1. 2 Oaklea
Tiverton
Devon
EX16 6NS
Tel: 01884 230970
Mobile: 07535711891
Email: flembo@me.com
NI no.: NP890501C
DOB: 16.05.1968
David Mark Fleming
TRADE Rigger / LOLER Competent Person
Qualifications NVQ Level 3 ( Ace Card 023559)
Vantage : 1395599
OPITO Level 3 Rigger
OPITO LOLER competent person
ISSOW Level 2
CPCS Appointed Person
BOSIET exp 25/09/17
Offshore Medical
MIST exp 03/10/2017
Working at Height exp 26/09/16
IOSH Managing Safely
Additional
Information
• I have been employed on varying projects including Oil Rigs, FPSOs,
Vessels, Wytch Farm Oil Field, Gas, Nuclear and Coal Power Stations, Petro
Chemical Refineries, Steel Works, Cement Works and Mining projects.
• Specifically I have been involved in stripping turbines including such tasks
as rotor blade removal, realignment, bearings, covers etc. I have installed,
removed and replaced elements inside boilers and installed pipework, valves,
headers and supports. My experience has included working on both gas and
water tanks, erecting shell plates and walkways. I have been in charge of the
lifting and erecting of 100 ton plus beams during my time at Wembley
Stadium.
• I consider myself to be a very competent and hard working individual,
demonstrating good time-keeping and reliability. Safety conscious
Experience Sparrows Group September 13 to Present Day
Rigger in the flying squad initially promoted to LOLER competent
person in the southern north sea
BIS Industrial services July 10 – September 13
Chargehand Rigger/Appointed Person on
Wytch Farm onshore Oil Exploration
2. AE&E, BELVEDERE May 10 – June 10
Rigger on Waste to Energy Project
UNIT ENGINEERING, IMMINGHAM March 10 – May 10
Rigger on Murco & Conoco Oil Refineries
PLASTICON, BEVERLEY October 09 – March 10
Lift Supervisor on Grain CHP New Build
ALSTOM POWER, NEWCASTLE August 09 – September 09
Rigger on Sizewell B Nuclear Power Station outage
R Blackett Charlton Ltd, Middlesborough April 09 – July 09
Rigger/Erector on L.O.R new build
FABRICOM, IMMINGHAM May 08 – Dec 08
Rigger and Safety Rep on New Build Power Station
DOOSAN BABCOCK April 08 – May 08
Rigger on Outage at Drax Power Station
CBI (UK) LTD, LONDON August 06 – April 08
Rigger working on Gas Plant
MITSUI BABCOCK, TIPTON July 06 – August 06
Erector on Fawley Chemical Plant
SIEMENS LTD, GERMANY May 06 – July 06
Rigger on various Gas Power Stations
FAST TRACK SITE SERVICES, WALLSALL October 04 – May 06
Charge Hand Erector on Wembley Stadium
MITSUI BABCOCK, TIPTON May 03 – February 04
Erector on Spalding Energy Project
FLS MILJO, DENMARK February 03 – April 03
Recalled to West Burton when FLS took over from Jilland
TEC LTD, DERBY Jan 03 – Feb 03
Erector on Buxton Cement Works
JILLAND ENGINEERING, DONCASTER June 02 – October 02
Erector on West Burton FGD
SELF EMPLOYED April 00 – June 02
LEDWOOD CONSTRUCTION, HULL June 99 – March 00
Erector on new Gas Power Station