SlideShare a Scribd company logo
1 of 4
Curriculu m vita:
Khaled ibrahem ahmed
ibrahe m
Site Engineer
Personal Informa tio n:
• Markez el hussnia –sharqia –Egypt (resident
in Cairo)
• Mobile: 01005544405
• E-mail: elkanteery@yahoo.com
• Marital status : married
• Military status : performed
• Nationality : Egyptian
• Date of Birth : 21-10-1988
• Egypt Driving License
Objective :
I am seeking a challenging position in a progressive
organization that satisfies my potentials & offers
opportunities for an advanced promising career by
effectively utilizing and improving my technical/practical
skills within a dynamic work group.
Education :
Civil depart m e n t , Faculty of Engineerin g,
Zagazig university
B.S.c. Degree of Civil Engineering
Graduation Year : 2011
Languages :
Arabic : Native
English : Good written, spoken
Personal skills:
1-Negotiation Skills.
2-Communication Skills.
3-Problem solving.
4-Ability to work under pressure.
5-Team Work.
6-Fast Learner.
7-Professional in Internet field.
8-Good User of Microsoft office.
Work Experience:
• Company : al-noor For General
Contracting Company
• THE PERIOD OF (1/9/2011)TO(1/3/2012)
Role: Site Engineer.
Responsibilities:
• managing construction projects
• overseeing building work
• undertaking surveys
• setting out sites and organizing facilities
• supervising contracted staff
• ensuring projects meet agreed specifications,
budgets or timescales
• liaising with clients, subcontractors and other
professional staff
• checking and preparing site reports.
Projects:
• Residential Buildings Project :
5 Building Blocks, ground floor + 5 levels
• Company: Egyptian Armed Forces
At national company For General
Contracting
• THE PERIOD OF(1/10/2012)TO(1/10/2014)
Role: Site Engineer.
Responsibilities:
• managing construction projects
• overseeing building work
• undertaking surveys
• setting out sites and organizing facilities
• supervising contracted staff
• ensuring projects meet agreed specifications,
budgets or timescales
• liaising with clients, subcontractors and other
professional staff
• Checking and preparing site reports.
• Ensuring site safety.
Projects:
• “ 2 building blocks, groun d floor +4 level cairo.
• Tunnel at fayou m road .
.
• “ Sarabiu m Road ” at the Suez Canal west bank.
1000 meter road construction.
• Shibeen El kou m Multi Story parking
Ground floor and 5 story
• Restoration of Sohag Museu m
• Company: ELWAAD EL SADEQ
• THE PERIOD OF(1/10/2014)TO(1/1/2015)
• “ The establishme n t of Residential Buildings,
• Company: Global MARASM
Company.
• TO build interna t ional school ( CAPITAL
INTRNATINAL SCHOOL) AT TAGMOAA EL KHAMES
BEHIND
• THE PERIOD OF(1/1/2015)TO(15/3/2016)
• Company:
DARNA Company
• TO build (LONG ISLAND) soon AT marsa
mat t r oh
• R.C.C Buildings
• Roads
Area of Expertise:

More Related Content

What's hot (18)

Cv eng ahmed
Cv eng ahmedCv eng ahmed
Cv eng ahmed
 
CV Thiep 2015(english)
CV Thiep 2015(english)CV Thiep 2015(english)
CV Thiep 2015(english)
 
Marwans CV. updated
Marwans CV. updatedMarwans CV. updated
Marwans CV. updated
 
C.V HOSSAM
C.V HOSSAMC.V HOSSAM
C.V HOSSAM
 
c v engineer Mohammed Riyadh-
c v  engineer Mohammed Riyadh-c v  engineer Mohammed Riyadh-
c v engineer Mohammed Riyadh-
 
Mohamed Atef Abbas C.V
Mohamed Atef Abbas C.VMohamed Atef Abbas C.V
Mohamed Atef Abbas C.V
 
Abd El Raouf Ashraf Hassan's CV
Abd El Raouf Ashraf Hassan's CVAbd El Raouf Ashraf Hassan's CV
Abd El Raouf Ashraf Hassan's CV
 
M.samy CV
M.samy CVM.samy CV
M.samy CV
 
Ahmed Anan CV 2015
Ahmed Anan CV 2015Ahmed Anan CV 2015
Ahmed Anan CV 2015
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDF
 
Raed Tahabsem cv+
Raed Tahabsem cv+Raed Tahabsem cv+
Raed Tahabsem cv+
 
Talal CV - English
Talal CV - EnglishTalal CV - English
Talal CV - English
 
eng_mohamed_eid
eng_mohamed_eideng_mohamed_eid
eng_mohamed_eid
 
C.v saad ali -
C.v saad ali  -C.v saad ali  -
C.v saad ali -
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sf
 
Youssef CV pdf
Youssef CV pdfYoussef CV pdf
Youssef CV pdf
 
My c.v sayed azab
My c.v sayed azabMy c.v sayed azab
My c.v sayed azab
 
Shireen Awaud
Shireen AwaudShireen Awaud
Shireen Awaud
 

Viewers also liked (14)

abd el aziz_final
abd el aziz_finalabd el aziz_final
abd el aziz_final
 
Funcionalismo
FuncionalismoFuncionalismo
Funcionalismo
 
La nube
La nubeLa nube
La nube
 
CARRICULUM VITEA
CARRICULUM VITEACARRICULUM VITEA
CARRICULUM VITEA
 
Harold robotica
Harold roboticaHarold robotica
Harold robotica
 
Prova seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro dProva seriado 1º ano caderno i primeiro d
Prova seriado 1º ano caderno i primeiro d
 
Prova vestibular primeiro dia
Prova vestibular primeiro diaProva vestibular primeiro dia
Prova vestibular primeiro dia
 
Prova seriado 2º ano caderno ii segundo d
Prova seriado 2º ano caderno ii segundo dProva seriado 2º ano caderno ii segundo d
Prova seriado 2º ano caderno ii segundo d
 
A comunicacao na era digital
A comunicacao na era digitalA comunicacao na era digital
A comunicacao na era digital
 
Pasos de eclipse
Pasos de eclipse Pasos de eclipse
Pasos de eclipse
 
Carlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio webCarlos magno publicidade 2010 12 revista portifólio web
Carlos magno publicidade 2010 12 revista portifólio web
 
Tcc tiago.docx
Tcc tiago.docxTcc tiago.docx
Tcc tiago.docx
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 201513vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
13vo Seminario Internacional JKA Shihan. Tatsuya Naka 2015
 

Similar to CV (20)

Eng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CVEng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CV
 
Eng Hisham cv
Eng Hisham cvEng Hisham cv
Eng Hisham cv
 
Eng.kareem mohsen
Eng.kareem mohsenEng.kareem mohsen
Eng.kareem mohsen
 
Ahmed Hassan CV
Ahmed Hassan CVAhmed Hassan CV
Ahmed Hassan CV
 
MarwanAssemElkhoulyCV2015 (1)
MarwanAssemElkhoulyCV2015 (1)MarwanAssemElkhoulyCV2015 (1)
MarwanAssemElkhoulyCV2015 (1)
 
AbdElaziz Ibrahem c.v neeew
AbdElaziz Ibrahem c.v  neeewAbdElaziz Ibrahem c.v  neeew
AbdElaziz Ibrahem c.v neeew
 
mona
monamona
mona
 
Tamer Muhammed El Saied
Tamer Muhammed El SaiedTamer Muhammed El Saied
Tamer Muhammed El Saied
 
CV
CVCV
CV
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Civil Engineer 2010 Mahmoud Mahdy
Civil Engineer 2010 Mahmoud MahdyCivil Engineer 2010 Mahmoud Mahdy
Civil Engineer 2010 Mahmoud Mahdy
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Eslam ramadan cv
Eslam ramadan cvEslam ramadan cv
Eslam ramadan cv
 
Khaled Naguib
Khaled NaguibKhaled Naguib
Khaled Naguib
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Samy Gaber CV sep18
Samy Gaber CV sep18Samy Gaber CV sep18
Samy Gaber CV sep18
 
cv
cvcv
cv
 
my cv
my cvmy cv
my cv
 
Karim Cv
Karim Cv Karim Cv
Karim Cv
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 

CV

  • 1. Curriculu m vita: Khaled ibrahem ahmed ibrahe m Site Engineer Personal Informa tio n: • Markez el hussnia –sharqia –Egypt (resident in Cairo) • Mobile: 01005544405 • E-mail: elkanteery@yahoo.com • Marital status : married • Military status : performed • Nationality : Egyptian • Date of Birth : 21-10-1988 • Egypt Driving License Objective : I am seeking a challenging position in a progressive organization that satisfies my potentials & offers opportunities for an advanced promising career by effectively utilizing and improving my technical/practical skills within a dynamic work group. Education : Civil depart m e n t , Faculty of Engineerin g, Zagazig university B.S.c. Degree of Civil Engineering Graduation Year : 2011 Languages : Arabic : Native English : Good written, spoken
  • 2. Personal skills: 1-Negotiation Skills. 2-Communication Skills. 3-Problem solving. 4-Ability to work under pressure. 5-Team Work. 6-Fast Learner. 7-Professional in Internet field. 8-Good User of Microsoft office. Work Experience: • Company : al-noor For General Contracting Company • THE PERIOD OF (1/9/2011)TO(1/3/2012) Role: Site Engineer. Responsibilities: • managing construction projects • overseeing building work • undertaking surveys • setting out sites and organizing facilities • supervising contracted staff • ensuring projects meet agreed specifications, budgets or timescales • liaising with clients, subcontractors and other professional staff • checking and preparing site reports. Projects: • Residential Buildings Project : 5 Building Blocks, ground floor + 5 levels • Company: Egyptian Armed Forces At national company For General Contracting • THE PERIOD OF(1/10/2012)TO(1/10/2014) Role: Site Engineer. Responsibilities: • managing construction projects • overseeing building work • undertaking surveys • setting out sites and organizing facilities
  • 3. • supervising contracted staff • ensuring projects meet agreed specifications, budgets or timescales • liaising with clients, subcontractors and other professional staff • Checking and preparing site reports. • Ensuring site safety. Projects: • “ 2 building blocks, groun d floor +4 level cairo. • Tunnel at fayou m road . . • “ Sarabiu m Road ” at the Suez Canal west bank. 1000 meter road construction. • Shibeen El kou m Multi Story parking Ground floor and 5 story • Restoration of Sohag Museu m • Company: ELWAAD EL SADEQ • THE PERIOD OF(1/10/2014)TO(1/1/2015) • “ The establishme n t of Residential Buildings, • Company: Global MARASM Company. • TO build interna t ional school ( CAPITAL INTRNATINAL SCHOOL) AT TAGMOAA EL KHAMES BEHIND • THE PERIOD OF(1/1/2015)TO(15/3/2016) • Company:
  • 4. DARNA Company • TO build (LONG ISLAND) soon AT marsa mat t r oh • R.C.C Buildings • Roads Area of Expertise: