2015 Page 1 Jamie Allen
Name Jamie Allen
DOB 09.08.1985
Address: 07414 477933
Profile
Moved to JSM from another civil company in August 2013; I been working within the substation
environment for over 9 years and has predominately worked for Western Power Distribution on various
projects. I have worked my way up from a ganger to site foreman, supervisor and now Field Engineer /
Project Manager; I would consider myself to have great knowledge on civil works and has excellent
knowledge on the installation of HV cables and understands all aspects of the HV installation process, I
would consider myself able to solve any issues that may arise during the day to day operations within the
business.
Qualifications
 NVQ (QCF) Level 2 DIPLOMA Occupations Construction
 EUSR – SHEA Power
 PASMA
 NRSWA Supervisor
 CPCS 360 Operator
 CPCS Dumper Operator
 NPORS
 SSSTS
 First Aid
 WPD authorized person – Document & key holder
 SSE authorized person – Document & key holder
 BESC
 MEWPS for managers
2015 Page 2 Jamie Allen
Key skills and experience
 12 years construction experience, of which 9 have been within the electrical industry
 Analytical approach to problem solving
 Able to work to stringent timescales and manage the team proficiently
 Good communication skills
Relevant Projects
 Western Power Distribution – Presteigne 11/33/66kV built new substation and was involved with new
circuit installment.
 Western Power Distribution – Shrewsbury 132kV, built an new switching house and installed trough
work and pulled in new cable to switch room
 Western Power Distribution – Corby 132Kv, Decommissioning of oil filled 132kV cable and installment
of new 132kV XLPE x 2 Circuits
 Western Power Distribution – Bixhead 33kV, 3 x circuits running from new switch room through the
forest of dean and terminated and newly installed H poles.
 Scottish Southern Electric – Stoke Poges lane, Installing new 132/33/11kV and LV circuits through new
railway bridge, working alongside Network Rail
 National Grid – Shrewsbury 275kV – Decommissioning and overlay inside substation
 Western Power Distribution/ Mercia waste – New 66kV circuit through Kidderminster into incinerator
plant.
 Oldbury Power Station – Part of the decommissioning of the site team – Phase 1 & 3
 Western Power Distribution – Hartlebury 66Kv cable installation (6km) and construction of a Sealing
End Platform on a 66Kv Tower
 Western Power Distribution – Various oil filled cable decommissioning works from 33/66/132kV
2015 Page 3 Jamie Allen
Specific Project role and responsibilities
Current Role Description:
To provide support both to the client and the team designated on the project, to ensure all employees are
fully aware of the works due to be undertaken and are competent to do so, I ensure all Risk Assessments
and Method Statements conform to the clients and company needs and are approved prior to work
commencing. Organise the site set up alongside the site manager/supervisor and ensure its set up
correctly to CDM / CPP regulations, Problems solve as and when any may arise and ensure a solution is
put forward to the client to resolve the issue.
Project Duties
 Interface management with the client
 High standard of professionalism of any civil or associated works for the project works
 Delivering high productivity in a safe and efficient manner, ensuring that all work is conducted safely
and in compliance with company policies
 Overview of day-to-day operations
 Recruitment of any specialist skilled personnel required
 Procurement of specialist plant & equipment
 Supply Chain Management; developing supplier relationships
 Identifying training requirements for OU staff and operatives
 Preparation of operational reports
 Cost management & financial reporting
 Promote a professional image on the site
 Proactively motivate and develop the workforce encouraging good communication and team work
 Work closely with the project delivery team to ensure that all processes and activities are carried and
completed in accordance with the approved procedures
 Prioritise own workload in order to meet project deadline without comprising quality standards
 Create and maintain good communication and relationships with, client, suppliers, councils, staff and
members of the public and any agencies
 Understand the scope of works, programme of works with the activities to meet delivery timescales
 Assess the level of risk and identify any health and safety risks! financial risks and the development of
the associated contingency plans
 Assist the team to produce method statements and risk assessment as required
 Ensure that all accidents, dangerous occurrences and near miss incidents are reported as per the
company procedures
2015 Page 4 Jamie Allen
 Accept full responsibility for the compliance with the Construction Design and Management
Regulation (CDM) 2007 for the personal safety, safety of all project team members and safety of the
general public within project work area
 Complying with all Safety rules, site rules and procedures instructed by others when working on 3'"
party sites
 Provide support to ensure that the jointing/cabling related records and as builts are completed,
accurate and up to date
 Maintain a strong customer focus and provide a positive customer experience
All References Available upon requet.

More Related Content

What's hot (20)

Joe Howard CV
Joe Howard CVJoe Howard CV
Joe Howard CV
 
resume
resumeresume
resume
 
David Adams CV
David Adams CVDavid Adams CV
David Adams CV
 
LETTER
LETTERLETTER
LETTER
 
Philip Skeparnides c.v.doc
Philip Skeparnides c.v.docPhilip Skeparnides c.v.doc
Philip Skeparnides c.v.doc
 
AAKASH SUMAN
AAKASH SUMANAAKASH SUMAN
AAKASH SUMAN
 
Michael Rafferty CV
Michael Rafferty CVMichael Rafferty CV
Michael Rafferty CV
 
2015 Resume Maint O
2015  Resume Maint O2015  Resume Maint O
2015 Resume Maint O
 
Resume2016
Resume2016Resume2016
Resume2016
 
Daniel Roberson Resume 2015
Daniel Roberson Resume 2015Daniel Roberson Resume 2015
Daniel Roberson Resume 2015
 
SallingerSteven_Resume (1)
SallingerSteven_Resume (1)SallingerSteven_Resume (1)
SallingerSteven_Resume (1)
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
Letter of recommendation
Letter of recommendationLetter of recommendation
Letter of recommendation
 
cover letter Izak potgieter 2016
cover letter Izak potgieter 2016cover letter Izak potgieter 2016
cover letter Izak potgieter 2016
 
Resume Karen Hartley
Resume Karen HartleyResume Karen Hartley
Resume Karen Hartley
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
FAHEEM_Power Engineer
FAHEEM_Power EngineerFAHEEM_Power Engineer
FAHEEM_Power Engineer
 
Reference Gary Winther QSS Systems
Reference Gary Winther QSS SystemsReference Gary Winther QSS Systems
Reference Gary Winther QSS Systems
 
Resume%25201%2520%25281%2529
Resume%25201%2520%25281%2529Resume%25201%2520%25281%2529
Resume%25201%2520%25281%2529
 
FaustoCabreraresume2-1-16
FaustoCabreraresume2-1-16FaustoCabreraresume2-1-16
FaustoCabreraresume2-1-16
 

Similar to CV_Jamie Allen - Field Engineer

Similar to CV_Jamie Allen - Field Engineer (20)

CV_Jamie Allen
CV_Jamie AllenCV_Jamie Allen
CV_Jamie Allen
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
resume
resumeresume
resume
 
Shane SHERRY Resume 2014
Shane SHERRY Resume 2014Shane SHERRY Resume 2014
Shane SHERRY Resume 2014
 
CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17
 
Daniel Baze
Daniel BazeDaniel Baze
Daniel Baze
 
JAMES MARSHALL CV PDF
JAMES MARSHALL CV PDFJAMES MARSHALL CV PDF
JAMES MARSHALL CV PDF
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016MostafaFahimHamdy25.7.2016
MostafaFahimHamdy25.7.2016
 
CT CV (6)
CT CV (6)CT CV (6)
CT CV (6)
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
Resume for Management position 14-05-15
Resume for Management position 14-05-15Resume for Management position 14-05-15
Resume for Management position 14-05-15
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
Resume Brian Miller February 2015
Resume Brian Miller February 2015Resume Brian Miller February 2015
Resume Brian Miller February 2015
 
CV Adam Dougherty CV new PDF
CV Adam Dougherty CV new PDFCV Adam Dougherty CV new PDF
CV Adam Dougherty CV new PDF
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Kush sharma cv
Kush sharma cvKush sharma cv
Kush sharma cv
 

CV_Jamie Allen - Field Engineer

  • 1. 2015 Page 1 Jamie Allen Name Jamie Allen DOB 09.08.1985 Address: 07414 477933 Profile Moved to JSM from another civil company in August 2013; I been working within the substation environment for over 9 years and has predominately worked for Western Power Distribution on various projects. I have worked my way up from a ganger to site foreman, supervisor and now Field Engineer / Project Manager; I would consider myself to have great knowledge on civil works and has excellent knowledge on the installation of HV cables and understands all aspects of the HV installation process, I would consider myself able to solve any issues that may arise during the day to day operations within the business. Qualifications  NVQ (QCF) Level 2 DIPLOMA Occupations Construction  EUSR – SHEA Power  PASMA  NRSWA Supervisor  CPCS 360 Operator  CPCS Dumper Operator  NPORS  SSSTS  First Aid  WPD authorized person – Document & key holder  SSE authorized person – Document & key holder  BESC  MEWPS for managers
  • 2. 2015 Page 2 Jamie Allen Key skills and experience  12 years construction experience, of which 9 have been within the electrical industry  Analytical approach to problem solving  Able to work to stringent timescales and manage the team proficiently  Good communication skills Relevant Projects  Western Power Distribution – Presteigne 11/33/66kV built new substation and was involved with new circuit installment.  Western Power Distribution – Shrewsbury 132kV, built an new switching house and installed trough work and pulled in new cable to switch room  Western Power Distribution – Corby 132Kv, Decommissioning of oil filled 132kV cable and installment of new 132kV XLPE x 2 Circuits  Western Power Distribution – Bixhead 33kV, 3 x circuits running from new switch room through the forest of dean and terminated and newly installed H poles.  Scottish Southern Electric – Stoke Poges lane, Installing new 132/33/11kV and LV circuits through new railway bridge, working alongside Network Rail  National Grid – Shrewsbury 275kV – Decommissioning and overlay inside substation  Western Power Distribution/ Mercia waste – New 66kV circuit through Kidderminster into incinerator plant.  Oldbury Power Station – Part of the decommissioning of the site team – Phase 1 & 3  Western Power Distribution – Hartlebury 66Kv cable installation (6km) and construction of a Sealing End Platform on a 66Kv Tower  Western Power Distribution – Various oil filled cable decommissioning works from 33/66/132kV
  • 3. 2015 Page 3 Jamie Allen Specific Project role and responsibilities Current Role Description: To provide support both to the client and the team designated on the project, to ensure all employees are fully aware of the works due to be undertaken and are competent to do so, I ensure all Risk Assessments and Method Statements conform to the clients and company needs and are approved prior to work commencing. Organise the site set up alongside the site manager/supervisor and ensure its set up correctly to CDM / CPP regulations, Problems solve as and when any may arise and ensure a solution is put forward to the client to resolve the issue. Project Duties  Interface management with the client  High standard of professionalism of any civil or associated works for the project works  Delivering high productivity in a safe and efficient manner, ensuring that all work is conducted safely and in compliance with company policies  Overview of day-to-day operations  Recruitment of any specialist skilled personnel required  Procurement of specialist plant & equipment  Supply Chain Management; developing supplier relationships  Identifying training requirements for OU staff and operatives  Preparation of operational reports  Cost management & financial reporting  Promote a professional image on the site  Proactively motivate and develop the workforce encouraging good communication and team work  Work closely with the project delivery team to ensure that all processes and activities are carried and completed in accordance with the approved procedures  Prioritise own workload in order to meet project deadline without comprising quality standards  Create and maintain good communication and relationships with, client, suppliers, councils, staff and members of the public and any agencies  Understand the scope of works, programme of works with the activities to meet delivery timescales  Assess the level of risk and identify any health and safety risks! financial risks and the development of the associated contingency plans  Assist the team to produce method statements and risk assessment as required  Ensure that all accidents, dangerous occurrences and near miss incidents are reported as per the company procedures
  • 4. 2015 Page 4 Jamie Allen  Accept full responsibility for the compliance with the Construction Design and Management Regulation (CDM) 2007 for the personal safety, safety of all project team members and safety of the general public within project work area  Complying with all Safety rules, site rules and procedures instructed by others when working on 3'" party sites  Provide support to ensure that the jointing/cabling related records and as builts are completed, accurate and up to date  Maintain a strong customer focus and provide a positive customer experience All References Available upon requet.