SlideShare a Scribd company logo
1 of 2
Ian Rae
71 Ballantrae Crescent,
Newton Mearns
G77 5TX
Mobile:07834354628
ianrae80@hotmail.com
PROFILE
A motivated and enthusiastic time served commissioning electrician with 13 years
working within the industry. A broad skill set encompassing work experience in Oil and
Gas, Marine, Commercial, Domestic and Industrial arenas. A reliable self-starter who
can work well as part of a team and individually.
Qualifications and Credentials
 17th Edition Inspection & Testing
 SVQ Level III Electrical Installations
 CompEx 1-4
 SJIB Electrician with CSCS
 IRATA Rope Access Tech L1
 BOSIET Offshore Survival
 MIST
Work History
Dron and Dickson Britannia Platform Jan 14 - Present
Part of the Core Crew team on Britannia tasked with the maintenance of Electrical and
Instrumentation Systems on the both the Britannia and BLP. My role is to produce work
orders, raise permits, and carry out task risk assessments before carrying out the work
required. Pre-commissioning tests will be carried out before any new Electrical and
Instrumentation installations are put back into service. This varies from Lighting and
Small power, Fire & Gas to Telephone and PA systems. Cat B authorized to Isolate LV
circuits and live equipment. Duties include EX Inspections and the updating and
amending the ATEX database using the Arnlea system I then work as Charge-hand and
liaise with the Management team to complete specific tasks. As part of the Maintenance
team we carry out fault finding & install/commission new equipment as required.
AMEC LTC Project Britannia Platform March12 – Dec13
The LTC Module was a Pre-Wired Module requiring hook up to the Britannia Platform.
I was part of the Inspection and Testing Dept and then went on to support the
Commissioning Team, Pre Commissioning, Fire & Gas, Instrument, PA, HV and LV
Systems throughout the compression module. I was also involved with Tri-party walk
downs before system handovers commenced. As a Cat B Electrical Competent person I
assisted Magma Products when access was required to perform Live Testing during
commissioning. One of my roles on LTC was to input the various E&I documentation
into Go Completions software which was used on the project.
Amec Gaupe Project BG Armada & BG North Everest March11-Feb12
On the Armada Project I was involved in the Installation and Testing of the Fire
and Gas, Telephone and PA, Production Control and LV power circuits on the
new Gaupe Pipeline. I gained a sound understanding of the ISSOW system.
Being a Permit Authority I was also involved in raising Work Permits and TRAs
At the North Everest I was part of a team that installed a new Accommodation
Block. It was essentially split into 6 sections after construction in a yard and
reassembled offshore. It involved rerunning pre made ends back into position
and retesting and termination. After this we completed the installation and
commissioning of the new life Boat.
Amec Leman Uptime Project Leman Alpha July10-March11
The Leman project consisted of two damaged Generators being safely removed and
three new Gas powered Generators and all associated equipment being installed in
their place. There again was Fire & Gas, Lighting & Small Power, Telephone and PA
circuits installed. There was a host of new panels installed monitoring and controlling
the Generators.
References
Paul McVey
OCS Shell
paulmcvey2@hotmail.com
Rob Lawson
Elec Comm
Magma Products
roblawson76@hotmail.com

More Related Content

What's hot

Sigstad, John_Resume
Sigstad, John_ResumeSigstad, John_Resume
Sigstad, John_ResumeJohn Sigstad
 
Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013Chris Irvine
 
220 kV Solar Power at Satara - We did Complete Commissioning
220 kV Solar Power at Satara - We did Complete Commissioning220 kV Solar Power at Satara - We did Complete Commissioning
220 kV Solar Power at Satara - We did Complete CommissioningSystem Protection
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010kmccarthy1981
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015Mark Barbour
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015ashok kumar
 
Nate booker resume 2010
Nate booker resume 2010Nate booker resume 2010
Nate booker resume 2010Nate Booker
 
TonyCV updated5dec16

TonyCV updated5dec16
TonyCV updated5dec16

TonyCV updated5dec16
Tony Newlands
 
Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16Derek Smith
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016dil mus
 

What's hot (20)

Sigstad, John_Resume
Sigstad, John_ResumeSigstad, John_Resume
Sigstad, John_Resume
 
resume t atwood oper
resume t atwood operresume t atwood oper
resume t atwood oper
 
HV Testing
HV TestingHV Testing
HV Testing
 
Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013Chris Irvine Resume 27.09.2013
Chris Irvine Resume 27.09.2013
 
220 kV Solar Power at Satara - We did Complete Commissioning
220 kV Solar Power at Satara - We did Complete Commissioning220 kV Solar Power at Satara - We did Complete Commissioning
220 kV Solar Power at Satara - We did Complete Commissioning
 
Raheel iqbal CV1
Raheel iqbal CV1Raheel iqbal CV1
Raheel iqbal CV1
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
Nate booker resume 2010
Nate booker resume 2010Nate booker resume 2010
Nate booker resume 2010
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
TonyCV updated5dec16

TonyCV updated5dec16
TonyCV updated5dec16

TonyCV updated5dec16

 
MECP Projects _Updated on 03-April-2015_
MECP Projects _Updated on 03-April-2015_MECP Projects _Updated on 03-April-2015_
MECP Projects _Updated on 03-April-2015_
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
 
greenid cv
greenid cvgreenid cv
greenid cv
 

Similar to Ian Rae CV docx

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
Marc White CV NOV16
Marc White CV NOV16Marc White CV NOV16
Marc White CV NOV16Marc White
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015Jim Reaves
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning managerMartin Bennie
 
AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)Alex Marvelley
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerRONNEL DOMINGO
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALdarren sahlen
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen Barkwitch
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
RICHARD LEMIN CV 2016
RICHARD LEMIN  CV 2016RICHARD LEMIN  CV 2016
RICHARD LEMIN CV 2016Richard Lemin
 
Paul Barker CV Word
Paul Barker CV WordPaul Barker CV Word
Paul Barker CV WordPaul Barker
 
TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project Steve Troyan
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician Darren Fountain
 

Similar to Ian Rae CV docx (20)

RA CV Current
RA CV CurrentRA CV Current
RA CV Current
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
Marc White CV NOV16
Marc White CV NOV16Marc White CV NOV16
Marc White CV NOV16
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
R Venkatesan
R VenkatesanR Venkatesan
R Venkatesan
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
 
AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical Engineer
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERAL
 
Charlie_McGregor_CV
Charlie_McGregor_CVCharlie_McGregor_CV
Charlie_McGregor_CV
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
RICHARD LEMIN CV 2016
RICHARD LEMIN  CV 2016RICHARD LEMIN  CV 2016
RICHARD LEMIN CV 2016
 
Paul Barker CV Word
Paul Barker CV WordPaul Barker CV Word
Paul Barker CV Word
 
TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project
 
Kieran McCarthy CV
Kieran McCarthy CVKieran McCarthy CV
Kieran McCarthy CV
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician
 

Ian Rae CV docx

  • 1. Ian Rae 71 Ballantrae Crescent, Newton Mearns G77 5TX Mobile:07834354628 ianrae80@hotmail.com PROFILE A motivated and enthusiastic time served commissioning electrician with 13 years working within the industry. A broad skill set encompassing work experience in Oil and Gas, Marine, Commercial, Domestic and Industrial arenas. A reliable self-starter who can work well as part of a team and individually. Qualifications and Credentials  17th Edition Inspection & Testing  SVQ Level III Electrical Installations  CompEx 1-4  SJIB Electrician with CSCS  IRATA Rope Access Tech L1  BOSIET Offshore Survival  MIST Work History Dron and Dickson Britannia Platform Jan 14 - Present Part of the Core Crew team on Britannia tasked with the maintenance of Electrical and Instrumentation Systems on the both the Britannia and BLP. My role is to produce work orders, raise permits, and carry out task risk assessments before carrying out the work required. Pre-commissioning tests will be carried out before any new Electrical and Instrumentation installations are put back into service. This varies from Lighting and Small power, Fire & Gas to Telephone and PA systems. Cat B authorized to Isolate LV circuits and live equipment. Duties include EX Inspections and the updating and amending the ATEX database using the Arnlea system I then work as Charge-hand and liaise with the Management team to complete specific tasks. As part of the Maintenance team we carry out fault finding & install/commission new equipment as required. AMEC LTC Project Britannia Platform March12 – Dec13 The LTC Module was a Pre-Wired Module requiring hook up to the Britannia Platform. I was part of the Inspection and Testing Dept and then went on to support the Commissioning Team, Pre Commissioning, Fire & Gas, Instrument, PA, HV and LV Systems throughout the compression module. I was also involved with Tri-party walk
  • 2. downs before system handovers commenced. As a Cat B Electrical Competent person I assisted Magma Products when access was required to perform Live Testing during commissioning. One of my roles on LTC was to input the various E&I documentation into Go Completions software which was used on the project. Amec Gaupe Project BG Armada & BG North Everest March11-Feb12 On the Armada Project I was involved in the Installation and Testing of the Fire and Gas, Telephone and PA, Production Control and LV power circuits on the new Gaupe Pipeline. I gained a sound understanding of the ISSOW system. Being a Permit Authority I was also involved in raising Work Permits and TRAs At the North Everest I was part of a team that installed a new Accommodation Block. It was essentially split into 6 sections after construction in a yard and reassembled offshore. It involved rerunning pre made ends back into position and retesting and termination. After this we completed the installation and commissioning of the new life Boat. Amec Leman Uptime Project Leman Alpha July10-March11 The Leman project consisted of two damaged Generators being safely removed and three new Gas powered Generators and all associated equipment being installed in their place. There again was Fire & Gas, Lighting & Small Power, Telephone and PA circuits installed. There was a host of new panels installed monitoring and controlling the Generators. References Paul McVey OCS Shell paulmcvey2@hotmail.com Rob Lawson Elec Comm Magma Products roblawson76@hotmail.com