SlideShare a Scribd company logo
1 of 8
Download to read offline
J
S
B
U
P
J
e
t
s
a
G
P
5
M
c
r
i
e
T
I
T
S
M
o
L
S
D
M
o
L
M
p
f
D
M
b
b
b
b
f
JOSÉ F.
Senior Brid
Bachelor of S
University of
Professional
José Tejidor
experience in
the lead on
substructure
application o
Girder Desig
Plate Girder
51) and Fram
Mr. Tejidor
completing p
remaining 1
ntimately fa
engineering
Tyler and Lu
Indiana. In a
Texas Tollw
Senior Bridg
Mr. Tejidor p
of all bridge
Loop 45 desi
SH 121 Desi
Dallas, Texa
Mr. Tejidor
overpasses/u
LBJ Freewa
Mr. Tejidor
project in Da
for in-field c
DFW Conne
Mr. Tejidor
build propos
bridge struct
bridge geom
bridge design
field changes
TEJIDO
dge Projec
Science in C
f Texas at A
Engineer, S
r is a Senior
n the planni
complicate
and foundat
of computer
gn (Pstr 14)
Design/Ana
me Analysis
worked m
projects thro
0 years as
familiar with
on bridge d
ubbock Dist
ddition to En
way Authori
ge Engineer
provided con
e girders and
ign-build tol
ign-Build Pr
as, Senior B
was respon
underpasses a
ay Design-B
was respons
allas, Texas.
onstruction
ector Design
served as th
sal as well a
tures (1-45 a
metry progra
ns included i
s, out-of-tole
OR, P.E.
ct Manager
Civil Enginee
Austin
State of TX, #
r Bridge Pro
ng and desig
ed designs.
tion design,
design prog
), PGSuper,
alysis (Merl
(Frame 11, S
more than 1
oughout Texa
the TxDOT
h TxDOT's
design proje
tricts, and h
nglish, Mr. T
ity (TTA), L
r
nstruction su
d design of r
ll road projec
roject: Betw
Bridge Engin
nsible for th
and intercha
Build Projec
sible for the
Additionally
issues.
n-Build Pro
he Senior Bri
as for the de
and 1-47, and
am BGS (tra
in the projec
erance const
r / Designe
ering (Struct
#63797 (198
oject Manag
gn of bridge
His technic
retaining wa
grams that in
Bent Cap A
lin-Dash, MD
Strudl).
3 years wit
as. The first
T Austin Di
procedures
ects for TxD
as designed
Tejidor is flu
Loop 45 Des
upport and w
remedial sol
ct in Austin,
ween Dallas
neer
he bridge p
anges to quan
t, Dallas, Te
e design of o
y, he assiste
oject, Tende
idge Engine
sign and dev
d 1-45 Revi
aining and e
ct, and provi
truction issue
r
tural) (1982)
88)
ger and Lead
e structures.
cal experien
alls, and rela
nclude Road
Analysis (CA
DX), Colum
th the Texa
three years
strict Bridg
s and prefer
DOT’s Hous
bridges for
uent in Span
sign-Build P
was responsi
lutions to ou
, Texas.
North Toll
portion of th
ntify the win
exas, Senior
one of the lo
d in reviewi
er, Dallas/Fo
er in the pre
velopment o
sed). Additio
execution),
ded on-call c
es).
)
d Structural
He supervis
nce includes
ated structure
dway Design
AP 18), Co
mn Design/A
as Departm
were spent
ge Engineer.
rences. He
ston, Waco,
r the DOT’s
nish.
Project, Aus
ible for verif
ut-of-toleran
lway (DNT)
he proposal
nning BOQ.
r Bridge En
ongest bridg
ing and prov
ort Worth, T
eliminary pla
of plans, spe
onally, he as
as Quality C
construction
l Engineer w
ses bridge d
s bridge lay
es. Mr. Tejid
n System (RD
ontinuous Be
Analysis (PIE
ment of Tran
with the Bri
This exper
has also w
Dallas, Pha
of Florida,
stin, Texas,
fying and co
nce construc
) and US 75
l, and prelim
ngineer
ge structures
viding structu
Texas, Seni
anning and d
ecifications a
ssisted with
Control (QC
n support (sh
with over 32
design projec
youts, super
dor is profic
DS/BGS), P
eam Analys
ER, PCA2,
nsportation
idge Divisio
rience has m
worked in c
arr, Lufkin,
Idaho, Neb
orrecting bea
ction problem
Tender,
minary desi
s for this de
ural recomm
ior Bridge E
design for th
and estimate
the preferre
C) reviewer
hop plan revi
2 years of
cts, taking
rstructure,
ient in the
Prestressed
is (B-30),
BM-COL
(TxDOT)
on, and the
made him
consulting
Amarillo,
braska and
aring seats
ms for the
gn of the
sign-build
mendations
Engineer
he design-
es for two
ed TxDOT
for other
iew, RFIs,
J
N
S
M
b
L
M
b
I
M
b
T
M
t
T
c
w
T
M
T
t
c
H
2
M
s
T








José F.
North Tarra
Senior Bridg
Mr. Tejidor s
build propos
LBJ Freewa
Mr. Tejidor s
build propos
I-35 East De
Mr. Tejidor
build propos
TxDOT Aus
Mr. Tejidor
to an interch
The project i
connectors to
width). Desig
TxDOT Hou
Mr. Tejidor
TxDOT Hou
tapering slab
construction
Harris Coun
2B and 2C H
Mr. Tejidor
specification
Texas. The b
 Mason C
 Franz Ro
 Morton R
 Keith Ha
 Beckend
 FM 529 O
 Longenb
 West Roa
Tejidor,
ant Express
ge Engineer
served as the
al for the NT
ay Design-B
served as the
al for the LB
esign-Build
served as S
al for I-35E
stin District
served as Se
hange under
involved fiv
o existing br
gn was comp
uston Distri
served as Br
uston Distric
b, offset ben
cost was $1
nty Toll Roa
Harris Coun
r served as
ns and estima
bridges inclu
Creek Overpa
oad Overpass
Road Overpa
arrow Road O
orf Road Ov
Overpass No
augh Road O
ad Overpass
P.E.
s (NTE) Des
r
e Senior Bri
TE in Dallas
Build Projec
e Senior Bri
BJ Freeway i
Project - Te
Senior Bridg
in Dallas, T
t / TTA, Art
enior Bridge
construction
ve additional
ridges (863’
pleted in 200
ict, I-610 / U
ridge Engine
ct. The proje
nts, abutmen
.2 million.
ad Authorit
nty, Texas, S
s Senior B
ates for 16 b
uded:
ass Northbou
s Northboun
ass Northbou
Overpass No
verpass Nort
orthbound an
Overpass No
s Northbound
sign-Build P
idge Enginee
s, Texas.
t, Dallas, Te
idge Enginee
in Dallas, Te
ender Dalla
ge Engineer
Texas.
terial C, Au
e Engineer re
n on the Art
l bridges, tw
EB and 12
06.
US 59 Multi-
eer for the d
ect encompas
nts, and deep
ty (HCTRA
Senior Brid
Bridge Engi
bridges for th
und and Sou
nd and South
und and Sou
orthbound an
thbound and
nd Southbou
orthbound an
d and Southb
Project – Te
er for the pre
exas, Senior
er for the pre
exas.
as, Texas, Se
for the prel
ustin, Texas,
esponsible f
terial C proj
wo frontage r
46’ WB), an
-Level Conn
design of the
ssed designi
p drilled sha
), Grand Pa
dge Enginee
ineer respon
he Grand Pa
uthbound
hbound
uthbound
nd Southbou
Southbound
und (plate gir
nd Southbou
bound (curv
ender, Dalla
eliminary pl
r Bridge En
eliminary pl
enior Bridg
liminary plan
, Senior Bri
for all design
ect for the T
road bridges
nd one overp
nector, Hou
e widening o
ing plate gir
aft foundatio
arkway (SH
er
nsible for
arkway (SH
und
d
rder superstr
und
ved steel plat
as, Texas,
lanning and
ngineer
lanning and
ge Engineer
anning and d
idge Engine
n work relat
TxDOT Aus
s (1392’ EB
pass (260’ l
uston, Texas
of a multi-le
rders and pre
ons in very
H 99), Segme
the design
99) Segmen
ructure)
te girder sup
design for th
design for th
design for th
eer
ted to a Chan
stin District
and 1557’
ength by 14
s, Bridge En
evel connect
estressed gir
weak soil.
ent E, Sectio
, plan dev
nt E in Harri
erstructure)
he design-
he design-
he design-
nge Order
and TTA.
WB), two
45’ overall
ngineer
tor for the
rders for a
Estimated
on 2A,
velopment,
is County,
J
T
B
M
e
i
i
w
T
M
n
d
g
d
N
&
M
t
w
P
c
T
M
T
g
t
w
T
M
e
g
s
w
a
T
M
a
w
t
m
a
José F.
TxDOT Hou
Bridge Engi
Mr. Tejidor
engineers wo
nvolved the
nverted-T b
was $1.5 mil
TxDOT Aus
Mr. Tejidor s
new bridge o
design of ho
girders to sp
drilled shafts
North Texas
& Southbou
Mr. Tejidor
the NTTA P
widths. The
PGL being
completed in
TxDOT Aus
Mr. Tejidor
TxDOT Aus
geometric la
transition, ho
was $750,00
TxDOT Aus
Mr. Tejidor
east frontage
girders, allow
substructure
water off the
and web wal
TxDOT Aus
Mr. Tejidor
and I beam u
worn out dec
the structura
modifying th
analyzed the
Tejidor,
uston Distri
ineer
served as B
orking on th
design of th
ents, steel b
llion.
stin District
served as Se
over Inks La
orizontally cu
pan the mai
s, and founda
s Tollway A
und Main L
served as Se
PGBT toll fa
bridges inco
referenced t
n 2007.
stin District
served as S
stin District
ayout. The p
orizontal and
0.
stin District
served as Se
e road for the
wing the ski
and founda
e bridge and
lls and found
stin District
served as Se
unit reconstr
ck and old H
al adequacy
he bents so
existing dec
P.E.
ict, I-610 / U
Bridge Engin
he Authorize
he prestresse
box straddle
t, SH 29 Ink
enior Bridge
ake for the T
urved appro
n river chan
ation design
Authority (N
anes Over M
enior Bridge
acility. The b
orporated aes
to a vertica
t, RM 165 O
enior Bridge
t. The proje
proposed br
d vertical cur
t, IH 35 Fro
enior Bridge
e TxDOT Au
pping of eve
ation costs. T
into a hazar
dation design
t, IH 35 Ove
enior Bridge
ruction for th
HS-15 I-beam
of the inter
prestressed
ck and beam
US 59 Autho
neer respon
d Vehicle L
ed girders an
bent, abutm
ks Lake Brid
Engineer re
TxDOT Aus
oach spans u
nnel, aesthe
n. Estimated
NTTA) / Pre
Miller Road
e Engineer r
bridges were
sthetic colum
al and horiz
Over Blanco
e Engineer r
ect consiste
ridge alignm
rves, and req
ntage Road
e Engineer r
ustin Distric
ery other be
The project
rdous materi
n. Estimated
er Blanco R
e Engineer in
he TxDOT A
m units with
rior and abu
girders cou
ms to assure t
orized Vehic
sible for the
Lane Bridge
nd plate girde
ments, and fo
dge, Texas,
esponsible fo
stin District
using prestre
tic hollow c
construction
esident Geor
d Dallas, Tex
esponsible f
e three-span
mns and ben
zontal curve
o River, Blan
responsible
ed of design
ment had a
quired web w
d Bridge, Ge
responsible f
ct. The proje
nt on the ad
also require
ial trap, the
d construction
River, San M
n charge of
Austin Distri
h a new dec
utment bents
ld be placed
that a specifi
cle Lane Br
e design, an
for the TxD
ers of the sup
oundation de
Senior Brid
or the design
. The projec
essed beams,
columns sup
n cost was $6
rge Bush Tu
xas, Senior
for the desig
n, type IV be
nts. Complex
baseline b
nco, Texas,
for the desi
ning a conv
severe skew
walls in the
eorgetown,
for the desig
ct consisted
djacent IH 35
ed designing
design of ve
n cost was $
Marcos, Texa
design and p
ict. The proj
ck supported
s for the inc
d on them. D
ic crane coul
ridge, Houst
nd for assig
DOT Houston
perstructure
esign. Estima
dge Enginee
n and develo
ct consisted
, design of w
pported by
6.2 million.
urnpike (PG
Bridge Eng
gn of two rep
eam structur
x geometry w
etween the
Senior Brid
ign and plan
ventional br
w of 55 de
river. Estim
Texas, Seni
gn of a long
of using typ
5 main lane
g a drainage
ery tall bent
$1.5 million.
as, Senior B
plan product
ect consisted
d on prestres
crease in de
During cons
ld operate on
ton, Texas,
gning design
n District. T
in a horizon
ated constru
er
opment of PS
of layout re
weathering s
a floating f
GBT), North
gineer
placement b
res with tap
was augmen
bridges. De
dge Enginee
n developme
ridge for a
egrees, supe
mated constru
ior Bridge E
river crossi
pe VI mod p
bridge, thus
e system to
ts requiring t
Bridge Engin
tion for a br
d of replacin
ssed girders,
sign load (D
struction, M
n the superst
n work, to
he project
ntal curve,
uction cost
S&E for a
efinement,
steel plate
footing on
hbound
bridges for
ering slab
nted by the
esign was
er
ent for the
a complex
erelevation
uction cost
Engineer
ng for the
prestressed
s reducing
carry the
tie beams,
neer
ridge deck
ng a badly
verifying
D.L.), and
Mr. Tejidor
tructure.
J
T
S
M
9
f
i
c
h
E
N
M
c
i
T
M
w
c
l
w
T
M
s
o
d
T
S
M
s
c
h
b
T
M
f
s
h
w
d
José F.
TxDOT Aus
Senior Bridg
Mr. Tejidor
971 over Op
for this proje
ncluded ero
case the eros
highly erodi
Estimated co
NTTA, FM
Mr. Tejidor
constructabil
ncorporation
TxDOT Aus
Mr. Tejidor
widening of
consisted of
loading. It a
with tie beam
TxDOT Aus
Mr. Tejidor
structures ov
on a horizon
design in var
TxDOT Aus
Senior Bridg
Mr. Tejidor
separate sect
consisted of
hide it from
beam design
TxDOT Aus
Mr. Tejidor
frontage tur
superstructur
horizontal cu
with web wa
during a seve
Tejidor,
stin District
ge Engineer
served as S
ossum Creek
ect because t
sion abatem
sion abateme
ble location
onstruction c
2818 and R
r served as
lity issues.
n into the pla
stin District
served as S
f a plate gir
f retrofitting
lso included
ms and web w
stin District
served as S
ver Brushy C
ntal curve wi
riable soil co
stin District
ge Engineer
served as S
tions of the
designing u
the front of
in variable
stin District
served as Se
rnout bridge
re that had
urve and extr
alls and fou
ere flood. Es
P.E.
t, FM 971 O
r
Senior Bridg
k in William
the road was
ent measure
ent did not w
n. The proje
cost was $30
Ramp C, Dal
QC Revie
Mr. Tejidor
an set.
t, FM 969 O
enior Bridge
rder bridge
the existing
d deck repla
walls, abutm
t, Parmer L
Senior Bridg
Creek for the
ith a superel
onditions.
t, Parmer L
r
Senior Bridg
Parmer Lan
unreinforced
f the wall to
soil conditio
t, Loop 360
enior Bridge
e for the
variable ske
reme cross s
undation desi
stimated con
Over Opossu
e Engineer r
mson County
s to be close
es around one
work and the
ct turned ou
0,000.
llas, Texas,
ewer respon
r issued cor
Over Colorad
e Engineer r
that has cov
g plate girde
acement, wid
ment widenin
ane (FM 73
ge Engineer
e TxDOT Au
levation tran
ane (FM 73
ge Engineer
ne (FM 734
masonry w
reduce the p
ons.
at RM 2222
e Engineer re
TxDOT Au
ews of mod
slope of .09 f
ign, and a s
nstruction co
um Creek, W
responsible
y for the TxD
d and box b
e abutment,
e bridge had
ut to be bat
QC Review
nsible for th
rrective com
do River, B
responsible
ver plates f
ers with add
dening of th
ng, and found
34) Bridges,
responsible
ustin Distric
nsition, abutm
34) Noise W
responsible
4) highway
walls between
picket fence
2, Austin, T
esponsible fo
ustin Distric
derate (32 d
ft/ft. Also in
slab hold-do
st was $170
Williamson
for the desi
DOT Austin
beams provid
designing th
d to be length
t-friendly an
wer
he review
mments and
Bastrop, Tex
for the desi
for the TxD
ditional cov
he bridge wi
dation desig
Austin, Tex
e for the des
ct. Project in
ment and in
Wall, Austin,
e for the de
for the TxD
n pilasters. E
look. Also
exas, Senior
or the design
ct. The pro
degrees) to s
ncluded was
own system
,000.
County, Te
ign and plan
District. Bo
de quick con
hat abutment
hened, and f
nd now has
of two brid
monitored
xas, Senior B
ign and plan
DOT Austin
ver plates to
th Type IV
gn in the rive
xas, Senior
sign of two
ncluded desig
nterior bent d
Texas,
esign of a n
DOT Austin
Every other
included wa
r Bridge En
n and plan d
oject consi
severe (63 d
abutment an
to prevent t
exas,
n developme
ox beams we
nstruction. T
t as an interi
foundation d
a substantia
dges for de
the details
Bridge Engi
n developme
District. Th
bring it up
beams, inte
er.
Bridge Eng
separate lo
gning a supe
design and f
oise wall al
District. Th
pilaster was
as footing an
ngineer
development
sted of des
degrees), a
nd interior be
the slab from
ent of FM
ere chosen
The project
ior bent in
design in a
al colony.
esign and
to ensure
ineer
ent for the
he project
p to HS20
erior bents
gineer
ong bridge
erstructure
foundation
long three
he project
s offset to
nd support
t of a right
signing a
20-degree
ent design
m floating
J
T
S
M
T
d
f
T
M
c
r
r
T
S
M
T
d
t
f
T
S
M
s
1
a
f
r
t
T
m
T
S
M
w
w
e
d
T
M
T
d
r
José F.
TxDOT Aus
Senior Bridg
Mr. Tejidor
TxDOT Aus
designing a
foundation d
TxDOT Aus
Mr. Tejidor s
crane destroy
replace the
reviewing be
TxDOT Aus
Senior Bridg
Mr. Tejidor
TxDOT Aus
designing a n
the ballast to
for research.
TxDOT Aus
Senior Bridg
Mr. Tejidor
specification
1930’s concr
and vehicula
for the pier e
replacement
time Project
The widened
million.
TxDOT Aus
Senior Bridg
Mr. Tejidor
widening of
widening the
extending th
design in ero
TxDOT Aus
Mr. Tejidor
TxDOT Aus
developing m
roadway and
Tejidor,
stin District
ge Engineer
served as S
stin District.
new deck, d
design.
stin District
served as Se
ying one spa
one that ca
ent shoring d
stin District
ge Engineer
served as S
stin District.
new prestres
o keep the ra
stin District
ge Engineer
r served as
ns and estim
rete arch stru
ar traffic at a
extensions, a
with a conv
Manager/C
d structure m
stin District
ge Engineer
served as S
f a continuou
e superstruc
he interior be
odible materi
stin District
served as S
stin District
metric plans
d the other fo
P.E.
t, Dessau Ro
r
Senior Bridg
. The projec
designing ne
t, Corn Hill
enior Bridge
an for the Tx
ame crashing
details, and a
t, Steck Ave
r
Senior Bridg
The project
ssed girder a
ailroad funct
t, SH 29 Ove
r
s Senior B
mates for this
ucture. The
all times dur
abutment ret
ventional sla
onstruction
maintained i
t, SH 29 Ove
r
enior Bridge
us I-beam u
cture with pr
ents for the w
ial. Estimate
t, IH 35: Ro
enior Bridge
t. The proj
s from exist
our were very
oad Over G
ge Engineer
ct encompas
ew floor bea
Underpass
Engineer re
xDOT Austi
g down on
assisting the
enue Under
ge Engineer
t consisted o
and coordina
tioning. The
er the South
Bridge Engi
s bridge wid
project cons
ring construc
taining wall
ab and prestr
Inspector du
its historic a
er San Gab
e Engineer r
unit bridge f
restressed g
widened por
ed cost of con
und Rock t
e Engineer r
ect consiste
ting English
y tall structu
Gilleland Cre
r in charge
ssed devising
ams, designi
at IH 35, Ja
esponsible fo
in District. T
IH 35, des
Contractor t
Mopac Rai
responsible
of removing
ating with th
e damaged b
h Fork of th
ineer respon
dening for th
sisted of lay
ction. It also
design on a
ressed girder
uring which
aesthetic qua
riel River, G
responsible
for the TxDO
irders, rehab
rtion, abutm
nstruction: $
o Georgetow
responsible
ed of widen
h units. Two
ures over riv
eek, Pfluger
of relocatin
g a method
ing new abu
arrell, Texa
or repair to th
The project i
signing the
to reduce de
ilroad, Aust
for the repa
the damage
e railroad co
beam was do
he San Gabr
nsible for
he TxDOT A
out developm
o required th
a sheer cliff,
r system. M
he personal
alities. Estim
Georgetown
for the desi
OT Austin D
bilitating th
ment break-ba
$1.1 million.
wn, Texas,
for the desi
ning six ma
o bridges we
vers.
rville, Texas
ng a historic
d to disassem
utments for t
as, Senior B
his bridge du
involved des
repair of th
elays.
tin, Texas,
air of this ra
ed prestresse
ompany on a
onated to the
riel River, G
the design
Austin Distr
ment, allow
he design of
f, and compl
Mr. Tejidor al
lly post-tens
mated constr
n, Texas,
ign and plan
District. The
e shoes und
ack and wid
.
Senior Brid
ign and plan
ain lane br
ere on a ho
s,
c truss bridg
mble the tru
the new loc
ridge Engin
ue to a truck
signing a ne
he damaged
ailroad bridg
ed concrete g
a method to
e University
Georgetown
, plan dev
rict. The brid
ing pedestri
f post-tension
lete deck rem
lso served a
sioned the p
ruction cost
n developme
e project co
der the I bea
dening and f
dge Enginee
n developme
ridges. This
orizontal cur
ge for the
uss bridge,
ation, and
neer
k-mounted
ew span to
columns,
ge for the
girder and
hold back
y of Texas
n, Texas,
velopment,
dge was a
an access,
ned wings
moval and
as the full-
ier wings.
was $1.1
ent for the
onsisted of
am spans,
foundation
er
ent for the
included
rve over a
J
T
M
t
s
s
T
M
b
a
T
M
1
f
o
f
T
L
M
b
t
E
T
T
t
c
T
M
c
d
w
s
d
T
D
e
T
T
l
s
José F.
TxDOT Aus
Mr. Tejidor
the TxDOT
spans on a
supported on
TxDOT Aus
Mr. Tejidor
beam bridge
aesthetic inte
TxDOT Aus
Mr. Tejidor
183 and Purp
friendly ramp
on the bottom
foundation d
TxDOT Am
Lubbock, T
Mr. Tejidor
bridge over I
the abutment
E-80 live loa
TxDOT Hou
This project
the TxDOT H
construction
TxDOT Luf
Mr. Tejidor
consisted of
deemed sens
without getti
spans were c
design were
TxDOT Tyl
Design of a
employed Ty
TxDOT Tyl
Tejidor perfo
lengths, bea
superstructur
Tejidor,
stin District
served as Se
Austin Distr
horizontal
n footings wi
stin District
served as Se
e for the Tx
erior bent wi
stin District
served as Se
ple Sage Dri
ps supported
m flanges o
design.
marillo Distr
exas, Bridg
served as B
I-27 for the T
t, abutment
ading. Estim
uston Distri
consisted of
Houston Dis
phasing, roa
fkin District
served as S
constructing
sitive by the
ing in the w
constructed f
all based on
er District,
bridge repla
ype B beam
er District.
formed all re
am layout,
re design, an
P.E.
t, US 290-Ra
enior Bridge
rict. The pro
curve, inve
ith drilled sh
t, North Lam
enior Bridge
xDOT Austin
ith bridge lig
t, US 183, A
enior Bridge
ive for the T
d on straddle
of Type IV b
rict, I-27 Atl
e Engineer
Bridge Engin
TxDOT Am
design, inte
ated constru
ict, IH 10 R
f four bridge
strict. Mr. Te
adway taper,
t, CR 256 at
Senior Bridg
g the new bri
U.S. Army
water was de
from the top
n the maximu
US 259 at U
acement con
ms to keep m
Finished br
equired desi
bent locati
nd foundation
amp E-2, A
e Engineer r
oject consist
erted-T sing
haft foundati
mar Crossov
e Engineer re
n District. T
ghting suppo
Austin, Texa
e Engineer r
TxDOT Aust
e and cantile
beams, a fen
lanta, Topek
neer respon
marillo Distric
erior bent de
uction cost w
econstructio
es, two twin
ejidor served
, superelevat
t Carrizo Ba
ge Engineer
idge from th
Corp of Eng
evised. The
p of the prev
um crane siz
UPRR, Kilg
nsisting of th
minimum cl
ridge is 83’
gn including
ions and be
n design.
ustin, Texas
responsible f
ted of design
gle-column b
ions.
ver, Austin,
esponsible f
The project
ort, and aesth
s, Senior Br
responsible f
tin District. T
evered bents,
nce enclosur
ka and Sant
sible for the
ct. The proje
esign, supers
was $350,000
on, Houston
n 2500’ U-be
d as Senior B
tion transitio
ayou, Kingt
responsible
he top down
gineers (USA
first span w
vious span. L
ze needed to
gore, Texas,
hree phases t
learance ove
wide with
g coding an
earing seats
s, Senior Br
for the desig
ning conven
bents and a
, Texas, Sen
for the desig
included de
hetic column
ridge Engin
for the desig
The project i
, the design
re on the wa
ta Fe (AT&
e design an
ect consisted
structure des
0.
n, Texas, Se
eam type an
Bridge Engi
on, and horiz
town, Texas
for the des
for the TxD
ACE) so a m
was built fro
Lengths of s
drive piles o
Senior Brid
to accommo
er the railro
sidewalks.
nd running th
s (elevation
ridge Engin
gn of an exit
ntional slab a
an inverted
nior Bridge
gn and plan d
esign of ske
ns and found
neer
gn of a pede
included the
of the walkw
alkway, sing
&SF) Railroa
d plan prep
d of designin
sign, and fou
enior Bridge
d two twin 5
ineer respon
zontal and ve
s, Senior Br
sign of a bri
DOT Lufkin D
method of co
om the appr
span, beam
off the newly
dge Enginee
odate existin
oad tracks a
As Senior B
he framing
ns), abutme
neer
t ramp on U
and prestres
-T straddle
Engineer
developmen
ewed-end bo
dation design
estrian overp
e design of w
way over the
gle column b
ad Spur,
paration for
ng an approa
undation des
e Engineer
570’ U-beam
sible for des
ertical curva
ridge Engine
idge replace
District. The
onstructing t
roach, and su
type and su
y constructe
er
ng traffic. N
after widenin
Bridge Engi
program to
nt and ben
US 290 for
sed girder
bent, all
nt of a box
ox beams,
n.
pass at US
wheelchair
e highway
bents, and
a railroad
ach slab at
sign using
m type for
sign of the
ature.
eer
ement that
e lake was
the bridge
ubsequent
ubstructure
d span.
ew bridge
ng for the
ineer, Mr.
get beam
nt design,
J
B
L
M
a
l
b
C
M
b
t
c
a
e
c
b
f
b
n
W
M
t
t
p
T
d
t
a
T
H
M
5
w
t
d
S
M
m
P
M
p
a
José F.
Bardin Road
Lead Struct
Mr. Tejidor s
airport taxiw
loading, buil
backfilled an
Creek Bend
Mr. Tejidor
bridge over W
the bridge. T
curve and ha
abutment. Th
emergency v
could suppor
beams. Mr.
frame the ex
bent/abutmen
new abutmen
William Can
Mr. Tejidor
the existing l
the large flo
prone area. T
The new brid
detour or con
the framing
abutment and
TxDOT Hou
Houston, Te
Mr. Tejidor s
5B40 and 5B
with a 26 de
to carry an a
design of a p
Sims Bayou
Mr. Tejidor
manholes for
Plate Girder
Mr. Tejidor s
plate girder
and monitore
Tejidor,
d Tunnel at
tural Engine
served as the
way tunnel/b
ldings, and a
nd overlaid w
d Bridge Ext
served as S
Williams Cr
This required
ad a sag vert
he design ha
vehicles. On
rt the increas
Tejidor perf
xisting and p
nt substructu
nt.
nnon Road
served as Se
low-water cr
od plain tha
The propose
dge was buil
nstruction ph
program to
d bent design
uston Distri
exas, Senior
served as Se
B34 boxes f
egree skew, a
additional loa
platform to c
Wastewate
served as L
r the Sims B
r Bridges, C
served as QC
bridges desi
ed details to
P.E.
t Arlington
eer
e Lead Struc
bridge. Proj
air-quality n
with the soil
tension On P
enior Bridge
reek to impro
d the lengthe
tical curve. T
ad to be phas
ne design fe
sed loads fro
formed all r
proposed sup
ure, designin
Over Onion
enior Bridge
rossing over
at had forced
d multi-span
lt adjacent to
hasing. Mr.
get beam l
n, superstruc
ict, US 90A
r Bridge Eng
enior Bridge
for the TxDO
and 96’-8” o
ad due to a 6
arry an adva
er Lines Rer
Lead Structur
Bayou Waste
Columbus, O
C Reviewer
igned for th
ensure incor
Municipal A
ctural Engine
ject features
needs. The t
and paveme
Pleasant Va
e Engineer i
ove the hydr
ening of the
The lengthen
sed to accom
ature was c
om the much
required des
perstructure
ng the new
n Creek, Au
e Engineer r
r Onion Cree
d the City to
n bridge wou
o the low-w
Tejidor perf
lengths, beam
cture design,
Burling-No
gineer
Engineer re
OT Houston
overall width
6’x 6’ concr
ance warning
routing Proj
ral Engineer
water Rerou
Ohio, QC R
for this proj
e City of Co
rporation int
Airport, Cit
eer for the de
s included
tunnel was c
ent of the run
alley Road,
in charge of
raulic openin
e existing bri
ning resulted
mmodate exis
onverting th
h longer span
ign includin
to acquire b
abutment, a
ustin, Texas
responsible i
ek on William
o buy homes
uld be much
ater crossing
formed all r
m layout, b
, and founda
orthern San
esponsible fo
n District. Th
h designed u
rete platform
g sign with h
ject, Housto
r for the des
uting Project
Reviewer
ject, which i
olumbus, Oh
to the plan s
ty of Arling
esign of a tw
multi-phase
constructed
nway.
Austin, Tex
f the design
ng and allow
idge by 110
d in an end
sting traffic,
he existing a
ns supported
ng running t
bearing seat
and foundat
s, Senior Bri
in charge of
m Cannon D
s in the area
h higher than
g enabling it
required desi
bent location
ation design.
nta Fe (BNSF
or the design
he overall le
using three p
m at the ends
handrail and
on, Texas, L
sign of nine
t.
involved rev
hio. Mr. Tej
et.
gton, Texas,
wo-span 110
ed airport d
using a brid
xas, Senior B
for the exte
w more flood
0’. The bridg
span being
including u
abutment to
d on Type IV
the framing/
ts (elevation
tion design
idge Engine
f the design
Drive. The ne
a and move
n the existin
t to be const
ign includin
ns and beari
.
F) Railroad
n of this box
ength of this
phases. Two
s. In addition
d control box
Lead Struct
e half-foot-d
viewing and
jidor issued
00’-wide cut
development
dge structure
Bridge Eng
ension of th
d waters to f
ge was in a h
acutely skew
uninterrupted
o an interior
V prestressed
/geometry pr
ns), designing
for the new
eer
for a replac
ew bridge ha
them out of
ng low-water
tructed witho
ng coding an
ing seats (el
d Overpass,
x beam struc
s structure w
o bents were
n, the projec
x.
tural Engine
diameter, 50-
analyzing tw
corrective c
and cover
, airplane
e that was
gineer
he existing
flow under
horizontal
wed at the
d access to
r bent that
d concrete
rogram to
g the new
w bent and
cement for
ad to span
f the flood
r crossing.
out a road
nd running
levations),
ture using
was 1135’,
e designed
t included
eer
-foot-deep
wo curved
comments
J
H
T
c
o
a
(
T
T
r
p
b
d
C
T
T
J
T
r
(
I
M
t
c
F
M
o
s
3
M
K
2
c
A
M
m
m
U
M
u
José F.
Harkey Roa
This project
concrete pile
on both side
and running
(elevations),
Tuckerton R
This bridge r
raised curb o
performed al
beam layout
design, and f
Cedar Break
This project
Type VI Mo
J beam at the
T girders. A
running the
(elevations),
I-95 Braided
Mr. Tejidor
thoroughfare
curved girde
Florida Tur
Mr. Tejidor
over Bird R
superstructur
30th Avenue
Mr. Tejidor
Kearny, Neb
210-meter st
cast, prestres
Avenue M/N
Mr. Tejidor s
meters total
materials we
US 95 Over
Mr. Tejidor
utilizing LRF
Tejidor,
ad and McL
consisted o
e foundations
es. As Senio
the framing
abutment an
Road Bridge
replacement
on other sid
ll required d
t, bent locat
foundation d
ks Bridge, W
involved a 1
od to accom
e request of
As Senior Br
framing pr
abutment an
d Connector
served as
e bridge in M
rs, interior b
rnpike, Miam
served as th
Road, Kenda
re widening,
e Project, K
served as t
braska utilizi
tructure (lon
ssed bulb-T g
N, Kearny, N
served as Br
length, whic
ere pre-cast, p
Bellgrove C
served as
FD design. A
P.E.
Lean Road B
of three span
s, abutments
or Bridge En
g program t
nd bent desig
es, Harris C
t project con
de, and 18”
design inclu
tions and be
design.
Williamson
1350.25’-lon
mmodate a 3
the Contract
idge Engine
rogram to g
nd bent desig
r, Miami, F
the Bridge
Miami, Flor
bent widenin
mi, Florida,
he Bridge En
ll and Mille
, widening o
Kearny, Neb
the Bridge E
ing Load an
ngest span w
girders.
Nebraska, B
ridge Engine
ch were desi
prestressed b
Creek, Bellg
Bridge Eng
Also include
Bridges, Pea
n slab beam
s designed as
ngineer, Mr.
to get beam
gn, superstru
County, Tex
nsisted of thr
concrete pil
ding coding
earing seats
County, Te
ng structure,
0” water lin
tor and addit
eer, Mr. Teji
get beam le
gn, superstru
Florida, Brid
Engineer re
rida. The pro
ng, and abutm
, Bridge En
ngineer respo
er Road in
of the inverte
braska, Brid
Engineer res
nd Resistance
was 44 meter
Bridge Engi
eer for this p
igned utilizin
bulb-T girde
grove, Idaho
gineer for th
d was LRFD
arland, Texa
bridges wit
s interior ben
Tejidor per
lengths, be
ucture design
xas, Senior B
ree-span Sla
le foundatio
g and runnin
(elevations
exas, Senior
which was o
ne. The Typ
tional design
idor perform
engths, beam
ucture design
dge Enginee
esponsible f
oject involv
ment widenin
gineer
onsible for v
Miami, Flor
ed-T caps, an
dge Enginee
sponsible fo
e Factor De
rs). The brid
ineer
project, whic
ng LRFD. T
ers.
o, Bridge En
his project,
D design of t
as, Senior B
th 18 and 1
nts for futur
rformed all
eam layout,
n, and found
Bridge Engi
ab Beam Bri
ons. As Seni
ng the frami
s), abutment
r Bridge Eng
originally de
pe VI Mod
n funded by
med all requ
m layout, b
n, and found
er
for the desi
ved widening
ng.
verifying an
rida. The pr
nd the abutm
er
or the design
sign (LRFD
dges were ne
ch included 1
The longest s
ngineer
which invo
the bridge de
Bridge Engin
5 degree sk
re bridge ext
required des
bent locatio
dation design
ineer
idges, a side
ior Bridge E
ng program
t and bent d
gineer
esigned with
was replace
the Contrac
uired design
bent location
dation design
ign of the w
g the supers
nd designing
roject consi
ment widenin
n of the 30
D). The proje
ew construct
10 spans of n
span was 44
olved twin
eck overhang
neer
kew, respecti
tension, and
sign includin
ons and bea
n.
ewalk on one
Engineer, M
m to get beam
design, supe
h Type IV be
ed after letti
ctor. J beams
including co
ns and bear
n.
widening of
structure wit
the bridge w
sted of desi
ng.
0th Avenue
ect involved
tion and incl
new constru
4 meters. Co
17.924-mete
g.
ively, 18”
sidewalks
ng coding
aring seats
e side and
Mr. Tejidor
m lengths,
erstructure
eams, then
ng with a
s are bulb-
oding and
ring seats
f a major
th parallel
widenings
igning the
Bridge in
d a 5-span,
luded pre-
uction, 420
nstruction
er bridges

More Related Content

What's hot

Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceAlfred Celestain
 
Joel Cummings Resume
Joel Cummings ResumeJoel Cummings Resume
Joel Cummings ResumeJoel Cummings
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovArmen Miskarov
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project listAhmad Mousa
 
SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016John Tinucci
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2Brian Levitt
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad Mousa
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resumeZade Couch
 

What's hot (11)

Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_Refernce
 
JAIME_TOVAR
JAIME_TOVARJAIME_TOVAR
JAIME_TOVAR
 
Joel Cummings Resume
Joel Cummings ResumeJoel Cummings Resume
Joel Cummings Resume
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen Miskarov
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
Senior Subsea Pipeline Engineer
Senior Subsea Pipeline EngineerSenior Subsea Pipeline Engineer
Senior Subsea Pipeline Engineer
 
Christopher CV 2015
Christopher CV 2015Christopher CV 2015
Christopher CV 2015
 
SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016SRKUS_Tinucci_Resume_Jan2016
SRKUS_Tinucci_Resume_Jan2016
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedin
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 

Similar to Tejidor, Resume

Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford ResumeDustin Crawford
 
Michael Foster 2016 sm
Michael Foster 2016 smMichael Foster 2016 sm
Michael Foster 2016 smmike foster
 
Civil Structural Resume12-06-14
Civil Structural Resume12-06-14Civil Structural Resume12-06-14
Civil Structural Resume12-06-14John Roberts
 
CV for Bob Gao 11.2014
CV for Bob Gao 11.2014CV for Bob Gao 11.2014
CV for Bob Gao 11.2014Bob Gao
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technicalBrendan O'Connor
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalBrendan O'Connor
 
Hemraj Parate_Project Engineer
Hemraj Parate_Project EngineerHemraj Parate_Project Engineer
Hemraj Parate_Project EngineerHemraj Parate
 
POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016Povilas Mackevičius
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignTimothy Fitch
 

Similar to Tejidor, Resume (20)

Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford Resume
 
Resume
ResumeResume
Resume
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
New Resume 5-09-14
New Resume 5-09-14New Resume 5-09-14
New Resume 5-09-14
 
Michael Foster 2016 sm
Michael Foster 2016 smMichael Foster 2016 sm
Michael Foster 2016 sm
 
Resume-16-3D
Resume-16-3DResume-16-3D
Resume-16-3D
 
Civil Structural Resume12-06-14
Civil Structural Resume12-06-14Civil Structural Resume12-06-14
Civil Structural Resume12-06-14
 
CV for Bob Gao 11.2014
CV for Bob Gao 11.2014CV for Bob Gao 11.2014
CV for Bob Gao 11.2014
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
 
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposalSouthland colonial pedestrianoverpass_tre0003-g_technicalproposal
Southland colonial pedestrianoverpass_tre0003-g_technicalproposal
 
Hemraj Parate_Project Engineer
Hemraj Parate_Project EngineerHemraj Parate_Project Engineer
Hemraj Parate_Project Engineer
 
POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016POVILAS MACKEVICIUS_Portfolio_2016
POVILAS MACKEVICIUS_Portfolio_2016
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech Design
 
AroResume(SK)
AroResume(SK)AroResume(SK)
AroResume(SK)
 
NA
NANA
NA
 
FNK rev 06.08.15
FNK rev 06.08.15FNK rev 06.08.15
FNK rev 06.08.15
 

Tejidor, Resume

  • 1. J S B U P J e t s a G P 5 M c r i e T I T S M o L S D M o L M p f D M b b b b f JOSÉ F. Senior Brid Bachelor of S University of Professional José Tejidor experience in the lead on substructure application o Girder Desig Plate Girder 51) and Fram Mr. Tejidor completing p remaining 1 ntimately fa engineering Tyler and Lu Indiana. In a Texas Tollw Senior Bridg Mr. Tejidor p of all bridge Loop 45 desi SH 121 Desi Dallas, Texa Mr. Tejidor overpasses/u LBJ Freewa Mr. Tejidor project in Da for in-field c DFW Conne Mr. Tejidor build propos bridge struct bridge geom bridge design field changes TEJIDO dge Projec Science in C f Texas at A Engineer, S r is a Senior n the planni complicate and foundat of computer gn (Pstr 14) Design/Ana me Analysis worked m projects thro 0 years as familiar with on bridge d ubbock Dist ddition to En way Authori ge Engineer provided con e girders and ign-build tol ign-Build Pr as, Senior B was respon underpasses a ay Design-B was respons allas, Texas. onstruction ector Design served as th sal as well a tures (1-45 a metry progra ns included i s, out-of-tole OR, P.E. ct Manager Civil Enginee Austin State of TX, # r Bridge Pro ng and desig ed designs. tion design, design prog ), PGSuper, alysis (Merl (Frame 11, S more than 1 oughout Texa the TxDOT h TxDOT's design proje tricts, and h nglish, Mr. T ity (TTA), L r nstruction su d design of r ll road projec roject: Betw Bridge Engin nsible for th and intercha Build Projec sible for the Additionally issues. n-Build Pro he Senior Bri as for the de and 1-47, and am BGS (tra in the projec erance const r / Designe ering (Struct #63797 (198 oject Manag gn of bridge His technic retaining wa grams that in Bent Cap A lin-Dash, MD Strudl). 3 years wit as. The first T Austin Di procedures ects for TxD as designed Tejidor is flu Loop 45 Des upport and w remedial sol ct in Austin, ween Dallas neer he bridge p anges to quan t, Dallas, Te e design of o y, he assiste oject, Tende idge Engine sign and dev d 1-45 Revi aining and e ct, and provi truction issue r tural) (1982) 88) ger and Lead e structures. cal experien alls, and rela nclude Road Analysis (CA DX), Colum th the Texa three years strict Bridg s and prefer DOT’s Hous bridges for uent in Span sign-Build P was responsi lutions to ou , Texas. North Toll portion of th ntify the win exas, Senior one of the lo d in reviewi er, Dallas/Fo er in the pre velopment o sed). Additio execution), ded on-call c es). ) d Structural He supervis nce includes ated structure dway Design AP 18), Co mn Design/A as Departm were spent ge Engineer. rences. He ston, Waco, r the DOT’s nish. Project, Aus ible for verif ut-of-toleran lway (DNT) he proposal nning BOQ. r Bridge En ongest bridg ing and prov ort Worth, T eliminary pla of plans, spe onally, he as as Quality C construction l Engineer w ses bridge d s bridge lay es. Mr. Tejid n System (RD ontinuous Be Analysis (PIE ment of Tran with the Bri This exper has also w Dallas, Pha of Florida, stin, Texas, fying and co nce construc ) and US 75 l, and prelim ngineer ge structures viding structu Texas, Seni anning and d ecifications a ssisted with Control (QC n support (sh with over 32 design projec youts, super dor is profic DS/BGS), P eam Analys ER, PCA2, nsportation idge Divisio rience has m worked in c arr, Lufkin, Idaho, Neb orrecting bea ction problem Tender, minary desi s for this de ural recomm ior Bridge E design for th and estimate the preferre C) reviewer hop plan revi 2 years of cts, taking rstructure, ient in the Prestressed is (B-30), BM-COL (TxDOT) on, and the made him consulting Amarillo, braska and aring seats ms for the gn of the sign-build mendations Engineer he design- es for two ed TxDOT for other iew, RFIs,
  • 2. J N S M b L M b I M b T M t T c w T M T t c H 2 M s T         José F. North Tarra Senior Bridg Mr. Tejidor s build propos LBJ Freewa Mr. Tejidor s build propos I-35 East De Mr. Tejidor build propos TxDOT Aus Mr. Tejidor to an interch The project i connectors to width). Desig TxDOT Hou Mr. Tejidor TxDOT Hou tapering slab construction Harris Coun 2B and 2C H Mr. Tejidor specification Texas. The b  Mason C  Franz Ro  Morton R  Keith Ha  Beckend  FM 529 O  Longenb  West Roa Tejidor, ant Express ge Engineer served as the al for the NT ay Design-B served as the al for the LB esign-Build served as S al for I-35E stin District served as Se hange under involved fiv o existing br gn was comp uston Distri served as Br uston Distric b, offset ben cost was $1 nty Toll Roa Harris Coun r served as ns and estima bridges inclu Creek Overpa oad Overpass Road Overpa arrow Road O orf Road Ov Overpass No augh Road O ad Overpass P.E. s (NTE) Des r e Senior Bri TE in Dallas Build Projec e Senior Bri BJ Freeway i Project - Te Senior Bridg in Dallas, T t / TTA, Art enior Bridge construction ve additional ridges (863’ pleted in 200 ict, I-610 / U ridge Engine ct. The proje nts, abutmen .2 million. ad Authorit nty, Texas, S s Senior B ates for 16 b uded: ass Northbou s Northboun ass Northbou Overpass No verpass Nort orthbound an Overpass No s Northbound sign-Build P idge Enginee s, Texas. t, Dallas, Te idge Enginee in Dallas, Te ender Dalla ge Engineer Texas. terial C, Au e Engineer re n on the Art l bridges, tw EB and 12 06. US 59 Multi- eer for the d ect encompas nts, and deep ty (HCTRA Senior Brid Bridge Engi bridges for th und and Sou nd and South und and Sou orthbound an thbound and nd Southbou orthbound an d and Southb Project – Te er for the pre exas, Senior er for the pre exas. as, Texas, Se for the prel ustin, Texas, esponsible f terial C proj wo frontage r 46’ WB), an -Level Conn design of the ssed designi p drilled sha ), Grand Pa dge Enginee ineer respon he Grand Pa uthbound hbound uthbound nd Southbou Southbound und (plate gir nd Southbou bound (curv ender, Dalla eliminary pl r Bridge En eliminary pl enior Bridg liminary plan , Senior Bri for all design ect for the T road bridges nd one overp nector, Hou e widening o ing plate gir aft foundatio arkway (SH er nsible for arkway (SH und d rder superstr und ved steel plat as, Texas, lanning and ngineer lanning and ge Engineer anning and d idge Engine n work relat TxDOT Aus s (1392’ EB pass (260’ l uston, Texas of a multi-le rders and pre ons in very H 99), Segme the design 99) Segmen ructure) te girder sup design for th design for th design for th eer ted to a Chan stin District and 1557’ ength by 14 s, Bridge En evel connect estressed gir weak soil. ent E, Sectio , plan dev nt E in Harri erstructure) he design- he design- he design- nge Order and TTA. WB), two 45’ overall ngineer tor for the rders for a Estimated on 2A, velopment, is County,
  • 3. J T B M e i i w T M n d g d N & M t w P c T M T g t w T M e g s w a T M a w t m a José F. TxDOT Hou Bridge Engi Mr. Tejidor engineers wo nvolved the nverted-T b was $1.5 mil TxDOT Aus Mr. Tejidor s new bridge o design of ho girders to sp drilled shafts North Texas & Southbou Mr. Tejidor the NTTA P widths. The PGL being completed in TxDOT Aus Mr. Tejidor TxDOT Aus geometric la transition, ho was $750,00 TxDOT Aus Mr. Tejidor east frontage girders, allow substructure water off the and web wal TxDOT Aus Mr. Tejidor and I beam u worn out dec the structura modifying th analyzed the Tejidor, uston Distri ineer served as B orking on th design of th ents, steel b llion. stin District served as Se over Inks La orizontally cu pan the mai s, and founda s Tollway A und Main L served as Se PGBT toll fa bridges inco referenced t n 2007. stin District served as S stin District ayout. The p orizontal and 0. stin District served as Se e road for the wing the ski and founda e bridge and lls and found stin District served as Se unit reconstr ck and old H al adequacy he bents so existing dec P.E. ict, I-610 / U Bridge Engin he Authorize he prestresse box straddle t, SH 29 Ink enior Bridge ake for the T urved appro n river chan ation design Authority (N anes Over M enior Bridge acility. The b orporated aes to a vertica t, RM 165 O enior Bridge t. The proje proposed br d vertical cur t, IH 35 Fro enior Bridge e TxDOT Au pping of eve ation costs. T into a hazar dation design t, IH 35 Ove enior Bridge ruction for th HS-15 I-beam of the inter prestressed ck and beam US 59 Autho neer respon d Vehicle L ed girders an bent, abutm ks Lake Brid Engineer re TxDOT Aus oach spans u nnel, aesthe n. Estimated NTTA) / Pre Miller Road e Engineer r bridges were sthetic colum al and horiz Over Blanco e Engineer r ect consiste ridge alignm rves, and req ntage Road e Engineer r ustin Distric ery other be The project rdous materi n. Estimated er Blanco R e Engineer in he TxDOT A m units with rior and abu girders cou ms to assure t orized Vehic sible for the Lane Bridge nd plate girde ments, and fo dge, Texas, esponsible fo stin District using prestre tic hollow c construction esident Geor d Dallas, Tex esponsible f e three-span mns and ben zontal curve o River, Blan responsible ed of design ment had a quired web w d Bridge, Ge responsible f ct. The proje nt on the ad also require ial trap, the d construction River, San M n charge of Austin Distri h a new dec utment bents ld be placed that a specifi cle Lane Br e design, an for the TxD ers of the sup oundation de Senior Brid or the design . The projec essed beams, columns sup n cost was $6 rge Bush Tu xas, Senior for the desig n, type IV be nts. Complex baseline b nco, Texas, for the desi ning a conv severe skew walls in the eorgetown, for the desig ct consisted djacent IH 35 ed designing design of ve n cost was $ Marcos, Texa design and p ict. The proj ck supported s for the inc d on them. D ic crane coul ridge, Houst nd for assig DOT Houston perstructure esign. Estima dge Enginee n and develo ct consisted , design of w pported by 6.2 million. urnpike (PG Bridge Eng gn of two rep eam structur x geometry w etween the Senior Brid ign and plan ventional br w of 55 de river. Estim Texas, Seni gn of a long of using typ 5 main lane g a drainage ery tall bent $1.5 million. as, Senior B plan product ect consisted d on prestres crease in de During cons ld operate on ton, Texas, gning design n District. T in a horizon ated constru er opment of PS of layout re weathering s a floating f GBT), North gineer placement b res with tap was augmen bridges. De dge Enginee n developme ridge for a egrees, supe mated constru ior Bridge E river crossi pe VI mod p bridge, thus e system to ts requiring t Bridge Engin tion for a br d of replacin ssed girders, sign load (D struction, M n the superst n work, to he project ntal curve, uction cost S&E for a efinement, steel plate footing on hbound bridges for ering slab nted by the esign was er ent for the a complex erelevation uction cost Engineer ng for the prestressed s reducing carry the tie beams, neer ridge deck ng a badly verifying D.L.), and Mr. Tejidor tructure.
  • 4. J T S M 9 f i c h E N M c i T M w c l w T M s o d T S M s c h b T M f s h w d José F. TxDOT Aus Senior Bridg Mr. Tejidor 971 over Op for this proje ncluded ero case the eros highly erodi Estimated co NTTA, FM Mr. Tejidor constructabil ncorporation TxDOT Aus Mr. Tejidor widening of consisted of loading. It a with tie beam TxDOT Aus Mr. Tejidor structures ov on a horizon design in var TxDOT Aus Senior Bridg Mr. Tejidor separate sect consisted of hide it from beam design TxDOT Aus Mr. Tejidor frontage tur superstructur horizontal cu with web wa during a seve Tejidor, stin District ge Engineer served as S ossum Creek ect because t sion abatem sion abateme ble location onstruction c 2818 and R r served as lity issues. n into the pla stin District served as S f a plate gir f retrofitting lso included ms and web w stin District served as S ver Brushy C ntal curve wi riable soil co stin District ge Engineer served as S tions of the designing u the front of in variable stin District served as Se rnout bridge re that had urve and extr alls and fou ere flood. Es P.E. t, FM 971 O r Senior Bridg k in William the road was ent measure ent did not w n. The proje cost was $30 Ramp C, Dal QC Revie Mr. Tejidor an set. t, FM 969 O enior Bridge rder bridge the existing d deck repla walls, abutm t, Parmer L Senior Bridg Creek for the ith a superel onditions. t, Parmer L r Senior Bridg Parmer Lan unreinforced f the wall to soil conditio t, Loop 360 enior Bridge e for the variable ske reme cross s undation desi stimated con Over Opossu e Engineer r mson County s to be close es around one work and the ct turned ou 0,000. llas, Texas, ewer respon r issued cor Over Colorad e Engineer r that has cov g plate girde acement, wid ment widenin ane (FM 73 ge Engineer e TxDOT Au levation tran ane (FM 73 ge Engineer ne (FM 734 masonry w reduce the p ons. at RM 2222 e Engineer re TxDOT Au ews of mod slope of .09 f ign, and a s nstruction co um Creek, W responsible y for the TxD d and box b e abutment, e bridge had ut to be bat QC Review nsible for th rrective com do River, B responsible ver plates f ers with add dening of th ng, and found 34) Bridges, responsible ustin Distric nsition, abutm 34) Noise W responsible 4) highway walls between picket fence 2, Austin, T esponsible fo ustin Distric derate (32 d ft/ft. Also in slab hold-do st was $170 Williamson for the desi DOT Austin beams provid designing th d to be length t-friendly an wer he review mments and Bastrop, Tex for the desi for the TxD ditional cov he bridge wi dation desig Austin, Tex e for the des ct. Project in ment and in Wall, Austin, e for the de for the TxD n pilasters. E look. Also exas, Senior or the design ct. The pro degrees) to s ncluded was own system ,000. County, Te ign and plan District. Bo de quick con hat abutment hened, and f nd now has of two brid monitored xas, Senior B ign and plan DOT Austin ver plates to th Type IV gn in the rive xas, Senior sign of two ncluded desig nterior bent d Texas, esign of a n DOT Austin Every other included wa r Bridge En n and plan d oject consi severe (63 d abutment an to prevent t exas, n developme ox beams we nstruction. T t as an interi foundation d a substantia dges for de the details Bridge Engi n developme District. Th bring it up beams, inte er. Bridge Eng separate lo gning a supe design and f oise wall al District. Th pilaster was as footing an ngineer development sted of des degrees), a nd interior be the slab from ent of FM ere chosen The project ior bent in design in a al colony. esign and to ensure ineer ent for the he project p to HS20 erior bents gineer ong bridge erstructure foundation long three he project s offset to nd support t of a right signing a 20-degree ent design m floating
  • 5. J T S M T d f T M c r r T S M T d t f T S M s 1 a f r t T m T S M w w e d T M T d r José F. TxDOT Aus Senior Bridg Mr. Tejidor TxDOT Aus designing a foundation d TxDOT Aus Mr. Tejidor s crane destroy replace the reviewing be TxDOT Aus Senior Bridg Mr. Tejidor TxDOT Aus designing a n the ballast to for research. TxDOT Aus Senior Bridg Mr. Tejidor specification 1930’s concr and vehicula for the pier e replacement time Project The widened million. TxDOT Aus Senior Bridg Mr. Tejidor widening of widening the extending th design in ero TxDOT Aus Mr. Tejidor TxDOT Aus developing m roadway and Tejidor, stin District ge Engineer served as S stin District. new deck, d design. stin District served as Se ying one spa one that ca ent shoring d stin District ge Engineer served as S stin District. new prestres o keep the ra stin District ge Engineer r served as ns and estim rete arch stru ar traffic at a extensions, a with a conv Manager/C d structure m stin District ge Engineer served as S f a continuou e superstruc he interior be odible materi stin District served as S stin District metric plans d the other fo P.E. t, Dessau Ro r Senior Bridg . The projec designing ne t, Corn Hill enior Bridge an for the Tx ame crashing details, and a t, Steck Ave r Senior Bridg The project ssed girder a ailroad funct t, SH 29 Ove r s Senior B mates for this ucture. The all times dur abutment ret ventional sla onstruction maintained i t, SH 29 Ove r enior Bridge us I-beam u cture with pr ents for the w ial. Estimate t, IH 35: Ro enior Bridge t. The proj s from exist our were very oad Over G ge Engineer ct encompas ew floor bea Underpass Engineer re xDOT Austi g down on assisting the enue Under ge Engineer t consisted o and coordina tioning. The er the South Bridge Engi s bridge wid project cons ring construc taining wall ab and prestr Inspector du its historic a er San Gab e Engineer r unit bridge f restressed g widened por ed cost of con und Rock t e Engineer r ect consiste ting English y tall structu Gilleland Cre r in charge ssed devising ams, designi at IH 35, Ja esponsible fo in District. T IH 35, des Contractor t Mopac Rai responsible of removing ating with th e damaged b h Fork of th ineer respon dening for th sisted of lay ction. It also design on a ressed girder uring which aesthetic qua riel River, G responsible for the TxDO irders, rehab rtion, abutm nstruction: $ o Georgetow responsible ed of widen h units. Two ures over riv eek, Pfluger of relocatin g a method ing new abu arrell, Texa or repair to th The project i signing the to reduce de ilroad, Aust for the repa the damage e railroad co beam was do he San Gabr nsible for he TxDOT A out developm o required th a sheer cliff, r system. M he personal alities. Estim Georgetown for the desi OT Austin D bilitating th ment break-ba $1.1 million. wn, Texas, for the desi ning six ma o bridges we vers. rville, Texas ng a historic d to disassem utments for t as, Senior B his bridge du involved des repair of th elays. tin, Texas, air of this ra ed prestresse ompany on a onated to the riel River, G the design Austin Distr ment, allow he design of f, and compl Mr. Tejidor al lly post-tens mated constr n, Texas, ign and plan District. The e shoes und ack and wid . Senior Brid ign and plan ain lane br ere on a ho s, c truss bridg mble the tru the new loc ridge Engin ue to a truck signing a ne he damaged ailroad bridg ed concrete g a method to e University Georgetown , plan dev rict. The brid ing pedestri f post-tension lete deck rem lso served a sioned the p ruction cost n developme e project co der the I bea dening and f dge Enginee n developme ridges. This orizontal cur ge for the uss bridge, ation, and neer k-mounted ew span to columns, ge for the girder and hold back y of Texas n, Texas, velopment, dge was a an access, ned wings moval and as the full- ier wings. was $1.1 ent for the onsisted of am spans, foundation er ent for the included rve over a
  • 6. J T M t s s T M b a T M 1 f o f T L M b t E T T t c T M c d w s d T D e T T l s José F. TxDOT Aus Mr. Tejidor the TxDOT spans on a supported on TxDOT Aus Mr. Tejidor beam bridge aesthetic inte TxDOT Aus Mr. Tejidor 183 and Purp friendly ramp on the bottom foundation d TxDOT Am Lubbock, T Mr. Tejidor bridge over I the abutment E-80 live loa TxDOT Hou This project the TxDOT H construction TxDOT Luf Mr. Tejidor consisted of deemed sens without getti spans were c design were TxDOT Tyl Design of a employed Ty TxDOT Tyl Tejidor perfo lengths, bea superstructur Tejidor, stin District served as Se Austin Distr horizontal n footings wi stin District served as Se e for the Tx erior bent wi stin District served as Se ple Sage Dri ps supported m flanges o design. marillo Distr exas, Bridg served as B I-27 for the T t, abutment ading. Estim uston Distri consisted of Houston Dis phasing, roa fkin District served as S constructing sitive by the ing in the w constructed f all based on er District, bridge repla ype B beam er District. formed all re am layout, re design, an P.E. t, US 290-Ra enior Bridge rict. The pro curve, inve ith drilled sh t, North Lam enior Bridge xDOT Austin ith bridge lig t, US 183, A enior Bridge ive for the T d on straddle of Type IV b rict, I-27 Atl e Engineer Bridge Engin TxDOT Am design, inte ated constru ict, IH 10 R f four bridge strict. Mr. Te adway taper, t, CR 256 at Senior Bridg g the new bri U.S. Army water was de from the top n the maximu US 259 at U acement con ms to keep m Finished br equired desi bent locati nd foundation amp E-2, A e Engineer r oject consist erted-T sing haft foundati mar Crossov e Engineer re n District. T ghting suppo Austin, Texa e Engineer r TxDOT Aust e and cantile beams, a fen lanta, Topek neer respon marillo Distric erior bent de uction cost w econstructio es, two twin ejidor served , superelevat t Carrizo Ba ge Engineer idge from th Corp of Eng evised. The p of the prev um crane siz UPRR, Kilg nsisting of th minimum cl ridge is 83’ gn including ions and be n design. ustin, Texas responsible f ted of design gle-column b ions. ver, Austin, esponsible f The project ort, and aesth s, Senior Br responsible f tin District. T evered bents, nce enclosur ka and Sant sible for the ct. The proje esign, supers was $350,000 on, Houston n 2500’ U-be d as Senior B tion transitio ayou, Kingt responsible he top down gineers (USA first span w vious span. L ze needed to gore, Texas, hree phases t learance ove wide with g coding an earing seats s, Senior Br for the desig ning conven bents and a , Texas, Sen for the desig included de hetic column ridge Engin for the desig The project i , the design re on the wa ta Fe (AT& e design an ect consisted structure des 0. n, Texas, Se eam type an Bridge Engi on, and horiz town, Texas for the des for the TxD ACE) so a m was built fro Lengths of s drive piles o Senior Brid to accommo er the railro sidewalks. nd running th s (elevation ridge Engin gn of an exit ntional slab a an inverted nior Bridge gn and plan d esign of ske ns and found neer gn of a pede included the of the walkw alkway, sing &SF) Railroa d plan prep d of designin sign, and fou enior Bridge d two twin 5 ineer respon zontal and ve s, Senior Br sign of a bri DOT Lufkin D method of co om the appr span, beam off the newly dge Enginee odate existin oad tracks a As Senior B he framing ns), abutme neer t ramp on U and prestres -T straddle Engineer developmen ewed-end bo dation design estrian overp e design of w way over the gle column b ad Spur, paration for ng an approa undation des e Engineer 570’ U-beam sible for des ertical curva ridge Engine idge replace District. The onstructing t roach, and su type and su y constructe er ng traffic. N after widenin Bridge Engi program to nt and ben US 290 for sed girder bent, all nt of a box ox beams, n. pass at US wheelchair e highway bents, and a railroad ach slab at sign using m type for sign of the ature. eer ement that e lake was the bridge ubsequent ubstructure d span. ew bridge ng for the ineer, Mr. get beam nt design,
  • 7. J B L M a l b C M b t c a e c b f b n W M t t p T d t a T H M 5 w t d S M m P M p a José F. Bardin Road Lead Struct Mr. Tejidor s airport taxiw loading, buil backfilled an Creek Bend Mr. Tejidor bridge over W the bridge. T curve and ha abutment. Th emergency v could suppor beams. Mr. frame the ex bent/abutmen new abutmen William Can Mr. Tejidor the existing l the large flo prone area. T The new brid detour or con the framing abutment and TxDOT Hou Houston, Te Mr. Tejidor s 5B40 and 5B with a 26 de to carry an a design of a p Sims Bayou Mr. Tejidor manholes for Plate Girder Mr. Tejidor s plate girder and monitore Tejidor, d Tunnel at tural Engine served as the way tunnel/b ldings, and a nd overlaid w d Bridge Ext served as S Williams Cr This required ad a sag vert he design ha vehicles. On rt the increas Tejidor perf xisting and p nt substructu nt. nnon Road served as Se low-water cr od plain tha The propose dge was buil nstruction ph program to d bent design uston Distri exas, Senior served as Se B34 boxes f egree skew, a additional loa platform to c Wastewate served as L r the Sims B r Bridges, C served as QC bridges desi ed details to P.E. t Arlington eer e Lead Struc bridge. Proj air-quality n with the soil tension On P enior Bridge reek to impro d the lengthe tical curve. T ad to be phas ne design fe sed loads fro formed all r proposed sup ure, designin Over Onion enior Bridge rossing over at had forced d multi-span lt adjacent to hasing. Mr. get beam l n, superstruc ict, US 90A r Bridge Eng enior Bridge for the TxDO and 96’-8” o ad due to a 6 arry an adva er Lines Rer Lead Structur Bayou Waste Columbus, O C Reviewer igned for th ensure incor Municipal A ctural Engine ject features needs. The t and paveme Pleasant Va e Engineer i ove the hydr ening of the The lengthen sed to accom ature was c om the much required des perstructure ng the new n Creek, Au e Engineer r r Onion Cree d the City to n bridge wou o the low-w Tejidor perf lengths, beam cture design, Burling-No gineer Engineer re OT Houston overall width 6’x 6’ concr ance warning routing Proj ral Engineer water Rerou Ohio, QC R for this proj e City of Co rporation int Airport, Cit eer for the de s included tunnel was c ent of the run alley Road, in charge of raulic openin e existing bri ning resulted mmodate exis onverting th h longer span ign includin to acquire b abutment, a ustin, Texas responsible i ek on William o buy homes uld be much ater crossing formed all r m layout, b , and founda orthern San esponsible fo n District. Th h designed u rete platform g sign with h ject, Housto r for the des uting Project Reviewer ject, which i olumbus, Oh to the plan s ty of Arling esign of a tw multi-phase constructed nway. Austin, Tex f the design ng and allow idge by 110 d in an end sting traffic, he existing a ns supported ng running t bearing seat and foundat s, Senior Bri in charge of m Cannon D s in the area h higher than g enabling it required desi bent location ation design. nta Fe (BNSF or the design he overall le using three p m at the ends handrail and on, Texas, L sign of nine t. involved rev hio. Mr. Tej et. gton, Texas, wo-span 110 ed airport d using a brid xas, Senior B for the exte w more flood 0’. The bridg span being including u abutment to d on Type IV the framing/ ts (elevation tion design idge Engine f the design Drive. The ne a and move n the existin t to be const ign includin ns and beari . F) Railroad n of this box ength of this phases. Two s. In addition d control box Lead Struct e half-foot-d viewing and jidor issued 00’-wide cut development dge structure Bridge Eng ension of th d waters to f ge was in a h acutely skew uninterrupted o an interior V prestressed /geometry pr ns), designing for the new eer for a replac ew bridge ha them out of ng low-water tructed witho ng coding an ing seats (el d Overpass, x beam struc s structure w o bents were n, the projec x. tural Engine diameter, 50- analyzing tw corrective c and cover , airplane e that was gineer he existing flow under horizontal wed at the d access to r bent that d concrete rogram to g the new w bent and cement for ad to span f the flood r crossing. out a road nd running levations), ture using was 1135’, e designed t included eer -foot-deep wo curved comments
  • 8. J H T c o a ( T T r p b d C T T J T r ( I M t c F M o s 3 M K 2 c A M m m U M u José F. Harkey Roa This project concrete pile on both side and running (elevations), Tuckerton R This bridge r raised curb o performed al beam layout design, and f Cedar Break This project Type VI Mo J beam at the T girders. A running the (elevations), I-95 Braided Mr. Tejidor thoroughfare curved girde Florida Tur Mr. Tejidor over Bird R superstructur 30th Avenue Mr. Tejidor Kearny, Neb 210-meter st cast, prestres Avenue M/N Mr. Tejidor s meters total materials we US 95 Over Mr. Tejidor utilizing LRF Tejidor, ad and McL consisted o e foundations es. As Senio the framing abutment an Road Bridge replacement on other sid ll required d t, bent locat foundation d ks Bridge, W involved a 1 od to accom e request of As Senior Br framing pr abutment an d Connector served as e bridge in M rs, interior b rnpike, Miam served as th Road, Kenda re widening, e Project, K served as t braska utilizi tructure (lon ssed bulb-T g N, Kearny, N served as Br length, whic ere pre-cast, p Bellgrove C served as FD design. A P.E. Lean Road B of three span s, abutments or Bridge En g program t nd bent desig es, Harris C t project con de, and 18” design inclu tions and be design. Williamson 1350.25’-lon mmodate a 3 the Contract idge Engine rogram to g nd bent desig r, Miami, F the Bridge Miami, Flor bent widenin mi, Florida, he Bridge En ll and Mille , widening o Kearny, Neb the Bridge E ing Load an ngest span w girders. Nebraska, B ridge Engine ch were desi prestressed b Creek, Bellg Bridge Eng Also include Bridges, Pea n slab beam s designed as ngineer, Mr. to get beam gn, superstru County, Tex nsisted of thr concrete pil ding coding earing seats County, Te ng structure, 0” water lin tor and addit eer, Mr. Teji get beam le gn, superstru Florida, Brid Engineer re rida. The pro ng, and abutm , Bridge En ngineer respo er Road in of the inverte braska, Brid Engineer res nd Resistance was 44 meter Bridge Engi eer for this p igned utilizin bulb-T girde grove, Idaho gineer for th d was LRFD arland, Texa bridges wit s interior ben Tejidor per lengths, be ucture design xas, Senior B ree-span Sla le foundatio g and runnin (elevations exas, Senior which was o ne. The Typ tional design idor perform engths, beam ucture design dge Enginee esponsible f oject involv ment widenin gineer onsible for v Miami, Flor ed-T caps, an dge Enginee sponsible fo e Factor De rs). The brid ineer project, whic ng LRFD. T ers. o, Bridge En his project, D design of t as, Senior B th 18 and 1 nts for futur rformed all eam layout, n, and found Bridge Engi ab Beam Bri ons. As Seni ng the frami s), abutment r Bridge Eng originally de pe VI Mod n funded by med all requ m layout, b n, and found er for the desi ved widening ng. verifying an rida. The pr nd the abutm er or the design sign (LRFD dges were ne ch included 1 The longest s ngineer which invo the bridge de Bridge Engin 5 degree sk re bridge ext required des bent locatio dation design ineer idges, a side ior Bridge E ng program t and bent d gineer esigned with was replace the Contrac uired design bent location dation design ign of the w g the supers nd designing roject consi ment widenin n of the 30 D). The proje ew construct 10 spans of n span was 44 olved twin eck overhang neer kew, respecti tension, and sign includin ons and bea n. ewalk on one Engineer, M m to get beam design, supe h Type IV be ed after letti ctor. J beams including co ns and bear n. widening of structure wit the bridge w sted of desi ng. 0th Avenue ect involved tion and incl new constru 4 meters. Co 17.924-mete g. ively, 18” sidewalks ng coding aring seats e side and Mr. Tejidor m lengths, erstructure eams, then ng with a s are bulb- oding and ring seats f a major th parallel widenings igning the Bridge in d a 5-span, luded pre- uction, 420 nstruction er bridges