SlideShare a Scribd company logo
1 of 4
JONATHAN SIMON FENNER
Resides : Chesham, Buckinghamshire
Telephone : +44 (0)7908 9983307
Email : jonathan.fenner@gmail.com
______________________________________________________________________________
CURRENT TITLE
Facilities Engineer
COMPETANCIES
• All aspects of mechanical/electrical maintenance and repairs
• Quality management (ISO TS 16949)
• Sales and customer service
• Inventory and store management
• Project management - plan, design, proposal and implementation
• Energy management - water, electricity and gas
• Team leadership skills - management of people
• Presentation skills - clear and concise use of English
• Budget management
• Electrical/mechanical designing experience
• Risk assessing and mitigation planning
• Root cause analysis
• IT literacy – Microsoft XL/word/outlook/PowerPoint, AutoCAD Light, AS400, Lotus Notes
______________________________________________________________________________
WORK HISTORY
April 2011 – present
Facilities Engineer - Dairy Crest Hanworth
1. Overseeing service plant and equipment including steam plant, ammonia refrigeration
plants, air compressors and condenser tower conditioning.
2. Responsible for the maintenance, repairs and improvements of all site building and
internals. A closely monitored system ensuring plant building and facilities are maintained in
good order in accordance to international manufacturing processing and packaging
standards (GMP).
3. Identifying energy saving initiatives and implementing effective systems to reduce energy
waste of water, gas and electricity.
4. Responsible for statutory inspections of pressurised vessels, pipe line integrity, lifting
equipment, safety harnesses, ladders, goods and passenger lifts, ventilation systems and
electric pallet lifts.
5. Overseeing and management of contractors including permit control, risk and method
statements.
May 2008 – March 2011
Multi-Skilled Engineer - Dairy Crest Hanworth
Electrical and mechanical repairs/maintenance to a wide range of industrial plant and
equipment. These included steam generation plants, air and water chilling plants, processing
homogenizers and pasteurisers, assorted valves, pumps and geared units, conveyors general
1
bottling and packaging machinery (TetraPac, Pergal and Dawson), CIP processes.
June 2007 – April 2008
Electrician - Foster & Allen London
Combination of team and independent work in general electrical upgrades, refurbishing and
new installations for the commercial industry in the greater London area. Assigned as the
competent person for testing and inspection of completed works.
February 2007 – March 2007
Emigrated from South Africa to England - Indefinite Leave to Remain
March 2006 – Jan 2007
Projects Manager for Energy and Combustion Services (Pty) Ltd
The company provides a service for BP to monitor plant and target systems for energy and
emission reduction at several strategic sites & locations in South Africa and surrounding
countries.
The position as Projects Manager included the following:
1. Assessing customer needs and objectives, understanding the processes, compiling a
comprehensive scope and bill of materials for quotation;
2. Consulting on best engineering practices;
3. Identifying suitable suppliers for specified equipment and services;
4. Implementing a project plan and achieving required deadlines/milestones;
5. Assigning duties and tasks to personnel and conducting resource management;
6. Budget/spend management
March 2004 – Feb 2006
BP Lubes Project Manager – Coastal
Identified customer needs and provided best practice lubrication methods across various
industries, including mining, smelting operations, motor industry and food/beverage processing.
Functions included:
1. Meeting and presenting lubrication systems to the customer;
2. Understanding industrial processes and cost benchmarking;
3. Design and project implementation;
4. Contractor and supplier management;
5. Monitoring and measuring usages accurately, providing reports on cost savings and
abnormalities;
6. Training of customer and BP personnel on correct lubrication procedures;
7. Hand over and sign off procedures
Jan 2002 – Feb 2004
Projects Manager – Castrol Lubricants
Provided a project service for several Castrol +Plus sites, eg:
1. Building “first fill” bulk tank farms for Toyota Manufacturing;
2. Upgrading bulk facilities and coolant ring main at Ford Motor Company;
3. Upgrading Castrol lube facilities at Atlantis Forge and Foundry facilities;
4. Implementing a Castrol facility and initiate a management program for Nestle;
5. Assisting with scope and design for lube facilities for Douglas Mining
2
Oct 1997 – Jan 2002
Castrol Plus Program Manager – Toyota SA Manufacturing
Responsible for the site management of a Castrol Plus team to ensure professional lubrication of
process machinery and production initial fill. The job requirements included conducting lube
schedules, building suitable storage facilities, setting up a management process, training of
personnel, generating accurate usage/saving reports and close interaction with the customer to
provide best services.
Jan 1995 – Sept 1997
Project Supervisor – Castrol Operations
General project implementation and management at the Castrol lubrication plant in Durban SA,
including building of a canteen, laboratory, mobile coolant rig and blend plant upgrade. Included
the responsibility of managing workshop staff and efficient running of the maintenance stores.
August 1992 – Dec 1994
Multi Skilled Engineer – Castrol Operations
General maintenance and installation work on all building and plant equipment/machinery.
April 1989 – July 1991
Electrical artisan – President Brand Gold Mine – Anglo America
Responsible for the maintenance and installation of electrical plants for four underground
production levels. Running and joining of HT cable, installation and final connection of power
transformers. Assisting electrical foreman on management and delegation when required.
Feb 1988 – March 1989
Electrical artisan – Port Shepstone Electrical
1. General domestic & commercial wiring and reticulation design for new coastal housing
developments. The work scope included the running and connections of HT cable up to
11KV.
2. New industrial plant electrical and instrument installations for several Coca Cola sites.
Jan 1984 – Nov 1987
Apprenticeship and electrical shift artisan - Hulett Aluminium Pietermaritzburg
Hulett Aluminium is a major processing plant of aluminium foil, rolling stock and extruded
products. I spent three month terms in each manufacturing section. Extrusion, foil mills, main
hot mills, foundries, anodizing and paint products. The company gave excellent grounding in
many electrical disciplines including AC/DC circuitry, design, reading schematics, wiring
principles, fault finding, maintenance and panel wiring.
I also studied for three months every year at the technical college and completed National levels
2/3 &4 higher class.
Awarded Apprentice of the year in 1986.
Jan 1979 - Nov 1983
Gifford Technical Bulawayo, Zimbabwe
Completed AEB O levels in Mathematics, Technical Drawing, English (distinction), Engineering
and Geography.
QUALIFICATIONS
• Issuing and receiving of work permit certification
• Health & Safety Level 2 certificate
3
• BS7671: 17th
Edition Certificate
• BS7671: Inspection & Testing Certificate
• 3D AutoCad
• Steam Plant Manager & Operator BOAS certificate
• SA Certificate of Competence in Electrical Engineering.
• SA National Diploma – Electrical Engineering (HND level 4)
• Leadership Programme – SPA Consultants
• Attended several project management courses
• Electrical Trade Certificate
4

More Related Content

What's hot

What's hot (20)

CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
RES-Philip.Harper
RES-Philip.HarperRES-Philip.Harper
RES-Philip.Harper
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
Resume
ResumeResume
Resume
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 
Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
UMA MAHESWAR RAO
UMA MAHESWAR RAOUMA MAHESWAR RAO
UMA MAHESWAR RAO
 
Jake-Oussoren (2)
Jake-Oussoren (2)Jake-Oussoren (2)
Jake-Oussoren (2)
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultz
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
amit
amitamit
amit
 
Able construction pte ltd company profile
Able construction pte ltd   company profileAble construction pte ltd   company profile
Able construction pte ltd company profile
 
VincentIvorLeeres
VincentIvorLeeresVincentIvorLeeres
VincentIvorLeeres
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 

Viewers also liked (17)

PRUEBA KARLA URRESTA
PRUEBA KARLA URRESTAPRUEBA KARLA URRESTA
PRUEBA KARLA URRESTA
 
Installasi drupal
Installasi drupalInstallasi drupal
Installasi drupal
 
Better burger
Better burgerBetter burger
Better burger
 
Importancia de la gestión de la investigación en las Universidades para el de...
Importancia de la gestión de la investigación en las Universidades para el de...Importancia de la gestión de la investigación en las Universidades para el de...
Importancia de la gestión de la investigación en las Universidades para el de...
 
Installasi moodle
Installasi moodleInstallasi moodle
Installasi moodle
 
Dualboot
DualbootDualboot
Dualboot
 
Chapter 2 menginstall windows server 2003 (autosaved)
Chapter 2 menginstall windows server 2003 (autosaved)Chapter 2 menginstall windows server 2003 (autosaved)
Chapter 2 menginstall windows server 2003 (autosaved)
 
Joint-level Force Sensing for a Soft Robot Manipulator
Joint-level Force Sensing for a Soft Robot ManipulatorJoint-level Force Sensing for a Soft Robot Manipulator
Joint-level Force Sensing for a Soft Robot Manipulator
 
Theme +dry
Theme +dryTheme +dry
Theme +dry
 
Віталій Волощук: Кар’єрне плато програміста
Віталій Волощук: Кар’єрне плато програмістаВіталій Волощук: Кар’єрне плато програміста
Віталій Волощук: Кар’єрне плато програміста
 
TE1-SE-2013-2S
TE1-SE-2013-2STE1-SE-2013-2S
TE1-SE-2013-2S
 
TE1-TE-2012-2S
TE1-TE-2012-2STE1-TE-2012-2S
TE1-TE-2012-2S
 
TE1-PE-2014-2S
TE1-PE-2014-2STE1-PE-2014-2S
TE1-PE-2014-2S
 
TE2-PE-2014-1S
TE2-PE-2014-1STE2-PE-2014-1S
TE2-PE-2014-1S
 
SSLL-PE-2014-1S
SSLL-PE-2014-1SSSLL-PE-2014-1S
SSLL-PE-2014-1S
 
TE1-TE-2014-1S
TE1-TE-2014-1STE1-TE-2014-1S
TE1-TE-2014-1S
 
SSLL-PE-2015-1S
SSLL-PE-2015-1SSSLL-PE-2015-1S
SSLL-PE-2015-1S
 

Similar to CURRICULUM VITAE - Jonathan Fenner (17)

Similar to CURRICULUM VITAE - Jonathan Fenner (17) (20)

Hassan CV -2
Hassan CV -2Hassan CV -2
Hassan CV -2
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
MHCV
MHCVMHCV
MHCV
 
Updated Resume' A
Updated Resume' AUpdated Resume' A
Updated Resume' A
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
 
CV Nic Badenhorst 2016
CV Nic Badenhorst 2016CV Nic Badenhorst 2016
CV Nic Badenhorst 2016
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
UPDATE in BIAS Shortform
UPDATE in BIAS ShortformUPDATE in BIAS Shortform
UPDATE in BIAS Shortform
 
CV JOHAN BOTHMA
CV  JOHAN BOTHMACV  JOHAN BOTHMA
CV JOHAN BOTHMA
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1Mechanical Engineer CV .doc1
Mechanical Engineer CV .doc1
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Paul Gee CV
Paul Gee CVPaul Gee CV
Paul Gee CV
 

CURRICULUM VITAE - Jonathan Fenner (17)

  • 1. JONATHAN SIMON FENNER Resides : Chesham, Buckinghamshire Telephone : +44 (0)7908 9983307 Email : jonathan.fenner@gmail.com ______________________________________________________________________________ CURRENT TITLE Facilities Engineer COMPETANCIES • All aspects of mechanical/electrical maintenance and repairs • Quality management (ISO TS 16949) • Sales and customer service • Inventory and store management • Project management - plan, design, proposal and implementation • Energy management - water, electricity and gas • Team leadership skills - management of people • Presentation skills - clear and concise use of English • Budget management • Electrical/mechanical designing experience • Risk assessing and mitigation planning • Root cause analysis • IT literacy – Microsoft XL/word/outlook/PowerPoint, AutoCAD Light, AS400, Lotus Notes ______________________________________________________________________________ WORK HISTORY April 2011 – present Facilities Engineer - Dairy Crest Hanworth 1. Overseeing service plant and equipment including steam plant, ammonia refrigeration plants, air compressors and condenser tower conditioning. 2. Responsible for the maintenance, repairs and improvements of all site building and internals. A closely monitored system ensuring plant building and facilities are maintained in good order in accordance to international manufacturing processing and packaging standards (GMP). 3. Identifying energy saving initiatives and implementing effective systems to reduce energy waste of water, gas and electricity. 4. Responsible for statutory inspections of pressurised vessels, pipe line integrity, lifting equipment, safety harnesses, ladders, goods and passenger lifts, ventilation systems and electric pallet lifts. 5. Overseeing and management of contractors including permit control, risk and method statements. May 2008 – March 2011 Multi-Skilled Engineer - Dairy Crest Hanworth Electrical and mechanical repairs/maintenance to a wide range of industrial plant and equipment. These included steam generation plants, air and water chilling plants, processing homogenizers and pasteurisers, assorted valves, pumps and geared units, conveyors general 1
  • 2. bottling and packaging machinery (TetraPac, Pergal and Dawson), CIP processes. June 2007 – April 2008 Electrician - Foster & Allen London Combination of team and independent work in general electrical upgrades, refurbishing and new installations for the commercial industry in the greater London area. Assigned as the competent person for testing and inspection of completed works. February 2007 – March 2007 Emigrated from South Africa to England - Indefinite Leave to Remain March 2006 – Jan 2007 Projects Manager for Energy and Combustion Services (Pty) Ltd The company provides a service for BP to monitor plant and target systems for energy and emission reduction at several strategic sites & locations in South Africa and surrounding countries. The position as Projects Manager included the following: 1. Assessing customer needs and objectives, understanding the processes, compiling a comprehensive scope and bill of materials for quotation; 2. Consulting on best engineering practices; 3. Identifying suitable suppliers for specified equipment and services; 4. Implementing a project plan and achieving required deadlines/milestones; 5. Assigning duties and tasks to personnel and conducting resource management; 6. Budget/spend management March 2004 – Feb 2006 BP Lubes Project Manager – Coastal Identified customer needs and provided best practice lubrication methods across various industries, including mining, smelting operations, motor industry and food/beverage processing. Functions included: 1. Meeting and presenting lubrication systems to the customer; 2. Understanding industrial processes and cost benchmarking; 3. Design and project implementation; 4. Contractor and supplier management; 5. Monitoring and measuring usages accurately, providing reports on cost savings and abnormalities; 6. Training of customer and BP personnel on correct lubrication procedures; 7. Hand over and sign off procedures Jan 2002 – Feb 2004 Projects Manager – Castrol Lubricants Provided a project service for several Castrol +Plus sites, eg: 1. Building “first fill” bulk tank farms for Toyota Manufacturing; 2. Upgrading bulk facilities and coolant ring main at Ford Motor Company; 3. Upgrading Castrol lube facilities at Atlantis Forge and Foundry facilities; 4. Implementing a Castrol facility and initiate a management program for Nestle; 5. Assisting with scope and design for lube facilities for Douglas Mining 2
  • 3. Oct 1997 – Jan 2002 Castrol Plus Program Manager – Toyota SA Manufacturing Responsible for the site management of a Castrol Plus team to ensure professional lubrication of process machinery and production initial fill. The job requirements included conducting lube schedules, building suitable storage facilities, setting up a management process, training of personnel, generating accurate usage/saving reports and close interaction with the customer to provide best services. Jan 1995 – Sept 1997 Project Supervisor – Castrol Operations General project implementation and management at the Castrol lubrication plant in Durban SA, including building of a canteen, laboratory, mobile coolant rig and blend plant upgrade. Included the responsibility of managing workshop staff and efficient running of the maintenance stores. August 1992 – Dec 1994 Multi Skilled Engineer – Castrol Operations General maintenance and installation work on all building and plant equipment/machinery. April 1989 – July 1991 Electrical artisan – President Brand Gold Mine – Anglo America Responsible for the maintenance and installation of electrical plants for four underground production levels. Running and joining of HT cable, installation and final connection of power transformers. Assisting electrical foreman on management and delegation when required. Feb 1988 – March 1989 Electrical artisan – Port Shepstone Electrical 1. General domestic & commercial wiring and reticulation design for new coastal housing developments. The work scope included the running and connections of HT cable up to 11KV. 2. New industrial plant electrical and instrument installations for several Coca Cola sites. Jan 1984 – Nov 1987 Apprenticeship and electrical shift artisan - Hulett Aluminium Pietermaritzburg Hulett Aluminium is a major processing plant of aluminium foil, rolling stock and extruded products. I spent three month terms in each manufacturing section. Extrusion, foil mills, main hot mills, foundries, anodizing and paint products. The company gave excellent grounding in many electrical disciplines including AC/DC circuitry, design, reading schematics, wiring principles, fault finding, maintenance and panel wiring. I also studied for three months every year at the technical college and completed National levels 2/3 &4 higher class. Awarded Apprentice of the year in 1986. Jan 1979 - Nov 1983 Gifford Technical Bulawayo, Zimbabwe Completed AEB O levels in Mathematics, Technical Drawing, English (distinction), Engineering and Geography. QUALIFICATIONS • Issuing and receiving of work permit certification • Health & Safety Level 2 certificate 3
  • 4. • BS7671: 17th Edition Certificate • BS7671: Inspection & Testing Certificate • 3D AutoCad • Steam Plant Manager & Operator BOAS certificate • SA Certificate of Competence in Electrical Engineering. • SA National Diploma – Electrical Engineering (HND level 4) • Leadership Programme – SPA Consultants • Attended several project management courses • Electrical Trade Certificate 4