Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Extension and Redevelopment
1. ScaleChecked by
Drawn by
Date
Project number
1 : 1
02/03/201516:46:34
Unnamed
John Laing Building -
Existing
Coventry University
Issue Date
Author
Checker
JL/A/21
John Laing - Extension and Redevelopment
2. UP
UP
UP
1
2
3
4
ABCDEFGHIJKLMNOP
Hydraulics lab
Lab tech office
Geotechnics lab Structures lab
Plant room
Materials lab
Male shower Female shower
changing rooms
Foyer
Equipment store
Admin office
Theatre
Female toilets
Male toilets
Disabled toilets
Disabled toilet
Ruins- Reception office
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 200
02/03/201516:01:42
Ground Floor
John Laing Building -
Existing
Coventry University
Checker
JL/A/21
Author 03/02/15
Rev Description Date
Ground Floor
3. UP
UPUP
UP
UP
1
2
3
4
ABCDEFGHIJKLMNOP
Void
Female toilet
Male toilet
Disabled toilet
Disabled toilet
230 m²
Computer room
177 m²
Computer room
83 m²
Work room
155 m²
Classroom
73 m²
Environmental lab
54 m²
Student work room
36 m²
Student work room
36 m²
Student work room storage
26 m²
I.T Tech room
19 m²
Working room
18 m²
Working room
21 m²
Working room
20 m²
working room
60 m²
Print room
344 m²
Stuctures lab double height
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 200
02/03/201516:02:12
First Floor
John Laing Building -
Existing
Coventry University
Checker
JL/A/22
Author 03/02/15
Rev Description Date
First Floor
4. UPUP
UPUP
UPUP
1
2
3
4
ABCDEFGHIJKLMNOP
Classroom Classroom
Staff room and
kitchen
Staff offices PhD room Theatre
Resource
shop
Classroom Classroom Classroom Classroom
Female toilet
Male toilet
Disabled toilet
Staff/Student meeting areas
disabled toilet
Staff offices Staff offices Staff offices
Open Access- Computer tables
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 200
02/03/201516:02:48
Second floor
John Laing Building -
Existing
Coventry University
Checker
JL/A/23
Author 03/02/15
Rev Description Date
Second Floor
5. UPUPUP
1
2
3
4
ABCDEFGHIJKLMNOP
AT drawing room Architecture studio
450mRoof terrace
Staff rooms Classroom
Female toilet
Male toilet
Disabled toilet
store
disabled
toilet
Staff rooms Staff rooms Staff rooms
Open Access- Computer tables
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 200
02/03/201516:03:33
Third Floor
John Laing Building -
Existing
Coventry University
Checker
JL/A/24
Author 03/02/15
Rev Description Date
Third Floor
6. A B C D E F G H I J K L M N O P
1234 1 2 3 4
ABCDEFGHIJKLMNOP
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
STATUS PURPOSE OF ISSUE
CODE SUITABILITY DESCRIPTION
1 : 200
02/03/201516:14:50
Elevations
John Laing Building -
Redevelopment
Coventry University
Checker
JL/A/21
Author 02/28/15
Rev Description Date
EAST
NORTH SOUTH
WEST
Main Entrance curtain glazed increasing the amount of natural light
entering the building
Ruins incorporated in the design
The existing masonry infill panels
and cladding will be replaced with
a facade consisting of glazed curtain
walls
Roof terrace
Joined to Richard Crossman
Second entrance
Main entrance
Balcony over ruins
Panel cladding
Fire exit
The glass will be high performance triple glazing to prevent glare both inside
and outside
Aluminium cladding
where there is no
curtainglazed walls
used
The cladding will be prefabricated with insulation to help in climate control and heat prevention
Where the aluminium cladding is used, there
will be
a Metsec frame making the internal skin of the
cavity wall
Timber flat roof with single ply membrane