SlideShare a Scribd company logo
1 of 17
RESUMERESUME
LAGAN AK AGANGLAGAN AK AGANG
FIELD CONSTRUCTION SUPERINTENDENTFIELD CONSTRUCTION SUPERINTENDENT
Career Objective:
Willing to do the job as a construction superintendent in a well-established construction firm and apply all
my skills and experience for the growth of the organization.
PROFESSIONAL PROFILEPROFESSIONAL PROFILE
Has over twenty five ( 25 ) years of experience in the field of onshore and offshore Construction,
Maintenance, Hook-up and Commissioning, design engineering, fabrication of Power Plant, refinery and
Oil and Gas Platform Modules/Topsides, jacket, and Living Quarters. Well versed in to assist in ensuring
general functioning of the company and day to day routine offshore/onshore activities. Provide technical
supports and field coordination for proper implementation of work. Involving for Work pack preparation,
estimating, planning and scheduling. Development of piping design drawing, detailing, and materials take
off. With knowledge in safety procedures, design specification and codes of practices, computer
application such as Microsoft Project, Microsoft Access, Microsoft Excel, Microsoft Word, Computer
Added Design, Micro Station 95 and familiar with PDMS ( Plant Design Management System ).
PPERSONALERSONAL DDETAILETAIL
NAME : LAGAN AK AGANG
GENDER : MALE
RACE : IBAN
NATIONALITY : MALAYSIAN
I.C NO. : 720115-13-5155
DATE OF BIRTH : 15TH
JANUARY 1972
PLACE OF BIRTH : SUNGAI GAAT, BALEH, KAPIT
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 1
MARITAL STATUS : MARRIED
PASSPORT NO. : K 20802598
DATE OF ISSUE /EXPIRY : 9TH
JANUARY 2013 – 8 JANUARY 2015
MEDICAL EXAMINATION/
EXPIRY
: 9TH
JANUARY 2013-8 JANUARY 2015 (DR.CHEU)
CORRESPONDENT ADDRESS : S/LOT 4495,JALAN SHANGRILLA,CENTURY PARK,BAKAM
98000 MIRI, SARAWAK. EAST MALAYSIA
TELEPHONE CONTACT : 06-013 8000449(Malaysian H/P)/+673 322 98888(Brunei)
EMAIL ADDRESS : aganglagan@yahoo.com/Lagan.Agang@akersolutions.com
OOTHERTHER IINFORMATIONNFORMATION
• Language Proficiency English, Malay& Iban
• Computer Skills Microsoft Application (Word, Excel, Project, power point) and DOS
• Career expectation To work under tight and strict working schedule and challenging environment and
continuous career advancement.
• Personal Strengths Able to work independently with self-motivation, team-work, safety minded,
responsible, hardworking, and able to learn new scope of works.
• Sports / hobbies Badminton, football, table tennis, swimming.
• Expected Salary Neg.
EDUCATION BACKGROUND / QUALIFICATION
• 1988 – 1989 Completed Primary 6
Ulu Teru Primary School, Miri, Sarawak
• 1985 – 1987 Sijil rendah Pelajaran (Lower Certificate of Education) - Grade A
Marudi secondary School, Sarawak, Malaysia
• 1992-1993
• 1994 – 1995
Sijil Pelajaran Malaysia (Malaysian Certificate of Education) - Grade Two
Marudi secondary School, Sarawak, Malaysia –Calon Persendirian
Sijil Tinggi Persekolahan Malaysia ( Malaysia Higher School Certificate)-Lulus Penuh
Marudi Secondary School,Sarawak,Malaysia-Calon Persendirian
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 2
TECHNICAL BACKGROUND
1. Programs attended
CERTIFICATION
DATE
Qualification ORGANIZER / CONDUCTOR
• 28th
August 2015 Business Ethics & Cross Culture Course AKER SOLUTION .Sdn.Bhd,
• 13th
June 2015 Incident Investigation and Reporting Course Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 2nd
September 2014
• -2nd
September 2018
Tropical FOET including Travel Safety By Boat and Tropical
EBS.
Sribima Marine Training Centre,
Miri, Sarawak
• 9th
March 2014 Method Intergrated Project System ( MIPS ) AKER SULUTION Sdn.Bhd.
• 1 August 2013
31July 2015
Competent Front Line Worksite Supervisor Megamas Training Co.Sdn.Bhd.
• 29 March 2013
27 March 2016
Senior First Aid Course ATDC SDN BHD
• 12 February 2013 Leadership Training for Frontline Worksite Supervisor AKER SULUTION Sdn.Bhd.
• 4 August 2011-
3 August 2013
Competent Front Line Worksite Supervisor ( Refresher ) Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 29 July 2011/28 July
2014
Permit To Work ( Refresher ) Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 4 Nov 2010 Manual Handling Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 21 Jan 2011 SKSWOOD Leadership And Management Development
Programme
Brunel Shell Ptl.Com
• 25 August 2008/24
August 2011
Permit To Work System Training Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 17 Nov 2009/16
Nov 2012
Senior First Aid Course Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 1 Nov 2010/31 Nov
2014
Tropical FOET including Travel Safety By Boat and Tropical
EBS.
Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 4 Nov 2010 Manual Handling Course Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 24 August 2010 Integrated Safe System Of Work Sentinel PRO(ISSOW)
Training
Brunel Shell Ptl.Com.
• 17 Sept 2009 / 16
Nov 2011
Competent Front Line Worksite Supervisor (Refresher) Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 3
• 24 March 2008 / 2
March 2011
Competent Worksite Supervisor Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 3 March 2008 - 2
Feb.2011
Tropical FOET Inc.Travel Safety By Boat Incl. Tropical EBS
(5618)
Sribima Marine Training Centre,
Miri, Sarawak
• 25 March 2007 - 12
Jun 2008
Helicopter Underwater Escape Training (With EBS) Sribima Marine Training Centre,
Miri, Sarawak
• 7-8 December 2006 Supervisory Safety Workshop Sarawak Shell Bhd.
• 14 March 2006 - 13
March 2009
Permit to Work Course(Applicant) BSTS SDN.BHD
• 23-25 February 2006 Becoming A Safety Leader Champion Executive Training International
and ATDC Sendirian Berhad
• 18-19 June 2005 Managing Hazards At The Workplace and BSP Permit To
Work System / Worksite Supervisors Course (PTW 1 & 2)
Megamas Training Co.Sdn.Bhd,
Kuala Belait,Brunei
• 13-15 June 2005 Tropical Basic Offshore Safety Induction and Emergency
Training (TBOSIET Course)
Sribima Marine Training Centre,
Miri, Sarawak
• 10 Jun 2005-9 Jun
2008
Hydrogen Sulphide (H2S) Competency Course BSTS SDN.BHD
• 06 Oct 2004 - 05
Oct 2007
02 Day Combined Sea Survival & Offshore MSTS Asia Sdn Bhd
• 23 – 24 Oct 2003 PCSB Applicant (Permit to Work – PTW) Petronas Carigali Sdn Bhd
(PCSB)
• 09-10 May 2003 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad)
• 24Jan 2003 Rigging & Slinging Course. Sribima Marine Training Centre,
Miri, Sarawak
• 20 Jan 2003 Emergency First Aid Course. Sribima Marine Training Centre,
Miri, Sarawak
• 08 June 2002 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad)
• 14 March 2002 Permit to Work Training (PTW) Sarawak Shell Berhad
• 15 Oct 2001 03 Day Combined Sea Survival & Offshore Sribima Marine Training Centre,
Miri, Sarawak
• 14 Oct 2004 Safety Procedures, HUET and Basic Fire Fighting & Self-
Rescue.
Sribima Marine Training Centre,
Miri, Sarawak
• 15 Nov 1999 Scaffolding Competent Person Inspection Course. Trident Training (M) Sdn Bhd
• 20 Nov 1998 Scaffolding Basic Part II. Trident Training (M) Sdn Bhd
• 08 July 1995 Scaffolding Basic Part I. Trident Training (M) Sdn Bhd
PPROFESSIONALROFESSIONAL EEXPERIENCEXPERIENCE
1) AKER SOLUTIONS SDN. BHD.
Duration : 1st
January 2013 – Present
Position : Field Construction Superintendent
(Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign)
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 4
Duties and Responsibilities
 Provide support to Field Supervision and Operations Teams in order to ensure that all operational issues impacting
production delivery are addressed,
 Attend and address applicable actions arising out of the Daily Operations Morning Call.
 Day to day support for operation of the asset..
 Develop, maintain and distribute procedures, work practices, standards and specifications utilized within
offshore/onshore production delivery team with appropriate support as required.
 Provide operations input to the Management of Engineering Change, including participation in, Hazards and other
relevant safety reviews.
 Liaise with Project and Technical Teams to provide operational input in order to ensure that any project is fit for
purpose and reflects operational best practice.
 Plan and ensure the coordination of Construction job.
 Ensures that the quality of work and materials is upheld.
 Supervises the subcontractor and ensure that they are punctual and that they deliver
 Writing project progress records and liaison with the supervisors and client site representative(CSR)
 Liaises with the client in operational aspect of the project ensure project milestone are being achieved.
 Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work
pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and
field trouble shooting for the construction term.
 Plan work daily activities. Arranging and make sure Permit To Work (PTW) in place. Monitoring work activities to
conduct in safe manner in accordance with the companies’ policies and procedures.
 To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work
activities completed, safe and achieve target.
 Submit Daily Report to personnel on line.
HSE & COMPLIANCE
 Leads the Delivery Team in maintaining the highest regard for Safety and the Environment
 Is familiar with the appropriate statutory legislation, Case for safety and Safety Management Systems used to
support the role
 Ensures all process plant equipment in hazardous and other areas is operated in accordance with the appropriate
legislation, guidelines, assurance and verification practices and is fully conversant with necessary performance
standards
 Completes regular offshore audits to ensure compliance with Safety and Operational Standards.
 Provides direction/input to risk assessment if required as operations responsible person
 Ensure by review / audit of procedures and work practices, that the safest and most cost effective operations
methods are used, while minimizing any loss
 General inspection of workers and their performance and safety.
 Ensuring that the stipulated safety rules and regulations are met.
 Continue the use of Hazards Identification Plan (HIP) and the Safety Checklist.
Monitor and control offshore waste disposal in accordance with the BSP HSE Standard.
Main Projects
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 5
• February – March ,2013  CONSTRUCTABILITY SITE SURVEY FOR EAST & WEST CAMPAIGN
• April - June , 2013
• June-August ‘2013
• September-October 14, 2013
• October 15-Dec.16, 2013
• Dec 17,2013 – March 31 ,
2014
 FIRE GALLEY PROTECTION AND DRIP PAN FOR CCS PUMP
STRAINERS( AMCX-09 CAMPAIGN)
 SERVICE PLATFORM FOR BYPASS VALVE 10" BIDI(AMCX-09
CAMPAIGN)
 HEAVY LIFTING FOR NEW HELIDECK INSTALLATION AND AMPA
09 SHUTDOWN CAMPAIGN
 AMCX09 HP COMPRESSOR UPGRADE.
 CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX12 WELL TIE-IN
PROJECT AND PM SCOPE PIPING ,VALVE REPLAVEMENT AND
BOATLANDING REPAIR WORK
 AMCX06 13 01 TURNOAROUND CAMPAIGN-AMCX04 SHUTDOWN
CAMPAIGN-PM SCOPE FOR VESSEL INSPECTION,VALVE AND
PIPING REPLACEMENT
 CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX04 PRE-
SHUTDOWN/SHUTDOWN AND POST SHUTDOWN SCOPE-VESSEL
INSPECTION WORK,VALVE AND PIPING REPLACEMENT.
 CPCX07 13 01TURNAROUND CAMPAIGN-CPCX03 PIPELINE
REPLACEMENT PROJECT(PRP PROJECT) AND REDUNDANT PIPING
DEMOLITION SCOPE
 INSTALLATION OF NEW DECK EXTENSION AND SERVICE
PLATFORM FOR PIPELINE REPLACEMENT PROJECT(PRP PROJECT).
 CHAMPION-07 BROWN FIELD PROJECT-WELL TIE IN AND NEW
MODULE INSTALLATION AT CHAMPION 1.
 CHAMPION WATER FLOOD A2 (PHASE 2) PROJECT-INSTALLATION
OF NEW TIE-IN/NEW MODULE/FIREWATER
UPGRADING/INSTALLATION OF NEW SERVICE PLATFORM AT
CHAMPION 33.
. May 1st
,2014 – June 17 , 2014  AMCX09 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND
CAMPAIGN.
 AMDP11-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF
VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL
CLEANING AND VESSEL INSPECTION,CORRODED PIPING
REPLACEMENT AND STRUCTURAL REPLACEMENT.
 AMDP25-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF
VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL
CLEANING AND VESSEL INSPECTION,CORRODED PIPING
REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT
SCOPE TO INSTALL NEW SERVICE PALTFORM FOR LIFE RAFT
INSTALLATION.
 AMCX15/24--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE
RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL
CLEANING AND VESSEL INSPECTION,CORRODED PIPING
REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT
SCOPE TO INSTALL NEW FCV AND FLOWLINE SWA247L
MODIFICATION.
 AMCX03--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF
VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL
CLEANING AND VESSEL INSPECTION,CORRODED PIPING
REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 6
SCOPE-PRP2-INSTALL NEW PIPING AND REMOVE EXISTING LINE.
 AMPA-06-EGRET CASCADE PROJECT-MODIFICATION OF
DN80/DN150 GAS LIFT AND FUEL GAS LINE.
. June – 20TH
July , 2014  FACX04 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND
CAMPAIGN.
 FAPP/FADP-01-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE
RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL
CLEANING AND VESSEL INSPECTION,CORRODED PIPING
REPLACEMENT AND STRUCTURAL REPLACEMENT..
 ADVANCE TIE-IN PRE-DRILL:1.INSTALLATION OF NEW
FLOWLINE,GAS LIFT LINES AND CASING BLOWDOWN LINES AND
TIE-IN TO RESPECTIVE HEADERS. 2.INSTALLATION AND HOOK-UP
OF CONTROL VALVES,MVFTS AND PSD VALVES.3.INSTALLATION
AND HOOK-UP OF WELLHEAD CONTROL PANEL & PRESSURE
RELIEF VALVE 4.RTU UPGRADE 5.REMOVAL OF THE EXISTING FA-
51 WELL AND ITS ASSOCIATED FACILITIES.
. July 21st
– 25th
August, 2014
26th
August – 14th
October, 2014
 CPCB07 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND
CAMPAIGN.
 PRP-2 PROJECT-INSTALLATION OF NEW PIPING FOR GAS AND OIL
LINE.
 INSTALLATION OF NEW SERVICES PLATFORM FOR PRP-2 SCOPE
 SHUTDOWN SCOPE-REPLACE CORRODED VALVES AND
PIPING.VESSEL CLEANING AND VESSEL INSPECTION
 AMCX06 14 01-AMRJ-01 SHUTDOWN-REPLACE CORRODED
PIPING,RISER REPAIR WORK,VALVE AND BOLT/NUTS
REPLACEMENT
 AMRP-06-HEAVY LIFTING FOR 24”/16”/12” & 10” ACTUATOR BALL
VALVE REPLACEMENT.
 AMDP-21-HEAVY LIFT FOR RISER GUARD FENDER INSTALLATION
AND RISER IMPACT PROTECTION INSTALLATION.
 SUMP VESSEL REPAIR WORK. PIPING,VALVES AND GASKET
REPLACEMENT WORK.
15th
October – 28st
May, 2015  CPCA07 15 01 TA CAMPAIGN-PRE SHUTDOWN AT CPCX-04 AND
CPDP-31.
 SHUTDOWN AT CPCX04 AND CPDP-31-REPLACE CORRODED
PIPING FOR PM SCOPE WITH VARIOUS SIZES-2”/3”/4”/6”/8” AND 12”
FOR OIL LINE,GAS LINE ,WATER INJECTION LINE AND PROCESS
DRAIN AND DECK DRAIN LINE.
 REPLACEMENT OF CORRODED VALVES/STUDBOLT AND NUTS
AND GASKETS
 REPLACEMENT OF CORRODED STRUCTURAL FOR S3 SCOPE.
 CPCX-12-PRP-2 PROJECT-INSTALLATION OF NEW DECK SERVICE
PLATFORM FOR PID 2042 & 2506.INSTALL SUPPORT,HANDRAILS
AND GRATINGS FOR NEW ESDV SERVIVE PLATFORM FOR PID
2505.
 CPDP-31 CW A2 BROWNFIELD PROJECT-INSTALLATION OF NEW
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 7
INTEGRATED MODULE SKID (IMS),NEW DECK EXTENSION,NEW
K.O.DRUM MODULE,WELL HEAD CONTROL PANEL (WHCP)
INSTALLATION,PIPING DEMOLATION SCOPE,NEW E& I SKID,NEW
VENT BOOM INSTALLTION, OFFSHORE PIPING & MODIFICATION
AND WELL TIE-IN PROJECT.
29th
May – 6th
June, 2015  CPCX09 15 01 TA CAMPAIGN- SHUTDOWN AT AMPA-09
7th
June – November, 2015  CPCB07 15 01 TA CAMPAIGN- CPDP-31 CWF-A2 Project-Water Injection
Well Tie-In Scope-Installation or new Piping as per project scope, Demolition
of existing line and Project Structural Installation.
 CPCB07 15 01 TA CAMPAIGN- CPDP-10 and CPPP-10-Water Injection
Tie-In Project at CPDP-04,PM Scope for Valve Replacement, Corroded
Structural Replacement, Riser Inspection and Riser Repair Work, Relief
Valve Inspection and Removal, Piping Replacement and Vessel Cleaning and
Inspection.
 FACB & FACX TA Campaign-Structural repair work at FAVJ-
01.Turnaround Campaign at Fairley 04 Complex for Valve’s replacement,
Vessel repair/inspection, corroded piping replacement, install new Porta
Cabin at FAAP04 and corroded structural replacement work.
 CPDP49 Green Field Project (Champion Intermediate Deep Project)-
Installation of new piping, structural, Electrical & Instrumentation and
Commissioning.
2) SKS WOOD SDN. BHD.
Duration : 25th
August 2008 – 28th
November 2012
Position : Construction Superintendent
(Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign & Asset Integrity
Retroration Team ( AIR Team ) at Chompion-07)
Duties and Responsibilities
• Plan and ensure the coordination of construction jobs.
• Responsility of supervising the construction project.
• Ensures that the quality of work and materials is upheld and that the budget is followed as planned.
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 8
• Entitled with the total supervision of all the operations on the site.
• Ensure that the workers are implementing what is on the design plan.
• Monitor the workers and the progress of the project and reports to the employers as well as to the general crews.
• Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid
down standards are met.
• Being on site to oversee all the construction process.
• Ensuring that both the health and safety project plans are implemented.
• Organizing the workers and ensuring that they are performing as required.
• General inspection of workers and their performance and safety.
• Ensuring that the stipulated safety rules and regulations are met.
• Follow the project construction process to ensure that it is completed in time.
• Supervises the subcontractor and ensures that they are punctual and that they deliver
• Writing project progress records in liaison with the supervisors and client site representative (CSR)
• Liaise with the client in operational aspect of the project ensure project milestone are being achieved.
• Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety
• Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack
description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble
shooting for the construction team.
• Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job
Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance
with the companies policies and procedures.
• To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work
activities completed, safe and achieve target.
• Submit Daily Progress Report to personnel on line.
Main Projects
• November ‘08  BUGAN RECOVERY PROJECT
• August –October ‘08  MAGPIE FACILITIES UPGRADE PROJECT
• March ‘09  IDDJ01 09 01 SUMMER CAMPAIGN
• March - April ‘09  CPCB07 09 01 SUMMER CAMPAIGN
• May – June ‘09  AMCX09 09 01 SUMMER CAMPAIGN
• June - July ‘09  AMCX06 09 01 SUMMER CAMPAIGN
• August – Sept ‘09  CPCA0709 01 SUMMER CAMPAIGN
• Feb ‘10  CPCX07 10 01 PRE-SUMMER CAMPAIGN
• March ‘10  CPCB07 10 01 SUMMER CAMPAIGN
• June ‘10  CPCA07 10 01 MAJOR CAMOPAIGN
• August ‘10  CPCX07 10 01 BARGE CAMPAIGN
• Oct ‘10  IDCX01 10 01 SUMMER CAMPAIGN
• Nov ‘10  CPCX01 10 01 WINTER CAMPAIGN
• February –June ‘11  CHAMPION WATER FLOOD UPGRADE PROJECT
• July-September ‘11  FACX 04 11 01 SUMMER CAMPAIGN
• October-November ‘11  AMCX 06 11 01 SUMMER CAMPAIGN
• December ‘11
• March ‘12
• March-May ‘12
• June-July ’12
•
• August-October ’12
 CPCX 07 11 01 WINTER CAMPAIGN
 SECX 01 12 01 TALI CAMPAIGN
 AMCX 09 12 01 AMPA CAMPAIGN
 FACX04 12 01 FAIRLEY-04 CAMPAIGN
 AMCX06 12 01 AMPA-06 SHUTDOWN CAMPAIGN
 CPCA07 12 01 AND MGCX01 12 01 CAMPAIGN-SHUTDOWN
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 9
1) JUSTRITE CONSTRUCTION & SERVICES SDN BHD
Joined Date : 8 March 2008-15 August 2008
Position : Construction Supervisor.
Project : Kikeh Spar Major Maintenance And Scaffolding Service
Client : Murphy Sabah Oil Co.Ltd.
Duties and Responsibilities
Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack
description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting
for the construction team. Plan works daily activities.Arranging and apply Permit To Work(PTW).To conduct Daily Safety
Meeting and Pre-Job Discussion base on JHA.Monitoring work activities,to conduct all activities in safe and efficient manner in
accordance with the companies policies and procedures.To ensuring the welfare of personnel and the protection of assets and
environment at all time.To ensuring the work activities completed,safe and achieve target.Liaise with the client in operational
aspect of the project ensure project milestore are being achieved.Submit Daily Progress Report to personnel in line.
• March-August 2008  WELL TIE-IN PROJECT-SHUTDOWN
 KIKEH SPAR MAJOR MAINTENANCE AND SCAFFOLDING PROJECT
WITH MURPHY SABAH OIL CO.LTD
2) PETRA RESOURCE SDN.BHD
Inclusive Date : 5th
February 2005 – 15th
January 2008
Project : Provision of Major Maintenance, Hook-Up, Commissioning and
Construction Services
Position : Construction Supervisor / Acting Superintendent
Duties and Responsibilities
• Plan and ensure the coordination of construction jobs.
• Responsility of supervising the construction project.
• Ensures that the quality of work and materials is upheld and that the budget is followed as planned.
• Entitled with the total supervision of all the operations on the site.
• Ensure that the workers are implementing what is on the design plan.
• Monitor the workers and the progress of the project and reports to the employers as well as to the general crews.
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 10
• Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid
down standards are met.
• Being on site to oversee all the construction process.
• Ensuring that both the health and safety project plans are implemented.
• Ensuring that the budget is followed in terms of purchases and wages.
• Organizing the workers and ensuring that they are performing as required.
• Recording the total costs for materials bought and payment for work done.
• General inspection of workers and their performance and safety.
• Ensuring that the stipulated safety rules and regulations are met.
• Follow the project construction process to ensure that it is completed in time.
• Supervises the subcontractor and ensures that they are punctual and that they deliver
• Ensure that quality is preserved in the construction process and that the budget is maintained
• Writing project progress records in liaison with the supervisors and client site representative (CSR)
• Liaise with the client in operational aspect of the project ensure project milestone are being achieved.
• Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety
• Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack
description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble
shooting for the construction team.
• Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job
Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance
with the companies policies and procedures.
• To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work
activities completed, safe and achieve target.
• Submit Daily Progress Report to personnel on line.
• February-December 05  SITE TEAM TO KINABALU PLATFORM AND BARTON PLATFORM
• February-December
2006/07/08
FOR PRE-DRIL AND WELL TIE-IN PROJECT
 SITE TEAM TO E-11 AND B-11 FOR PRE-DRILL AND WELL TIE-IN
PROJECT
 BARTON MINIMALLY FILTERED SEAWATER INJECTION AND
DECK EXTENSION PROJECT
 F23 AND F06 REJUVENATION PROJECT
 F23 BOAT LANDING UPGRADED PROJECT
 F23 AND F-06 PRE-DRILL AND WELL TIE-IN PROJECT
3) SKS WOOD SDN.BHD
Inclusive Date : 10th
June 2005 - 1st
October 2005
Project : Brunei Shell Petroleum (SCO) Summer Campaign
Position : Assistant Construction Supervisor
Duties and Responsibilities
Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack
description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 11
for the construction team. To conduct hydro testing, pneumatic test and re-instatement test, site checks and verify installation and
location as per approved drawings. To supervise piping, structure and rigging activities to be carried out and prepare shift
progress report.
• June-October 2005  CHAMPION-07 FLARE UPGRADE
 INSTALLATION OF NEW 5 GENERATOR ON CPEP-07
 FAIRLEY-04 SHUTDOWN AND NEW QUARTERS INTERFACE AND
HELIDECK DRIP PAN.
4) SARKU ENGINEERING SDN.BHD.WOOD SDN.BHD
Inclusive Date : 15th
February 2002 - 25th
January 2005
Project : Provision of Major Maintenance, Hook-Up, Commissioning and
Construction Services
Position : Shift Supervisor
Duties and Responsibilities
• In general provide drafting services related to all structural and piping system for the above mentioned
projects. Including complete detailing for the purpose of fabrication, erection, planning and project
scheduling.
• Base on piping general plans and P & ID, prepare comprehensive isometric drawing with sufficient
technical information to cover necessary fabrication and erection activities including material take - off
such piping system includes water fire protection, potable water, service air, ethylenelycol, fuel gas,
crude oil, hydrogen, clycerine acidulation and fatty alcohol lines. Such materials of pipeline are follows:
carbon steel, stainless steel, copper etc.
• Provide input data on computerized material stock list using lotus 123. Prepare corresponding report for
material availability.
• Prepare detailed drawing of structural I-beams and trusses.
• Provide cutting plans for structural components, with accurate dimension to minimize waste material off
cuts.
• Prepare structural weld mans or weld joint configuration.
• Randomly verify critical actual dimensions of piping and structural material on site as per fabrication
drawing.
• Provide assistance to shop supervisors or lead-man in the interpretation of issued for construction
drawing.
• Prepare modification drawing and as built drawing.
• February-December 2002  SITE TEAM TO M-01 PRE-DRILL ,HOOK-UP,MAJOR MAINTENACE
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 12
,COMMISSIONING AND WELL TIE-IN PROJECT
• February-December 2003-
2004
 SITE TEAM TO KINABALU PLATFORM FOR PRE-DRILL AND WELL
TIE-IN PROJECT
 BARAM B AND BARAM A SHUTDOWN,HOOK-UP,MAJOR
MAINTENANCE AND TIE-IN PROJECT
 BARAM B-BADP-AA-REVISIT 2003-PCSB PROJECT
 B-11 HOOK-UP, MAJOR MAINTENANCE,CONSTRUCTION SERVICES
AND WELL TIE-IN PROJECT.
 E-11 REJUVENATION PROJECT
5) CLOUGH OFFSHORE, SINGAPORE
Inclusive Date : June 2000 - 25th
January 2002
Project : Combined Cycle Power Plant, 220 MW Block 1-2-3, Ratchaburi, Thailand.
Position : Shift Supervisor / Commissioning Supervisor
Duties and Responsibilities
• Study and review the (AFC) approved for construction drawings as per specification for the preparation of
pre-fabrication.
• Operate/review the PDMS design to check the interference between pipelines and other components.
• Operate/review the PDMS design of each pipeline number to convert on isodraft for material take off
checking as per client standard and specification.
• Preparation of detailed isometric drawings, which is instructed to PDMS operator to in-put the (FW) field
weld location and isometric line number for fabrication purposes.
• Review AFC drawing, client specification, and reference necessary for the preparation of Purchase
Inquiry Document of pipe, pipe fittings, valve, gasket, bolts & nuts and pipe support materials.
• Prepare complete material take off (MTO) for material control and procurement of material.
• Responsible for the development of piping design drawing such as piping plan, piping isometric, pipe
supports and process flow diagram (P&ID).
• Provide technical assistance and coordination with the project management team for proper
implementation of project scope of work.
• Recommend design modification based on actual erection if there’s any obstruction or interference with
other components.
• Prepare technical bid evaluation (TBE) on piping materials and valves.
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 13
• Responsible in preparing and providing as built plan.
• Prepare ship loose list of pipe spools, pipe supports, valves, fittings and other miscellaneous items for the
project.
• Perform other duties and functions that maybe assigned by the immediate supervisor.
• June 2000-January 2002  GE/RAYTHEON ASIA BADGER INC FOR COMBINED CYCLE POWER
PLANT 2200MW BLOCK 1-2-3 RATCHABURI PROJECT.
6) CLOUGH OFFSHORE, SINGAPORE
Inclusive Date : March 2000 - June 2000
Project : Thermal Power Plant (FDG) 1740 MW Ratchaburi, Thailand
Position : Shift Supervisor / Commissioning Supervisor
Duties and Responsibilities
• Review consultant documents (drawings, specifications & references) for the preparation of design
fabrication drawing, i.e. isometric drawing, pipe support drawing and other miscellaneous work for the
project.
• Prepare material take off needed for procurement of material.
• Prepare and provide purchase inquiry documents (PID).
• Prepare technical bid evaluation (TBE). Evaluate vendor proposals and product technical conformity
against client requirements and specifications.
• Prepare piping fabrication isometric drawing from piping plans. Review and revise drawing of the pipe
support as required.
• Check interferences or clashes between pipe lines and structure, equipments and other pipe lines.
• Provide technical assistance and field coordination to ensure that works are properly implemented and
conform with the client specification.
• March 2000-June 2000  MUTSUBISHI HEAVY INDUSTRY(MHI) FOR THEMAL POWER
PLANT(FGD) 1740MW RATCHABURI PROJECT.
7) PERKASA PADU SDN.BHD. (PPSB)
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 14
Inclusive Date : 10th
February 1998 - 24th
December 1999
Project : Maintenance, Hook-Up and Commissioning at
BCOT - Bintulu Crude Oil Terminal.
Position : Shift Supervisor
Duties and Responsibilities
• Review client specification and reference necessary for the preparation of purchase inquiry document
(PID) of piping, pipe fittings, valve, gasket, bolt & nuts and pipe support materials.
• Prepare material take off (MTO) of piping system for material control and procurement that also include
piping specialty items.
• Prepare and provide purchase inquiry documents (PID).
• Review vendor data of the winning vendor, coordinate, discuss and resolve technical issues or comments
by client engineers or representative, such vendor data are: assembly/detailed drawings, parts list etc.
• Revised isometric drawing as per stringing result.
• Prepared job cards.
• Prepare pipe support fabrication drawing as per client standard.
• Prepare hand over documents as per client requirements such as piping isometric drawing and
mechanical flow diagram (MFD) per each system for final line check and acceptance.
• Prepare and provide as-built drawing.
• Perform other duties and function as may necessary to satisfactory complete a given task.
• February 1998-December
1999
 BCOT-BINTULU CRUDE OIL TERMINAL FOR MAJOR
MAINTENANCE HOOK-UP AND COMMISSIONING PROJECT.
8) PERKASA PADU SDN. BHD (PPSB)
Inclusive Date : January 1995 - November 1997
Project : Provision Of Consolidated Engineering and Construction Services For
Retrofits And Host Tie-In-EPMI
Position : Scaffolding Inspector / Supervisor
Duties and Responsibilities
• To ensure that client “Permit To Work System” is complied with.
• To conduct site specific Tool Box Talk prior to start work.
• Planned scaffold activities as per requested and supervise scaffolding activities which to be carried out
• To signed scaffold Tag.
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 15
• To check and inspect the scaffold are:-
• That the standards are correctly aligned and properly supported at their bases
• That there is no undue deflection in ledgers and putlogs or transoms
• That no essential member of the structure has been removed.
• That all ties and braces are effective in stabilizing the structure.
• That all couplers are properly tightened.
• That all scaffolds boards are sound and properly supported.
• That all guardrails and toe boards are in place.
• That all ladders are in good condition, properly supported and secured.
• January 1995-November
1997
 RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO
PLATFORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS
OFFSHORE TERENGGANU.
 IDRECO/NOEIL CONSORTIUM INC. AT FLUE GAS
DESCULFFERIZED RETROFIT PROJECT.
9) STOLT COMEX SEAWAY (S) Pte. Ltd.
Inclusive Date : 5th
August 1992 - 30th
July 1994
Project : Major Maintenance, Hook-Up, and Construction Service
Position : Shift Supervisor
Duties and Responsibilities
Responsible for the preparation of general arrangement plan, body plans, hydrostatic curves, capacity plan and other
pertinent plans as required by approving classification society.
Responsible for the preparation of cutting plans for automatic condor cutting/automatic oxyacetylene cutting machine
to facilitate mass production of material components such brackets, flat bars for I-beams fabrication and etc.
Responsible for the preparation of docking plans for ship lift berthing and at respective laying of vessels at births
for repairs.
Responsible for the preparation of piping lay-out, isometric drawing spool drawing to include material take off required
for fabrication and installation.
Responsible for the preparation of drawing and details for modification of ship repairs.
Prepared shell expansion plan to indicate the re-plating, renewed plate installed of anodes and other required for
updating.
Responsible for the preparation of as-built plan.
Perform other related duties as may be assigned by immediate supervisor and department manager.
• August 1992-July 1994  RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO
PLATFORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 16
OFFSHORE TERENGGANU.
10) STOLT COMEX SEAWAY (S) Pte Ltd
Inclusive Date : 15th
February 1990 - 30th
July 1992
Project : Major Maintenance, Hook-Up and Construction Services
Position : Assistant Shift Supervisor
Duties and Responsibilities
Responsible for work plan of piping, structure and rigging activities as per work pack description and spade listing. To implement
and carry out company Quality / Safety / Environment Policies and Procedure. Conducted hydro test, site check and variety exact
installation and location. Be able to give inputs, suggestion to the Yard Superintendent and improve the smooth and safety of
work execution. Supervise piping, structure and rigging activities to be carried out and prepare shift progress report to the Yard
Superintendent.
• January 1990-July 1992  PREPARATION FOR PIPING.STRUCTURE AND GASKETS FOR
OFFSHORE PROJECT
 HEAVY LIFTING FOR PLATFORM/JACKET INSTALLATION
 PIPING AND STRUCTURAL FABRICATION PROJECT
Referees:
1.Name : Robert White (Bob)
Designation : HUC Construction Manager
Tel :
Email : robert_white @ murphyoilcorp.com
2. Name : Ahmad Yusni Ahmad Johari
Designation : Murphy Well Supervisor
Tel : 019-6500109
Email : ahmad_yusni @ murphyoilcorp.com
3. Name : Masation Maran
Designation : Justrite Project Engineer
Tel : 019-8884725
Email : masation.maran@jrc.com.my
4. Name : Gerald Sim/Hj.Samad
Designation : SKSW Onshore Co-ordinator
Tel : +673-8711732/8721732
Email : Gerald.Sim@SKSWOOD.com
5. Name : Gerald Sim
Designation: : Aker Solution West Manager
Tel : +673-718 6435
Email : Gerald.Sim@akersolutions.com
Lagan ak Agang
Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,
Sarawak, East Malaysia
Mobile: +6013 8000449
Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 17

More Related Content

What's hot

Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Traininggoldrto
 
CV Updated - Copy (3)
CV Updated - Copy (3)CV Updated - Copy (3)
CV Updated - Copy (3)HARIDAS MANOJ
 
Benjamin_A_Manuel_Resume_August 2015 v 1
Benjamin_A_Manuel_Resume_August 2015 v 1Benjamin_A_Manuel_Resume_August 2015 v 1
Benjamin_A_Manuel_Resume_August 2015 v 1Benjamin Manuel
 
Detail cv patrick keyser 2016
Detail cv patrick keyser 2016Detail cv patrick keyser 2016
Detail cv patrick keyser 2016Pat Keyser
 
s.khan.cv for Chief Engineer
s.khan.cv for Chief Engineers.khan.cv for Chief Engineer
s.khan.cv for Chief EngineerSamshed khan
 
Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne
 
Mario Germino_CV -10 April 2016
Mario Germino_CV -10 April 2016Mario Germino_CV -10 April 2016
Mario Germino_CV -10 April 2016Mario Germino
 
Rami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami Hakeem
 
George Stark Aero CV
George Stark Aero CVGeorge Stark Aero CV
George Stark Aero CVGeorge Stark
 

What's hot (19)

keliew CV
keliew CVkeliew CV
keliew CV
 
Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Training
 
Mechanical Supervisor
Mechanical SupervisorMechanical Supervisor
Mechanical Supervisor
 
CV Updated - Copy (3)
CV Updated - Copy (3)CV Updated - Copy (3)
CV Updated - Copy (3)
 
Gregory Organ Resume 06-16
Gregory Organ Resume 06-16Gregory Organ Resume 06-16
Gregory Organ Resume 06-16
 
Benjamin_A_Manuel_Resume_August 2015 v 1
Benjamin_A_Manuel_Resume_August 2015 v 1Benjamin_A_Manuel_Resume_August 2015 v 1
Benjamin_A_Manuel_Resume_August 2015 v 1
 
Detail cv patrick keyser 2016
Detail cv patrick keyser 2016Detail cv patrick keyser 2016
Detail cv patrick keyser 2016
 
nsrpcv
nsrpcvnsrpcv
nsrpcv
 
Ck 3
Ck 3Ck 3
Ck 3
 
s.khan.cv for Chief Engineer
s.khan.cv for Chief Engineers.khan.cv for Chief Engineer
s.khan.cv for Chief Engineer
 
manoj CV
manoj CVmanoj CV
manoj CV
 
Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No ID
 
Mario Germino_CV -10 April 2016
Mario Germino_CV -10 April 2016Mario Germino_CV -10 April 2016
Mario Germino_CV -10 April 2016
 
Resume for Tech Suptd
Resume for Tech SuptdResume for Tech Suptd
Resume for Tech Suptd
 
Rami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cvRami lifting & hoisting supervisor cv
Rami lifting & hoisting supervisor cv
 
George Stark Aero CV
George Stark Aero CVGeorge Stark Aero CV
George Stark Aero CV
 
CV mine
CV mineCV mine
CV mine
 
CV Gith A
CV Gith ACV Gith A
CV Gith A
 
Hassan Cv Modified
Hassan Cv   ModifiedHassan Cv   Modified
Hassan Cv Modified
 

Similar to Construction Superintendent Resume

Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416lenin venugopal
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentMuhammad MuhdKhairul
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515newaffendy ali
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae Heny Manula
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions OperationspetroEDGE
 
Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015Leo Kencono
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)Mochammad Anis
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)Irene Lim
 
Drilling Supervisor and Engineer with more than 12 years of experience
Drilling Supervisor and Engineer with more than 12 years of experienceDrilling Supervisor and Engineer with more than 12 years of experience
Drilling Supervisor and Engineer with more than 12 years of experienceNILANJAN PODDAR
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum VitaeAndi Aris
 

Similar to Construction Superintendent Resume (20)

Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
 
Deva resume
Deva resumeDeva resume
Deva resume
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
Mark's Resume
Mark's ResumeMark's Resume
Mark's Resume
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Muhamad Khairizuwan_Resume
Muhamad Khairizuwan_ResumeMuhamad Khairizuwan_Resume
Muhamad Khairizuwan_Resume
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
CV HENDRA PERMANA R1
CV HENDRA PERMANA R1CV HENDRA PERMANA R1
CV HENDRA PERMANA R1
 
AVBENAKE Chris CV
AVBENAKE Chris CVAVBENAKE Chris CV
AVBENAKE Chris CV
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)
 
tmy resume 2014
tmy resume 2014tmy resume 2014
tmy resume 2014
 
Professional Resume Rasyid
Professional Resume RasyidProfessional Resume Rasyid
Professional Resume Rasyid
 
Drilling Supervisor and Engineer with more than 12 years of experience
Drilling Supervisor and Engineer with more than 12 years of experienceDrilling Supervisor and Engineer with more than 12 years of experience
Drilling Supervisor and Engineer with more than 12 years of experience
 
My Resume
My ResumeMy Resume
My Resume
 
ANAND HSE- CV
ANAND HSE- CVANAND HSE- CV
ANAND HSE- CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

More from Lagan Agang

Stolt Comex Seaway
Stolt Comex SeawayStolt Comex Seaway
Stolt Comex SeawayLagan Agang
 
Stolt Comex Seaway 1
Stolt Comex Seaway 1Stolt Comex Seaway 1
Stolt Comex Seaway 1Lagan Agang
 
SKSWood Testimonial 1
SKSWood Testimonial 1SKSWood Testimonial 1
SKSWood Testimonial 1Lagan Agang
 
Scaffolding Competent Person Inspection Course
Scaffolding Competent Person Inspection CourseScaffolding Competent Person Inspection Course
Scaffolding Competent Person Inspection CourseLagan Agang
 
Scaffolding Basic Part II Course
Scaffolding Basic Part II CourseScaffolding Basic Part II Course
Scaffolding Basic Part II CourseLagan Agang
 
Scaffolding Basic Part 1 Course
Scaffolding Basic Part 1 CourseScaffolding Basic Part 1 Course
Scaffolding Basic Part 1 CourseLagan Agang
 
Sarku Testimonial
Sarku TestimonialSarku Testimonial
Sarku TestimonialLagan Agang
 
Safety Leader Champion Course
Safety Leader Champion CourseSafety Leader Champion Course
Safety Leader Champion CourseLagan Agang
 
Petra Testimonial
Petra TestimonialPetra Testimonial
Petra TestimonialLagan Agang
 
Petra Testimonial 1
Petra Testimonial 1Petra Testimonial 1
Petra Testimonial 1Lagan Agang
 
Pakat Certificate
Pakat CertificatePakat Certificate
Pakat CertificateLagan Agang
 
Pakat Appreciation
Pakat AppreciationPakat Appreciation
Pakat AppreciationLagan Agang
 
Murphy Testimonial
Murphy TestimonialMurphy Testimonial
Murphy TestimonialLagan Agang
 
Murphy Testimonial 1
Murphy Testimonial 1Murphy Testimonial 1
Murphy Testimonial 1Lagan Agang
 
Certificate Of Appreciation
Certificate Of AppreciationCertificate Of Appreciation
Certificate Of AppreciationLagan Agang
 
Certificate Of Appreciation II
Certificate Of Appreciation IICertificate Of Appreciation II
Certificate Of Appreciation IILagan Agang
 
Certificate Of Appreciation 1
Certificate Of Appreciation 1Certificate Of Appreciation 1
Certificate Of Appreciation 1Lagan Agang
 
Supervisory Safety Workshop Certificate
Supervisory Safety Workshop CertificateSupervisory Safety Workshop Certificate
Supervisory Safety Workshop CertificateLagan Agang
 
BSP Appreciation Certificate
BSP Appreciation CertificateBSP Appreciation Certificate
BSP Appreciation CertificateLagan Agang
 
Appreciation Certificate
Appreciation CertificateAppreciation Certificate
Appreciation CertificateLagan Agang
 

More from Lagan Agang (20)

Stolt Comex Seaway
Stolt Comex SeawayStolt Comex Seaway
Stolt Comex Seaway
 
Stolt Comex Seaway 1
Stolt Comex Seaway 1Stolt Comex Seaway 1
Stolt Comex Seaway 1
 
SKSWood Testimonial 1
SKSWood Testimonial 1SKSWood Testimonial 1
SKSWood Testimonial 1
 
Scaffolding Competent Person Inspection Course
Scaffolding Competent Person Inspection CourseScaffolding Competent Person Inspection Course
Scaffolding Competent Person Inspection Course
 
Scaffolding Basic Part II Course
Scaffolding Basic Part II CourseScaffolding Basic Part II Course
Scaffolding Basic Part II Course
 
Scaffolding Basic Part 1 Course
Scaffolding Basic Part 1 CourseScaffolding Basic Part 1 Course
Scaffolding Basic Part 1 Course
 
Sarku Testimonial
Sarku TestimonialSarku Testimonial
Sarku Testimonial
 
Safety Leader Champion Course
Safety Leader Champion CourseSafety Leader Champion Course
Safety Leader Champion Course
 
Petra Testimonial
Petra TestimonialPetra Testimonial
Petra Testimonial
 
Petra Testimonial 1
Petra Testimonial 1Petra Testimonial 1
Petra Testimonial 1
 
Pakat Certificate
Pakat CertificatePakat Certificate
Pakat Certificate
 
Pakat Appreciation
Pakat AppreciationPakat Appreciation
Pakat Appreciation
 
Murphy Testimonial
Murphy TestimonialMurphy Testimonial
Murphy Testimonial
 
Murphy Testimonial 1
Murphy Testimonial 1Murphy Testimonial 1
Murphy Testimonial 1
 
Certificate Of Appreciation
Certificate Of AppreciationCertificate Of Appreciation
Certificate Of Appreciation
 
Certificate Of Appreciation II
Certificate Of Appreciation IICertificate Of Appreciation II
Certificate Of Appreciation II
 
Certificate Of Appreciation 1
Certificate Of Appreciation 1Certificate Of Appreciation 1
Certificate Of Appreciation 1
 
Supervisory Safety Workshop Certificate
Supervisory Safety Workshop CertificateSupervisory Safety Workshop Certificate
Supervisory Safety Workshop Certificate
 
BSP Appreciation Certificate
BSP Appreciation CertificateBSP Appreciation Certificate
BSP Appreciation Certificate
 
Appreciation Certificate
Appreciation CertificateAppreciation Certificate
Appreciation Certificate
 

Construction Superintendent Resume

  • 1. RESUMERESUME LAGAN AK AGANGLAGAN AK AGANG FIELD CONSTRUCTION SUPERINTENDENTFIELD CONSTRUCTION SUPERINTENDENT Career Objective: Willing to do the job as a construction superintendent in a well-established construction firm and apply all my skills and experience for the growth of the organization. PROFESSIONAL PROFILEPROFESSIONAL PROFILE Has over twenty five ( 25 ) years of experience in the field of onshore and offshore Construction, Maintenance, Hook-up and Commissioning, design engineering, fabrication of Power Plant, refinery and Oil and Gas Platform Modules/Topsides, jacket, and Living Quarters. Well versed in to assist in ensuring general functioning of the company and day to day routine offshore/onshore activities. Provide technical supports and field coordination for proper implementation of work. Involving for Work pack preparation, estimating, planning and scheduling. Development of piping design drawing, detailing, and materials take off. With knowledge in safety procedures, design specification and codes of practices, computer application such as Microsoft Project, Microsoft Access, Microsoft Excel, Microsoft Word, Computer Added Design, Micro Station 95 and familiar with PDMS ( Plant Design Management System ). PPERSONALERSONAL DDETAILETAIL NAME : LAGAN AK AGANG GENDER : MALE RACE : IBAN NATIONALITY : MALAYSIAN I.C NO. : 720115-13-5155 DATE OF BIRTH : 15TH JANUARY 1972 PLACE OF BIRTH : SUNGAI GAAT, BALEH, KAPIT Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 1
  • 2. MARITAL STATUS : MARRIED PASSPORT NO. : K 20802598 DATE OF ISSUE /EXPIRY : 9TH JANUARY 2013 – 8 JANUARY 2015 MEDICAL EXAMINATION/ EXPIRY : 9TH JANUARY 2013-8 JANUARY 2015 (DR.CHEU) CORRESPONDENT ADDRESS : S/LOT 4495,JALAN SHANGRILLA,CENTURY PARK,BAKAM 98000 MIRI, SARAWAK. EAST MALAYSIA TELEPHONE CONTACT : 06-013 8000449(Malaysian H/P)/+673 322 98888(Brunei) EMAIL ADDRESS : aganglagan@yahoo.com/Lagan.Agang@akersolutions.com OOTHERTHER IINFORMATIONNFORMATION • Language Proficiency English, Malay& Iban • Computer Skills Microsoft Application (Word, Excel, Project, power point) and DOS • Career expectation To work under tight and strict working schedule and challenging environment and continuous career advancement. • Personal Strengths Able to work independently with self-motivation, team-work, safety minded, responsible, hardworking, and able to learn new scope of works. • Sports / hobbies Badminton, football, table tennis, swimming. • Expected Salary Neg. EDUCATION BACKGROUND / QUALIFICATION • 1988 – 1989 Completed Primary 6 Ulu Teru Primary School, Miri, Sarawak • 1985 – 1987 Sijil rendah Pelajaran (Lower Certificate of Education) - Grade A Marudi secondary School, Sarawak, Malaysia • 1992-1993 • 1994 – 1995 Sijil Pelajaran Malaysia (Malaysian Certificate of Education) - Grade Two Marudi secondary School, Sarawak, Malaysia –Calon Persendirian Sijil Tinggi Persekolahan Malaysia ( Malaysia Higher School Certificate)-Lulus Penuh Marudi Secondary School,Sarawak,Malaysia-Calon Persendirian Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 2
  • 3. TECHNICAL BACKGROUND 1. Programs attended CERTIFICATION DATE Qualification ORGANIZER / CONDUCTOR • 28th August 2015 Business Ethics & Cross Culture Course AKER SOLUTION .Sdn.Bhd, • 13th June 2015 Incident Investigation and Reporting Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 2nd September 2014 • -2nd September 2018 Tropical FOET including Travel Safety By Boat and Tropical EBS. Sribima Marine Training Centre, Miri, Sarawak • 9th March 2014 Method Intergrated Project System ( MIPS ) AKER SULUTION Sdn.Bhd. • 1 August 2013 31July 2015 Competent Front Line Worksite Supervisor Megamas Training Co.Sdn.Bhd. • 29 March 2013 27 March 2016 Senior First Aid Course ATDC SDN BHD • 12 February 2013 Leadership Training for Frontline Worksite Supervisor AKER SULUTION Sdn.Bhd. • 4 August 2011- 3 August 2013 Competent Front Line Worksite Supervisor ( Refresher ) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 29 July 2011/28 July 2014 Permit To Work ( Refresher ) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 4 Nov 2010 Manual Handling Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 21 Jan 2011 SKSWOOD Leadership And Management Development Programme Brunel Shell Ptl.Com • 25 August 2008/24 August 2011 Permit To Work System Training Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 17 Nov 2009/16 Nov 2012 Senior First Aid Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 1 Nov 2010/31 Nov 2014 Tropical FOET including Travel Safety By Boat and Tropical EBS. Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 4 Nov 2010 Manual Handling Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 24 August 2010 Integrated Safe System Of Work Sentinel PRO(ISSOW) Training Brunel Shell Ptl.Com. • 17 Sept 2009 / 16 Nov 2011 Competent Front Line Worksite Supervisor (Refresher) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 3
  • 4. • 24 March 2008 / 2 March 2011 Competent Worksite Supervisor Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 3 March 2008 - 2 Feb.2011 Tropical FOET Inc.Travel Safety By Boat Incl. Tropical EBS (5618) Sribima Marine Training Centre, Miri, Sarawak • 25 March 2007 - 12 Jun 2008 Helicopter Underwater Escape Training (With EBS) Sribima Marine Training Centre, Miri, Sarawak • 7-8 December 2006 Supervisory Safety Workshop Sarawak Shell Bhd. • 14 March 2006 - 13 March 2009 Permit to Work Course(Applicant) BSTS SDN.BHD • 23-25 February 2006 Becoming A Safety Leader Champion Executive Training International and ATDC Sendirian Berhad • 18-19 June 2005 Managing Hazards At The Workplace and BSP Permit To Work System / Worksite Supervisors Course (PTW 1 & 2) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei • 13-15 June 2005 Tropical Basic Offshore Safety Induction and Emergency Training (TBOSIET Course) Sribima Marine Training Centre, Miri, Sarawak • 10 Jun 2005-9 Jun 2008 Hydrogen Sulphide (H2S) Competency Course BSTS SDN.BHD • 06 Oct 2004 - 05 Oct 2007 02 Day Combined Sea Survival & Offshore MSTS Asia Sdn Bhd • 23 – 24 Oct 2003 PCSB Applicant (Permit to Work – PTW) Petronas Carigali Sdn Bhd (PCSB) • 09-10 May 2003 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad) • 24Jan 2003 Rigging & Slinging Course. Sribima Marine Training Centre, Miri, Sarawak • 20 Jan 2003 Emergency First Aid Course. Sribima Marine Training Centre, Miri, Sarawak • 08 June 2002 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad) • 14 March 2002 Permit to Work Training (PTW) Sarawak Shell Berhad • 15 Oct 2001 03 Day Combined Sea Survival & Offshore Sribima Marine Training Centre, Miri, Sarawak • 14 Oct 2004 Safety Procedures, HUET and Basic Fire Fighting & Self- Rescue. Sribima Marine Training Centre, Miri, Sarawak • 15 Nov 1999 Scaffolding Competent Person Inspection Course. Trident Training (M) Sdn Bhd • 20 Nov 1998 Scaffolding Basic Part II. Trident Training (M) Sdn Bhd • 08 July 1995 Scaffolding Basic Part I. Trident Training (M) Sdn Bhd PPROFESSIONALROFESSIONAL EEXPERIENCEXPERIENCE 1) AKER SOLUTIONS SDN. BHD. Duration : 1st January 2013 – Present Position : Field Construction Superintendent (Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign) Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 4
  • 5. Duties and Responsibilities  Provide support to Field Supervision and Operations Teams in order to ensure that all operational issues impacting production delivery are addressed,  Attend and address applicable actions arising out of the Daily Operations Morning Call.  Day to day support for operation of the asset..  Develop, maintain and distribute procedures, work practices, standards and specifications utilized within offshore/onshore production delivery team with appropriate support as required.  Provide operations input to the Management of Engineering Change, including participation in, Hazards and other relevant safety reviews.  Liaise with Project and Technical Teams to provide operational input in order to ensure that any project is fit for purpose and reflects operational best practice.  Plan and ensure the coordination of Construction job.  Ensures that the quality of work and materials is upheld.  Supervises the subcontractor and ensure that they are punctual and that they deliver  Writing project progress records and liaison with the supervisors and client site representative(CSR)  Liaises with the client in operational aspect of the project ensure project milestone are being achieved.  Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction term.  Plan work daily activities. Arranging and make sure Permit To Work (PTW) in place. Monitoring work activities to conduct in safe manner in accordance with the companies’ policies and procedures.  To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work activities completed, safe and achieve target.  Submit Daily Report to personnel on line. HSE & COMPLIANCE  Leads the Delivery Team in maintaining the highest regard for Safety and the Environment  Is familiar with the appropriate statutory legislation, Case for safety and Safety Management Systems used to support the role  Ensures all process plant equipment in hazardous and other areas is operated in accordance with the appropriate legislation, guidelines, assurance and verification practices and is fully conversant with necessary performance standards  Completes regular offshore audits to ensure compliance with Safety and Operational Standards.  Provides direction/input to risk assessment if required as operations responsible person  Ensure by review / audit of procedures and work practices, that the safest and most cost effective operations methods are used, while minimizing any loss  General inspection of workers and their performance and safety.  Ensuring that the stipulated safety rules and regulations are met.  Continue the use of Hazards Identification Plan (HIP) and the Safety Checklist. Monitor and control offshore waste disposal in accordance with the BSP HSE Standard. Main Projects Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 5
  • 6. • February – March ,2013  CONSTRUCTABILITY SITE SURVEY FOR EAST & WEST CAMPAIGN • April - June , 2013 • June-August ‘2013 • September-October 14, 2013 • October 15-Dec.16, 2013 • Dec 17,2013 – March 31 , 2014  FIRE GALLEY PROTECTION AND DRIP PAN FOR CCS PUMP STRAINERS( AMCX-09 CAMPAIGN)  SERVICE PLATFORM FOR BYPASS VALVE 10" BIDI(AMCX-09 CAMPAIGN)  HEAVY LIFTING FOR NEW HELIDECK INSTALLATION AND AMPA 09 SHUTDOWN CAMPAIGN  AMCX09 HP COMPRESSOR UPGRADE.  CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX12 WELL TIE-IN PROJECT AND PM SCOPE PIPING ,VALVE REPLAVEMENT AND BOATLANDING REPAIR WORK  AMCX06 13 01 TURNOAROUND CAMPAIGN-AMCX04 SHUTDOWN CAMPAIGN-PM SCOPE FOR VESSEL INSPECTION,VALVE AND PIPING REPLACEMENT  CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX04 PRE- SHUTDOWN/SHUTDOWN AND POST SHUTDOWN SCOPE-VESSEL INSPECTION WORK,VALVE AND PIPING REPLACEMENT.  CPCX07 13 01TURNAROUND CAMPAIGN-CPCX03 PIPELINE REPLACEMENT PROJECT(PRP PROJECT) AND REDUNDANT PIPING DEMOLITION SCOPE  INSTALLATION OF NEW DECK EXTENSION AND SERVICE PLATFORM FOR PIPELINE REPLACEMENT PROJECT(PRP PROJECT).  CHAMPION-07 BROWN FIELD PROJECT-WELL TIE IN AND NEW MODULE INSTALLATION AT CHAMPION 1.  CHAMPION WATER FLOOD A2 (PHASE 2) PROJECT-INSTALLATION OF NEW TIE-IN/NEW MODULE/FIREWATER UPGRADING/INSTALLATION OF NEW SERVICE PLATFORM AT CHAMPION 33. . May 1st ,2014 – June 17 , 2014  AMCX09 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.  AMDP11-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING REPLACEMENT AND STRUCTURAL REPLACEMENT.  AMDP25-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT SCOPE TO INSTALL NEW SERVICE PALTFORM FOR LIFE RAFT INSTALLATION.  AMCX15/24--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT SCOPE TO INSTALL NEW FCV AND FLOWLINE SWA247L MODIFICATION.  AMCX03--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING REPLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 6
  • 7. SCOPE-PRP2-INSTALL NEW PIPING AND REMOVE EXISTING LINE.  AMPA-06-EGRET CASCADE PROJECT-MODIFICATION OF DN80/DN150 GAS LIFT AND FUEL GAS LINE. . June – 20TH July , 2014  FACX04 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.  FAPP/FADP-01-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING REPLACEMENT AND STRUCTURAL REPLACEMENT..  ADVANCE TIE-IN PRE-DRILL:1.INSTALLATION OF NEW FLOWLINE,GAS LIFT LINES AND CASING BLOWDOWN LINES AND TIE-IN TO RESPECTIVE HEADERS. 2.INSTALLATION AND HOOK-UP OF CONTROL VALVES,MVFTS AND PSD VALVES.3.INSTALLATION AND HOOK-UP OF WELLHEAD CONTROL PANEL & PRESSURE RELIEF VALVE 4.RTU UPGRADE 5.REMOVAL OF THE EXISTING FA- 51 WELL AND ITS ASSOCIATED FACILITIES. . July 21st – 25th August, 2014 26th August – 14th October, 2014  CPCB07 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.  PRP-2 PROJECT-INSTALLATION OF NEW PIPING FOR GAS AND OIL LINE.  INSTALLATION OF NEW SERVICES PLATFORM FOR PRP-2 SCOPE  SHUTDOWN SCOPE-REPLACE CORRODED VALVES AND PIPING.VESSEL CLEANING AND VESSEL INSPECTION  AMCX06 14 01-AMRJ-01 SHUTDOWN-REPLACE CORRODED PIPING,RISER REPAIR WORK,VALVE AND BOLT/NUTS REPLACEMENT  AMRP-06-HEAVY LIFTING FOR 24”/16”/12” & 10” ACTUATOR BALL VALVE REPLACEMENT.  AMDP-21-HEAVY LIFT FOR RISER GUARD FENDER INSTALLATION AND RISER IMPACT PROTECTION INSTALLATION.  SUMP VESSEL REPAIR WORK. PIPING,VALVES AND GASKET REPLACEMENT WORK. 15th October – 28st May, 2015  CPCA07 15 01 TA CAMPAIGN-PRE SHUTDOWN AT CPCX-04 AND CPDP-31.  SHUTDOWN AT CPCX04 AND CPDP-31-REPLACE CORRODED PIPING FOR PM SCOPE WITH VARIOUS SIZES-2”/3”/4”/6”/8” AND 12” FOR OIL LINE,GAS LINE ,WATER INJECTION LINE AND PROCESS DRAIN AND DECK DRAIN LINE.  REPLACEMENT OF CORRODED VALVES/STUDBOLT AND NUTS AND GASKETS  REPLACEMENT OF CORRODED STRUCTURAL FOR S3 SCOPE.  CPCX-12-PRP-2 PROJECT-INSTALLATION OF NEW DECK SERVICE PLATFORM FOR PID 2042 & 2506.INSTALL SUPPORT,HANDRAILS AND GRATINGS FOR NEW ESDV SERVIVE PLATFORM FOR PID 2505.  CPDP-31 CW A2 BROWNFIELD PROJECT-INSTALLATION OF NEW Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 7
  • 8. INTEGRATED MODULE SKID (IMS),NEW DECK EXTENSION,NEW K.O.DRUM MODULE,WELL HEAD CONTROL PANEL (WHCP) INSTALLATION,PIPING DEMOLATION SCOPE,NEW E& I SKID,NEW VENT BOOM INSTALLTION, OFFSHORE PIPING & MODIFICATION AND WELL TIE-IN PROJECT. 29th May – 6th June, 2015  CPCX09 15 01 TA CAMPAIGN- SHUTDOWN AT AMPA-09 7th June – November, 2015  CPCB07 15 01 TA CAMPAIGN- CPDP-31 CWF-A2 Project-Water Injection Well Tie-In Scope-Installation or new Piping as per project scope, Demolition of existing line and Project Structural Installation.  CPCB07 15 01 TA CAMPAIGN- CPDP-10 and CPPP-10-Water Injection Tie-In Project at CPDP-04,PM Scope for Valve Replacement, Corroded Structural Replacement, Riser Inspection and Riser Repair Work, Relief Valve Inspection and Removal, Piping Replacement and Vessel Cleaning and Inspection.  FACB & FACX TA Campaign-Structural repair work at FAVJ- 01.Turnaround Campaign at Fairley 04 Complex for Valve’s replacement, Vessel repair/inspection, corroded piping replacement, install new Porta Cabin at FAAP04 and corroded structural replacement work.  CPDP49 Green Field Project (Champion Intermediate Deep Project)- Installation of new piping, structural, Electrical & Instrumentation and Commissioning. 2) SKS WOOD SDN. BHD. Duration : 25th August 2008 – 28th November 2012 Position : Construction Superintendent (Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign & Asset Integrity Retroration Team ( AIR Team ) at Chompion-07) Duties and Responsibilities • Plan and ensure the coordination of construction jobs. • Responsility of supervising the construction project. • Ensures that the quality of work and materials is upheld and that the budget is followed as planned. Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 8
  • 9. • Entitled with the total supervision of all the operations on the site. • Ensure that the workers are implementing what is on the design plan. • Monitor the workers and the progress of the project and reports to the employers as well as to the general crews. • Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid down standards are met. • Being on site to oversee all the construction process. • Ensuring that both the health and safety project plans are implemented. • Organizing the workers and ensuring that they are performing as required. • General inspection of workers and their performance and safety. • Ensuring that the stipulated safety rules and regulations are met. • Follow the project construction process to ensure that it is completed in time. • Supervises the subcontractor and ensures that they are punctual and that they deliver • Writing project progress records in liaison with the supervisors and client site representative (CSR) • Liaise with the client in operational aspect of the project ensure project milestone are being achieved. • Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety • Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team. • Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures. • To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work activities completed, safe and achieve target. • Submit Daily Progress Report to personnel on line. Main Projects • November ‘08  BUGAN RECOVERY PROJECT • August –October ‘08  MAGPIE FACILITIES UPGRADE PROJECT • March ‘09  IDDJ01 09 01 SUMMER CAMPAIGN • March - April ‘09  CPCB07 09 01 SUMMER CAMPAIGN • May – June ‘09  AMCX09 09 01 SUMMER CAMPAIGN • June - July ‘09  AMCX06 09 01 SUMMER CAMPAIGN • August – Sept ‘09  CPCA0709 01 SUMMER CAMPAIGN • Feb ‘10  CPCX07 10 01 PRE-SUMMER CAMPAIGN • March ‘10  CPCB07 10 01 SUMMER CAMPAIGN • June ‘10  CPCA07 10 01 MAJOR CAMOPAIGN • August ‘10  CPCX07 10 01 BARGE CAMPAIGN • Oct ‘10  IDCX01 10 01 SUMMER CAMPAIGN • Nov ‘10  CPCX01 10 01 WINTER CAMPAIGN • February –June ‘11  CHAMPION WATER FLOOD UPGRADE PROJECT • July-September ‘11  FACX 04 11 01 SUMMER CAMPAIGN • October-November ‘11  AMCX 06 11 01 SUMMER CAMPAIGN • December ‘11 • March ‘12 • March-May ‘12 • June-July ’12 • • August-October ’12  CPCX 07 11 01 WINTER CAMPAIGN  SECX 01 12 01 TALI CAMPAIGN  AMCX 09 12 01 AMPA CAMPAIGN  FACX04 12 01 FAIRLEY-04 CAMPAIGN  AMCX06 12 01 AMPA-06 SHUTDOWN CAMPAIGN  CPCA07 12 01 AND MGCX01 12 01 CAMPAIGN-SHUTDOWN Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 9
  • 10. 1) JUSTRITE CONSTRUCTION & SERVICES SDN BHD Joined Date : 8 March 2008-15 August 2008 Position : Construction Supervisor. Project : Kikeh Spar Major Maintenance And Scaffolding Service Client : Murphy Sabah Oil Co.Ltd. Duties and Responsibilities Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team. Plan works daily activities.Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA.Monitoring work activities,to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures.To ensuring the welfare of personnel and the protection of assets and environment at all time.To ensuring the work activities completed,safe and achieve target.Liaise with the client in operational aspect of the project ensure project milestore are being achieved.Submit Daily Progress Report to personnel in line. • March-August 2008  WELL TIE-IN PROJECT-SHUTDOWN  KIKEH SPAR MAJOR MAINTENANCE AND SCAFFOLDING PROJECT WITH MURPHY SABAH OIL CO.LTD 2) PETRA RESOURCE SDN.BHD Inclusive Date : 5th February 2005 – 15th January 2008 Project : Provision of Major Maintenance, Hook-Up, Commissioning and Construction Services Position : Construction Supervisor / Acting Superintendent Duties and Responsibilities • Plan and ensure the coordination of construction jobs. • Responsility of supervising the construction project. • Ensures that the quality of work and materials is upheld and that the budget is followed as planned. • Entitled with the total supervision of all the operations on the site. • Ensure that the workers are implementing what is on the design plan. • Monitor the workers and the progress of the project and reports to the employers as well as to the general crews. Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 10
  • 11. • Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid down standards are met. • Being on site to oversee all the construction process. • Ensuring that both the health and safety project plans are implemented. • Ensuring that the budget is followed in terms of purchases and wages. • Organizing the workers and ensuring that they are performing as required. • Recording the total costs for materials bought and payment for work done. • General inspection of workers and their performance and safety. • Ensuring that the stipulated safety rules and regulations are met. • Follow the project construction process to ensure that it is completed in time. • Supervises the subcontractor and ensures that they are punctual and that they deliver • Ensure that quality is preserved in the construction process and that the budget is maintained • Writing project progress records in liaison with the supervisors and client site representative (CSR) • Liaise with the client in operational aspect of the project ensure project milestone are being achieved. • Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety • Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team. • Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures. • To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work activities completed, safe and achieve target. • Submit Daily Progress Report to personnel on line. • February-December 05  SITE TEAM TO KINABALU PLATFORM AND BARTON PLATFORM • February-December 2006/07/08 FOR PRE-DRIL AND WELL TIE-IN PROJECT  SITE TEAM TO E-11 AND B-11 FOR PRE-DRILL AND WELL TIE-IN PROJECT  BARTON MINIMALLY FILTERED SEAWATER INJECTION AND DECK EXTENSION PROJECT  F23 AND F06 REJUVENATION PROJECT  F23 BOAT LANDING UPGRADED PROJECT  F23 AND F-06 PRE-DRILL AND WELL TIE-IN PROJECT 3) SKS WOOD SDN.BHD Inclusive Date : 10th June 2005 - 1st October 2005 Project : Brunei Shell Petroleum (SCO) Summer Campaign Position : Assistant Construction Supervisor Duties and Responsibilities Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 11
  • 12. for the construction team. To conduct hydro testing, pneumatic test and re-instatement test, site checks and verify installation and location as per approved drawings. To supervise piping, structure and rigging activities to be carried out and prepare shift progress report. • June-October 2005  CHAMPION-07 FLARE UPGRADE  INSTALLATION OF NEW 5 GENERATOR ON CPEP-07  FAIRLEY-04 SHUTDOWN AND NEW QUARTERS INTERFACE AND HELIDECK DRIP PAN. 4) SARKU ENGINEERING SDN.BHD.WOOD SDN.BHD Inclusive Date : 15th February 2002 - 25th January 2005 Project : Provision of Major Maintenance, Hook-Up, Commissioning and Construction Services Position : Shift Supervisor Duties and Responsibilities • In general provide drafting services related to all structural and piping system for the above mentioned projects. Including complete detailing for the purpose of fabrication, erection, planning and project scheduling. • Base on piping general plans and P & ID, prepare comprehensive isometric drawing with sufficient technical information to cover necessary fabrication and erection activities including material take - off such piping system includes water fire protection, potable water, service air, ethylenelycol, fuel gas, crude oil, hydrogen, clycerine acidulation and fatty alcohol lines. Such materials of pipeline are follows: carbon steel, stainless steel, copper etc. • Provide input data on computerized material stock list using lotus 123. Prepare corresponding report for material availability. • Prepare detailed drawing of structural I-beams and trusses. • Provide cutting plans for structural components, with accurate dimension to minimize waste material off cuts. • Prepare structural weld mans or weld joint configuration. • Randomly verify critical actual dimensions of piping and structural material on site as per fabrication drawing. • Provide assistance to shop supervisors or lead-man in the interpretation of issued for construction drawing. • Prepare modification drawing and as built drawing. • February-December 2002  SITE TEAM TO M-01 PRE-DRILL ,HOOK-UP,MAJOR MAINTENACE Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 12
  • 13. ,COMMISSIONING AND WELL TIE-IN PROJECT • February-December 2003- 2004  SITE TEAM TO KINABALU PLATFORM FOR PRE-DRILL AND WELL TIE-IN PROJECT  BARAM B AND BARAM A SHUTDOWN,HOOK-UP,MAJOR MAINTENANCE AND TIE-IN PROJECT  BARAM B-BADP-AA-REVISIT 2003-PCSB PROJECT  B-11 HOOK-UP, MAJOR MAINTENANCE,CONSTRUCTION SERVICES AND WELL TIE-IN PROJECT.  E-11 REJUVENATION PROJECT 5) CLOUGH OFFSHORE, SINGAPORE Inclusive Date : June 2000 - 25th January 2002 Project : Combined Cycle Power Plant, 220 MW Block 1-2-3, Ratchaburi, Thailand. Position : Shift Supervisor / Commissioning Supervisor Duties and Responsibilities • Study and review the (AFC) approved for construction drawings as per specification for the preparation of pre-fabrication. • Operate/review the PDMS design to check the interference between pipelines and other components. • Operate/review the PDMS design of each pipeline number to convert on isodraft for material take off checking as per client standard and specification. • Preparation of detailed isometric drawings, which is instructed to PDMS operator to in-put the (FW) field weld location and isometric line number for fabrication purposes. • Review AFC drawing, client specification, and reference necessary for the preparation of Purchase Inquiry Document of pipe, pipe fittings, valve, gasket, bolts & nuts and pipe support materials. • Prepare complete material take off (MTO) for material control and procurement of material. • Responsible for the development of piping design drawing such as piping plan, piping isometric, pipe supports and process flow diagram (P&ID). • Provide technical assistance and coordination with the project management team for proper implementation of project scope of work. • Recommend design modification based on actual erection if there’s any obstruction or interference with other components. • Prepare technical bid evaluation (TBE) on piping materials and valves. Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 13
  • 14. • Responsible in preparing and providing as built plan. • Prepare ship loose list of pipe spools, pipe supports, valves, fittings and other miscellaneous items for the project. • Perform other duties and functions that maybe assigned by the immediate supervisor. • June 2000-January 2002  GE/RAYTHEON ASIA BADGER INC FOR COMBINED CYCLE POWER PLANT 2200MW BLOCK 1-2-3 RATCHABURI PROJECT. 6) CLOUGH OFFSHORE, SINGAPORE Inclusive Date : March 2000 - June 2000 Project : Thermal Power Plant (FDG) 1740 MW Ratchaburi, Thailand Position : Shift Supervisor / Commissioning Supervisor Duties and Responsibilities • Review consultant documents (drawings, specifications & references) for the preparation of design fabrication drawing, i.e. isometric drawing, pipe support drawing and other miscellaneous work for the project. • Prepare material take off needed for procurement of material. • Prepare and provide purchase inquiry documents (PID). • Prepare technical bid evaluation (TBE). Evaluate vendor proposals and product technical conformity against client requirements and specifications. • Prepare piping fabrication isometric drawing from piping plans. Review and revise drawing of the pipe support as required. • Check interferences or clashes between pipe lines and structure, equipments and other pipe lines. • Provide technical assistance and field coordination to ensure that works are properly implemented and conform with the client specification. • March 2000-June 2000  MUTSUBISHI HEAVY INDUSTRY(MHI) FOR THEMAL POWER PLANT(FGD) 1740MW RATCHABURI PROJECT. 7) PERKASA PADU SDN.BHD. (PPSB) Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 14
  • 15. Inclusive Date : 10th February 1998 - 24th December 1999 Project : Maintenance, Hook-Up and Commissioning at BCOT - Bintulu Crude Oil Terminal. Position : Shift Supervisor Duties and Responsibilities • Review client specification and reference necessary for the preparation of purchase inquiry document (PID) of piping, pipe fittings, valve, gasket, bolt & nuts and pipe support materials. • Prepare material take off (MTO) of piping system for material control and procurement that also include piping specialty items. • Prepare and provide purchase inquiry documents (PID). • Review vendor data of the winning vendor, coordinate, discuss and resolve technical issues or comments by client engineers or representative, such vendor data are: assembly/detailed drawings, parts list etc. • Revised isometric drawing as per stringing result. • Prepared job cards. • Prepare pipe support fabrication drawing as per client standard. • Prepare hand over documents as per client requirements such as piping isometric drawing and mechanical flow diagram (MFD) per each system for final line check and acceptance. • Prepare and provide as-built drawing. • Perform other duties and function as may necessary to satisfactory complete a given task. • February 1998-December 1999  BCOT-BINTULU CRUDE OIL TERMINAL FOR MAJOR MAINTENANCE HOOK-UP AND COMMISSIONING PROJECT. 8) PERKASA PADU SDN. BHD (PPSB) Inclusive Date : January 1995 - November 1997 Project : Provision Of Consolidated Engineering and Construction Services For Retrofits And Host Tie-In-EPMI Position : Scaffolding Inspector / Supervisor Duties and Responsibilities • To ensure that client “Permit To Work System” is complied with. • To conduct site specific Tool Box Talk prior to start work. • Planned scaffold activities as per requested and supervise scaffolding activities which to be carried out • To signed scaffold Tag. Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 15
  • 16. • To check and inspect the scaffold are:- • That the standards are correctly aligned and properly supported at their bases • That there is no undue deflection in ledgers and putlogs or transoms • That no essential member of the structure has been removed. • That all ties and braces are effective in stabilizing the structure. • That all couplers are properly tightened. • That all scaffolds boards are sound and properly supported. • That all guardrails and toe boards are in place. • That all ladders are in good condition, properly supported and secured. • January 1995-November 1997  RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO PLATFORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS OFFSHORE TERENGGANU.  IDRECO/NOEIL CONSORTIUM INC. AT FLUE GAS DESCULFFERIZED RETROFIT PROJECT. 9) STOLT COMEX SEAWAY (S) Pte. Ltd. Inclusive Date : 5th August 1992 - 30th July 1994 Project : Major Maintenance, Hook-Up, and Construction Service Position : Shift Supervisor Duties and Responsibilities Responsible for the preparation of general arrangement plan, body plans, hydrostatic curves, capacity plan and other pertinent plans as required by approving classification society. Responsible for the preparation of cutting plans for automatic condor cutting/automatic oxyacetylene cutting machine to facilitate mass production of material components such brackets, flat bars for I-beams fabrication and etc. Responsible for the preparation of docking plans for ship lift berthing and at respective laying of vessels at births for repairs. Responsible for the preparation of piping lay-out, isometric drawing spool drawing to include material take off required for fabrication and installation. Responsible for the preparation of drawing and details for modification of ship repairs. Prepared shell expansion plan to indicate the re-plating, renewed plate installed of anodes and other required for updating. Responsible for the preparation of as-built plan. Perform other related duties as may be assigned by immediate supervisor and department manager. • August 1992-July 1994  RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO PLATFORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 16
  • 17. OFFSHORE TERENGGANU. 10) STOLT COMEX SEAWAY (S) Pte Ltd Inclusive Date : 15th February 1990 - 30th July 1992 Project : Major Maintenance, Hook-Up and Construction Services Position : Assistant Shift Supervisor Duties and Responsibilities Responsible for work plan of piping, structure and rigging activities as per work pack description and spade listing. To implement and carry out company Quality / Safety / Environment Policies and Procedure. Conducted hydro test, site check and variety exact installation and location. Be able to give inputs, suggestion to the Yard Superintendent and improve the smooth and safety of work execution. Supervise piping, structure and rigging activities to be carried out and prepare shift progress report to the Yard Superintendent. • January 1990-July 1992  PREPARATION FOR PIPING.STRUCTURE AND GASKETS FOR OFFSHORE PROJECT  HEAVY LIFTING FOR PLATFORM/JACKET INSTALLATION  PIPING AND STRUCTURAL FABRICATION PROJECT Referees: 1.Name : Robert White (Bob) Designation : HUC Construction Manager Tel : Email : robert_white @ murphyoilcorp.com 2. Name : Ahmad Yusni Ahmad Johari Designation : Murphy Well Supervisor Tel : 019-6500109 Email : ahmad_yusni @ murphyoilcorp.com 3. Name : Masation Maran Designation : Justrite Project Engineer Tel : 019-8884725 Email : masation.maran@jrc.com.my 4. Name : Gerald Sim/Hj.Samad Designation : SKSW Onshore Co-ordinator Tel : +673-8711732/8721732 Email : Gerald.Sim@SKSWOOD.com 5. Name : Gerald Sim Designation: : Aker Solution West Manager Tel : +673-718 6435 Email : Gerald.Sim@akersolutions.com Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: aganglagan@yahoo.com/Lagan.Agang@akersolutions.com[Type text] Page 17