Zambezi River Crossing Feasibility Study
   Zambezi River Crossing, Feasibility Study
Location Zambezi River, Mozambique
Client DNEP, Maputo, Mozambique
Cost tba
Firm Mott MacDonald
Services Feasibility study and design of alternative crossings
Completion 1998
Extensive hydrological studies were undertaken to investigate the channel discharge and the
flood behaviour of the river in the general locality where a provisional ferry crossing has been
established.
A number of alternative sites and crossings were evaluated including the development of a
combined pontoon and Bailey structure to determine the most cost effective way to provide
for vehicular access.
Approach embankments were designed for overtopping in extreme floods and detailed
recommendations were made to upgrade the ferry. Investigations were carried out for the
bridge designs and for construction of ferry berthing ramps.
Site of the Zambezi River Crossing and the existing Ferry

More Related Content

What's hot

05 xiaodong liu geologic setting of interformational-braided-channel type sa...
05 xiaodong liu  geologic setting of interformational-braided-channel type sa...05 xiaodong liu  geologic setting of interformational-braided-channel type sa...
05 xiaodong liu geologic setting of interformational-braided-channel type sa...Monatom Mgl
 
Bridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_UgandaBridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_UgandaJavad Akhtar
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015 Mehmet INANIR
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated designManuel Retagi
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueTristan Wiggill
 
MarketNote September 15 2015
MarketNote September 15 2015MarketNote September 15 2015
MarketNote September 15 2015Matthew Marshall
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMining On Top
 
Bridge and culvert
Bridge and culvertBridge and culvert
Bridge and culvertfarazsugh
 
CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesRebecca Abel
 
NSW linear reserve environmental management forum proceedings 2012
NSW linear reserve environmental management forum proceedings 2012NSW linear reserve environmental management forum proceedings 2012
NSW linear reserve environmental management forum proceedings 2012Neil Dufty
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationSteven Rosenberg
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
Seattle Port White Paper
Seattle Port White PaperSeattle Port White Paper
Seattle Port White PaperPhilip Corsano
 
Mozambique's rail industry
Mozambique's rail industryMozambique's rail industry
Mozambique's rail industryTristan Wiggill
 

What's hot (20)

05 xiaodong liu geologic setting of interformational-braided-channel type sa...
05 xiaodong liu  geologic setting of interformational-braided-channel type sa...05 xiaodong liu  geologic setting of interformational-braided-channel type sa...
05 xiaodong liu geologic setting of interformational-braided-channel type sa...
 
Bridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_UgandaBridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_Uganda
 
Session 11 – site visits port of maputo
Session 11  – site visits  port of maputoSession 11  – site visits  port of maputo
Session 11 – site visits port of maputo
 
Dry port logistics 2015
Dry port logistics 2015 Dry port logistics 2015
Dry port logistics 2015
 
Dry ports integrated design
Dry ports   integrated designDry ports   integrated design
Dry ports integrated design
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
 
BoardRec
BoardRecBoardRec
BoardRec
 
Day 1 development scenarios english final
Day 1 development scenarios   english finalDay 1 development scenarios   english final
Day 1 development scenarios english final
 
Saving the mekong journal
Saving the mekong journalSaving the mekong journal
Saving the mekong journal
 
MarketNote September 15 2015
MarketNote September 15 2015MarketNote September 15 2015
MarketNote September 15 2015
 
Galveston
GalvestonGalveston
Galveston
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
 
Bridge and culvert
Bridge and culvertBridge and culvert
Bridge and culvert
 
CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridges
 
Port of Beira
Port of BeiraPort of Beira
Port of Beira
 
NSW linear reserve environmental management forum proceedings 2012
NSW linear reserve environmental management forum proceedings 2012NSW linear reserve environmental management forum proceedings 2012
NSW linear reserve environmental management forum proceedings 2012
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentation
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
Seattle Port White Paper
Seattle Port White PaperSeattle Port White Paper
Seattle Port White Paper
 
Mozambique's rail industry
Mozambique's rail industryMozambique's rail industry
Mozambique's rail industry
 

Similar to Zambezi River Crossing Feasibility Study

Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Mike Bisland
 
Environmental implications of the proposed materials handling and ship loadin...
Environmental implications of the proposed materials handling and ship loadin...Environmental implications of the proposed materials handling and ship loadin...
Environmental implications of the proposed materials handling and ship loadin...Alexander Decker
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...Michal Krzeminski
 
India's preparedness for IWT
India's preparedness for IWTIndia's preparedness for IWT
India's preparedness for IWTcmmindia2017
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Foundation of Jamuna Bridge , method construction
Foundation of Jamuna Bridge , method constructionFoundation of Jamuna Bridge , method construction
Foundation of Jamuna Bridge , method constructionvalter gentile
 
ODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_MozambiqueODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_MozambiqueJavad Akhtar
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 
Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Phil Styles
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...IRJET Journal
 
BG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_NepalBG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_NepalJavad Akhtar
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01Pavitter Virdi
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
PHS - Hydrography for Transhipment of Resources
PHS - Hydrography for Transhipment of ResourcesPHS - Hydrography for Transhipment of Resources
PHS - Hydrography for Transhipment of ResourcesNeil Hewitt
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall
 
Cynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekCynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekTony Smith
 

Similar to Zambezi River Crossing Feasibility Study (20)

Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 
Environmental implications of the proposed materials handling and ship loadin...
Environmental implications of the proposed materials handling and ship loadin...Environmental implications of the proposed materials handling and ship loadin...
Environmental implications of the proposed materials handling and ship loadin...
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
 
India's preparedness for IWT
India's preparedness for IWTIndia's preparedness for IWT
India's preparedness for IWT
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Foundation of Jamuna Bridge , method construction
Foundation of Jamuna Bridge , method constructionFoundation of Jamuna Bridge , method construction
Foundation of Jamuna Bridge , method construction
 
ODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_MozambiqueODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_Mozambique
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222
 
DP0901.pdf
DP0901.pdfDP0901.pdf
DP0901.pdf
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
BG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_NepalBG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_Nepal
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
PHS - Hydrography for Transhipment of Resources
PHS - Hydrography for Transhipment of ResourcesPHS - Hydrography for Transhipment of Resources
PHS - Hydrography for Transhipment of Resources
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
 
Cynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekCynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds Creek
 
Body corctd
Body corctdBody corctd
Body corctd
 

More from Javad Akhtar

150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_JavadJavad Akhtar
 
000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_AkhtarJavad Akhtar
 
0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_AkhtarJavad Akhtar
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_AkhtarJavad Akhtar
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_AkhtarJavad Akhtar
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_AkhtarJavad Akhtar
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
091115_Bridge Maintenance_Javad_Akhtar
091115_Bridge Maintenance_Javad_Akhtar091115_Bridge Maintenance_Javad_Akhtar
091115_Bridge Maintenance_Javad_AkhtarJavad Akhtar
 

More from Javad Akhtar (9)

150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad
 
UK-Gantries
UK-GantriesUK-Gantries
UK-Gantries
 
000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar
 
0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
091115_Bridge Maintenance_Javad_Akhtar
091115_Bridge Maintenance_Javad_Akhtar091115_Bridge Maintenance_Javad_Akhtar
091115_Bridge Maintenance_Javad_Akhtar
 

Zambezi River Crossing Feasibility Study

  • 1. Zambezi River Crossing Feasibility Study    Zambezi River Crossing, Feasibility Study Location Zambezi River, Mozambique Client DNEP, Maputo, Mozambique Cost tba Firm Mott MacDonald Services Feasibility study and design of alternative crossings Completion 1998 Extensive hydrological studies were undertaken to investigate the channel discharge and the flood behaviour of the river in the general locality where a provisional ferry crossing has been established. A number of alternative sites and crossings were evaluated including the development of a combined pontoon and Bailey structure to determine the most cost effective way to provide for vehicular access. Approach embankments were designed for overtopping in extreme floods and detailed recommendations were made to upgrade the ferry. Investigations were carried out for the bridge designs and for construction of ferry berthing ramps. Site of the Zambezi River Crossing and the existing Ferry