Presentation Outline
• Introduction
• Roles in the Procurement Process
• Historical Approaches
• Current Procurement Options
• 5 Key Questions to Ask
• Avoiding Inevitable Pitfalls
• Closing Remarks
AMTA/AWWA © 3
Introduction
WQ
RFP
Bid
Opex
RFQ
Life Cycle
Cost
Capex
Procurement
Warranty
Pre-Select /
Pre-Purchase
Pilot
AMTA/AWWA © 4
Roles in the Procurement Process
4
 Owner
◦ Works with
Engineer on
wants and
needs
◦ Provides
operational
input
 Engineer
• Works with
Owner on wants
and needs
◦ Works with
Membrane
Supplier to
develop design
that meets
project goals
 Membrane Supplier
◦ Provides direction on system operating capabilities
◦ Works with Owner and Engineer to provide compliant system
AMTA/AWWA © 5
Historical Approaches
Traditional
Design-Bid-Build
Traditional
Bid-Design-Build
AMTA/AWWA © 6
Historical Approaches
• Pilot…I thought we were talking about procurement?
– Most state regulatory agencies (including TCEQ!) require
pilot-scale testing of MF and UF technologies prior to
construction
– Exceptions to the rule:
• NF and RO systems in Texas may be approved for
construction using NF/RO model projections (confirmed via
full-scale testing)
• MBR systems in Texas can be approved via compliance with
standard Chapter 217 criteria for hollow fiber or flat sheet
MBR (piloting is required to utilize operating criteria more
aggressive than 217 criteria)
AMTA/AWWA © 7
Current Procurement Options
• Traditional Options
– Design-Bid-Build
– Bid-Design-Build
• Newer Options
– Pre-Purchase?
– Pre-Select?
AMTA/AWWA © 8
Current Procurement Options
• Pre-Purchase?
– Owner selects and purchases the membrane and/or system
– Treatment facility is designed
– Contractor is selected and begins construction
– Owner manages membrane and/or system contract (Owner acts
as intermediary between supplier and contractor, or may assign
contract)
– Owner manages warranty issues with supplier directly
or
AMTA/AWWA © 9
Current Procurement Options
• Pre-Select?
– Owner selects the membrane and/or system
– Treatment facility design is centered around selected membrane
and/or system
– Contractor is selected and begins construction
– Owner assigns equipment contract to Contractor to manage
– Contractor coordinates warranty issues
AMTA/AWWA © 10
5 Questions to Ask
• Who’s Footing the Bill?
– Federal or State funding agencies typically require
some form of competitive bidding (potentially
including HUB participation)
– Even with private funding, municipal utilities are
bound by state requirements for competitive bidding
• Caveat – How you build the project can further affect this…
AMTA/AWWA © 11
5 Questions to Ask
• How Will You Build It?
– Traditional approaches require bidding either prior or
following design
– Design-build approach can support either pre-
selection or pre-purchase
– CMAR approach focuses on enhanced use of pre-
selection to obtain “best value” for project
AMTA/AWWA © 12
5 Questions to Ask
• Proprietary or Open Platform?
– Proprietary
• Integrated and proven system
• Ongoing support after commissioning
• Historically “chained at the hip”
– Open Platform
• Gaining ground in the market
• Open approach supports change to different
membranes in the future
• Multiple membrane / OEM options have limited the
amount of consistent installation experience
AMTA/AWWA © 13
5 Questions to Ask
• Capex, Opex or Life Cycle?
AMTA/AWWA © 14
5 Questions to Ask
• You’re Going to Pilot When?
– Approach most affected by funding and/or timeline
– Pilot then Procure?
• May need to pilot 2-3 membranes/systems, which
impacts project schedule and piloting costs
– Select (based on RFQ) then Pilot?
• Can reduce to 1 or more pilots, but risks
unsuccessful performance
AMTA/AWWA © 15
Avoiding Pitfalls
• Pre-Qualification Do’s and Don’ts
• Contractual Issues
• Defining the “best” manufacturer
• Performance Criteria
• Warranty Requirements
• Ongoing Support After Commissioning
AMTA/AWWA © 16
Avoiding Pitfalls
• Pre-Qualification Do’s and Don’ts
• DO
– Check references – No better information than
previous owner experience
– Look at prospective systems yourself – Your needs
will likely vary from other facilities
• DON’T
– Assume that newer is better – New frequently
translates to “still in R&D”
– Assume that engineers and manufacturers have given
you every piece of information – everyone has
different priorities
AMTA/AWWA © 17
Avoiding Pitfalls
• Contractual Issues
– Defining scope of supply – What’s in the box?
– Full-scale water quality parameters – “It’s not my
system, it’s your water”
– Support during startup – Beyond the O&M manual
– Ongoing system support – Beyond just handing you the
keys
AMTA/AWWA © 18
Avoiding Pitfalls
• Defining the “best” manufacturer
– Quality vs. Capacity?
– Capex vs. Opex vs. LC?
– Capex vs. Membrane Replacement?
– Number of installations overall vs. number of
installations with proposed membrane?
AMTA/AWWA © 19
Avoiding Pitfalls
• Performance Criteria
– Current and future product quality
– Energy, water and chemical usage
– Backwash and/or CIP frequency
– Maximum number of broken fibers
– Sustained recovery
– Meeting log removal requirements
– Challenges
• How do we factor in variable feed water quality?
• How do we account for differences between pilot-scale and
full-scale?
AMTA/AWWA © 20
Avoiding Pitfalls
• Warranty Requirements
– Full Warranty?
• MF/UF/MBR - Typically 1-2 years, more can be
added with increased Capex
• NF/RO - Typically none
– Prorated Warranty?
• MF/UF/MBR - Typically 4-8 years
– Recommend total (full + prorated) at a minimum of 8
years to capture typical life of membranes
• NF/RO – Typically 3-5 years
– Recommend total (prorated) at a minimum of 3 years to
capture typical life of membranes
AMTA/AWWA © 21
Avoiding Pitfalls
• Ongoing Support After Commissioning
– Online monitoring of system performance
– Onsite visits to “check in” and offer re-optimization
suggestions
– Recommend
• Minimum of 2 years of post-commissioning support should
be included in contract up front to ensure staff successfully
optimizes system through “honeymoon period”
AMTA/AWWA © 22
Closing Remarks
• Successful procurement is affected by many variables –
try to identify the “deal breakers” as early as possible in
the planning phase!
• There is no “silver bullet” – procurement approach
should support your project goals, funding method and
timeline.
• You need to spend adequate time to successfully
procure what you need – remember, the only stupid
question is the one you don’t ask!
AMTA/AWWA © 23
• For further questions:
Joshua Berryhill, P.E.
Enprotec / Hibbs & Todd, Inc.
joshua.berryhill@e-ht.com

More Related Content

What's hot

Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsEmerson Exchange
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenancefljungbe
 
Cross Functional Warranty Management- A closed Loop approach to boost profita...
Cross Functional Warranty Management- A closed Loop approach to boost profita...Cross Functional Warranty Management- A closed Loop approach to boost profita...
Cross Functional Warranty Management- A closed Loop approach to boost profita...Tavant Technologies Inc.
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Genpact Ltd
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS PresentationMike Fallows
 
Business Plan Sample By Alan Ray
Business Plan Sample By Alan RayBusiness Plan Sample By Alan Ray
Business Plan Sample By Alan RayAlan Ray
 
Gate Keeping the Storeroom - SMRP 2016 Annual Conference
Gate Keeping the Storeroom - SMRP 2016 Annual ConferenceGate Keeping the Storeroom - SMRP 2016 Annual Conference
Gate Keeping the Storeroom - SMRP 2016 Annual ConferenceJames Kovacevic, MMP CMRP CAMA
 
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...Viswajit Mani Kumar Koyada
 
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Brian Thomas
 
Organizational Culture - Confusing and Unclear Procedures
Organizational Culture - Confusing and Unclear ProceduresOrganizational Culture - Confusing and Unclear Procedures
Organizational Culture - Confusing and Unclear ProceduresFAA Safety Team Central Florida
 
Software for Oil, Gas & Marine Sector by Labsols
Software for Oil, Gas & Marine Sector by LabsolsSoftware for Oil, Gas & Marine Sector by Labsols
Software for Oil, Gas & Marine Sector by LabsolsSapon Naskar
 

What's hot (20)

Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Energycentric water
Energycentric waterEnergycentric water
Energycentric water
 
Cross Functional Warranty Management- A closed Loop approach to boost profita...
Cross Functional Warranty Management- A closed Loop approach to boost profita...Cross Functional Warranty Management- A closed Loop approach to boost profita...
Cross Functional Warranty Management- A closed Loop approach to boost profita...
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS Presentation
 
Business Plan Sample By Alan Ray
Business Plan Sample By Alan RayBusiness Plan Sample By Alan Ray
Business Plan Sample By Alan Ray
 
Gate Keeping the Storeroom - SMRP 2016 Annual Conference
Gate Keeping the Storeroom - SMRP 2016 Annual ConferenceGate Keeping the Storeroom - SMRP 2016 Annual Conference
Gate Keeping the Storeroom - SMRP 2016 Annual Conference
 
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
Optimization and Standardization of Air Intake and Valve Cover Assembly Lines...
 
Implementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project ManagementImplementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project Management
 
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
 
Organizational Culture - Confusing and Unclear Procedures
Organizational Culture - Confusing and Unclear ProceduresOrganizational Culture - Confusing and Unclear Procedures
Organizational Culture - Confusing and Unclear Procedures
 
Shipmanagement System Selection Process
Shipmanagement System Selection ProcessShipmanagement System Selection Process
Shipmanagement System Selection Process
 
Software for Oil, Gas & Marine Sector by Labsols
Software for Oil, Gas & Marine Sector by LabsolsSoftware for Oil, Gas & Marine Sector by Labsols
Software for Oil, Gas & Marine Sector by Labsols
 
Abby-Watson-Gamesa
Abby-Watson-GamesaAbby-Watson-Gamesa
Abby-Watson-Gamesa
 
Meter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI SystemMeter Asset Tracking and the Power of Analytics in an AMI System
Meter Asset Tracking and the Power of Analytics in an AMI System
 
Tesco's AMI Specific Products and Services
Tesco's AMI Specific Products and ServicesTesco's AMI Specific Products and Services
Tesco's AMI Specific Products and Services
 
Bi reporting final
Bi reporting finalBi reporting final
Bi reporting final
 
AMO_General_2015
AMO_General_2015AMO_General_2015
AMO_General_2015
 

Similar to MTC16 Presentation - eHT

Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisCharlton Inao
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...AVEVA Group plc
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...MECConference
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 dieselpub
 
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation Forum
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation ForumChallenges in Global Standardisation | EnergySys Hydrocarbon Allocation Forum
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation ForumEnergySys Limited
 
Cutler-Hammer Maintenance Program LTM 2010
Cutler-Hammer Maintenance Program LTM 2010Cutler-Hammer Maintenance Program LTM 2010
Cutler-Hammer Maintenance Program LTM 2010p6q4ck9dyn
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...AJAYKUMAR836335
 
Performance Testing in the Agile Lifecycle
Performance Testing in the Agile LifecyclePerformance Testing in the Agile Lifecycle
Performance Testing in the Agile LifecycleLee Barnes
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldDesign World
 
How is Your QC Boosting Business Results?
How is Your QC Boosting Business Results?How is Your QC Boosting Business Results?
How is Your QC Boosting Business Results?Shridhar Lolla
 

Similar to MTC16 Presentation - eHT (20)

1588494157-15.pptx
1588494157-15.pptx1588494157-15.pptx
1588494157-15.pptx
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
 
FMEA
FMEAFMEA
FMEA
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2
 
Getting things made
Getting things madeGetting things made
Getting things made
 
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation Forum
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation ForumChallenges in Global Standardisation | EnergySys Hydrocarbon Allocation Forum
Challenges in Global Standardisation | EnergySys Hydrocarbon Allocation Forum
 
Fundamentals OF UAT
Fundamentals OF UATFundamentals OF UAT
Fundamentals OF UAT
 
Cutler-Hammer Maintenance Program LTM 2010
Cutler-Hammer Maintenance Program LTM 2010Cutler-Hammer Maintenance Program LTM 2010
Cutler-Hammer Maintenance Program LTM 2010
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
 
Performance Testing in the Agile Lifecycle
Performance Testing in the Agile LifecyclePerformance Testing in the Agile Lifecycle
Performance Testing in the Agile Lifecycle
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
FMEA-Intro.ppt
FMEA-Intro.pptFMEA-Intro.ppt
FMEA-Intro.ppt
 
How is Your QC Boosting Business Results?
How is Your QC Boosting Business Results?How is Your QC Boosting Business Results?
How is Your QC Boosting Business Results?
 
Claims
ClaimsClaims
Claims
 

MTC16 Presentation - eHT

  • 1. AMTA/AWWA © 1 Pre-Conference Workshop “Back to Basics” Membrane Procurement and Implementation Joshua Berryhill, P.E. Enprotec / Hibbs & Todd, Inc.
  • 2. AMTA/AWWA © 2 Presentation Outline • Introduction • Roles in the Procurement Process • Historical Approaches • Current Procurement Options • 5 Key Questions to Ask • Avoiding Inevitable Pitfalls • Closing Remarks
  • 3. AMTA/AWWA © 3 Introduction WQ RFP Bid Opex RFQ Life Cycle Cost Capex Procurement Warranty Pre-Select / Pre-Purchase Pilot
  • 4. AMTA/AWWA © 4 Roles in the Procurement Process 4  Owner ◦ Works with Engineer on wants and needs ◦ Provides operational input  Engineer • Works with Owner on wants and needs ◦ Works with Membrane Supplier to develop design that meets project goals  Membrane Supplier ◦ Provides direction on system operating capabilities ◦ Works with Owner and Engineer to provide compliant system
  • 5. AMTA/AWWA © 5 Historical Approaches Traditional Design-Bid-Build Traditional Bid-Design-Build
  • 6. AMTA/AWWA © 6 Historical Approaches • Pilot…I thought we were talking about procurement? – Most state regulatory agencies (including TCEQ!) require pilot-scale testing of MF and UF technologies prior to construction – Exceptions to the rule: • NF and RO systems in Texas may be approved for construction using NF/RO model projections (confirmed via full-scale testing) • MBR systems in Texas can be approved via compliance with standard Chapter 217 criteria for hollow fiber or flat sheet MBR (piloting is required to utilize operating criteria more aggressive than 217 criteria)
  • 7. AMTA/AWWA © 7 Current Procurement Options • Traditional Options – Design-Bid-Build – Bid-Design-Build • Newer Options – Pre-Purchase? – Pre-Select?
  • 8. AMTA/AWWA © 8 Current Procurement Options • Pre-Purchase? – Owner selects and purchases the membrane and/or system – Treatment facility is designed – Contractor is selected and begins construction – Owner manages membrane and/or system contract (Owner acts as intermediary between supplier and contractor, or may assign contract) – Owner manages warranty issues with supplier directly or
  • 9. AMTA/AWWA © 9 Current Procurement Options • Pre-Select? – Owner selects the membrane and/or system – Treatment facility design is centered around selected membrane and/or system – Contractor is selected and begins construction – Owner assigns equipment contract to Contractor to manage – Contractor coordinates warranty issues
  • 10. AMTA/AWWA © 10 5 Questions to Ask • Who’s Footing the Bill? – Federal or State funding agencies typically require some form of competitive bidding (potentially including HUB participation) – Even with private funding, municipal utilities are bound by state requirements for competitive bidding • Caveat – How you build the project can further affect this…
  • 11. AMTA/AWWA © 11 5 Questions to Ask • How Will You Build It? – Traditional approaches require bidding either prior or following design – Design-build approach can support either pre- selection or pre-purchase – CMAR approach focuses on enhanced use of pre- selection to obtain “best value” for project
  • 12. AMTA/AWWA © 12 5 Questions to Ask • Proprietary or Open Platform? – Proprietary • Integrated and proven system • Ongoing support after commissioning • Historically “chained at the hip” – Open Platform • Gaining ground in the market • Open approach supports change to different membranes in the future • Multiple membrane / OEM options have limited the amount of consistent installation experience
  • 13. AMTA/AWWA © 13 5 Questions to Ask • Capex, Opex or Life Cycle?
  • 14. AMTA/AWWA © 14 5 Questions to Ask • You’re Going to Pilot When? – Approach most affected by funding and/or timeline – Pilot then Procure? • May need to pilot 2-3 membranes/systems, which impacts project schedule and piloting costs – Select (based on RFQ) then Pilot? • Can reduce to 1 or more pilots, but risks unsuccessful performance
  • 15. AMTA/AWWA © 15 Avoiding Pitfalls • Pre-Qualification Do’s and Don’ts • Contractual Issues • Defining the “best” manufacturer • Performance Criteria • Warranty Requirements • Ongoing Support After Commissioning
  • 16. AMTA/AWWA © 16 Avoiding Pitfalls • Pre-Qualification Do’s and Don’ts • DO – Check references – No better information than previous owner experience – Look at prospective systems yourself – Your needs will likely vary from other facilities • DON’T – Assume that newer is better – New frequently translates to “still in R&D” – Assume that engineers and manufacturers have given you every piece of information – everyone has different priorities
  • 17. AMTA/AWWA © 17 Avoiding Pitfalls • Contractual Issues – Defining scope of supply – What’s in the box? – Full-scale water quality parameters – “It’s not my system, it’s your water” – Support during startup – Beyond the O&M manual – Ongoing system support – Beyond just handing you the keys
  • 18. AMTA/AWWA © 18 Avoiding Pitfalls • Defining the “best” manufacturer – Quality vs. Capacity? – Capex vs. Opex vs. LC? – Capex vs. Membrane Replacement? – Number of installations overall vs. number of installations with proposed membrane?
  • 19. AMTA/AWWA © 19 Avoiding Pitfalls • Performance Criteria – Current and future product quality – Energy, water and chemical usage – Backwash and/or CIP frequency – Maximum number of broken fibers – Sustained recovery – Meeting log removal requirements – Challenges • How do we factor in variable feed water quality? • How do we account for differences between pilot-scale and full-scale?
  • 20. AMTA/AWWA © 20 Avoiding Pitfalls • Warranty Requirements – Full Warranty? • MF/UF/MBR - Typically 1-2 years, more can be added with increased Capex • NF/RO - Typically none – Prorated Warranty? • MF/UF/MBR - Typically 4-8 years – Recommend total (full + prorated) at a minimum of 8 years to capture typical life of membranes • NF/RO – Typically 3-5 years – Recommend total (prorated) at a minimum of 3 years to capture typical life of membranes
  • 21. AMTA/AWWA © 21 Avoiding Pitfalls • Ongoing Support After Commissioning – Online monitoring of system performance – Onsite visits to “check in” and offer re-optimization suggestions – Recommend • Minimum of 2 years of post-commissioning support should be included in contract up front to ensure staff successfully optimizes system through “honeymoon period”
  • 22. AMTA/AWWA © 22 Closing Remarks • Successful procurement is affected by many variables – try to identify the “deal breakers” as early as possible in the planning phase! • There is no “silver bullet” – procurement approach should support your project goals, funding method and timeline. • You need to spend adequate time to successfully procure what you need – remember, the only stupid question is the one you don’t ask!
  • 23. AMTA/AWWA © 23 • For further questions: Joshua Berryhill, P.E. Enprotec / Hibbs & Todd, Inc. joshua.berryhill@e-ht.com