bag
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsJames Chuck
 
The company deck grid logsistics inc.
The company deck grid logsistics inc.The company deck grid logsistics inc.
The company deck grid logsistics inc.davidalba10
 
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROPLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROIRJET Journal
 
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...Investigation on Bridges Connection to Network Carrefour in Existing Roads in...
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...IJERA Editor
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report Vikas Sukhwal
 
Foundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docxFoundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docxbudbarber38650
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocationJatin Mandhyan
 
Interim Shuttle Association Service Project Project.docx
Interim Shuttle Association Service Project          Project.docxInterim Shuttle Association Service Project          Project.docx
Interim Shuttle Association Service Project Project.docxnormanibarber20063
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Atkins
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 
Skybus technology
Skybus technology Skybus technology
Skybus technology SauravPhad
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
 
Transportation Term PaperDiverging Diamond Interch.docx
Transportation Term PaperDiverging Diamond Interch.docxTransportation Term PaperDiverging Diamond Interch.docx
Transportation Term PaperDiverging Diamond Interch.docxturveycharlyn
 

Similar to 2014 IRF GRAA Winners (20)

Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
Right Angle GUlf Engineering News Clips 2009
Right Angle GUlf Engineering News Clips 2009Right Angle GUlf Engineering News Clips 2009
Right Angle GUlf Engineering News Clips 2009
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
The company deck grid logsistics inc.
The company deck grid logsistics inc.The company deck grid logsistics inc.
The company deck grid logsistics inc.
 
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROPLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
 
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...Investigation on Bridges Connection to Network Carrefour in Existing Roads in...
Investigation on Bridges Connection to Network Carrefour in Existing Roads in...
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
 
Foundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docxFoundation Design For the abutment and footing design, soil anal.docx
Foundation Design For the abutment and footing design, soil anal.docx
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Interim Shuttle Association Service Project Project.docx
Interim Shuttle Association Service Project          Project.docxInterim Shuttle Association Service Project          Project.docx
Interim Shuttle Association Service Project Project.docx
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...Analyst presentation: Crossrail and our international tunnelling expertise - ...
Analyst presentation: Crossrail and our international tunnelling expertise - ...
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
Skybus technology
Skybus technology Skybus technology
Skybus technology
 
Final report
Final reportFinal report
Final report
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
 
Transportation Term PaperDiverging Diamond Interch.docx
Transportation Term PaperDiverging Diamond Interch.docxTransportation Term PaperDiverging Diamond Interch.docx
Transportation Term PaperDiverging Diamond Interch.docx
 

More from Lars Forslöf

Roadroid user-guide-version-2-pro-Vietnamese
Roadroid user-guide-version-2-pro-VietnameseRoadroid user-guide-version-2-pro-Vietnamese
Roadroid user-guide-version-2-pro-VietnameseLars Forslöf
 
Roadroid reference projects 0.5 Vietnamese
Roadroid reference projects 0.5 Vietnamese Roadroid reference projects 0.5 Vietnamese
Roadroid reference projects 0.5 Vietnamese Lars Forslöf
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixLars Forslöf
 
Farsi Roadroid references 0.7
Farsi Roadroid references 0.7Farsi Roadroid references 0.7
Farsi Roadroid references 0.7Lars Forslöf
 
Roadroid references 0.7, in Turkish
Roadroid references 0.7, in TurkishRoadroid references 0.7, in Turkish
Roadroid references 0.7, in TurkishLars Forslöf
 
Roadroid reference projects 0.6
Roadroid reference projects 0.6Roadroid reference projects 0.6
Roadroid reference projects 0.6Lars Forslöf
 
Roadroid referencia de proyectos 0.4
Roadroid referencia de proyectos 0.4Roadroid referencia de proyectos 0.4
Roadroid referencia de proyectos 0.4Lars Forslöf
 

More from Lars Forslöf (8)

Roadroid user-guide-version-2-pro-Vietnamese
Roadroid user-guide-version-2-pro-VietnameseRoadroid user-guide-version-2-pro-Vietnamese
Roadroid user-guide-version-2-pro-Vietnamese
 
Roadroid reference projects 0.5 Vietnamese
Roadroid reference projects 0.5 Vietnamese Roadroid reference projects 0.5 Vietnamese
Roadroid reference projects 0.5 Vietnamese
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
 
Farsi Roadroid references 0.7
Farsi Roadroid references 0.7Farsi Roadroid references 0.7
Farsi Roadroid references 0.7
 
Roadroid references 0.7, in Turkish
Roadroid references 0.7, in TurkishRoadroid references 0.7, in Turkish
Roadroid references 0.7, in Turkish
 
Roadroid davis
Roadroid davisRoadroid davis
Roadroid davis
 
Roadroid reference projects 0.6
Roadroid reference projects 0.6Roadroid reference projects 0.6
Roadroid reference projects 0.6
 
Roadroid referencia de proyectos 0.4
Roadroid referencia de proyectos 0.4Roadroid referencia de proyectos 0.4
Roadroid referencia de proyectos 0.4
 

Recently uploaded

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 

Recently uploaded (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 

2014 IRF GRAA Winners

  • 1. 2014 GRAA Winner for Design San Francisco-Oakland Bay Bridge New East Span T.Y. Lin International/Moffatt & Nichol, Joint Venture Photograph by Noah Berger For Professionals. By Professionals. 2014 Global Road Achievement Awards Book of Winning Projects International Road Federation Better Roads. Better World.
  • 2.
  • 3. 1 Table of Contents Chairman’s Message. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Construction Methodology Sheikh Zayed Street Tunnel Abu Dhabi Municipality and Parsons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Design The San Francisco-Oakland Bay Bridge New East Span T.Y. Lin International/Moffatt & Nichol, Joint Venture . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Environmental Mitigation Legacy Way Transcity Joint Venture. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Traffic Management & ITS Xerox Merge Dynamic Parking Pricing Xerox. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Program Management Ma-Wu Highway Construction Project Hubei Changjiang Road & Bridge Co., Ltd . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Project Finance 11th Street Bridge Project Washington, D.C. District Department of Transportation. . . . . . . . . . . . . . . . . . . . . . . . . 7 Quality Management Columbus Crossroads Delcan, a Parsons Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Safety Children Road Safety is a Shared Responsibility Roads and Transport Authority (Dubai) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Technology, Equipment & Manufacturing Smartphone IRI Data Collection Roadroid. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Columbus Crossroads
  • 4. 2 Celebrating the 14th Year of the GRAA Program On behalf of the International Road Federation (IRF) and our international panel of judges, I would like to congratulate the winners of the 2014 IRF Global Road Achievement Awards! This year’s winners represent of some the most forward-thinking and cutting edge organizations around the world. I invite you examine the groundbreaking projects listed in this book and learn from their outstanding accomplishments. Established in 2000, the IRF GRAA Program plays a significant role in IRF’s mission to gather global best practices and promote technology transfer, by seeking out innovative and successful organizations and highlighting their accomplishments to share with the global transportation community. By showcasing new technologies and creative solutions, we are able to learn from each other, and build on our successes. As we continue fulfilling IRF’s mission of encouraging and promoting better, safer and more sustainable roads through the continuous exchange of knowledge and best practices, I would also encourage leading companies and organizations to submit their exemplary projects to the 2015 GRAA Competition. Eng. Abdullah A. Al-Mogbel IRF Chairman “Better Roads. Better World.” CHAIRMAN’S MESSAGE
  • 5. 3 Sheikh Zayed Street Tunnel Abu Dhabi Municipality and Parsons The Sheikh Zayed (formerly Al Salam) Street and Tunnel project is one of the largest road infrastructure projects undertaken in Abu Dhabi, United Arab Emirates. It was the biggest civil engineering project in the Gulf region in 2010. The project consisted of 4 separate contracts, which entailed setting up 4 contract teams. The US $1.3 billion, 14-km project was constructed over 5 years, during which the project team continuously addressed the technical, social and economic challenges associated with such a complex project. Each contract was completed and opened to traffic in stages. The largest of these contracts was the Sheikh Zayed Tunnel, which was opened to the public on December 5, 2012. The Sheikh Zayed corridor is a vital improvement to a highly developed area of Abu Dhabi, linking major existing, new and future developments, such as Saadiyat Island, Eastern Mangroves, Maryah Island, Lulu Island and Mina Zayed area. The project was designed and constructed to segregate local and through movement of traffic. Thus, the surface roads, underpass and tunnel accommodate 4 lanes in each direction. This design arrangement has doubled the current traffic capacity to 12,000 vehicles per hour in each direction, in and out of Abu Dhabi. In conjunction with the elimination of the signalized intersections along Sheikh Zayed Street, the travel time from the outskirts of the city to Cornice has been reduced from 30 to 12 minutes. The Sheikh Zayed Street and Tunnel are compliant with the highest construction standards and provided state-of-the art functionalities in traffic operation and management, allowing capabilities for integration into the Abu Dhabi City Traffic Management Plan. The size and the complexity of this project required strategic planning and input for an extensive list of stakeholders. The design of the tunnel structure is based on a traditional cut and cover technique. The tunnel overall length is 3.6 km (box tunnel 2.4 km, depressed tunnel 1 km and approaches 0.2 km). The project includes 23 utility buildings with a 300 m separation and improved system redundancy, 23 emergency sliding doors in the median wall spaced at 100 m with 2 shutter doors, 2 redundant tunnel control rooms linked with the Abu Dhabi Traffic Management Center. The tunnel is equipped with SCADA controlling and monitoring systems. A computerized maintenance management system was specifically designed for this project to keep up the high performance and operations requirements for this tunnel. The construction of the tunnel included, but was not limited to: 7 km of shoring system, 400,000 square meters of asphalt, 1.7 million cubic meters of excavations, 0.5 million cubic meters of structural concrete, and 35 km of electrical cables. The 35 million labor hours required to construct the tunnel have created employment and business opportunities. At the peak of construction, over 5,000 laborers and 500 engineers were actively engaged in the administration and construction of the tunnel. The project teams successfully achieved the key objectives as set by the project owner: the project was successfully completed within budget; the ride-ability on the surface roads and within the tunnel is of a very high quality; the completion of the 3.6-km long tunnel in a dense urban environment with close proximity to buildings without damage to any of those buildings; the aesthetics of the tunnel is widely acknowledged as being the best in Abu Dhabi. The project serves as one of the vital elements to spur sustainable economic growth of Abu Dhabi. The tunnel is part of the Municipality’s strategic aim to meet the requirements of rapid development, as well as a response to the needs of the growing population. CONSTRUCTION METHODOLOGY Gary Adams // MEA President, Parsons | Todd Wager // Group President, Parsons “Parsons is honored to have been chosen for yet another award by the International Road Federation. Like many projects, the Sheikh Zayed Street and Tunnel project’s construction period was very challenging, so this award is a testimonial to the project’s success.” // Gary Adams “Sheikh Zayed Street and Tunnel is a crucial improvement to a highly urbanized city. The tunnel is designed to link with new major developments, including a future transport system, while improving connectivity between landmarks in Abu Dhabi and providing a gateway to more development opportunities.” // Todd Wager Sheikh Zayed Street Tunnel
  • 6. 4 DESIGN Alvaro J. Piedrahita, P.E. // President and CEO, T.Y. Lin International “T.Y. Lin International, in a joint venture with Moffatt & Nichol, is extremely honored that our design for the San Francisco-Oakland Bay Bridge New East Span has been recognized by the International Road Federation. T.Y. Lin International has had the privilege of delivering some of the world’s most challenging and iconic infrastructure projects. The San Francisco-Oakland Bay Bridge New East Span is a seismically-resilient landmark bridge that has been designed to serve the people of California for decades to come.” The San Francisco-Oakland Bay Bridge New East Span T.Y. Lin International/Moffatt & Nichol, Joint Venture The San Francisco-Oakland Bay Bridge New East Span (East Span), one of the busiest toll bridges in the United States, is located in a high seismic zone within miles of two major faults capable of producing large earthquakes. T.Y. Lin International/Moffatt & Nichol, Joint Venture, working in conjunction with the California Department of Transportation, the Metropolitan Transportation Commission, and the California Transportation Commission, was charged with designing a signature bridge that met community demands while adhering to stringent seismic engineering requirements. Featuring state-of-the-art seismic technologies and engineering innovations designed to protect the bridge’s structural elements during an earthquake, the East Span is a designated Lifeline Structure that must be operational for emergency traffic shortly after the largest anticipated earthquake. Its design life was also set at 150 years, or twice the bridge standard at the time. The new East Span includes four interrelated components: the 624-meter-long Self-Anchored Suspension Span (SAS); the 1.9-kilometer-long Skyway that ascends to the SAS from the Oakland shoreline; the 1,289-meter-long Oakland Touchdown connecting the Skyway to Interstate 80; and the 470-meter-long Yerba Buena Island Transition Structure that links the SAS to Yerba Buena Island. The main architectural feature of the East Span is the single, 160-meter-tall SAS tower, which comprises four steel legs interconnected by fusible shear link beams. An industry first, shear link beams are designed to absorb seismic energy and allow the legs to move independently during an earthquake, protecting the structure. The SAS is also the first bridge on this scale to use a single, 1,387-meter-long suspension cable. Due to challenging geological conditions, the cable anchors in the superstructure itself rather than in the ground at either end. Rising up from the east end of the bridge deck to the cable saddle atop the tower, the cable descends and loops around the west bent. Designed to minimize the weight of the anchorage, the loop at the west bent is the first application of its kind in the world. The 408-metric ton cable saddle on top of the tower is the world’s largest for a suspension bridge. The longest portion of the East Span, the Skyway features parallel viaducts that carry five westbound and five eastbound lanes, and are pre-cast concrete segmental bridges, erected in balanced cantilever. Deck sections are connected by fusible hinge pipe beams and expansion joints that absorb seismic energy and allow movement during an earthquake. The Skyway’s 452 pre-cast concrete segments are the largest of their kind ever cast, each weighing as much as 680 metric tons. The 2.4-meter diameter, rebar and concrete-filled steel pipe piles for the Skyway foundations were driven up to 91 meters below the water’s surface to anchor into stable soils, and at a slight batter (incline) to increase stability. While this method has been used to create secure foundations for offshore oil rigs, this is the first time this method has been used for bridge construction of this scale. The piles for the deepest foundations required the use of the largest hydraulic hammers in the world. The East Span opened to traffic on September 2, 2013 and carries 300,000 vehicles each day. To meet community demand for a signature structure, T.Y. Lin International/Moffatt & Nichol, Joint Venture, designed the bridge to have an elegant, aerodynamic profile, the design of which minimizes its visual mass and is marked by the dramatic single tower, the looped cable system, and the sweeping roadways of the Skyway. In order to meet the challenges of seismicity and the bay’s geological features, the project team advanced existing bridge design and engineering principles in order to provide the highest levels of seismic safety. The iconic East Span will serve the people of the San Francisco Bay Area and the State of California for generations to come. The New East Span of the San Francisco-Oakland Bay Bridge
  • 7. 5 Legacy Way Transcity Joint Venture Brisbane is no stranger to large-scale infrastructure projects with the city at the center of South East Queensland, one of the fastest growing regions in Australia. As a result of this growth, all levels of government are seeking to combat congestion and cater for population growth through smart traffic connections and innovative road network schemes. The $1.5 billion Legacy Way is Brisbane City Council’s (Council) current flagship road project comprising twin, two lane tunnels, 4.6 kilometers in length, connecting the city’s western and northern suburbs. The delivery phase of the project has been underway since early 2011 and is due for completion in 2015. The project is being constructed by Transcity, a joint venture between Brisbane’s local experts BMD Constructions (BMD), Italian tunneling specialists Ghella, and Spanish tunneling and civil infrastructure giant Acciona Infrastructures. Transcity is responsible for the design, construction, operation and maintenance of Legacy Way. This project has been delivered with a strong focus on collaboration between Transcity and Council, designed to achieve outcomes that provide optimum benefits with minimal impacts. Legacy Way consists of two portals, including cut and cover tunnels, two mainline tunnels constructed by twin, double shield tunnel boring machines, six substations and 37 cross passages and impacts some of Brisbane’s most established inner-city communities. In total, this infrastructure project has interacted with 454 volumetrically resumed landowners, 7,500 community members, six elected representatives and has inducted more than 7,500 employees. Transcity’s Community and Stakeholder Relations team has conducted more than 18,000 proactive events (door knocks, phone calls, emails, meetings, briefings and presentations) since 2011, with only seven per cent of total interactions being complaint driven. Having operated as a 24-hour construction site since 2012, the impact of the infrastructure project may have been significant when considering the individual interactions with stakeholders and urban setting of the construction sites. The project is bound by contractual requirements set by the client, Brisbane City Council, and strict project approval conditions from the Queensland Coordinator-General. Working within an urban environment makes mitigation of construction impacts paramount. Unlike any other tunnel in Brisbane, Legacy Way does not follow an existing road corridor or the Brisbane River, instead the project alignment lies beneath the Toowong Cemetery and 454 private properties in some of Brisbane’s most established inner-western and inner-northern suburbs. Legacy Way is being delivered under a design and construct (D&C) contract. While traditionally a D&C contract is not considered the most receptive of environments to implement community decision making and changes, Council and Transcity established a working relationship from the outset, which allowed the project team to provide opportunities for impacted communities to make decisions. In practice, it meant that Transcity was not necessarily constrained to rigorous specification as with many other construction projects and Council could benefit from on-the-ground feedback. The relationship facilitated better outcomes that invariably come from technical innovation and inviting participation from impacted residents who knew their community better than the project team did. Throughout the delivery of the project, Transcity has aimed to go beyond compliance of project conditions to design and construct Legacy Way in a way that both protects and enhances both the surrounding social and natural environments. Transcity Joint Venture // Environmental Mitigation “Transcity Joint Venture is honored to have been awarded the 2014 IRF GRAA for Environmental Mitigation. The team have accomplished many innovations in safety, design, environment and construction since Transcity began in early 2011. The award pays tribute to the thousands who have worked tirelessly on this project and demonstrates how large infrastructure projects can be constructed with high levels of environmental compliance within an urban environment.” The Legacy Way Team Celebrates ENVIRONMENTAL MITIGATION
  • 8. 6 TRAFFIC MANAGEMENT & ITS Richard Harris // Solution Director, Xerox “With Merge the authorities now have a policy adaptive on-street parking system allowing them to influence behavior and to make adjustments according to their policy objectives. We are delighted that the Merge parking system has been recognized by the IRF with this prestigious award. We are long time admirers and supporters of the IRF and appreciate the outstanding work that it does in spreading best practice worldwide.” Xerox Merge Dynamic Parking Pricing Xerox The innovative Xerox Merge system sets new standards in on-street parking. It uses big data and analytics to provide improved services to users. Harnessing existing and technical innovation including a dynamic pricing algorithm, it manages the complexity of on-street parking and provides a comprehensive management dashboard for the authorities. It addresses social and economic concerns and reduces congestion and pollution and is a policy adaptive tool for cities. Proven in Los Angeles (increased convenience, management and control, more efficient use of existing spaces, reduced circling traffic by 10% and revenue increase of 2%) it is now ready for deployment elsewhere. The Xerox Merge parking system is a first-of-its-kind, city-wide sensor based, smart parking solution. It is a smart grid for parking. It enables guided parking, predictive enforcement, meter and pay-by-cell management, demand based pricing – all layered with analytics. Because of its cloud delivery and open architecture platform it can be deployed both in green-field deployments and existing paid parking systems. It is deployed in downtown Los Angeles as part of the LA Express Park project. It uses the data from smart meters, off-street parking lots and over 6,000 on-street parking sensors to get a complete view of parking demand and behavior in a 6 square mile area. The Merge system feeds this data in real-time to smart phone applications and a vehicle’s navigation system to provide guided parking, i.e. to provide motorists with actual parking rates and guidance to available spaces. A pay-by-cell system allows drivers to pay for, and top up their parking meters using a cell phone or smart phone. The enforcement systems are automatically updated so that mobile payments are automatically visible to enforcement officers. The overlay of parking data and occupancy data allows for optimized enforcement routes and the monitoring of special parking permits. Demand based pricing allows rates to be set to better match the observed demand. Merge’s smart pricing algorithms use the parking sensor data to make parking patterns insightful to parking managers using dashboard capabilities, and to refine rates based on demand. This is done at one-month intervals for time-of-day pricing and in 30 minute intervals for real-time dynamic pricing (in operation in small zones since December 2013). Blocks that are often full see their rates increased; blocks that are often underutilized see their rates decreased. The result is that drivers get an incentive to use a different mode, or to park slightly further away to help reduce congestion. When rates are set appropriately there is a high probability that spaces are available in every block, this reduces the need to circle around looking for parking resulting in less time lost, reduced congestion, safer driving and better access to shops. The Los Angeles implementation was focused on achieving two overarching goals, saving time, and improving traffic flow. Time is a valuable asset that is wasted in congestion, looking for spaces, and figuring out how to pay meters. Merge® seeks to give time back to citizens through parking guidance and increased payment options. Merge® also improves the flow of traffic with parking guidance and demand based pricing, which is often referred to as dynamic pricing. Guided parking has a clear advantage to motorists looking for parking spaces since they spend less time and energy finding a space. But since the need to circle around looking for parking is reduced it also benefits general traffic and citizens by reducing congestion and pollution. Studies have shown that 30% of urban congestion is attributed to drivers looking for parking. Demand based rates ensure that scarce parking resources are better used, and also that it is easier for drivers to find a spot, again implying a reduction of cars circling to find spaces. Demand based pricing will automatically detect the optimal rates where such local optimizations take place. They also reduce the inefficiencies that are inherent of maximum durations. Xerox Merge Dynamic Parking Pricing Model
  • 9. 7 Ma-Wu Highway Construction Project // Hubei Changjiang Road & Bridge Co., Ltd. “The Construction Project rose above the challenges and accomplished the Project on time. According to the Hubei Department of Transportation, the acceptance rate of the construction quality was 100% and more than 95% of the construction was rated ‘Excellent’. We are honored to receive the 2014 Global Road Achievement Award in the category of Program Management, which helps us promote our international business. Many thanks to the IRF for this opportunity!” Ma-Wu Highway Construction Project Hubei Changjiang Road & Bridge Co., Ltd. The Ma-Wu Highway is an important section of the National Highway G42, located in Hubei Province, China, connecting Macheng — the hometown of more than 200 Generals — and Wuhan, the capital city of Hubei Province. Within two and one half years, the Ma-Wu Highway Construction Project completed a total mileage of 101.387 kilometers, including 82 bridges (15,138m), five tunnels (7,705m), five interchanges, two service centers, one parking center and one traffic management center. The Ma-Wu Highway Construction Project has been a model of project management with two records: • The smallest management team for such a project scale: only 18 staff members; and • The least average investment cost: approximately US $60 million was saved due to excellent construction management. The Ma-Wu Highway Construction Project had the following challenges: • Construction challenge. The Ma-Wu Highway runs through Dabie Mountain and three river systems, where the relative elevation difference is 912 meters and unfavorable geological areas are located. The total earth work of the entire project was 12.24 million cubic meters. The longest tunnel is 4,901 meters. The largest bridge span is 120 meters, and the highest bridge pier is 95 meters. Bridges and tunnels account for 22.5% of the total mileage. All construction must be completed within two and half years. • Coordination challenge. This highway connects 11 towns and crosses two major railways and the National Highway G45. The Construction Project requisitioned land of 5.678 million square meters, relocated 410 residential houses and removed 378 power hubs and pipelines. Significant coordination efforts were made to assure the on schedule completion of the Construction Project. • Sustainability challenge. This Construction Project was required to: 1) maximize the efficiency of resource utilization, i.e. “zero waste of resource”; and 2) minimize the interference of environment and ecological system, i.e. “zero interference of environment”. With the assurance of construction quality, the Construction Project saved 8,562 tons of steel, 227,000 tons of cement, 748,000 cubic meters of stone, and 956,000 cubic meters of earth work. The Construction Project planted green areas of 406,000 square meters, and accordingly reduced masonry areas of 108,000 square meters. All these achievements contributed a total saving of 201,000 tons of carbon dioxide emission. PROGRAM MANAGEMENT Ma-Wu Highway Construction Project
  • 10. 8 PROJECT FINANCE Ravindra D. Ganvir, PE // Deputy Chief Engineer, Anacostia Waterfront Initiative, District Department of Transportation “The District’s Department of Transportation and its decade of innovative transportation solutions make the District of Columbia a national leader in sustainable, sensible, economical transportation measures. The 11th Street Bridge project, a part of the $10B Anacostia Waterfront Initiative, is a monumental DDOT accomplishment and we are excited that it is not only being acknowledged nationally as such, but internationally, as well.” 11th Street Bridge Project Washington, D.C. District Department of Transportation By far the largest DDOT project to date, 11th Street Bridge Replacement project was critical to improving travel and achieving the larger vision of the Anacostia Waterfront Initiative. The project goals were as follows: • Create freeway continuity through the corridor by providing for the missing freeway connections to DC-295, • Replace aging and structurally deficient infrastructure, • Separate local and freeway traffic, creating a multi-modal local bridge, • Create an additional evacuation route from the Nation’s Capital, and • Provide environmental investments that improve drainage and treat all storm water runoff within the project area. The 11th Street Bridge was part of an incomplete freeway system that remained unbuilt from the early 1960’s. Because of the discontinuity of the freeway network, commuters and local residents did not have direct connection between the freeways east and west of the Anacostia River and neighborhood streets east of the Anacostia River were used as cut-through routes for commuters accessing job centers in Capitol Hill and downtown Washington, DC. The project created these missing connections, removed commuters from neighborhood streets and provided the network continuity missing for so many years. The project not only corrected these deficits, but also provided the additional evacuation route, improved multi-modal mobility and improved the overall environmental health of the river by treating storm water runoff. The project provides the missing direct connections between DC-295 (Anacostia Freeway) and I-695 (SE/SW Freeway), diverting traffic from local roads and keeping neighborhood streets free of cut-through commuter traffic. By separating freeway and local traffic, it creates a direct connection between the neighborhoods of Capitol Hill and Historic Anacostia for motorists, bicyclists and pedestrians, and accommodates future streetcar infrastructure. The project also replaces the structurally deficient spans and provides an additional emergency evacuation route from the Nation’s Capital. By using low-impact development that captures and treats all storm water runoff before it enters the water-body, environmental health of the river is improved. Due to the rapidly deteriorating conditions of the existing 11th Street Bridges, DDOT needed to move quickly to begin the project. The project had six major funding sources, • DC General Obligation Bonds • DOT Pilot funds • DC Dedicated Parking Tax revenue • Federal funds derived from funds earmarked for the project • FHWA Program Funds • Grant Anticipation Revenue Vehicle (GARVEE) Bonds. Because DDOT provided funds in excess of the required local match, FHWA allowed an innovative Tapered Match for Phase II of the project, which applied the excess local funding in Phase I to apply to the non-Federal share of GARVEE debt service. Therefore, FHWA provides 100% funding for debt service for Phase II of the project. The project had financial constraints, with the EIS proposed cost of $459 million but only $300 million available, DDOT encouraged contractors to develop innovative ways to deliver the project efficiently. Ultimately, DDOT collaborated with HNTB Corporation, the 11th Street Bridge Construction Manager, to use a design-build to budget procurement. This procurement method not only significantly reduced the cost of the project, but also allowed DDOT to accelerate the construction schedule by five (5) months. Using design-build-to-budget procurement, success management and aggressive contract management, DDOT delivered 80 percent of the project for 60 percent of the cost. 11st Street Bridge Project
  • 11. 9 Columbus Crossroads Delcan, a Parsons Company Delcan, a Parsons Company, led the development and deployment of a Quality Assurance Oversight Program for Columbus Crossroads, one of the most highly traveled sections of Ohio’s Interstate system within the urban limits of the City of Columbus. The project, including quality management, saved the Ohio Department of Transportation (ODOT) $41 million over original estimates and was substantially complete 7½ months ahead of schedule. Delcan developed several new technologies within their innovative QMost system for this complex urban interchange project. The high performance of quality achieved is a result of a number of key factors, including accurately verifying conformance and clearly depicting performance to all stakeholders. As a member of the Kokosing Design-Build team, Delcan fulfilled the role of the Independent Quality Firm (IQF) and was responsible for development and deployment of the quality acceptance program leading the effort to identify key contract requirements. A unique attribute of this project organization, the IQF team worked fully independent of the design build team’s Quality Control (QC) efforts and reported all recorded findings jointly to the ODOT and Design-Build Project Managers. Valued at $200 Million, the project covers the full reconstruction of the I-670/I-71 interchange within the urban boundary of the City of Columbus. The Interstate to Interstate interchange includes the demolition and reconstruction of 22 roadway bridge structures including two curved steel beam fly overs and a cut and cover tunnel, over 22 MSE retaining walls, a 6 segment storm water micro-tunnel and reconstruction of eight adjacent City of Columbus surface streets. The project is the first phase of its reconstruction of the I-70/71 South Innerbelt Corridor, which has been under study for more than nine years, and is the largest project ever performed by ODOT District 6, including completion of a community goal by reconnecting the culturally significant King Lincoln District to central downtown Columbus. Further, Delcan supported ODOT, along with the City of Columbus, by supporting their “Complete Streets” philosophy to provide multimodal options and green urban avenues to enhance sustainability and aesthetics. The Delcan led IQF team was tasked with completing a full review of the design, inspection and testing of all construction efforts to verify that the work conforms to contract requirements. To assist with this effort, Delcan teamed with two local firms, Richland Engineering and Resource International. Delcan led the development of a Quality Management Plan that was a living document used by all members of the delivery team to produce good work, solid evidence of high performance that resulted in a strong confidence of the stakeholders that the work met their defined expectations. This plan included an innovative Quality Management approach that systematically identified each stakeholder defined contract requirement and then collected accurate objective evidence that those requirements were fulfilled. Further, Delcan deployed a tailored version of its unique QMost system to facilitate the capture and verification of contract requirements. QMost provides consistent and practical information, helping ODOT and the design-build team meet specific project requirements, on time and within budget. QMost includes a full suite of data management processes that allow the program management staff to capture and classify quality records, reports, and to track progress toward contract final acceptance. Deployment of the QMost program allowed for collection of all requirement verification data to be in a fully digital format, complete with GPS tagging of field data using ruggedized tablets. The governing requirements of the constructed work were each ‘risk profiled’. Each requirement was evaluated through an adaptation of ‘Failure Mode and Effect Analysis’ (FMEA) to arrive at a ‘Risk Priority Number’ (RPN). Having the risk level incorporated into the verification effort allowed for efficient use of specialized field inspection staff, along with a significant reduction in the field verification staff needed, and a noticeable increase in the valuable data collected relative to the higher risk elements of the work. By collecting a significant volume of verification data points, the observed performance of each element of the work was determined and allowed the project management team to efficiently target for improvement those aspects of the work at lower performance rates. Brian Stearman // Vice President, Delcan, a Parsons Company “The IRF is a prestigious world class organization. When it endorses a process or project through its Global Road Achievement Program, it is viewed by those of us in the industry as a “BIG DEAL”. Winning these Awards is an endorsement of what most of us strive to be…“the best at what we do. To that end, we are both pleased and honored that our Columbus Crossroads project in Ohio received the 2014 Award for Quality Management. This is the sixth time in the past nine years that a project using our QMost (Quality Management Oversight System for Transportation) process has been recognized by the IRF as the Quality Management winner in the Global Road Achievement Awards Program. We view these awards as significant contributions to us achieving our goal of being “the best at what we do” in the area of Quality Management.” QUALITY MANAGEMENT Columbus Crossroads
  • 12. 10 Children Road Safety is a Shared Responsibility // Roads & Transport Authority (Dubai) “As a result of this project, Dubai witnessed a systematic decrease in child fatalities — reduced to 7 in 2012 from 23 in 2008, a reduction of almost 70%. The most significant achievement is ZERO fatalities between 2010 and 2012 around schools for ages 3 to 18. This project has significantly contributed to the Dubai Road Safety Strategy, and the Roads & Tranport Authority of Dubai is extremely grateful for the IRF’s recognition of this meaningful and life-saving project.” Children Road Safety is a Shared Responsibility Roads and Transport Authority (Dubai) Introduction: In 2009, the Dubai Roads and Transport Authority (RTA) has set a target to reduce road fatalities by 30% by 2014. As a result a project was developed to reduce child fatalities caused by road accidents by: 1. Providing suitable engineering measures. 2. Providing state of the art technologies to train school bus drivers and monitors. 3. Providing supporting legislation and law enforcement. 4. Raising awareness and educate students, children, teachers and parents This project was initiated to address the increasing trends in child fatality age 1 – 18 years old as a result of road accidents through a government agencies partnership consolidation of resources to improve traffic safety within Dubai by developing and policies, technical and social programs to improve road safety for school children. The project reached over 21,000 child over its three-year life. School bus drivers, teachers, parents and mothers were also targeted through communication mediums. A multifaceted innovative approach was taken covering education, training, change in legislation/policies and infrastructure enhancements in the form of 1,086 traffic calming measures installed around 247 schools in Dubai. As a result a 41% decrease in fatal road accidents for ages between 1 and 18 year old, a 64% decrease in fatal accidents caused by women drivers and 46% decrease in school buses accidents were realized. A significant Zero fatalities have been achieved around schools for ages 3 -18. Complexity: A number of complex challenges had to be overcome to reach the intended goal. Dubai is a multinational multicultural society with an increasing population of diverse levels of education and road safety awareness. The road safety legislation related to child seat and seatbelt was not comprehensive. Delivering the project through a partnership of government agencies that have conflicting priorities. RTA initiated this project in partnership with Dubai Police, Dubai Health Authority and Emirates Transport with support from the Ministry of Interior, The Ministry of Social Affairs, Ministry of Education. In addition the project was sponsored by UNICEF, Safe Kids and private companies. Replication Capability and Contribution to Social Concerns: The foundation has been laid to easily replicate and expand the project to other segments of the society. All required procedures, organizational structure and communication lines are in place to facilitate that. The Partnership intends to roll out the project to universities and social groups. Cost And Efficiency Consideration and Contribution to Economic Concerns: Financial responsibilities and purpose were identified and agreed in the early stages of the project which guaranteed financial efficiency by avoiding duplication and the utilization of current organizations’ supply chain. The cost of the project was $2,050,000 of which $260,000 was through sponsorships. $500,000 was spent on engineering measures such as pedestrian crossings and traffic calming measures around schools. Innovation: A multi-prong approach was taken on this project with innovation at the heart of it. Both public and private sectors social network channels were utilized to promote traffic safety messages. Stationary LED screens and those on public transport were utilized to support the project’s campaign. State of the art technologies such as a roll over vehicle simulator, a crash impact simulator and the “Safety Bus” were utilized to train drivers and educate children, teachers and parents. Surpassing the Regulatory Requirements: As a result of this project a child seat law will be in effect by the end of 2014. SAFETY Part of the Dubai RTA’s Children Road Safety is a Shared Responsibility Campaign
  • 13. 11 Smartphone IRI Data Collection Roadroid Roadroid is a road survey system using the accelerometer and GPS in modern smartphones to measure IRI at IQL3. This opens new application areas, for an objective data collection on low volume roads – but also for monitoring system performance on high end roads. We are involved in projects at different road class levels in countries such as Myanmar, Afghanistan, Peru and Papua New Guinea, as well as in Sweden, New Zealand, South Africa and the USA. For low income countries and on low volume roads, important advantages are: • Simplicity: Train local teams to do large objective surveys. • Portability: Bring anywhere, and you do not need a specific vehicle • Objectivity: Replace ocular surveys with objective data, saving time and increase quality • Accessibility: Share data through cloud services, with experts and sponsors anywhere • Durability: No expensive or rare spare parts On high-volume roads with a high standard there are different benefits. The most important is the possibility to make continuous (daily) data collection • Roadroid completes the laser profile-meters. Smartphones will never replace these accurate (but expensive) survey trucks. The survey trucks collect allot of fundamental data for pavement management; ground radar, rutting, cracks etc. • Detailed surveys are expensive and can’t be done often. Even if you can estimate wear, climate factors as frost heave, heat buckles, earth movements and heavy rains deteriorates the roads in unpredictable ways. Same with heavy traffic loads. • Imagine daily IRI values and dynamic assets management systems, new types of Key Performance Indexes and follow ups on performance based contracts. Early warning systems that tells you that something is changing - and you can guide direct actions or more accurate surveys to find out exactly what is happening. In Sweden, 100,000 km of roads has been monitored voluntarily by a motorist club, in Myanmar four local survey teams has gathered most of the country’s roads and in USA a newspaper surveys counties in Pennsylvania. Road survey apps will be available to download for crowdsourcing, enabling to share your roughness data on social media. For sure this will mean new inputs to your assets management. And, it is not only about bitumen; Roadroid can provide a dynamic and comfort based route guidance and traffic information. Many road users are interested to avoid poor road parts if they can drive a few miles extra. Motorcyclists, freight companies, ambulances and owners of new and expensive cars with high expectations. Roadroid’s Smartphone IRI Data Collection TECHNOLOGY, EQUIPMENT & MANUFACTURING Lars Forslof // CEO & Founder, Roadroid “Winning the GRAA is a great proof for Roadroid, especially as we still are a small startup company. This field is not always the most dynamic and progressive to enter, as heavy investments, existing knowledge and standards and long term procurements makes work for startup innovators sometimes quite difficult. The GRAA is confirmation and proof we are on the right path and encourages us to continue! IRF congresses are also a very important arena, with the possibilities to present papers and network with the right people.”
  • 14. 12 2015 GRAA APPLICATION PROCESS Application Process The application package must include: 1. A completed application form 2. A project summary (<500 words) 3. An explanation of how the project meets the criteria of the category in which it has been submitted (~100 words) 4. Microsoft PowerPoint® presentation (.ppt or .pptx) including but not limited to slides, photographs, drawings, diagrams, videos, or additional explanatory materials. (Presentations should be limited to 30 slides or less). • If completing a paper application, please compress all your files into a single ZIP archive and send the files via email (if <5MB) or a file-sharing service (if ≥5MB) such as Dropbox, WeTransfer, ShareFile or other like service. OR • Complete our online application, which includes built in file uploading (https://irf.wufoo.com/ forms/2015-graa-application/) Incomplete applications will not be considered. All materials must clearly identify the name of the project, the award category, and contact information of the submitting applicant. Please note: The submission of copyrighted material to IRF for the Global Road Achievement Awards shall constitute a general grant of permission to IRF to use the materials for promotional purposes. Each application package must be accompanied by a non-refundable entry fee of $300 for IRF Member, $875 for non-members. A separate application package (accompanied by payment of the entry fee) must be submitted for each project entered in each category. Entry packages must be received by the IRF, at the address listed below, by 5:00pm EST on May 2, 2015. Entries must be addressed to: Global Road Achievement Awards c/o International Road Federation 500 Montgomery Street. 5th Floor Alexandria, VA 22314 USA For further information, please contact: communications@IRFnews.org Tel: +1 703 535 1001
  • 15. 2015 GRAA APPLICATION q Environmental Mitigation q Safety q Construction Methodology q Design q Quality Management q Program Management q Project Finance & Economics q Maintenance Management q Research q Traffic Management and Intelligent Transportation Systems q Technology, Equipment & Manufacturing q Application Form q Application Fee: US $300 for IRF Members, US $875 for non-members q Brief project summary (<500 words) q Explanation of how project meets category-specific award criteria (~100 words) q PowerPoint™ presentation Entry Category (Select ONE): Application Package Checklist (Each application package must contain the following): 2015 IRF Global Road Achievement Awards q Please invoice q I wish to pay by credit card q I wish to pay by check (make payable to: International Road Federation) q I wish to pay by wire transfer (contact Maha Halaby at mhalaby@IRFnews.org) Credit Card q VISA q MasterCard qAMEX Card Number:____________________________________________________________ Cardholder’s name (as written on the card):__________________________________________________________________________ Expiration date (MM/YY): _ _________________ Amount agreed to be charged:_______________________________________________ Signature:______________________________________ Date (MM/DD/YYYY): ____________________________ Fax the completed application form to the IRF at +1 703 535 1007 or email to melabyad@IRFnews.org Payment Submitting Organization:_ _______________________________________________________________________________________ Project Name:__________________________________________________________________________________________________ Contact Name (Individual):_ ______________________________________________________________________________________ Address:_ _____________________________________________________________________________________________________ Address continued:_ ____________________________________________________________________________________________ City:__________________________________________ State / Province: ______________________________________ Zip / Postal Code: _______________________________ Country: ____________________________________________ Tel (with country code): +__________________________ Fax (with country code): +________________________________ Email Address:_ ________________________________________________________________________________________________
  • 16. KNOWLEDGE • SOLUTIONS • EDUCATION BUSINESS OPPORTUNITIES • BEST PRACTICES Madison Place 500 Montgomery Street, Suite 525 Alexandria, VA 22314 USA Telephone: +1 703 535 1001 Facsimile: +1 703 535 1007 International Road Federation BUILDING INDUSTRY PARTNERSHIPS Better Roads. Better World. www.IRFnews.org FOR PROFESSIONALS. BY PROFESSIONALS.