SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
More Ketan A. Mob-1 : +91 9558652081
Mob-2 : +91 8980014625
(B.E. Mechanical Engg.) Email : more_ketan@yahoo.com
more.ketan777@gmail.com
Passport no : H9885196
Objective
I am interested in expanding my professional horizons by seeking new challenges in the area of interest
which your organization is dealing in.
I posses an analytical bent of mind with an attitude towards excellent performance. I strive to utilize these
traits to achieve the task assigned to me.
I excel in maintaining good interpersonal relations assisted greatly by my communication skills. Desire to
learn while working in a dynamic environment is in some of my personality traits. My objective is to work
effectively and strategically in a focused manner to make valuable contributions towards organization goals.
Education
 I had completed Diploma in Mechanical Engg. from M.S.University polytechnic Baroda in 2008
with 55%.
 I had completed B.E. in Mechanical from R.G.P.V. University Bhopal in 2014 with 69.97%
Skill Set
Basic Languages : M.S.Office, Internet, Email & Surfing etc.
Computer soft. Knowledge : AutoCAD (Autodesk) 2008 – 2009 & 3D Advance
Advance Command, SAP (PP module), Microsoft power point,
Microsoft Word, Microsoft Excel.
Experience
Current Employer: - COSMO FILMS LTD (MNC), Karajan, Vemardi Road,Vadodara, Gujarat.
Designation: PRODUCTION EXECUTIVE
Working from May2008 to till date
PROJECT WORK
BOPP LINE PROJECT:-
 Attending project work of 8.2Meter BOPP Production Plant establishment.
 Erection of 8.2 Meter Bopp Line of Bruckner Machinery by assisting Bruckner’s Engineers.
Specially attending work in PRS unit, material fiddling cylos of bops line. Also work in startup
process
 Leveling and synchronizing of roll with transmission.
 Erection of Ingersoll rand compressors, gas heating furnace for oil heating, vapor absorption system.
ATLAS PRIMARY & SECONDORY SLITTER PROJECT:-
 Erection of 8.2 meter Primary slitting machinery of atlas converting machinery. Installation of
machine frame & whole machine structure with help of drawings available
 Installation of pneumatic systems , air brake systems
 Installation of hydraulic systems like hydraulic powerpack & connection of supply hoses to
hydraulic cylinders through solenoid valve , installation of conveyer system for movement of output
rolls
 installation of groove roll & idler roll of machine
 installation of power transmission system like motors , flat belt pulley , magnetic clutches
 installation of trim winding section
 Erection of two secondary 2.2meter slitting machineries
 Successfully running of all slitting machinery with 1200 to 1000 MPM speed
 Achievement – all machinery first output rolls were dispatched.
FONKY WET-LAMINATION LINE PROJECT:-
 foundation work of machine
 installation of extruder moving section
 installation of chill roll section
 installation of hydraulic & pneumatic systems
Job Profile
PRODUCTION
 Supervision in shift & Maintaining plan, manpower and M/c down time.
 Operating 8.2mtr & 4.2mtr primary slitting machinery .
 Maintaining plan accordingly arrange the manpower, machine parameters & materials. Monitoring
the product quality & quantity.
 Sustaining material specification & special requirements of customers. Analysis of customer
complaints.
 Preplan for future maintenance of m/c without interrupting production & dispatch quantity.
 Preparing production report, waste detail, M/c efficiency & ratio detail.
 Daily reporting to department head & plant head.
 Work according to BRC parameters.
 To follow safety standards & operating parameter.
 To follow the ERP (SAP) system.
MAINTENANCE
 Maintenance of existing plant & Work with production management to develop and implement plans
for plant.
 Maintenance and schedule maintenance of plant and facilities.
 Inspection & lubrication of equipments.
 Alteration existing and new installation of equipments.
 Scheduling predictive, preventive, breakdown maintenance jobs for equipments, planning
maintenance schedules in the plants.
 Executing maintenance plans/schedules for reducing machinery downtime to minimum and
managing waste / discharges as per norms.
 Handling repair or replacement of faulty equipments and correcting any faults to ensure safety.
 Handling the maintenance of pneumatic system & Hydraulic System.
 Experience in Mechanical Maintenance of continuous process plant.
Personal Details
Name : More Ketan A.
DOB : 25th Feb., 1987
Father’s Name : More AshokBhai S.
Gender : Male
Marital status : Married
Nationality : Indian
Address : 157/B, Motinagar No: 2,
Sussen Tarsali Road,
Tarsali, Vadodara – 390009,
Gujarat,
India
Declaration
I hereby declare that all the information mentioned above is true to the best of my knowledge. I will make it
my earnest endeavor to discharge competently and carefully the duties you may be pleased to entrust with
me.
Date: -20/10/2015 You’re faithfully
Place: -VADODARA [KETAN A. MORE]

More Related Content

What's hot (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Shaan 536 cv h (1)
Shaan 536  cv h (1)Shaan 536  cv h (1)
Shaan 536 cv h (1)
 
shahzad anjum c.v
shahzad anjum c.vshahzad anjum c.v
shahzad anjum c.v
 
Umer CV - - Copy
Umer CV - - CopyUmer CV - - Copy
Umer CV - - Copy
 
COVER LETTER
COVER LETTERCOVER LETTER
COVER LETTER
 
Muhammad Shahid Khan
Muhammad Shahid KhanMuhammad Shahid Khan
Muhammad Shahid Khan
 
Sunil_CV-A
Sunil_CV-ASunil_CV-A
Sunil_CV-A
 
resume atulbhatnagar
resume atulbhatnagarresume atulbhatnagar
resume atulbhatnagar
 
Abdul Qayyom (Resume)
Abdul Qayyom (Resume)Abdul Qayyom (Resume)
Abdul Qayyom (Resume)
 
New resume kamlesh
New resume kamleshNew resume kamlesh
New resume kamlesh
 
Francis Padayatty - CV
Francis Padayatty - CVFrancis Padayatty - CV
Francis Padayatty - CV
 
KUMAR PREM RANJAN CV
KUMAR PREM RANJAN CVKUMAR PREM RANJAN CV
KUMAR PREM RANJAN CV
 
testimonial muhammad afif zauqi
testimonial muhammad afif zauqitestimonial muhammad afif zauqi
testimonial muhammad afif zauqi
 
KIRASANTH-CV
KIRASANTH-CVKIRASANTH-CV
KIRASANTH-CV
 
Amish_CV
Amish_CVAmish_CV
Amish_CV
 
Muhammad Ramzan CV
Muhammad Ramzan CVMuhammad Ramzan CV
Muhammad Ramzan CV
 
selva new
selva newselva new
selva new
 
moncy cv new 1
moncy cv new 1moncy cv new 1
moncy cv new 1
 
cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
RAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_originalRAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_original
 

Viewers also liked

7 zak low carbon vehicles repute conference - 9 june 2015 - presentation -...
7  zak low carbon vehicles   repute conference - 9 june 2015 - presentation -...7  zak low carbon vehicles   repute conference - 9 june 2015 - presentation -...
7 zak low carbon vehicles repute conference - 9 june 2015 - presentation -...REPUTE101
 
Dominic_accomplishments
Dominic_accomplishmentsDominic_accomplishments
Dominic_accomplishmentsNcw Domnic
 
2 ranald repute presentation hitrans
2   ranald repute presentation hitrans2   ranald repute presentation hitrans
2 ranald repute presentation hitransREPUTE101
 
Moath Salameh 2014 5
Moath Salameh 2014 5Moath Salameh 2014 5
Moath Salameh 2014 5Moath Salameh
 
Look Up: How our screens have impacted life as we know it
Look Up: How our screens have impacted life as we know it Look Up: How our screens have impacted life as we know it
Look Up: How our screens have impacted life as we know it carlibianchi
 
Dominic_accomplishments
Dominic_accomplishmentsDominic_accomplishments
Dominic_accomplishmentsNcw Domnic
 
C. L. Brewer Ascend resume
C. L. Brewer Ascend resumeC. L. Brewer Ascend resume
C. L. Brewer Ascend resumeCandice Ballard
 
Digital Distractions
Digital DistractionsDigital Distractions
Digital DistractionsVivian Li
 
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlocked
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlockedManual de estabilizacion_de_suelos_con_cemento_o_cal_unlocked
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlockedwilder Hinojosa
 

Viewers also liked (10)

7 zak low carbon vehicles repute conference - 9 june 2015 - presentation -...
7  zak low carbon vehicles   repute conference - 9 june 2015 - presentation -...7  zak low carbon vehicles   repute conference - 9 june 2015 - presentation -...
7 zak low carbon vehicles repute conference - 9 june 2015 - presentation -...
 
Dominic_accomplishments
Dominic_accomplishmentsDominic_accomplishments
Dominic_accomplishments
 
2 ranald repute presentation hitrans
2   ranald repute presentation hitrans2   ranald repute presentation hitrans
2 ranald repute presentation hitrans
 
Moath Salameh 2014 5
Moath Salameh 2014 5Moath Salameh 2014 5
Moath Salameh 2014 5
 
Look Up: How our screens have impacted life as we know it
Look Up: How our screens have impacted life as we know it Look Up: How our screens have impacted life as we know it
Look Up: How our screens have impacted life as we know it
 
Dominic_accomplishments
Dominic_accomplishmentsDominic_accomplishments
Dominic_accomplishments
 
C. L. Brewer Ascend resume
C. L. Brewer Ascend resumeC. L. Brewer Ascend resume
C. L. Brewer Ascend resume
 
Digital Distractions
Digital DistractionsDigital Distractions
Digital Distractions
 
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlocked
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlockedManual de estabilizacion_de_suelos_con_cemento_o_cal_unlocked
Manual de estabilizacion_de_suelos_con_cemento_o_cal_unlocked
 
Israel
IsraelIsrael
Israel
 

Similar to KETAN MORE (20)

VASANT MANGALE FINAL_new
VASANT MANGALE FINAL_newVASANT MANGALE FINAL_new
VASANT MANGALE FINAL_new
 
Er+Abhishek_Maintenace.compressed
Er+Abhishek_Maintenace.compressedEr+Abhishek_Maintenace.compressed
Er+Abhishek_Maintenace.compressed
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
RESUME2
RESUME2RESUME2
RESUME2
 
updated_resume_280815
updated_resume_280815updated_resume_280815
updated_resume_280815
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
azym resume 2016
azym resume 2016azym resume 2016
azym resume 2016
 
Yusuff- CV
Yusuff- CVYusuff- CV
Yusuff- CV
 
CV
CVCV
CV
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
Dipesh pawar CV
Dipesh pawar CVDipesh pawar CV
Dipesh pawar CV
 
Resume tech
Resume techResume tech
Resume tech
 
VeeraModifiedCV
VeeraModifiedCVVeeraModifiedCV
VeeraModifiedCV
 
Harshal Resume
Harshal ResumeHarshal Resume
Harshal Resume
 
Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Maint engg
Maint enggMaint engg
Maint engg
 
cv .
cv .cv .
cv .
 
CV
CVCV
CV
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 

KETAN MORE

  • 1. CURRICULUM VITAE More Ketan A. Mob-1 : +91 9558652081 Mob-2 : +91 8980014625 (B.E. Mechanical Engg.) Email : more_ketan@yahoo.com more.ketan777@gmail.com Passport no : H9885196 Objective I am interested in expanding my professional horizons by seeking new challenges in the area of interest which your organization is dealing in. I posses an analytical bent of mind with an attitude towards excellent performance. I strive to utilize these traits to achieve the task assigned to me. I excel in maintaining good interpersonal relations assisted greatly by my communication skills. Desire to learn while working in a dynamic environment is in some of my personality traits. My objective is to work effectively and strategically in a focused manner to make valuable contributions towards organization goals. Education  I had completed Diploma in Mechanical Engg. from M.S.University polytechnic Baroda in 2008 with 55%.  I had completed B.E. in Mechanical from R.G.P.V. University Bhopal in 2014 with 69.97% Skill Set Basic Languages : M.S.Office, Internet, Email & Surfing etc. Computer soft. Knowledge : AutoCAD (Autodesk) 2008 – 2009 & 3D Advance Advance Command, SAP (PP module), Microsoft power point, Microsoft Word, Microsoft Excel. Experience Current Employer: - COSMO FILMS LTD (MNC), Karajan, Vemardi Road,Vadodara, Gujarat. Designation: PRODUCTION EXECUTIVE Working from May2008 to till date PROJECT WORK BOPP LINE PROJECT:-  Attending project work of 8.2Meter BOPP Production Plant establishment.  Erection of 8.2 Meter Bopp Line of Bruckner Machinery by assisting Bruckner’s Engineers. Specially attending work in PRS unit, material fiddling cylos of bops line. Also work in startup process  Leveling and synchronizing of roll with transmission.  Erection of Ingersoll rand compressors, gas heating furnace for oil heating, vapor absorption system.
  • 2. ATLAS PRIMARY & SECONDORY SLITTER PROJECT:-  Erection of 8.2 meter Primary slitting machinery of atlas converting machinery. Installation of machine frame & whole machine structure with help of drawings available  Installation of pneumatic systems , air brake systems  Installation of hydraulic systems like hydraulic powerpack & connection of supply hoses to hydraulic cylinders through solenoid valve , installation of conveyer system for movement of output rolls  installation of groove roll & idler roll of machine  installation of power transmission system like motors , flat belt pulley , magnetic clutches  installation of trim winding section  Erection of two secondary 2.2meter slitting machineries  Successfully running of all slitting machinery with 1200 to 1000 MPM speed  Achievement – all machinery first output rolls were dispatched. FONKY WET-LAMINATION LINE PROJECT:-  foundation work of machine  installation of extruder moving section  installation of chill roll section  installation of hydraulic & pneumatic systems Job Profile PRODUCTION  Supervision in shift & Maintaining plan, manpower and M/c down time.  Operating 8.2mtr & 4.2mtr primary slitting machinery .  Maintaining plan accordingly arrange the manpower, machine parameters & materials. Monitoring the product quality & quantity.  Sustaining material specification & special requirements of customers. Analysis of customer complaints.  Preplan for future maintenance of m/c without interrupting production & dispatch quantity.  Preparing production report, waste detail, M/c efficiency & ratio detail.  Daily reporting to department head & plant head.  Work according to BRC parameters.  To follow safety standards & operating parameter.  To follow the ERP (SAP) system.
  • 3. MAINTENANCE  Maintenance of existing plant & Work with production management to develop and implement plans for plant.  Maintenance and schedule maintenance of plant and facilities.  Inspection & lubrication of equipments.  Alteration existing and new installation of equipments.  Scheduling predictive, preventive, breakdown maintenance jobs for equipments, planning maintenance schedules in the plants.  Executing maintenance plans/schedules for reducing machinery downtime to minimum and managing waste / discharges as per norms.  Handling repair or replacement of faulty equipments and correcting any faults to ensure safety.  Handling the maintenance of pneumatic system & Hydraulic System.  Experience in Mechanical Maintenance of continuous process plant. Personal Details Name : More Ketan A. DOB : 25th Feb., 1987 Father’s Name : More AshokBhai S. Gender : Male Marital status : Married Nationality : Indian Address : 157/B, Motinagar No: 2, Sussen Tarsali Road, Tarsali, Vadodara – 390009, Gujarat, India Declaration I hereby declare that all the information mentioned above is true to the best of my knowledge. I will make it my earnest endeavor to discharge competently and carefully the duties you may be pleased to entrust with me. Date: -20/10/2015 You’re faithfully Place: -VADODARA [KETAN A. MORE]