SlideShare a Scribd company logo
1 of 6
Download to read offline
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 1 of 6 
 
  
 
MANAGERIAL PROFILE – ELECTRICAL CONSULTING SERVICES/PROJECT MANAGEMENT 
Electrical Power Systems Design & Studies ~ Modeling & Simulation ~ Protection Engineering ~ Power Quality Analysis  
 
Almost 12 years’ experience in technical and management consultancy on electrical systems of large oil & Gas industries and power utilities. 
Excellent in system studies, analysis and reporting with latest tools and software. Experienced in preparing, pricing, bidding, negotiating, executing 
and delivering projects with highest degree of technical integrity. Work with Future Technologies Ltd. – Alkhobar, Saudi Arabia, since October 
2010, currently as Modeling & Simulation Services Manager. Being an ETAP software instructor for almost 30 ETAP workshops.  
 
 
COMMUNICATION PARTICULARS 
 
 Full Name  :  Islam Mohamed Elmontasser Abdelfattah Elsayed
 Nationality  :  Egyptian
 Date of Birth  :  February 07, 1980 
 Location  :  Al‐Khobar City, East Province, Saudi Arabia
 Contact (KSA)  :  +966567663635 
 Contact (EGY)  :  +201064223780 
 E‐mail  :  Islam.Elgarf@outlook.com
 Visa Status  :  KSA (Residency Visa); USA (Multiple Entry Visa expiring on 02/10/2018)
 Driving License  :  Gulf Driving License 
 International 
Business Visits 
:  Nigeria, Spain, KSA, Bahrain, India & USA 
 LinkedIn  :  https://sa.linkedin.com/in/islam‐elgarf‐b944b959
KEY FUNCTIONAL SKILLS 
 
 Conduct classes for ETAP software workshop & prepare electrical training courses and seminars. 
 Prepare project pricing, quotes, negotiate, bidding, schedules, execute projects and submit reports. 
 Lead and coordinate team on desk and site works. 
 Using SKM & ETAP software’s for AC & DC Load Flow, Short Circuit, Protective Devices Coordination & Arc Flash studies. 
 Electrical Equipment evaluation using ETAP software. 
 Create library for all types of protective devices & cables using SKM & ETAP software’s. 
 Static & Dynamic Motor Starting (Acceleration) studies & Motors Group Restarting (Reacceleration) Study using ETAP software. 
 Cables Sizing, Cables Amp capacity, Cables Pulling, Ground Grid System & Underground Raceway Systems using ETAP software. 
 Transformer sizing, Tap Optimizations, Transmission Lines Sag, Tension & Amp capacity using ETAP software. 
 Parameter Estimation, Battery sizing & battery discharge using ETAP software. 
 AC & DC PV Array study using ETAP software. 
 LV & MV distribution systems design and full specifications for industrial facilities. 
 Harmonic, Power quality & Power capacity measurements using FLUKE three phase power quality analyzer & MS Excel for analysis. 
 Illumination design using CALCULUX & DIALUX. 
 Develop electrical single line diagram & raiser diagram using AutoCAD. 
 Attend & supervise acceptance routine tests for MV switchgears, LV panels & Generators. 
 Supervision on Site electrical installation. 
 
 
 
 
 
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 2 of 6 
 
EXPERIENCE SUMMARY 
 
Since Oct 2010 Till Date            Future Technologies Ltd. (FTL) – Alkhobar, KSA. 
Modeling & Simulation Services Manager 
Progressive Roles   
 Till Jun’11                            Senior Electrical Engineer. 
 Till Jun’14                       Deputy Manager – Modeling & Simulation Services. 
 Till Date  Manager – Modeling & Simulation Services. 
   
Key Responsibilities   
 Project management from bidding stage through final report submission. 
 Conduct ETAP workshops (as Instructor). 
 Training & qualifying engineers for electrical power system analysis on ETAP. 
 Qualifying & evaluating company engineers to be ETAP workshop instructors.
 
Jan 2006 – Oct 2010                 
 
Integrated Bureau for Engineering & Consultations (IBEC), GE Authorized Representative – Cairo, Egypt. 
Deputy Manager 
Progressive Roles   
 Till Jan’08                            Electrical Design and Protection Engineer. 
 Jan’08 – Jan’09                   Project Manager–Faults & Coordination Studies. 
 Jan’09 – Oct’10                  Group Manager & Vice Company Manager. 
   
During 2010                               
 
Center for Management Developing – Egypt. 
Part Time Electrical Courses Preparer & Instructor 
   
Jan 2005 – Jan 2006                   Modern International Plastics Company ‐ Qwesna, Egypt. 
Electrical Engineer 
Progressive Roles   
 Electrical & Mechanical Maintenance of forming machines. 
 Periodic Maintenance of on‐site Diesel Generators. 
                                        
EDUCATION & PROFESSIONAL DEVELOPMENT 
 
 B.Sc. in Electrical Power and Machines Engineering, Zagazig University, Faculty of Engineering, Egypt, May 2004. 
 
Training/Courses/Certificates  
 Internal Electrical Safety Training ‐ IBEC's Office, Cairo, Egypt ‐ January 2009. 
 GE MULTILIN Training Course on Protective Relaying ‐ Spain ‐ May 2009.  
 ETAP Basic Workshop by OTI ‐ KHOBAR, KSA ‐ October 2010.  
 SABIC, Saudi KAYAN safety orientation training – Jubail, KSA ‐ October 2010. 
 IEEE ENERGYCON 2010 ‐ Arc Flash Mitigation & Calculations ‐ Bahrain.  
 ETAP 293 Real‐Time Workshop by OTI ‐ Mumbai, India ‐ March 2011. 
 ETAP 215 Advanced Workshop by OTI ‐ KHOBAR, KSA ‐ April 2011. 
 Exhibitor to OTI in WEPOWER Conference and Exhibition ‐ Dammam, KSA ‐ May 2011.  
 ETAP 273 Dynamic & Stability Analysis II ‐ KHOBAR, KSA ‐ June 2012. 
 Saudi ARAMCO safety orientation training (SAOO) – North Gawarh, KSA ‐ December 2012. 
 ETAP 184 OSPAS Real‐Time training with ARAMCO ‐ KHOBAR, KSA ‐ April 2013. 
 12 professional development units training program on “Project Management Fundamentals” – FTL Office – May 2013. 
 ETAP 183, Real‐Time Integrator Training, 3‐Day Workshop ‐ Irvine, California, USA ‐ May 2014. 
 35 professional development units training program on “Project Management Fundamentals” ‐ KHOBAR, KSA ‐ January 2015. 
 SIPCHEM (Saudi International Petrochemical Company) safety orientation ‐ Jubail, KSA ‐ April 2015. 
 SABIC, Sharq safety orientation training ‐ Jubail, KSA ‐ October 2015. 
 Problem‐solving and decision‐making ‐ Massive open online course (MOOC) – Edraak ‐ June 2016. 
 Time Management Courseware – Online Course – Expert Rating Inc. – June 206.     
  
Professional Memberships 
 Member of the Egyptian Syndicate of Engineers (54/08055).  
 Member of the Saudi Council of Engineers as professional engineer (173880). 
 Member of the Project Management Institute (PMI), ID 4560168.  
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 3 of 6 
 
 
ANNEXURE 1 ‐ TRAININGS COURSES CONDUCTED AS INSTRUCTOR 
 
1. Part time instructor at Center for Management Development (CMD) ‐ Egypt. 
2. ETAP 115 Onsite Training ‐ 5 Days Workshop ‐ GEDAC Electric ‐ Jeddah, KSA ‐ November 2010. 
3. Supporting in ETAP Training ‐ 5 Days Workshop ‐ Saudi ARAMCO ‐ December 2010. 
4. ETAP 113 Onsite Training – 3 Days Workshop ‐ GPIC, Bahrain ‐ January 2011. 
5. ETAP 115 Onsite Training – 5 Days Workshop ‐ Schneider Electric, Riyadh ‐ March 2011. 
6. ETAP Star Training – 1 Day Workshop ‐ ATWAAR AL‐HANDASIA Est. ‐ April 2011. 
7. Supporting OTI in ETAP Advanced – 5 Days Training ‐ KHOBAR, KSA ‐ April 2011. 
8. ETAP 115 Onsite Training – 5 Days Workshop ‐ Prince Mohammad Bin Fahd University ‐ May 2012.   
9. Sharing in ETAP Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2012. 
10. ETAP 114 Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2013.   
11. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2013. 
12. ETAP Onsite Training – 3 Days Workshop ‐ Fluor Company ‐ KHOBAR, KSA ‐ November 2013. 
13. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2013. 
14. ETAP 114 Training – 4 Days Workshop ‐ Jeddah, KSA ‐ February 2014. 
15. ETAP Cables Systems Training ‐ 3 Days Workshop ‐ Saudi Electricity Company ‐ Jeddah, KSA ‐ February 2014. 
16. ETAP 115 Training ‐ 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2014. 
17. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2014. 
18. ETAP Onsite Training – 3 Days Workshop ‐ ABB Company ‐ Riyadh, KSA ‐ September 2014.   
19. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ December 2014.   
20. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2014. 
21. ETAP Onsite Training – 5 Days Workshop ‐ ARAMCO, Khursaniyah Gas Plant, KSA ‐ January 2015.   
22. ETAP Onsite Training – 3 Days Workshop ‐ Saudi Diesel Company ‐ KHOBAR, KSA ‐ January 2015. 
23. ETAP 114SA Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2015. 
24. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ March 2015. 
25. ETAP Onsite Training – 2 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ April 2015.   
26. ETAP Onsite Training – 5 Days Workshop ‐ JIC (Jubail Industrial College) ‐ Jubail, KSA – May 2015. 
27. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2015.  
28. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2015.  
29. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ October 2015. 
30. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ November 2015. 
31. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2015. 
32. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA – February 2016. 
33. ETAP 115 Training – 5 Days Workshop – SADARA, KSA – February 2016.      
 
ANNEXURE 2 ‐ PROJECTS HANDLED 
   
 Electrical Design Projects 
 
 Procter & Gamble (P&G) 
 Procter & Gamble, Cairo Plant, Warehouse 6000. 
 Procter & Gamble, New Headquarters, Nile City, Cairo ‐ Illumination design & electrical supply lines. 
 Procter & Gamble, New Headquarters cafeteria, Cairo (Only Design). 
 Procter & Gamble, Cairo Plant, Boiler House Panel. 
 Procter & Gamble, Cairo Plant, New Multilane Machines (Packing Line). 
 Procter & Gamble, Cairo Plant, PSG Leaders Office Panel ‐ Data retrieval, data management & supervision on the design team. 
 Procter & Gamble, Cairo Plant ‐ F&HC Power Capacity Increase ‐ Electrical Engineering Study for MV Loop Modification and MLVDB 
Design ‐ Load analysis for the new F&HC capacity increase ‐ Load analysis for moving papers MV cables to the new SWG ‐ Transformer 
specs, new RMU specs & design of MLVDB ‐ Design of MV working cables ‐ Scenario for the contractor working procedures. 
 
 Power System Studies 
 
 Procter & Gamble (P&G) 
Site  power  circuits’  data  collection  &  developing  as  built  drawings  ‐  Short  circuit,  PDs  coordination,  arc  flash  studies  with 
recommendations 
 Egypt, Cairo Plant, Egypt ‐ Always #4 production line. 
 Nigeria ‐ CWH & HCF Plants.    
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 4 of 6 
 
 Nigeria ‐ F&HC Plant.  
 Nigeria ‐ CWH & HCF Plants (Complete Study Update). 
 Egypt, Cairo Plant ‐ JOA1 & JOA2. 
Developing as built drawings ‐ Short circuit, PDs coordination, arc flash studies with recommendations 
 Egypt, Cairo Plant ‐ MIELE Machines (Arc flash study only). 
 Egypt, Cairo Plant ‐ Substation of transformer #14. 
 Egypt, Cairo Plant ‐ Substation of transformer #15. 
 Egypt, Cairo Plant ‐ Substation of transformer #1. 
 KSA, Jeddah Plant ‐ 11 Substations. 
 Pakistan, Port QASIM Plant ‐ Design review included. 
 Pakistan, Port QASIM Plant ‐ Complete Study Update. 
 KSA, Jeddah Plant ‐ 5 Substations. 
 South Africa ‐ Johannesburg Plant. 
 Egypt, 6th October ‐ New Pampers Site ‐ 4 Substations. 
 Nigeria ‐ Ibadan Plant ‐ New JOA Lines. 
 Nigeria ‐ Ibadan Plant ‐ New JOA Lines ‐ Complete Study Update.  
Reviewing & reporting the electrical Safety Studies done by other engineers 
 KSA ‐ Dammam Plant ‐ Cornflake. 
 Egypt ‐ Cairo Plant ‐ Cornflake ‐ Substation of transformers 1 & 2. 
 Egypt ‐ Cairo Plant ‐ Bar Soap ‐ Substation of transformers 19 & 20. 
 
 Schneider Electric Egypt 
Short circuit, PDs coordination studies with recommendations 
 Sheraton Heliopolis Extension, Cairo, Egypt. 
 Nakheel Hotel, East Africa, Djibouti. 
 Nasr Petroleum Company, Suez, Egypt (11/6.6 KV System). 
 Suez Canal Container Terminal, Egypt (66/22 KV System). 
 Suez Canal Container Terminal, Egypt (Complete study update) 
 
 Schneider Electric Saudi Arabia 
ETAP Load Flow, short circuit, PDs coordination & arc flash studies  
 Petro Rabigh ‐ Department Manager at FTL 
 
 Italcementi Group 
Short circuit & PDs coordination studies with recommendations 
 Suez Cement Company, Suez II Line, Suez, Egypt (245/11KV System) 
 Tourah Cement II, Helwan, Egypt (66/6.3 KV System) 
 Air Liquide Arabia (ALAR) 
 New Nitrogen plant at Qurayyah Air Separation Plant ‐ Study review & reporting for load flow, short circuit & motor acceleration studies 
done by Air Liquide Arabia (ALAR). 
 New Nitrogen plant at Qurayyah Air Separation Plant ‐ Supervising on the verification for all ETAP model electrical data ‐ Supervising on 
the load flow, short circuit, coordination & motor acceleration studies. 
 New Nitrogen plant at Qurayyah Air Separation Plant – Department Manager at FTL ‐ Load Flow, short circuit Motor acceleration studies. 
 
 Saudi Aramco 
 Jauymah Tank Farm (JTF) ‐ Arc flash study using hand calculations ‐ Subcontractor for EPC 
 Jauymah Tank Farm (JTF) ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC 
 Safaniya Plant ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC 
 Jeddah Marine Terminal Facility ‐ ETAP short circuit, PDs coordination & arc flash studies ‐ Subcontractor for KBR‐AMCDE  
 Jeddah Refinery ‐ ETAP PDs coordination & arc flash studies for 16 substations. 
 Jeddah Refinery ‐ ETAP short circuit, PDs coordination & arc flash studies for 38 substations. 
 North Park Solar System, Dhahran, KSA ‐ Protective devices coordination study. 
 Yanbu Crude Oil, YCOT & AMT Plants ‐ ETAP short circuit, PDs coordination & arc flash studies. 
 Jeddah Refinery ‐ Updating ETAP PDs coordination & arc flash studies for 9 substations. 
 HAWIYAH NGL Recovery Plant ‐ ETAP short circuit, PDs coordination & arc flash studies for 13 substations. 
 KHURSANIYAH Gas Plant (KGP) ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations. 
 (NGPD) North Gawar Producing Department Plants ‐ Modeling & Simulation Team Leader‐ETAP short circuit, PDs coordination & arc 
flash studies for 8 substations. 
 (SGPD) South Gawar Producing Department Plants ‐ Manager at FTL ‐ Modeling & Simulation Team Leader ‐ ETAP short circuit, PDs 
coordination & arc flash studies for 18 substations. 
 (UGP) Uthmaniyah Gas Plant‐Department Manager ‐ ETAP short circuit, PDs coordination & arc flash studies for 28 substations. 
 (HDGP) Harad Gas Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 14 substations. 
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 5 of 6 
 
 (SOFPD) Safaniyah, Zuluf & Marjan Plants ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 10 
substations. 
 Qurayah Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations. 
 (RR) Riyadh Refinery ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 25 substations. 
 KAPSARC ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 9 substations. 
 Khurais Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 23 substations. 
 (CRDD) Central Regional Distribution Department at FTL – ETAP short circuit, PDs coordination & arc flash studies for 6 substations. 
 KACWC Mosque ‐ Department Manager at FTL ‐ ETAP arc flash study. 
 (NGPD) North Gawarh Producing Department Plants – Department Manager at FTL ‐ Simulation engineer ‐ Arc flash Mitigation study. 
 
 SABIC – KSA 
 Saudi Kayan Petrochemical Company, Al‐Jubail industrial city, KSA ‐ ETAP protective devices coordination study for 22 substations. 
 GAS (National Industrial Gases Company) – 3 substations ‐ Site Power Circuits As‐Built Data Collection ‐ ETAP power system modeling ‐ 
Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination & arc flash studies. 
 Saudi  Specialty  Chemicals  Company  ‐  3  substations  ‐  Subcontractor  for  Coperion  (Germany)  ‐  Supervision  on  ETAP  power  system 
modeling ‐ ETAP protective devices coordination study. 
 SHARQ (Eastern Petrochemical Company), Al‐Jubail industrial city, KSA – 6 substations ‐ Subcontractor for Saudi SIEMENS ‐ Supervision 
on ETAP power system modeling ‐ Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination study. 
 YANSAB, Yanbu National Petrochemical Company, Yanbu industrial city, KSA – 15 substations ‐ ETAP Protective Devices Coordination & 
Arc Flash Studies. 
 KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ ETAP short circuit, protective devices coordination & arc flash studies. 
 KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ Department Manager at FTL ‐ ETAP Power System Studies. 
 YANPET, Yanbu Petrochemical Company ‐ Yanbu industrial city – Department Manager at FTL ‐ ETAP Power System Studies. 
 SADAF, Saudi Petrochemical Company ‐ Al‐Jubail industrial city ‐ Subcontractor for ABB Norway – Department Manager at FTL ‐ ETAP 
Power System Studies. 
 SHARQ (Eastern Petrochemical Company) ‐ Al‐Jubail industrial city, KSA ‐ Department Manager at FTL ‐ Field measurements ‐ ETAP Load 
Flow, Short Circuit, PDs Coordination, Motor Acceleration, Harmonics, Arc Flash, PF improvement, capacitor placement studies. 
 AlBayroni, Al‐Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on SOFCON and L&T – ETAP model, Load Flow, Short 
Circuit, PDs Coordination review & evaluate. 
 GAS, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.  
 SAFCO, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.  
 Pertokemya, Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on ISCOSA – ETAP model, Load Flow, Short Circuit, PDs 
Coordination review & evaluate. 
 
 KSU (King Saud University) 
 Third Party on Schneider Electric KSA – Department Manager at FTL ‐ ETAP modeling & Power System Studies. 
 
 Al‐Tasnee 
 12 Substation ‐ Department Manager at FTL ‐ Project Protection Engineer at FTL ‐ ETAP Power System studies. 
 
 Al‐Muhaidib Contracting 
 KAUST Research Park/ARAMCO ‐ Department Manager at FTL ‐ ETAP Shot Circuit, PDs Coordination & Arc Flash studies. 
 KASC (King Abdullah Sports City) ‐ Department Manager at FTL ‐ ETAP Short Circuit study. 
 
 SIPCHEM (Saudi International Petrochemical Company) 
 IGC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies. 
 IPC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies. 
 IGC Plant ‐ Department Manager at FTL – ETAP Power System studies. 
 
 ISCOSA Saudi Arabia (A Siemens Company) 
 Petrokemya/SABIC ‐ Department Manager at FTL ‐ ETAP Motor Starting & Harmonics studies. 
 
 ETAP Real‐time Projects 
 Saudi Aramco 
OSPAS, Saudi Aramco Centralized Monitoring System. 
 Supporting OTI with the ETAP Real‐Time OSPAS system maintenance. 
 
 GE MULTIIN Projects 
 Technical support & commissioning for MIFII relays as GE Sales Representative. 
 
 Power Capacity Analysis 
 MobiNil (The Egyptian Company for Mobile Services), recent is “Orange” since 2016. 
Supervision  and  monitor  installation  ‐  Data  retrieval  and  data  management  ‐  Data  plotting,  data  documenting  and  developing 
recommendations 
ISLAM MOHAMMED ELSAYED 
PROGRAM MANAGER 
 
Page 6 of 6 
 
 Al‐HOUSSARY Switch, 6th of October City. 
 2 Main Supply at First Service Site. 
 Al‐Sawwah Switch, Cairo City. 
 Al‐Obour Switch, Al‐Obour City. 
 Heliopolis1 Switch, Cairo City. 
 Semoha Switch, Alexandria City. 
 MSC6 & MSC14 of Al‐Sawwah, Cairo. 
 MSC12, 13 & SS5 of First Service Site. 
 
 Generator Testing 
 Orascom Telecom 
 The Egyptian Company for Mobile Services (MobiNil).   
 Mobi‐Factory (An Orascom Telecom Company). 
 MENA Submarine Cable Systems (An Orascom Telecom Company). 
 
 Power Quality & Harmonics Studies 
Supervision of monitor installation ‐ Data retrieval and data management ‐ Data plotting and documenting ‐ Data analysis and power 
quality evaluation 
 Procter & Gamble, Cairo Plant ‐ Two of the Main Power Transformers, E‐Lite2, Main Incoming, Transformer #11. 
 MobiNil, Al‐Houssary Switch, 6th October City. 
 
 Miscellaneous Projects 
 Reef Oasis Beach Resort, Sharm EL Sheikh, South Sinai, Egypt & Procter & Gamble, Cairo Plant (5 Substations) ‐ Power circuits data 
collection & developing single line diagram 
 MENA Submarine Cable Systems, Suez, Egypt ‐Supervision on charging the Emerson batteries with equalization voltage. 
 Modern Plastic Company, Spuntex Site, Egypt ‐ Final receipt for the site electrical installation. 
 Procter & Gamble, Cairo Plant ‐ Developing tender & construction package for the new MV switchgear room. 
 
 
End of File 
 

More Related Content

What's hot (17)

Ee(cv)
Ee(cv)Ee(cv)
Ee(cv)
 
Cv tamerمقاولات احدث انجليزى
Cv tamerمقاولات  احدث انجليزىCv tamerمقاولات  احدث انجليزى
Cv tamerمقاولات احدث انجليزى
 
C.V.
C.V.C.V.
C.V.
 
Sulafa CV.pdf
Sulafa CV.pdfSulafa CV.pdf
Sulafa CV.pdf
 
shahenda hesham ahmed
shahenda hesham ahmedshahenda hesham ahmed
shahenda hesham ahmed
 
MOE ALI CV
MOE ALI CVMOE ALI CV
MOE ALI CV
 
Ahmed mohamed ewais mousa cv
Ahmed mohamed ewais mousa cvAhmed mohamed ewais mousa cv
Ahmed mohamed ewais mousa cv
 
Ms alaa cv
Ms alaa cvMs alaa cv
Ms alaa cv
 
CV Resume
CV ResumeCV Resume
CV Resume
 
Book1
Book1Book1
Book1
 
cv-zeina
cv-zeinacv-zeina
cv-zeina
 
CV m alzain JAN 2017
CV m alzain JAN 2017CV m alzain JAN 2017
CV m alzain JAN 2017
 
Mohamed Ahmed Abdelkhalek
Mohamed Ahmed AbdelkhalekMohamed Ahmed Abdelkhalek
Mohamed Ahmed Abdelkhalek
 
Cv ahmad
Cv ahmadCv ahmad
Cv ahmad
 
Updated CV
Updated CVUpdated CV
Updated CV
 
GERT HENDRIK VAN STADEN_CV_2016
GERT HENDRIK VAN STADEN_CV_2016GERT HENDRIK VAN STADEN_CV_2016
GERT HENDRIK VAN STADEN_CV_2016
 
ZUHAIR CV
ZUHAIR CVZUHAIR CV
ZUHAIR CV
 

Similar to Islam mohammed elsayed

Similar to Islam mohammed elsayed (20)

Fady Victor ELV engineer
Fady Victor ELV engineerFady Victor ELV engineer
Fady Victor ELV engineer
 
CV-Zeiad Yazji 2017
CV-Zeiad Yazji 2017 CV-Zeiad Yazji 2017
CV-Zeiad Yazji 2017
 
c.v
c.vc.v
c.v
 
CURRICULUM VITAE GR
CURRICULUM VITAE GRCURRICULUM VITAE GR
CURRICULUM VITAE GR
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)
 
Eslam-Moawed
Eslam-MoawedEslam-Moawed
Eslam-Moawed
 
Hossam Goda
Hossam GodaHossam Goda
Hossam Goda
 
Cv
CvCv
Cv
 
AHMED-MOUSTAFA-MOHAMMED-TAWFIEK
AHMED-MOUSTAFA-MOHAMMED-TAWFIEKAHMED-MOUSTAFA-MOHAMMED-TAWFIEK
AHMED-MOUSTAFA-MOHAMMED-TAWFIEK
 
Eng_Amr_CV2
Eng_Amr_CV2Eng_Amr_CV2
Eng_Amr_CV2
 
Immanuel Leduaba cv Latest
Immanuel Leduaba cv LatestImmanuel Leduaba cv Latest
Immanuel Leduaba cv Latest
 
cv zeiad Yazji 2013
cv zeiad Yazji 2013cv zeiad Yazji 2013
cv zeiad Yazji 2013
 
Mehr ali CV
Mehr ali CVMehr ali CV
Mehr ali CV
 
Eng. abdel rahman elmasry resume
Eng. abdel rahman elmasry resumeEng. abdel rahman elmasry resume
Eng. abdel rahman elmasry resume
 
Eng. abdelrahman Elmasry resume
Eng. abdelrahman Elmasry resumeEng. abdelrahman Elmasry resume
Eng. abdelrahman Elmasry resume
 
my cv
my cvmy cv
my cv
 
CV Marco-Magdy Monir
CV Marco-Magdy MonirCV Marco-Magdy Monir
CV Marco-Magdy Monir
 
hamdan CV NEW.doc2
hamdan CV NEW.doc2hamdan CV NEW.doc2
hamdan CV NEW.doc2
 
ahmed esam - electrical engineer
ahmed esam - electrical engineerahmed esam - electrical engineer
ahmed esam - electrical engineer
 
SIRAJ CV.docx
SIRAJ CV.docxSIRAJ CV.docx
SIRAJ CV.docx
 

Recently uploaded

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Recently uploaded (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

Islam mohammed elsayed

  • 1. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 1 of 6         MANAGERIAL PROFILE – ELECTRICAL CONSULTING SERVICES/PROJECT MANAGEMENT  Electrical Power Systems Design & Studies ~ Modeling & Simulation ~ Protection Engineering ~ Power Quality Analysis     Almost 12 years’ experience in technical and management consultancy on electrical systems of large oil & Gas industries and power utilities.  Excellent in system studies, analysis and reporting with latest tools and software. Experienced in preparing, pricing, bidding, negotiating, executing  and delivering projects with highest degree of technical integrity. Work with Future Technologies Ltd. – Alkhobar, Saudi Arabia, since October  2010, currently as Modeling & Simulation Services Manager. Being an ETAP software instructor for almost 30 ETAP workshops.       COMMUNICATION PARTICULARS     Full Name  :  Islam Mohamed Elmontasser Abdelfattah Elsayed  Nationality  :  Egyptian  Date of Birth  :  February 07, 1980   Location  :  Al‐Khobar City, East Province, Saudi Arabia  Contact (KSA)  :  +966567663635   Contact (EGY)  :  +201064223780   E‐mail  :  Islam.Elgarf@outlook.com  Visa Status  :  KSA (Residency Visa); USA (Multiple Entry Visa expiring on 02/10/2018)  Driving License  :  Gulf Driving License   International  Business Visits  :  Nigeria, Spain, KSA, Bahrain, India & USA   LinkedIn  :  https://sa.linkedin.com/in/islam‐elgarf‐b944b959 KEY FUNCTIONAL SKILLS     Conduct classes for ETAP software workshop & prepare electrical training courses and seminars.   Prepare project pricing, quotes, negotiate, bidding, schedules, execute projects and submit reports.   Lead and coordinate team on desk and site works.   Using SKM & ETAP software’s for AC & DC Load Flow, Short Circuit, Protective Devices Coordination & Arc Flash studies.   Electrical Equipment evaluation using ETAP software.   Create library for all types of protective devices & cables using SKM & ETAP software’s.   Static & Dynamic Motor Starting (Acceleration) studies & Motors Group Restarting (Reacceleration) Study using ETAP software.   Cables Sizing, Cables Amp capacity, Cables Pulling, Ground Grid System & Underground Raceway Systems using ETAP software.   Transformer sizing, Tap Optimizations, Transmission Lines Sag, Tension & Amp capacity using ETAP software.   Parameter Estimation, Battery sizing & battery discharge using ETAP software.   AC & DC PV Array study using ETAP software.   LV & MV distribution systems design and full specifications for industrial facilities.   Harmonic, Power quality & Power capacity measurements using FLUKE three phase power quality analyzer & MS Excel for analysis.   Illumination design using CALCULUX & DIALUX.   Develop electrical single line diagram & raiser diagram using AutoCAD.   Attend & supervise acceptance routine tests for MV switchgears, LV panels & Generators.   Supervision on Site electrical installation.           
  • 2. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 2 of 6    EXPERIENCE SUMMARY    Since Oct 2010 Till Date            Future Technologies Ltd. (FTL) – Alkhobar, KSA.  Modeling & Simulation Services Manager  Progressive Roles     Till Jun’11                            Senior Electrical Engineer.   Till Jun’14                       Deputy Manager – Modeling & Simulation Services.   Till Date  Manager – Modeling & Simulation Services.      Key Responsibilities     Project management from bidding stage through final report submission.   Conduct ETAP workshops (as Instructor).   Training & qualifying engineers for electrical power system analysis on ETAP.   Qualifying & evaluating company engineers to be ETAP workshop instructors.   Jan 2006 – Oct 2010                    Integrated Bureau for Engineering & Consultations (IBEC), GE Authorized Representative – Cairo, Egypt.  Deputy Manager  Progressive Roles     Till Jan’08                            Electrical Design and Protection Engineer.   Jan’08 – Jan’09                   Project Manager–Faults & Coordination Studies.   Jan’09 – Oct’10                  Group Manager & Vice Company Manager.      During 2010                                  Center for Management Developing – Egypt.  Part Time Electrical Courses Preparer & Instructor      Jan 2005 – Jan 2006                   Modern International Plastics Company ‐ Qwesna, Egypt.  Electrical Engineer  Progressive Roles     Electrical & Mechanical Maintenance of forming machines.   Periodic Maintenance of on‐site Diesel Generators.                                           EDUCATION & PROFESSIONAL DEVELOPMENT     B.Sc. in Electrical Power and Machines Engineering, Zagazig University, Faculty of Engineering, Egypt, May 2004.    Training/Courses/Certificates    Internal Electrical Safety Training ‐ IBEC's Office, Cairo, Egypt ‐ January 2009.   GE MULTILIN Training Course on Protective Relaying ‐ Spain ‐ May 2009.    ETAP Basic Workshop by OTI ‐ KHOBAR, KSA ‐ October 2010.    SABIC, Saudi KAYAN safety orientation training – Jubail, KSA ‐ October 2010.   IEEE ENERGYCON 2010 ‐ Arc Flash Mitigation & Calculations ‐ Bahrain.    ETAP 293 Real‐Time Workshop by OTI ‐ Mumbai, India ‐ March 2011.   ETAP 215 Advanced Workshop by OTI ‐ KHOBAR, KSA ‐ April 2011.   Exhibitor to OTI in WEPOWER Conference and Exhibition ‐ Dammam, KSA ‐ May 2011.    ETAP 273 Dynamic & Stability Analysis II ‐ KHOBAR, KSA ‐ June 2012.   Saudi ARAMCO safety orientation training (SAOO) – North Gawarh, KSA ‐ December 2012.   ETAP 184 OSPAS Real‐Time training with ARAMCO ‐ KHOBAR, KSA ‐ April 2013.   12 professional development units training program on “Project Management Fundamentals” – FTL Office – May 2013.   ETAP 183, Real‐Time Integrator Training, 3‐Day Workshop ‐ Irvine, California, USA ‐ May 2014.   35 professional development units training program on “Project Management Fundamentals” ‐ KHOBAR, KSA ‐ January 2015.   SIPCHEM (Saudi International Petrochemical Company) safety orientation ‐ Jubail, KSA ‐ April 2015.   SABIC, Sharq safety orientation training ‐ Jubail, KSA ‐ October 2015.   Problem‐solving and decision‐making ‐ Massive open online course (MOOC) – Edraak ‐ June 2016.   Time Management Courseware – Online Course – Expert Rating Inc. – June 206.         Professional Memberships   Member of the Egyptian Syndicate of Engineers (54/08055).    Member of the Saudi Council of Engineers as professional engineer (173880).   Member of the Project Management Institute (PMI), ID 4560168.  
  • 3. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 3 of 6      ANNEXURE 1 ‐ TRAININGS COURSES CONDUCTED AS INSTRUCTOR    1. Part time instructor at Center for Management Development (CMD) ‐ Egypt.  2. ETAP 115 Onsite Training ‐ 5 Days Workshop ‐ GEDAC Electric ‐ Jeddah, KSA ‐ November 2010.  3. Supporting in ETAP Training ‐ 5 Days Workshop ‐ Saudi ARAMCO ‐ December 2010.  4. ETAP 113 Onsite Training – 3 Days Workshop ‐ GPIC, Bahrain ‐ January 2011.  5. ETAP 115 Onsite Training – 5 Days Workshop ‐ Schneider Electric, Riyadh ‐ March 2011.  6. ETAP Star Training – 1 Day Workshop ‐ ATWAAR AL‐HANDASIA Est. ‐ April 2011.  7. Supporting OTI in ETAP Advanced – 5 Days Training ‐ KHOBAR, KSA ‐ April 2011.  8. ETAP 115 Onsite Training – 5 Days Workshop ‐ Prince Mohammad Bin Fahd University ‐ May 2012.    9. Sharing in ETAP Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2012.  10. ETAP 114 Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2013.    11. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2013.  12. ETAP Onsite Training – 3 Days Workshop ‐ Fluor Company ‐ KHOBAR, KSA ‐ November 2013.  13. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2013.  14. ETAP 114 Training – 4 Days Workshop ‐ Jeddah, KSA ‐ February 2014.  15. ETAP Cables Systems Training ‐ 3 Days Workshop ‐ Saudi Electricity Company ‐ Jeddah, KSA ‐ February 2014.  16. ETAP 115 Training ‐ 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2014.  17. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2014.  18. ETAP Onsite Training – 3 Days Workshop ‐ ABB Company ‐ Riyadh, KSA ‐ September 2014.    19. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ December 2014.    20. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2014.  21. ETAP Onsite Training – 5 Days Workshop ‐ ARAMCO, Khursaniyah Gas Plant, KSA ‐ January 2015.    22. ETAP Onsite Training – 3 Days Workshop ‐ Saudi Diesel Company ‐ KHOBAR, KSA ‐ January 2015.  23. ETAP 114SA Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2015.  24. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ March 2015.  25. ETAP Onsite Training – 2 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ April 2015.    26. ETAP Onsite Training – 5 Days Workshop ‐ JIC (Jubail Industrial College) ‐ Jubail, KSA – May 2015.  27. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2015.   28. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2015.   29. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ October 2015.  30. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ November 2015.  31. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2015.  32. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA – February 2016.  33. ETAP 115 Training – 5 Days Workshop – SADARA, KSA – February 2016.         ANNEXURE 2 ‐ PROJECTS HANDLED       Electrical Design Projects     Procter & Gamble (P&G)   Procter & Gamble, Cairo Plant, Warehouse 6000.   Procter & Gamble, New Headquarters, Nile City, Cairo ‐ Illumination design & electrical supply lines.   Procter & Gamble, New Headquarters cafeteria, Cairo (Only Design).   Procter & Gamble, Cairo Plant, Boiler House Panel.   Procter & Gamble, Cairo Plant, New Multilane Machines (Packing Line).   Procter & Gamble, Cairo Plant, PSG Leaders Office Panel ‐ Data retrieval, data management & supervision on the design team.   Procter & Gamble, Cairo Plant ‐ F&HC Power Capacity Increase ‐ Electrical Engineering Study for MV Loop Modification and MLVDB  Design ‐ Load analysis for the new F&HC capacity increase ‐ Load analysis for moving papers MV cables to the new SWG ‐ Transformer  specs, new RMU specs & design of MLVDB ‐ Design of MV working cables ‐ Scenario for the contractor working procedures.     Power System Studies     Procter & Gamble (P&G)  Site  power  circuits’  data  collection  &  developing  as  built  drawings  ‐  Short  circuit,  PDs  coordination,  arc  flash  studies  with  recommendations   Egypt, Cairo Plant, Egypt ‐ Always #4 production line.   Nigeria ‐ CWH & HCF Plants.    
  • 4. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 4 of 6     Nigeria ‐ F&HC Plant.    Nigeria ‐ CWH & HCF Plants (Complete Study Update).   Egypt, Cairo Plant ‐ JOA1 & JOA2.  Developing as built drawings ‐ Short circuit, PDs coordination, arc flash studies with recommendations   Egypt, Cairo Plant ‐ MIELE Machines (Arc flash study only).   Egypt, Cairo Plant ‐ Substation of transformer #14.   Egypt, Cairo Plant ‐ Substation of transformer #15.   Egypt, Cairo Plant ‐ Substation of transformer #1.   KSA, Jeddah Plant ‐ 11 Substations.   Pakistan, Port QASIM Plant ‐ Design review included.   Pakistan, Port QASIM Plant ‐ Complete Study Update.   KSA, Jeddah Plant ‐ 5 Substations.   South Africa ‐ Johannesburg Plant.   Egypt, 6th October ‐ New Pampers Site ‐ 4 Substations.   Nigeria ‐ Ibadan Plant ‐ New JOA Lines.   Nigeria ‐ Ibadan Plant ‐ New JOA Lines ‐ Complete Study Update.   Reviewing & reporting the electrical Safety Studies done by other engineers   KSA ‐ Dammam Plant ‐ Cornflake.   Egypt ‐ Cairo Plant ‐ Cornflake ‐ Substation of transformers 1 & 2.   Egypt ‐ Cairo Plant ‐ Bar Soap ‐ Substation of transformers 19 & 20.     Schneider Electric Egypt  Short circuit, PDs coordination studies with recommendations   Sheraton Heliopolis Extension, Cairo, Egypt.   Nakheel Hotel, East Africa, Djibouti.   Nasr Petroleum Company, Suez, Egypt (11/6.6 KV System).   Suez Canal Container Terminal, Egypt (66/22 KV System).   Suez Canal Container Terminal, Egypt (Complete study update)     Schneider Electric Saudi Arabia  ETAP Load Flow, short circuit, PDs coordination & arc flash studies    Petro Rabigh ‐ Department Manager at FTL     Italcementi Group  Short circuit & PDs coordination studies with recommendations   Suez Cement Company, Suez II Line, Suez, Egypt (245/11KV System)   Tourah Cement II, Helwan, Egypt (66/6.3 KV System)   Air Liquide Arabia (ALAR)   New Nitrogen plant at Qurayyah Air Separation Plant ‐ Study review & reporting for load flow, short circuit & motor acceleration studies  done by Air Liquide Arabia (ALAR).   New Nitrogen plant at Qurayyah Air Separation Plant ‐ Supervising on the verification for all ETAP model electrical data ‐ Supervising on  the load flow, short circuit, coordination & motor acceleration studies.   New Nitrogen plant at Qurayyah Air Separation Plant – Department Manager at FTL ‐ Load Flow, short circuit Motor acceleration studies.     Saudi Aramco   Jauymah Tank Farm (JTF) ‐ Arc flash study using hand calculations ‐ Subcontractor for EPC   Jauymah Tank Farm (JTF) ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC   Safaniya Plant ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC   Jeddah Marine Terminal Facility ‐ ETAP short circuit, PDs coordination & arc flash studies ‐ Subcontractor for KBR‐AMCDE    Jeddah Refinery ‐ ETAP PDs coordination & arc flash studies for 16 substations.   Jeddah Refinery ‐ ETAP short circuit, PDs coordination & arc flash studies for 38 substations.   North Park Solar System, Dhahran, KSA ‐ Protective devices coordination study.   Yanbu Crude Oil, YCOT & AMT Plants ‐ ETAP short circuit, PDs coordination & arc flash studies.   Jeddah Refinery ‐ Updating ETAP PDs coordination & arc flash studies for 9 substations.   HAWIYAH NGL Recovery Plant ‐ ETAP short circuit, PDs coordination & arc flash studies for 13 substations.   KHURSANIYAH Gas Plant (KGP) ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations.   (NGPD) North Gawar Producing Department Plants ‐ Modeling & Simulation Team Leader‐ETAP short circuit, PDs coordination & arc  flash studies for 8 substations.   (SGPD) South Gawar Producing Department Plants ‐ Manager at FTL ‐ Modeling & Simulation Team Leader ‐ ETAP short circuit, PDs  coordination & arc flash studies for 18 substations.   (UGP) Uthmaniyah Gas Plant‐Department Manager ‐ ETAP short circuit, PDs coordination & arc flash studies for 28 substations.   (HDGP) Harad Gas Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 14 substations. 
  • 5. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 5 of 6     (SOFPD) Safaniyah, Zuluf & Marjan Plants ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 10  substations.   Qurayah Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations.   (RR) Riyadh Refinery ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 25 substations.   KAPSARC ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 9 substations.   Khurais Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 23 substations.   (CRDD) Central Regional Distribution Department at FTL – ETAP short circuit, PDs coordination & arc flash studies for 6 substations.   KACWC Mosque ‐ Department Manager at FTL ‐ ETAP arc flash study.   (NGPD) North Gawarh Producing Department Plants – Department Manager at FTL ‐ Simulation engineer ‐ Arc flash Mitigation study.     SABIC – KSA   Saudi Kayan Petrochemical Company, Al‐Jubail industrial city, KSA ‐ ETAP protective devices coordination study for 22 substations.   GAS (National Industrial Gases Company) – 3 substations ‐ Site Power Circuits As‐Built Data Collection ‐ ETAP power system modeling ‐  Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination & arc flash studies.   Saudi  Specialty  Chemicals  Company  ‐  3  substations  ‐  Subcontractor  for  Coperion  (Germany)  ‐  Supervision  on  ETAP  power  system  modeling ‐ ETAP protective devices coordination study.   SHARQ (Eastern Petrochemical Company), Al‐Jubail industrial city, KSA – 6 substations ‐ Subcontractor for Saudi SIEMENS ‐ Supervision  on ETAP power system modeling ‐ Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination study.   YANSAB, Yanbu National Petrochemical Company, Yanbu industrial city, KSA – 15 substations ‐ ETAP Protective Devices Coordination &  Arc Flash Studies.   KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ ETAP short circuit, protective devices coordination & arc flash studies.   KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ Department Manager at FTL ‐ ETAP Power System Studies.   YANPET, Yanbu Petrochemical Company ‐ Yanbu industrial city – Department Manager at FTL ‐ ETAP Power System Studies.   SADAF, Saudi Petrochemical Company ‐ Al‐Jubail industrial city ‐ Subcontractor for ABB Norway – Department Manager at FTL ‐ ETAP  Power System Studies.   SHARQ (Eastern Petrochemical Company) ‐ Al‐Jubail industrial city, KSA ‐ Department Manager at FTL ‐ Field measurements ‐ ETAP Load  Flow, Short Circuit, PDs Coordination, Motor Acceleration, Harmonics, Arc Flash, PF improvement, capacitor placement studies.   AlBayroni, Al‐Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on SOFCON and L&T – ETAP model, Load Flow, Short  Circuit, PDs Coordination review & evaluate.   GAS, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.    SAFCO, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.    Pertokemya, Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on ISCOSA – ETAP model, Load Flow, Short Circuit, PDs  Coordination review & evaluate.     KSU (King Saud University)   Third Party on Schneider Electric KSA – Department Manager at FTL ‐ ETAP modeling & Power System Studies.     Al‐Tasnee   12 Substation ‐ Department Manager at FTL ‐ Project Protection Engineer at FTL ‐ ETAP Power System studies.     Al‐Muhaidib Contracting   KAUST Research Park/ARAMCO ‐ Department Manager at FTL ‐ ETAP Shot Circuit, PDs Coordination & Arc Flash studies.   KASC (King Abdullah Sports City) ‐ Department Manager at FTL ‐ ETAP Short Circuit study.     SIPCHEM (Saudi International Petrochemical Company)   IGC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies.   IPC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies.   IGC Plant ‐ Department Manager at FTL – ETAP Power System studies.     ISCOSA Saudi Arabia (A Siemens Company)   Petrokemya/SABIC ‐ Department Manager at FTL ‐ ETAP Motor Starting & Harmonics studies.     ETAP Real‐time Projects   Saudi Aramco  OSPAS, Saudi Aramco Centralized Monitoring System.   Supporting OTI with the ETAP Real‐Time OSPAS system maintenance.     GE MULTIIN Projects   Technical support & commissioning for MIFII relays as GE Sales Representative.     Power Capacity Analysis   MobiNil (The Egyptian Company for Mobile Services), recent is “Orange” since 2016.  Supervision  and  monitor  installation  ‐  Data  retrieval  and  data  management  ‐  Data  plotting,  data  documenting  and  developing  recommendations 
  • 6. ISLAM MOHAMMED ELSAYED  PROGRAM MANAGER    Page 6 of 6     Al‐HOUSSARY Switch, 6th of October City.   2 Main Supply at First Service Site.   Al‐Sawwah Switch, Cairo City.   Al‐Obour Switch, Al‐Obour City.   Heliopolis1 Switch, Cairo City.   Semoha Switch, Alexandria City.   MSC6 & MSC14 of Al‐Sawwah, Cairo.   MSC12, 13 & SS5 of First Service Site.     Generator Testing   Orascom Telecom   The Egyptian Company for Mobile Services (MobiNil).     Mobi‐Factory (An Orascom Telecom Company).   MENA Submarine Cable Systems (An Orascom Telecom Company).     Power Quality & Harmonics Studies  Supervision of monitor installation ‐ Data retrieval and data management ‐ Data plotting and documenting ‐ Data analysis and power  quality evaluation   Procter & Gamble, Cairo Plant ‐ Two of the Main Power Transformers, E‐Lite2, Main Incoming, Transformer #11.   MobiNil, Al‐Houssary Switch, 6th October City.     Miscellaneous Projects   Reef Oasis Beach Resort, Sharm EL Sheikh, South Sinai, Egypt & Procter & Gamble, Cairo Plant (5 Substations) ‐ Power circuits data  collection & developing single line diagram   MENA Submarine Cable Systems, Suez, Egypt ‐Supervision on charging the Emerson batteries with equalization voltage.   Modern Plastic Company, Spuntex Site, Egypt ‐ Final receipt for the site electrical installation.   Procter & Gamble, Cairo Plant ‐ Developing tender & construction package for the new MV switchgear room.      End of File