SlideShare a Scribd company logo
1 of 23
Innovative Modular Solutions | www.innovativemodular.com
Modular Solutions
When and why should charter schools consider it
Innovative Modular Solutions | www.innovativemodular.com
About Innovative Modular Solutions
 Founded in 1999
o Licensed general contractor / commercial modular contractor
o Prime or specialty contractor, offering design-build services
o Temporary and permanent projects of 400 to 100,000 square feet
 Team of industry veterans with diverse, complementary skills
Construction management
Factory production, Quality Control
General contracting
Operations and Logistics
Sales and Service management
 All employees are CPR and first-aid trained.
 All field workers are OSHA certified (10 or 30 hour).
Innovative Modular Solutions | www.innovativemodular.com
IMS Offers Accelerated Construction Technology
Innovative Modular Solutions | www.innovativemodular.com
Modular Construction Overview
 Modular solutions provide an alternative method of construction.
 Building components are manufactured in a controlled factory environment to the same
building codes as conventional construction, using the same materials.
 Partially finished components are transported to the project site, assembled and finished.
 Modular buildings can be one, two or more stories.
 Modular buildings can be temporary, semi-permanent or permanent.
 Modular construction can be easily incorporated with other types of construction to
capitalize on the advantages that each has to offer.
Innovative Modular Solutions | www.innovativemodular.com
Benefits of Modular Construction
 Speed: On Time, Accelerated Construction Schedule
o Concurrent site preparation and modular component fabrication
o Reduced weather delays
o Works well in areas where the construction season is short
o Reduced job site ‘chaos’ – limited deliveries, limited disruption
 Flexibility: Project Team Defines Design and Finish
o Design of building as well as makeup of design team
o Portability responds to changes in user demographics
o Variety of financing options available
 Cost: Controlled Budget Process
o Replicable, standardized
• Few change orders
• Improved quality
o Costs typically less than conventional construction
Innovative Modular Solutions | www.innovativemodular.com
Modular = Green
 Inherently green – contributes to sustainable building initiatives
 Limits site disturbance
 Minimizes waste onsite due to factory construction and recycling
 Eliminates environmental factors that affect building materials
 Reduces overall construction time
 Simplifies relocation and reuse of buildings
 Saves energy through
o Tighter Building Envelope
o Efficient HVAC design
o High insulation levels
Innovative Modular Solutions | www.innovativemodular.com
CONVENTIONAL—SITE
BUILT
CONSTRUCTION
PRE-ENGINEERED
CONSTRUCTION
Project Site
Deliver
Cut
Prepare
Assemble
Piece by Piece
Raw Material Inputs
Manufacturing Facility
Deliver
Cut, Prepare
Ship
Building Element Outputs
Project Site
Deliver
Assemble
Piece by Piece
RelativeTimeScale
Longest Delivery Cycle
MODULAR
CONSTRUCTION
Manufacturing Facility
Deliver
Cut, Prepare
Assemble
Ship
Building Component
Outputs
Project Site
Deliver, Assemble
Component by Component
Shortest Delivery Cycle
Raw Material Inputs Raw Material Inputs
Construction Process:
Innovative Modular Solutions | www.innovativemodular.com
 Hybrid Construction is a Combination of Modular and Conventional, Pre-Engineered, or
another Method of Construction
o Common for Large Projects
o Allows the Project to take Advantage of the Benefits of Different Methods
o High Ceiling, Long Span Spaces can be Conventional or Pre-Engineered
o Repetitive Spaces (Classrooms, Restrooms, Offices) can be Modular
o Concurrent Construction - Preplanning Allows Modular Components to be Built
Off-Site While Site Preparation Activities (Grading, Foundations, Utilities, etc.) are
completed on site
About Hybrid Construction
Innovative Modular Solutions | www.innovativemodular.com
Existing BuildingAddition Addition
Future Building
 Modular Construction easily accommodates Phased Construction
o Future Additions (Horizontal)
o Future Additions (Vertical) – Add a Second Floor
o Future Upgrade to Finishes
Phased Construction Offers Flexibility
Innovative Modular Solutions | www.innovativemodular.com
Types of Modular Construction Used at
Charter Schools
Innovative Modular Solutions | www.innovativemodular.com
Temporary and Semi-Permanent Construction
Innovative Modular Solutions | www.innovativemodular.com
Permanent Modular Construction
Innovative Modular Solutions | www.innovativemodular.com
Custom Floorplans
Innovative Modular Solutions | www.innovativemodular.com
 The Project Team should review all material selections and
specifications
 Selections are easily customized to suit budgetary requirements and
aesthetic needs
 Selections include most options available in conventional construction
 Material Selection drives the cost of any construction project
 Customers should use and specify ‘commercial grade’ materials
Material Selection
Innovative Modular Solutions | www.innovativemodular.com
Financing Options
Innovative Modular Solutions | www.innovativemodular.com
Financing Options
Operating Lease – IMS retains ownership of the asset and the user to returns
the building at the end of the lease.
Capital Lease –IMS transfers ownership to the lessee at the end of the lease
upon execution of a predetermined purchase option
Finance Lease – User maintains ownership upon full payment of all applicable
cost, monthly payments and finance charges.
Gap Funding / Bridge loans – IMS can provide interim funding particularly for
Charter Schools
Bond Financing
Considered a Depreciable Asset, Modular Buildings allow for
more flexible financing
Innovative Modular Solutions | www.innovativemodular.com
Case Studies
Innovative Modular Solutions | www.innovativemodular.com
Jalen Rose Leadership Academy, Detroit, MI
Innovative Modular Solutions | www.innovativemodular.com
Innovative Modular Solutions | www.innovativemodular.com
Old Redford Academy, Detroit, MI
Innovative Modular Solutions | www.innovativemodular.com
Dubois Integrity Academy, Atlanta, GA
Innovative Modular Solutions | www.innovativemodular.com
Modular building quality and design has improved significantly
 Accelerated
o Concurrent construction = shorter schedule
 Cost effective
o Factory costs are controlled, will maintain value if properly designed, built, and
maintained
 Flexible
o Design and finish
 Sustainable
o Energy efficient, less disruption
 Financing
o Several options available
Summary
Innovative Modular Solutions | www.innovativemodular.com
www.innovativemodular.com

More Related Content

What's hot

CSCM Chapter 1 construction supply chain management part 2
CSCM Chapter 1 construction supply chain management part 2CSCM Chapter 1 construction supply chain management part 2
CSCM Chapter 1 construction supply chain management part 2Est
 
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loop
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loopDRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loop
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loopCLICKNL
 
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...CLICKNL
 
Presentation on types of capital budgeting decisions
Presentation on types of capital budgeting decisionsPresentation on types of capital budgeting decisions
Presentation on types of capital budgeting decisionsKomal Mahajan
 
Drupal enterprise solutions reduce total cost of ownership (tco)
Drupal enterprise solutions  reduce total cost of ownership (tco)Drupal enterprise solutions  reduce total cost of ownership (tco)
Drupal enterprise solutions reduce total cost of ownership (tco)Tom T
 

What's hot (7)

CSCM Chapter 1 construction supply chain management part 2
CSCM Chapter 1 construction supply chain management part 2CSCM Chapter 1 construction supply chain management part 2
CSCM Chapter 1 construction supply chain management part 2
 
Pres 128 tony morgan july 6 2016
Pres 128 tony morgan july 6 2016Pres 128 tony morgan july 6 2016
Pres 128 tony morgan july 6 2016
 
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loop
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loopDRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loop
DRIVE 2016 | 27 October - CIRCO: Engage your customer in closing the loop
 
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...
DRIVE 2016 | 27 October - CIRCO: Circular business models - we know why but d...
 
Presentation on types of capital budgeting decisions
Presentation on types of capital budgeting decisionsPresentation on types of capital budgeting decisions
Presentation on types of capital budgeting decisions
 
Design Process 2
Design Process 2Design Process 2
Design Process 2
 
Drupal enterprise solutions reduce total cost of ownership (tco)
Drupal enterprise solutions  reduce total cost of ownership (tco)Drupal enterprise solutions  reduce total cost of ownership (tco)
Drupal enterprise solutions reduce total cost of ownership (tco)
 

Viewers also liked

Taller de 2° 2° bloque
Taller de 2° 2° bloqueTaller de 2° 2° bloque
Taller de 2° 2° bloqueHector Juarez
 
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - Nictiz
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - NictizBlockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - Nictiz
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - NictizJaco van Duivenboden
 
Metoda keaktoran stanislavsky
Metoda keaktoran stanislavskyMetoda keaktoran stanislavsky
Metoda keaktoran stanislavskyFerdi Firdaus
 
Investimento sr sollution ing
Investimento sr sollution ingInvestimento sr sollution ing
Investimento sr sollution ingSandro Rocha
 
Transfer sr sollution ing
Transfer sr sollution ingTransfer sr sollution ing
Transfer sr sollution ingSandro Rocha
 
Wycc internship presentation
Wycc internship presentationWycc internship presentation
Wycc internship presentationToni Reed
 
NJ Future Redevelopment Forum 2017 Bryant
NJ Future Redevelopment Forum 2017 BryantNJ Future Redevelopment Forum 2017 Bryant
NJ Future Redevelopment Forum 2017 BryantNew Jersey Future
 
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their Secrets
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their SecretsNew AdWords Features You Shouldn't Ignore: 3 Experts Share Their Secrets
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their SecretsHanapin Marketing
 
NJ Future Redevelopment Forum 2017 Lee
NJ Future Redevelopment Forum 2017 LeeNJ Future Redevelopment Forum 2017 Lee
NJ Future Redevelopment Forum 2017 LeeNew Jersey Future
 
Project Name: Poly Informer(Android App)
Project Name: Poly Informer(Android App)Project Name: Poly Informer(Android App)
Project Name: Poly Informer(Android App)Mahamodul Hasan khan
 
Master trainers election Ganderbal
Master trainers election GanderbalMaster trainers election Ganderbal
Master trainers election GanderbalAfra Khan
 
concentración y dilución de orina
concentración y dilución de orina concentración y dilución de orina
concentración y dilución de orina Katt Alvarenga
 

Viewers also liked (20)

Taller de 2° 2° bloque
Taller de 2° 2° bloqueTaller de 2° 2° bloque
Taller de 2° 2° bloque
 
Impress práctica1
Impress práctica1Impress práctica1
Impress práctica1
 
Sinonimos
SinonimosSinonimos
Sinonimos
 
Aula 3º semana
Aula 3º semanaAula 3º semana
Aula 3º semana
 
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - Nictiz
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - NictizBlockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - Nictiz
Blockchain: bouwsteen voor digitale zorg? Zorg & ICT 2017 - Nictiz
 
Aeph ep 001 i
Aeph ep 001 iAeph ep 001 i
Aeph ep 001 i
 
Guia 2
Guia 2Guia 2
Guia 2
 
Guia 1
Guia 1Guia 1
Guia 1
 
Metoda keaktoran stanislavsky
Metoda keaktoran stanislavskyMetoda keaktoran stanislavsky
Metoda keaktoran stanislavsky
 
Investimento sr sollution ing
Investimento sr sollution ingInvestimento sr sollution ing
Investimento sr sollution ing
 
Transfer sr sollution ing
Transfer sr sollution ingTransfer sr sollution ing
Transfer sr sollution ing
 
Wycc internship presentation
Wycc internship presentationWycc internship presentation
Wycc internship presentation
 
NJ Future Redevelopment Forum 2017 Bryant
NJ Future Redevelopment Forum 2017 BryantNJ Future Redevelopment Forum 2017 Bryant
NJ Future Redevelopment Forum 2017 Bryant
 
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their Secrets
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their SecretsNew AdWords Features You Shouldn't Ignore: 3 Experts Share Their Secrets
New AdWords Features You Shouldn't Ignore: 3 Experts Share Their Secrets
 
NJ Future Redevelopment Forum 2017 Lee
NJ Future Redevelopment Forum 2017 LeeNJ Future Redevelopment Forum 2017 Lee
NJ Future Redevelopment Forum 2017 Lee
 
Project Name: Poly Informer(Android App)
Project Name: Poly Informer(Android App)Project Name: Poly Informer(Android App)
Project Name: Poly Informer(Android App)
 
Master trainers election Ganderbal
Master trainers election GanderbalMaster trainers election Ganderbal
Master trainers election Ganderbal
 
concentración y dilución de orina
concentración y dilución de orina concentración y dilución de orina
concentración y dilución de orina
 
Inglés 2
Inglés 2Inglés 2
Inglés 2
 
Nose job
Nose jobNose job
Nose job
 

Similar to Modular Solutions: When and Why Should Charter Schools Consider It?

Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovationSJVijay
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notesFluidconstructions
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 
13 Design_for_Manufacturing.ppt
13 Design_for_Manufacturing.ppt13 Design_for_Manufacturing.ppt
13 Design_for_Manufacturing.pptssusera85eeb1
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayBrittany Berryman
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesaAconex
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxlmelaine
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxmecklenburgstrelitzh
 
Master Presentation Ali Bassiouny Darwish
Master Presentation Ali Bassiouny Darwish Master Presentation Ali Bassiouny Darwish
Master Presentation Ali Bassiouny Darwish Ali Bassiouny DARWISH
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingLoay Ghazaleh MBA, BSc Civil Eng.
 
Construction mirror oct2014
Construction mirror oct2014Construction mirror oct2014
Construction mirror oct2014Param Saxena
 

Similar to Modular Solutions: When and Why Should Charter Schools Consider It? (20)

JDByriderCD.ppt
JDByriderCD.pptJDByriderCD.ppt
JDByriderCD.ppt
 
Prebarication
PrebaricationPrebarication
Prebarication
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 
Permanent alternative Construction
Permanent alternative ConstructionPermanent alternative Construction
Permanent alternative Construction
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notes
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 
Modular buildings
Modular buildingsModular buildings
Modular buildings
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
13 Design_for_Manufacturing.ppt
13 Design_for_Manufacturing.ppt13 Design_for_Manufacturing.ppt
13 Design_for_Manufacturing.ppt
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
Prefabricated structure
Prefabricated structurePrefabricated structure
Prefabricated structure
 
Master Presentation Ali Bassiouny Darwish
Master Presentation Ali Bassiouny Darwish Master Presentation Ali Bassiouny Darwish
Master Presentation Ali Bassiouny Darwish
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
 
Construction mirror oct2014
Construction mirror oct2014Construction mirror oct2014
Construction mirror oct2014
 
UNIT 1
UNIT 1UNIT 1
UNIT 1
 
project management
project managementproject management
project management
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Modular Solutions: When and Why Should Charter Schools Consider It?

  • 1. Innovative Modular Solutions | www.innovativemodular.com Modular Solutions When and why should charter schools consider it
  • 2. Innovative Modular Solutions | www.innovativemodular.com About Innovative Modular Solutions  Founded in 1999 o Licensed general contractor / commercial modular contractor o Prime or specialty contractor, offering design-build services o Temporary and permanent projects of 400 to 100,000 square feet  Team of industry veterans with diverse, complementary skills Construction management Factory production, Quality Control General contracting Operations and Logistics Sales and Service management  All employees are CPR and first-aid trained.  All field workers are OSHA certified (10 or 30 hour).
  • 3. Innovative Modular Solutions | www.innovativemodular.com IMS Offers Accelerated Construction Technology
  • 4. Innovative Modular Solutions | www.innovativemodular.com Modular Construction Overview  Modular solutions provide an alternative method of construction.  Building components are manufactured in a controlled factory environment to the same building codes as conventional construction, using the same materials.  Partially finished components are transported to the project site, assembled and finished.  Modular buildings can be one, two or more stories.  Modular buildings can be temporary, semi-permanent or permanent.  Modular construction can be easily incorporated with other types of construction to capitalize on the advantages that each has to offer.
  • 5. Innovative Modular Solutions | www.innovativemodular.com Benefits of Modular Construction  Speed: On Time, Accelerated Construction Schedule o Concurrent site preparation and modular component fabrication o Reduced weather delays o Works well in areas where the construction season is short o Reduced job site ‘chaos’ – limited deliveries, limited disruption  Flexibility: Project Team Defines Design and Finish o Design of building as well as makeup of design team o Portability responds to changes in user demographics o Variety of financing options available  Cost: Controlled Budget Process o Replicable, standardized • Few change orders • Improved quality o Costs typically less than conventional construction
  • 6. Innovative Modular Solutions | www.innovativemodular.com Modular = Green  Inherently green – contributes to sustainable building initiatives  Limits site disturbance  Minimizes waste onsite due to factory construction and recycling  Eliminates environmental factors that affect building materials  Reduces overall construction time  Simplifies relocation and reuse of buildings  Saves energy through o Tighter Building Envelope o Efficient HVAC design o High insulation levels
  • 7. Innovative Modular Solutions | www.innovativemodular.com CONVENTIONAL—SITE BUILT CONSTRUCTION PRE-ENGINEERED CONSTRUCTION Project Site Deliver Cut Prepare Assemble Piece by Piece Raw Material Inputs Manufacturing Facility Deliver Cut, Prepare Ship Building Element Outputs Project Site Deliver Assemble Piece by Piece RelativeTimeScale Longest Delivery Cycle MODULAR CONSTRUCTION Manufacturing Facility Deliver Cut, Prepare Assemble Ship Building Component Outputs Project Site Deliver, Assemble Component by Component Shortest Delivery Cycle Raw Material Inputs Raw Material Inputs Construction Process:
  • 8. Innovative Modular Solutions | www.innovativemodular.com  Hybrid Construction is a Combination of Modular and Conventional, Pre-Engineered, or another Method of Construction o Common for Large Projects o Allows the Project to take Advantage of the Benefits of Different Methods o High Ceiling, Long Span Spaces can be Conventional or Pre-Engineered o Repetitive Spaces (Classrooms, Restrooms, Offices) can be Modular o Concurrent Construction - Preplanning Allows Modular Components to be Built Off-Site While Site Preparation Activities (Grading, Foundations, Utilities, etc.) are completed on site About Hybrid Construction
  • 9. Innovative Modular Solutions | www.innovativemodular.com Existing BuildingAddition Addition Future Building  Modular Construction easily accommodates Phased Construction o Future Additions (Horizontal) o Future Additions (Vertical) – Add a Second Floor o Future Upgrade to Finishes Phased Construction Offers Flexibility
  • 10. Innovative Modular Solutions | www.innovativemodular.com Types of Modular Construction Used at Charter Schools
  • 11. Innovative Modular Solutions | www.innovativemodular.com Temporary and Semi-Permanent Construction
  • 12. Innovative Modular Solutions | www.innovativemodular.com Permanent Modular Construction
  • 13. Innovative Modular Solutions | www.innovativemodular.com Custom Floorplans
  • 14. Innovative Modular Solutions | www.innovativemodular.com  The Project Team should review all material selections and specifications  Selections are easily customized to suit budgetary requirements and aesthetic needs  Selections include most options available in conventional construction  Material Selection drives the cost of any construction project  Customers should use and specify ‘commercial grade’ materials Material Selection
  • 15. Innovative Modular Solutions | www.innovativemodular.com Financing Options
  • 16. Innovative Modular Solutions | www.innovativemodular.com Financing Options Operating Lease – IMS retains ownership of the asset and the user to returns the building at the end of the lease. Capital Lease –IMS transfers ownership to the lessee at the end of the lease upon execution of a predetermined purchase option Finance Lease – User maintains ownership upon full payment of all applicable cost, monthly payments and finance charges. Gap Funding / Bridge loans – IMS can provide interim funding particularly for Charter Schools Bond Financing Considered a Depreciable Asset, Modular Buildings allow for more flexible financing
  • 17. Innovative Modular Solutions | www.innovativemodular.com Case Studies
  • 18. Innovative Modular Solutions | www.innovativemodular.com Jalen Rose Leadership Academy, Detroit, MI
  • 19. Innovative Modular Solutions | www.innovativemodular.com
  • 20. Innovative Modular Solutions | www.innovativemodular.com Old Redford Academy, Detroit, MI
  • 21. Innovative Modular Solutions | www.innovativemodular.com Dubois Integrity Academy, Atlanta, GA
  • 22. Innovative Modular Solutions | www.innovativemodular.com Modular building quality and design has improved significantly  Accelerated o Concurrent construction = shorter schedule  Cost effective o Factory costs are controlled, will maintain value if properly designed, built, and maintained  Flexible o Design and finish  Sustainable o Energy efficient, less disruption  Financing o Several options available Summary
  • 23. Innovative Modular Solutions | www.innovativemodular.com www.innovativemodular.com