1. CURRICULUM VITAE
N a m e : RENSUS PARTOGIAN SINAGA
Place of birth : Pematang Siantar
Date of birth : 29 April 1978
Religion : Christians
S e x : Male
Status : Married
Nationality : Indonesian
Home address : Jln. Rajawali block D no 189 Bengkong Abadi II
P. Batam
Phone number : Mobile (+62)81266013279
E-mail : rensus.sinaga@yahoo.co.id
FORMAL EDUCATION
1997 – 1999 Padjajaran University, majoring Instrumentasi Elektronika
1994 – 1997 SMUN 19 Bandung, Bandung
1991 – 1994 SMP Yos Sudarso, Batam
1985 – 1991 Budi Utama Primary School, Batam
FURTHER EDUCATION
Kronos WORKFORCE CENTRAL conducted by PT. Mc Dermott Indonesia.
Light rigging conducted by PT. Mc Dermott Indonesia.
Permit to work & Confine space entry conducted by PT. Mc Dermott Indonesia.
5S training conducted by PT. Mc Dermott Indonesia.
Quality Awareness (QA) Training conducted by PT. Mc Dermott Indonesia.
FTE system (fabrication time entry) conducted by PT. Mc Dermott Indonesia.
PTW Issuing authority conducted by PT. Mc Dermott Indonesia.
Dimensional Control for Fitting department conducted at PT. Mc Dermott Indonesia.
ASNT UT level II by UNIVERSAL
Safety Conversation & BBSM training conducted by PT. Mc Dermott Indonesia
Work Place assessor training conducted by PT. Mc Dermott Indonesia
OTHER CAPABILITY
Language : Good command of written and spoken Indonesia
Good command of written and spoken English
Computer Literate (MS Word, MS Excel, MS Power Point, MS Access, MS Outlook).
EXPERIENCE
1. PT. McDermott Indonesia Batam
Subcontractor Oil Mining and Refinery Equipment and Facility
Period : August 2006 until December 2012 ( 6 year and 4 months)
Purpose : Permanently Working
Position : Administrative Assistant
Duty and Specific Responsibility:
Take dictation & transcribes correspondence and report.
Ensuring that man-hours are correctly booked to jobs
Compiles periodic report on the basis of general instruction.
Receiving & distribute any information, letters or announcement letters from
management to all employee.
Make form for some request.
Assembles detailed information gathered from research or files and prepare
the information in suitable format.
High standard of safe working practice, quality and productivity as well as
compliance with the code business conduct.
Page 1 of 3
2. Project Involved:
Gorgon Upstream Project, Fabrication of Sub Sea Structure & Spools
Gorgon Project, Barrow Island LNG Plant
Chevron Thailand Exploration and Production LTD Platong Gas II Project
Esso Australian Pty Ltd, Kipper Tuna Turrum (KTT) Project
North Rankin B Project Platform Substructure Fabrication for Woodside
Energy Limited
Top Side Central Process Platform North Belut Project Natuna Sea for Conoco
Philips Petroleum Company.
Maersk Peregrino FPSO Module Fabrication Project.
Su tu vang “CUULONG “Jacket & Deck R-2837
Pluto LNG Project
Top Side Central Process Platform Kerisi Project for Conoco Philips Petroleum
Company.
NWS LNG Phase V Expansion Project for Woodside Energy Limited Train - 5,
Project under by Foster Wheeler Worley.
Jacket Phase III B Campaign 2 Arthit Central Process Platform for PTT
Exploration and Production Public Company Ltd Thailand, Project under by Thai Nippon
Steel.
Angel Project
2. PT. McDermott Indonesia Batam
Subcontractor Oil Mining and Refinery Equipment and Facility
Period : January 2012 until present
Purpose : Permanently Working
Position : Structural Fitting Foreman
Duty and Specific Responsibility:
Identify & removed from site immediately any tools, material, or sling ect
which are un safe, damaged or defective (report to Fitting Supervisor)
Liaise daily with supervisor regarding fitting requirement, identifying and
deploying suitably trained competent crew which to achieve the supervisors instruction
and target.
Ensure compliance with HSE policy and any Overriding company policies.
Visual inspect all fit up & sign off on CIR for compliance.
Monitor, record and control the punctuality and effectiveness of the fitting
crew.
Provide leadership, direction, support and daily supervision for fitting crew.
Responsible and accountable for ensuring that housekeeping discipline is
employed at all time.
Responsible for reading, understanding and adhering to drawing,
specifications and procedures.
Identify and report to Supervisor any training needs or qualification
requirement of allocated fitting crew.
Attend all toolbox Talks and lead his crew by example.
Responsible for ensuring seamless job continuity between shift by
establishing anf maintaining good lines of communication.
Continually review and institute measures for improvement by modification
operation procedure/ work instructions.
Possess a good understanding of company HSE policy, Philosophy and
Procedures.
Report to Supervisor in a timely manner any obstacles or problems which
are likely to impede the crew’s ability to meet targets.
High standard of safe working practice, quality and productivity as well as
compliance with the code business conduct.
Project Involved:
Kepodang Gas Development Project “ Jacket & Deck “
Page 2 of 3