 Project: Middle School Mapping of Attendance Areas Phases 1, 2, and 3
Client: State of Hawaii Department of Education
Roles: Data manager, Client Trainer, Meeting Facilitator, Mapping Technician
Mapped middle school attendance areas on Oahu, Maui County, and Kauai. Used various data sources, such as
hardcopy, electronic, and verbal interview data. Helped secure all project phases.
 Project: Ala Wai Flood Control
Client: U.S. Army Corps of Engineers
Role: GIS Specialist
Managed GIS for the project dealing with the flooding problem of Manoa Stream that caused over $100 million
in damage. Prepared Watershed Plan/EIS exhibits and data. Tasks included conducting topographic surveys of
the stream and floodplains and first floor surveys in flood-prone areas in the watershed. Prepared SDSFIE
Geodatabases for Client.
 Project: Hawai‘i Dam Inventory
Client: Department of Land and Natural Resources
Role: GIS data manager and field data collector
Customized field data collection software interface, taking into account field crew’s preferred work flow
patterns. Manager for incoming and outgoing geospatial data.
 Project: Military Base Infrastructure
Client: Department of the Army
Role: Geospatial Technician, data manager, and field worker
Managed, collected and QAQC project data. Built SDSFIE GIS Geodatabases for submitting to the Client.
 Project: Kawainui Marsh Invasive Plant Study
Client: U.S. Army Corps of Engineer
Role: GIS Analyst
Mapped out vegetation on Kawainui Marsh. Assisted with field data collection using, setting up, and customizing
Arc Pad to field crew’s specific needs. Prepared SDSFIE Geodatabases for the Client.
 Project: Hilo Judiciary
Client: Swinerton Pacific
Role: GIS Specialist and Data Manager
Conducted soil testing at the site of the planned Hilo Judiciary Building. Developed a mitigation plan to protect
workers and future visitors to the public building and conducted additional tests to assure appropriate disposal
of excess soils at the County landfill. Conducted soil testing in association with the removal of an abandoned
fuel tank discovered on-site.
 Project: ATLAS
Client: National Railroad Passenger Corporation (AMTRAK) Continental United States
Role: GIS Specialist and Data Manager
Conducted field surveys of transportation infrastructure sites on the continental United States using GPS and
GIS. Made recommendations to the client for infrastructure hardening and modification to minimize terrorist
threats.

More Related Content

What's hot

Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...IES / IAQM
 
Map-To-Mine-Data-Services
Map-To-Mine-Data-ServicesMap-To-Mine-Data-Services
Map-To-Mine-Data-ServicesDee Rodwell
 
resume_Matthew_Saal_GIS
resume_Matthew_Saal_GISresume_Matthew_Saal_GIS
resume_Matthew_Saal_GISMatt Saal
 
Scullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesScullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesRobert Scullion
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental ComplianceHudbay Minerals Inc.
 
Wenninger Resume Feb2018
Wenninger Resume Feb2018Wenninger Resume Feb2018
Wenninger Resume Feb2018Stan Wenninger
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Brad Wilson
 
Ellis_newresume_Nov2016
Ellis_newresume_Nov2016Ellis_newresume_Nov2016
Ellis_newresume_Nov2016Andria Ellis
 
Project synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationProject synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationSoumik Chakraborty
 

What's hot (20)

Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
Neil Coyne and Anthony Jones - Data collection and presentation tools in real...
 
MDE_Projects_history_2016
MDE_Projects_history_2016MDE_Projects_history_2016
MDE_Projects_history_2016
 
Cotton Resume (2020)
Cotton Resume (2020)Cotton Resume (2020)
Cotton Resume (2020)
 
Map-To-Mine-Data-Services
Map-To-Mine-Data-ServicesMap-To-Mine-Data-Services
Map-To-Mine-Data-Services
 
3 methods ofdesign
3 methods ofdesign3 methods ofdesign
3 methods ofdesign
 
CBI
CBICBI
CBI
 
resume_Matthew_Saal_GIS
resume_Matthew_Saal_GISresume_Matthew_Saal_GIS
resume_Matthew_Saal_GIS
 
Project Summaries
Project SummariesProject Summaries
Project Summaries
 
Scullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferencesScullion_Robert_Resume_ NOReferences
Scullion_Robert_Resume_ NOReferences
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental Compliance
 
Mashel III Cost Amendment Request
Mashel III Cost Amendment RequestMashel III Cost Amendment Request
Mashel III Cost Amendment Request
 
Wenninger Resume Feb2018
Wenninger Resume Feb2018Wenninger Resume Feb2018
Wenninger Resume Feb2018
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
 
CAbbott_Resume_GISP_072416
CAbbott_Resume_GISP_072416CAbbott_Resume_GISP_072416
CAbbott_Resume_GISP_072416
 
Cotton Resume (2019)
Cotton Resume (2019)Cotton Resume (2019)
Cotton Resume (2019)
 
TWDB Updates - Natalie Ballew
TWDB Updates - Natalie BallewTWDB Updates - Natalie Ballew
TWDB Updates - Natalie Ballew
 
Texas Water Development Board Updates - Larry French
Texas Water Development Board Updates - Larry FrenchTexas Water Development Board Updates - Larry French
Texas Water Development Board Updates - Larry French
 
Ellis_newresume_Nov2016
Ellis_newresume_Nov2016Ellis_newresume_Nov2016
Ellis_newresume_Nov2016
 
Lightning Round on Current TWDB Studies
Lightning Round on Current TWDB StudiesLightning Round on Current TWDB Studies
Lightning Round on Current TWDB Studies
 
Project synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationProject synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS Implementation
 

Similar to Project List

Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed A. Baquerizo
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resumekatebarnhart
 
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...Douglas B. Blatchford, PE, PH, CEM, CFM
 
20131030 baid nssi_briefing
20131030 baid nssi_briefing20131030 baid nssi_briefing
20131030 baid nssi_briefingProper Printshop
 
Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2Shweta Bhatia Gupta
 
Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2guesta56b77
 
Beech, Emmellda-July2015 trunc
Beech, Emmellda-July2015 truncBeech, Emmellda-July2015 trunc
Beech, Emmellda-July2015 truncEmmellda Beech
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Projectecowatchers
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)apwacoachellavalley
 
IT Project Consultant
IT Project ConsultantIT Project Consultant
IT Project ConsultantDashiell Cruz
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrDaniel Koziol
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad Mousa
 

Similar to Project List (20)

Project list
Project listProject list
Project list
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
GIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access MappingGIS-Based Approach to Shoreline Access Mapping
GIS-Based Approach to Shoreline Access Mapping
 
Resume_GIS
Resume_GISResume_GIS
Resume_GIS
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resume
 
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
The Gila-Salt-Verde River System: Improving River Forecasts and Emergency Man...
 
20131030 baid nssi_briefing
20131030 baid nssi_briefing20131030 baid nssi_briefing
20131030 baid nssi_briefing
 
Resume - James A Blumenschein
Resume - James A BlumenscheinResume - James A Blumenschein
Resume - James A Blumenschein
 
DVRPC_ProjectSummary_2005
DVRPC_ProjectSummary_2005DVRPC_ProjectSummary_2005
DVRPC_ProjectSummary_2005
 
Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2
 
Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2Risk Analysis Of Cultural Resource4th June2
Risk Analysis Of Cultural Resource4th June2
 
Beech, Emmellda-July2015 trunc
Beech, Emmellda-July2015 truncBeech, Emmellda-July2015 trunc
Beech, Emmellda-July2015 trunc
 
Fall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration ProjectFall 2015--DEC Upated on Spring Creek Restoration Project
Fall 2015--DEC Upated on Spring Creek Restoration Project
 
CSresume1_edits[1]
CSresume1_edits[1]CSresume1_edits[1]
CSresume1_edits[1]
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
 
IT Project Consultant
IT Project ConsultantIT Project Consultant
IT Project Consultant
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil Engr
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedin
 
draftstadiumeir
draftstadiumeirdraftstadiumeir
draftstadiumeir
 

Project List

  • 1. Project List  Project: Middle School Mapping of Attendance Areas Phases 1, 2, and 3 Client: State of Hawaii Department of Education Roles: Data manager, Client Trainer, Meeting Facilitator, Mapping Technician Mapped middle school attendance areas on Oahu, Maui County, and Kauai. Used various data sources, such as hardcopy, electronic, and verbal interview data. Helped secure all project phases.  Project: Ala Wai Flood Control Client: U.S. Army Corps of Engineers Role: GIS Specialist Managed GIS for the project dealing with the flooding problem of Manoa Stream that caused over $100 million in damage. Prepared Watershed Plan/EIS exhibits and data. Tasks included conducting topographic surveys of the stream and floodplains and first floor surveys in flood-prone areas in the watershed. Prepared SDSFIE Geodatabases for Client.  Project: Hawai‘i Dam Inventory Client: Department of Land and Natural Resources Role: GIS data manager and field data collector Customized field data collection software interface, taking into account field crew’s preferred work flow patterns. Manager for incoming and outgoing geospatial data.  Project: Military Base Infrastructure Client: Department of the Army Role: Geospatial Technician, data manager, and field worker Managed, collected and QAQC project data. Built SDSFIE GIS Geodatabases for submitting to the Client.  Project: Kawainui Marsh Invasive Plant Study Client: U.S. Army Corps of Engineer Role: GIS Analyst Mapped out vegetation on Kawainui Marsh. Assisted with field data collection using, setting up, and customizing Arc Pad to field crew’s specific needs. Prepared SDSFIE Geodatabases for the Client.  Project: Hilo Judiciary Client: Swinerton Pacific Role: GIS Specialist and Data Manager Conducted soil testing at the site of the planned Hilo Judiciary Building. Developed a mitigation plan to protect workers and future visitors to the public building and conducted additional tests to assure appropriate disposal of excess soils at the County landfill. Conducted soil testing in association with the removal of an abandoned fuel tank discovered on-site.  Project: ATLAS Client: National Railroad Passenger Corporation (AMTRAK) Continental United States Role: GIS Specialist and Data Manager Conducted field surveys of transportation infrastructure sites on the continental United States using GPS and GIS. Made recommendations to the client for infrastructure hardening and modification to minimize terrorist threats.