Executive Summary
All Singles Social Media Website
The attached quality management plan described in detail the steps that will be taken to
ensure compliance with all quality-related specifications, requirements, and laws.
Since the client has stated that safety and reliability are high priorities, the Project Team has
emphasized these aspects in the overall plan. In addition, because of the size of the project,
internal project quality also will be given considerable attention.
ABC Smart, LLC will be basing its quality plan as requiring on strict adherence to ISO
9001:2000 standards for both quality control and quality assurance.
A number of areas are highlighted in the plan as requiring special attention from the
Project Team. Primarily, these areas are related to design, contracting, purchasing, testing, and
document control, although all ISO procedures are covered thoroughly. In particular, ABC Smart
LLC, will keep detailed quality-related records to assist the client in securing the necessary
guideline and user agreements and affordable liability insurance for the ongoing Website
Construction and Operation.
Status reports are expected to be frequent, in keeping with the client’s wishes, but quality
issues will be reported only on an as required basis as well as each significant milestone. The
client will be consulted on all significant quality-related issues and changes.
This document constitutes a formal plan. It will be briefed to the client and must be
approved and signed off by the client or the client’s representative. Once accepted, the Quality
Management Plan cannot be amended except through a formal change control process.
Standards
All Singles Social Media is an ISO 9001:2000-certified company and use the ISO
9001:2000 standard for all project management contracts. All Singles Social Media is also
Organizational Structure
As shown in Figure 8.2 the organizational structure of ABC Smart LLC. includes a quality
system section within its headquarters. These people are available to the Project Manager (PM)
to conduct training, audits, quality assurance, and similar functions. Although not part of the
formal project team, they are considered on-call resources that the PM can task to assist with
quality-related issues.
In addition, ISO 9001:2000, section 4.1.2, mandates the PM to appoint a member of the
project team who, irrespective of other duties, shall be the project authority and point of contact
for all aspects of quality. For the All Singles Social Media, that responsibility has been delegated
to the Team Leader (TL) for Finance.
Responsibilities
All personnel at All Singles Social Media have the following responsibilities for quality
in accordance with ISO 9001:2000, section 4.1.2 overall project responsibility for quality rest
with the PM notwithstanding the defined authority and responsibility delegated to the other
members of the team.
Pau-lattaer Rutledge
(PM)
Shakim White
Design
Tina Rome TL
Joseph Howard
III
Engineer
Gerod Brown
Legal
Latarsha Williams
Fin
Quality Assurance
Quality assurance ensures that quality processes are implemented. Quality assurance for
the All Singles Social Media project will be managed primarily through the ISO 9001:2000-
mandated activates, with particular attention to the following.
 Design Control
 Contract review
 Document control
 Verification of host
 Verification of purchased of product
 Control of product
 Corrective and preventive actions
 Internal quality audits
Specific quality assurance verification will be based on the requirements described in the
quality in the quality planning process. The methods of providing assurance are shown in table
8.1. The client should note the following additional ABC Smart LLC policies with respect to
quality assurance and workplace safety:
 All material must be at least contractor grade
 All equipment must be certified and approved be the safety standards
 Zero tolerance for any practice that endangers worker’s safety
Quality Control
The construction, web design, and layout will identify in detail the specifications and
standards for the ABC Smart LLC All Singles Social Media project. Quality control of these
requirements will be carried out in accordance with the ISO 9001:2000 standard, with particular
attention to the following:
 Section 4.4.7: Design Verification- to ensure the website design complies with
specifications, codes, and so on
 Section 4.4.8: Design Validation- to ensure that the design is in keeping with the
wishes of the client and investors
 Section 4.6.2: Evaluation of Suppliers- to monitor and control the quality of any
product or service purchased from or subcontracted to a third party that can have
an impact on the overall quality of the project
 Section 4.6.4: Verification of Purchased Product- to confirm prior to use that
delivered goods were in fact those selected and purchased by the PM or the client
 Section 4.10.2: Receiving, Inspection, and Testing- to confirm prior to use the
materials conform to standards
 Section 4.13.2: Review and Disposition of Nonconforming Product- to identify
and quarantine nonconforming product until it can be disposed of, reworked, or
otherwise certified for use by a duly authorized representative of the Project Team
 Section 4.16.1: Control of Quality Records- to ensure that documented proof of
compliance with standards and specifications is captured and stored for future
reference, and handed over to the client upon completion of the project
Reports
Formal quality status reports will be provided at dates and times specified in the Work
Breakdown Structure (WBS), and as agreed on with the client and other stakeholders. Normally,
ABC Smart LLC. will report quality issues by exception (that is, when there is a quality
problem), but quality reporting also will be part of all milestone and end-of-phase meetings.
The quality reports will be sent to the client but also may be sent to other stakeholders for
information or action when there is a need to know. It is ABC Smart LLC.’s responsibility to
document each quality issue and make recommendations on a course of action. It is the client’s
responsibility to approve the course of action.
Documentation
ABC Smart, LLC will require a copy of all legal documents from Groupwise, Inc. We
will provide documentation of the project schedule, project cost and budget, communication plan
and quality management plan. ABC Smart, LLC will provide documentation of your finished
website’s framework and sitemap. The documentation of the website framework and sitemap
includes operator instructions to conduct website maintenance.
Management Approval of the Plan
This plan will be briefed to the client and ABC Smart, LLC management at a point to be
specified in the WBS. Formal approval and sign-off will be required. Once accepted this Quality
Management Plan becomes a key source document for the project and will be safeguarded as
such. Subsequent amendments will be permitted only through a formal quality review process.

More Related Content

What's hot

Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFRubab Tanveer
 
Ch 9 traceability and verification
Ch 9 traceability and verificationCh 9 traceability and verification
Ch 9 traceability and verificationKittitouch Suteeca
 
Ch 1 the software quality assurance challange
Ch 1 the software quality assurance challangeCh 1 the software quality assurance challange
Ch 1 the software quality assurance challangeKittitouch Suteeca
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa systemKittitouch Suteeca
 
Ashutosh_Sharma_7 Yrs_Manual Testing
Ashutosh_Sharma_7 Yrs_Manual TestingAshutosh_Sharma_7 Yrs_Manual Testing
Ashutosh_Sharma_7 Yrs_Manual TestingAshutosh Sharma
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management processKittitouch Suteeca
 
Development and quality plan
Development and quality planDevelopment and quality plan
Development and quality plannethisip13
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software qualityKittitouch Suteeca
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paperMuhammad Umar
 

What's hot (12)

Ch 8 configuration management
Ch 8 configuration managementCh 8 configuration management
Ch 8 configuration management
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
 
Ch 9 traceability and verification
Ch 9 traceability and verificationCh 9 traceability and verification
Ch 9 traceability and verification
 
Ch 1 the software quality assurance challange
Ch 1 the software quality assurance challangeCh 1 the software quality assurance challange
Ch 1 the software quality assurance challange
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa system
 
Ashutosh_Sharma_7 Yrs_Manual Testing
Ashutosh_Sharma_7 Yrs_Manual TestingAshutosh_Sharma_7 Yrs_Manual Testing
Ashutosh_Sharma_7 Yrs_Manual Testing
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
 
Development and quality plan
Development and quality planDevelopment and quality plan
Development and quality plan
 
ikp321-02
ikp321-02ikp321-02
ikp321-02
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software quality
 
6 pma salehuddin - pqp & 3 core process procedures
6   pma salehuddin - pqp & 3 core process procedures6   pma salehuddin - pqp & 3 core process procedures
6 pma salehuddin - pqp & 3 core process procedures
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paper
 

Similar to Executive Summary_joe

TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesTechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesKabeed Mansur
 
121 r 98 - quality management system for concrete constructio
121 r 98 - quality management system for concrete constructio121 r 98 - quality management system for concrete constructio
121 r 98 - quality management system for concrete constructioMOHAMMED SABBAR
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
121 r 85 - quality assurance systems for concrete constructio
121 r 85 - quality assurance systems for concrete constructio121 r 85 - quality assurance systems for concrete constructio
121 r 85 - quality assurance systems for concrete constructioMOHAMMED SABBAR
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docxCRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docxfaithxdunce63732
 
Tuli e services_development_process
Tuli e services_development_processTuli e services_development_process
Tuli e services_development_processTULI eServices Inc.
 
Relationship between ISO 9001:2015 and Scrum practices in the production and ...
Relationship between ISO 9001:2015 and Scrum practices in the production and ...Relationship between ISO 9001:2015 and Scrum practices in the production and ...
Relationship between ISO 9001:2015 and Scrum practices in the production and ...Светла Иванова
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assuranceruth_reategui
 
Quality assurance-in-bpo
Quality assurance-in-bpoQuality assurance-in-bpo
Quality assurance-in-bpoPuneet B
 
Sapple systems capability document
Sapple systems capability documentSapple systems capability document
Sapple systems capability documentSapple Systems
 
Sapple systems capability document
Sapple systems capability documentSapple systems capability document
Sapple systems capability documentSubhasit Ratnam
 

Similar to Executive Summary_joe (20)

TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesTechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
 
121 r 98 - quality management system for concrete constructio
121 r 98 - quality management system for concrete constructio121 r 98 - quality management system for concrete constructio
121 r 98 - quality management system for concrete constructio
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
121 r 85 - quality assurance systems for concrete constructio
121 r 85 - quality assurance systems for concrete constructio121 r 85 - quality assurance systems for concrete constructio
121 r 85 - quality assurance systems for concrete constructio
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
ISO/IEC 27001:2005 naar ISO 27001:2013 Checklist
ISO/IEC 27001:2005 naar ISO 27001:2013  ChecklistISO/IEC 27001:2005 naar ISO 27001:2013  Checklist
ISO/IEC 27001:2005 naar ISO 27001:2013 Checklist
 
A guide to business analysis
A guide to business analysis A guide to business analysis
A guide to business analysis
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docxCRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
 
QM & PM in TT
QM & PM in TTQM & PM in TT
QM & PM in TT
 
Tuli e services_development_process
Tuli e services_development_processTuli e services_development_process
Tuli e services_development_process
 
Relationship between ISO 9001:2015 and Scrum practices in the production and ...
Relationship between ISO 9001:2015 and Scrum practices in the production and ...Relationship between ISO 9001:2015 and Scrum practices in the production and ...
Relationship between ISO 9001:2015 and Scrum practices in the production and ...
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assurance
 
Quality assurance-in-bpo
Quality assurance-in-bpoQuality assurance-in-bpo
Quality assurance-in-bpo
 
Sapple systems capability document
Sapple systems capability documentSapple systems capability document
Sapple systems capability document
 
Sapple systems capability document
Sapple systems capability documentSapple systems capability document
Sapple systems capability document
 
Vinolie profile new
Vinolie profile newVinolie profile new
Vinolie profile new
 
GuideIT Customer Success Criteria Guide
GuideIT Customer Success Criteria GuideGuideIT Customer Success Criteria Guide
GuideIT Customer Success Criteria Guide
 
PM
PMPM
PM
 

Executive Summary_joe

  • 1. Project Plan Singles Social Media 1/1/2014 Joseph Howard III
  • 2. Executive Summary All Singles Social Media Website The attached quality management plan described in detail the steps that will be taken to ensure compliance with all quality-related specifications, requirements, and laws. Since the client has stated that safety and reliability are high priorities, the Project Team has emphasized these aspects in the overall plan. In addition, because of the size of the project, internal project quality also will be given considerable attention. ABC Smart, LLC will be basing its quality plan as requiring on strict adherence to ISO 9001:2000 standards for both quality control and quality assurance. A number of areas are highlighted in the plan as requiring special attention from the Project Team. Primarily, these areas are related to design, contracting, purchasing, testing, and document control, although all ISO procedures are covered thoroughly. In particular, ABC Smart LLC, will keep detailed quality-related records to assist the client in securing the necessary guideline and user agreements and affordable liability insurance for the ongoing Website Construction and Operation. Status reports are expected to be frequent, in keeping with the client’s wishes, but quality issues will be reported only on an as required basis as well as each significant milestone. The client will be consulted on all significant quality-related issues and changes. This document constitutes a formal plan. It will be briefed to the client and must be approved and signed off by the client or the client’s representative. Once accepted, the Quality Management Plan cannot be amended except through a formal change control process. Standards All Singles Social Media is an ISO 9001:2000-certified company and use the ISO 9001:2000 standard for all project management contracts. All Singles Social Media is also Organizational Structure As shown in Figure 8.2 the organizational structure of ABC Smart LLC. includes a quality system section within its headquarters. These people are available to the Project Manager (PM) to conduct training, audits, quality assurance, and similar functions. Although not part of the formal project team, they are considered on-call resources that the PM can task to assist with quality-related issues. In addition, ISO 9001:2000, section 4.1.2, mandates the PM to appoint a member of the project team who, irrespective of other duties, shall be the project authority and point of contact
  • 3. for all aspects of quality. For the All Singles Social Media, that responsibility has been delegated to the Team Leader (TL) for Finance. Responsibilities All personnel at All Singles Social Media have the following responsibilities for quality in accordance with ISO 9001:2000, section 4.1.2 overall project responsibility for quality rest with the PM notwithstanding the defined authority and responsibility delegated to the other members of the team. Pau-lattaer Rutledge (PM) Shakim White Design Tina Rome TL Joseph Howard III Engineer Gerod Brown Legal Latarsha Williams Fin Quality Assurance Quality assurance ensures that quality processes are implemented. Quality assurance for the All Singles Social Media project will be managed primarily through the ISO 9001:2000- mandated activates, with particular attention to the following.  Design Control  Contract review  Document control  Verification of host  Verification of purchased of product  Control of product  Corrective and preventive actions  Internal quality audits
  • 4. Specific quality assurance verification will be based on the requirements described in the quality in the quality planning process. The methods of providing assurance are shown in table 8.1. The client should note the following additional ABC Smart LLC policies with respect to quality assurance and workplace safety:  All material must be at least contractor grade  All equipment must be certified and approved be the safety standards  Zero tolerance for any practice that endangers worker’s safety Quality Control The construction, web design, and layout will identify in detail the specifications and standards for the ABC Smart LLC All Singles Social Media project. Quality control of these requirements will be carried out in accordance with the ISO 9001:2000 standard, with particular attention to the following:  Section 4.4.7: Design Verification- to ensure the website design complies with specifications, codes, and so on  Section 4.4.8: Design Validation- to ensure that the design is in keeping with the wishes of the client and investors  Section 4.6.2: Evaluation of Suppliers- to monitor and control the quality of any product or service purchased from or subcontracted to a third party that can have an impact on the overall quality of the project  Section 4.6.4: Verification of Purchased Product- to confirm prior to use that delivered goods were in fact those selected and purchased by the PM or the client  Section 4.10.2: Receiving, Inspection, and Testing- to confirm prior to use the materials conform to standards  Section 4.13.2: Review and Disposition of Nonconforming Product- to identify and quarantine nonconforming product until it can be disposed of, reworked, or otherwise certified for use by a duly authorized representative of the Project Team  Section 4.16.1: Control of Quality Records- to ensure that documented proof of compliance with standards and specifications is captured and stored for future reference, and handed over to the client upon completion of the project Reports Formal quality status reports will be provided at dates and times specified in the Work Breakdown Structure (WBS), and as agreed on with the client and other stakeholders. Normally, ABC Smart LLC. will report quality issues by exception (that is, when there is a quality problem), but quality reporting also will be part of all milestone and end-of-phase meetings.
  • 5. The quality reports will be sent to the client but also may be sent to other stakeholders for information or action when there is a need to know. It is ABC Smart LLC.’s responsibility to document each quality issue and make recommendations on a course of action. It is the client’s responsibility to approve the course of action. Documentation ABC Smart, LLC will require a copy of all legal documents from Groupwise, Inc. We will provide documentation of the project schedule, project cost and budget, communication plan and quality management plan. ABC Smart, LLC will provide documentation of your finished website’s framework and sitemap. The documentation of the website framework and sitemap includes operator instructions to conduct website maintenance. Management Approval of the Plan This plan will be briefed to the client and ABC Smart, LLC management at a point to be specified in the WBS. Formal approval and sign-off will be required. Once accepted this Quality Management Plan becomes a key source document for the project and will be safeguarded as such. Subsequent amendments will be permitted only through a formal quality review process.