Trans Anatolian Natural Gas Pipeline Project
TANAP’S VISION AND MISSION
2
TANAP’S VISION:
“To create a new gas supply corridor from Azerbaijan to Europe in order to
enhance supply security and diversity in Turkish and European Gas Markets
and strengthen the economic cooperation among the countries in the supply
chain by stimulating the investments.”
TANAP’S MISSION:
“To build and operate a secure and reliable gas transmission pipeline system to
the highest quality, health and safety, environmental and social standards.”
 Existing/Potential Shareholders: SOCAR, BOTAŞ and BP
 FID (Resolution to Construct the P/L): 17 December 2013
 Initial investment for Phase-1: 16 bcma (6 bcma for BOTAŞ and 10 bcma for
TAP)
 Agreements that constitute the legal and commercial basis for the Project:
 Intergovernmental Agreement between Republic of Turkey and Republic of
Azerbaijan (İmza Tarihi: 26 Haziran 2012, Yürürlük Tarihi: 4 Nisan 2013)
 Host Government Agreement between Republic of Turkey and SOCAR
(HGA) (İmza Tarihi: 26 Haziran 2012, Yürürlük Tarihi: 4 Nisan 2013)
 Shareholders Agreement among SOCAR - BOTAŞ - BP
 Gas Transportation Agreement between TANAP and Shah Deniz
Consorsium
 Gas Transportation Agreement between TANAP and BOTAŞ
BACKGROUND
3
4
PROJECT SCOPE
PIPELINE
 1,810 km (From Georgia/Turkey border to Turkey-Greece border)
- 56“ - 1,333 km. (From Georgia-Turkey border to Eskişehir off-take point)
- 48“ - 458 km. (From Eskişehir off-take point to Turkey-Greece border)
- 2 x 36“ - 19 km. (Dardanelle Strait Crossing)
- 30“ - 31 km. (Lateral line to Eskişehir off-take point)
STATIONS
 Compressor stations (CS)
- Phase-1 (16 bcma) : 2 CS
- Phase-2 (24 bcma) : + 1 CS (Total 3)
- Phase-3 (31 bcma) : + 2 CS (Total 6)
 Fiscal Metering Station (FMS) : Georgia-Turkey border
 Metering Station (MS) : Turkey-Greece border
 2 x Pressure Reduction & Metering Station (PRMS): Eskişehir ve Thrace off-take points
 Pig launchers/receivers and block valves
TELECOM-SCADA SYSTEM
5
FEED PROGRESS
• FEED for Onshore Pipeline is completed as of April 2014 as planned.
• FEED completion for Stations is expected in early May 2014.
ROUTE SELECTION
• Centerline definition based on surveys and field studies completed for 1810 km
up to Greece Border - 100%
GEOHAZARD ASSESSMENT
• Geohazard assessment by EC with support of international consultant for
landslides completed for the entire route
• Identification of active faults and preliminary assessment of displacement
values completed, 13 faults are identified and will be assessed further during
detail engineering.
• 10 different locations found critical in 233 km section of the centerline.
• After re-routings, Rev. H route (100%) issued based upon field studies and
consultations with public authorities.
ENGINEERING STUDIES
6
ROUTE SELECTION
Main Route Selection Principles Applied
The process is constraint driven to “identify a technically feasible and safe
pipeline centerline, respectively AGI site with reasonably low impact on
environment and land use”
Constraint Based Principles:
• Environment (avoid no-go areas, minimize crossing of protected areas)
• Public Health and Safety (distance to settlements)
• Constructability (topography, geological extremities)
• Structural Integrity (geohazards – considered as key issue in Tanap route)
• Land Use (avoid areas of distinct utilization)
• Infrastructure (minimize crossings of major infrastructure)
• Construction cost (pipeline length)
7
ROUTE SELECTION
Methodology Applied for Route Selection Process
• Pre-definitions: Entry & exit points and areas for off-takes
• Project Corridor: selection based on evaluation of major constraints high level
“resistance factors” by GIS application (desktop study)
• Route alternatives inside project corridor: evaluation based on refined
“resistance factors” (ESIA no-go) by GIS application (desktop study)
• Preferred Corridor – 2 km: further refined evaluation of resistance data (e.g.
geohazard mapping) by GIS application, basically as desktop study, supported
by engineering judgment
• Specified Corridor - 500 m: as combined field and desktop exercise with
refined geohazard assessment (aerial photo + DTM available)
• Centerline (construction corridor) as combined field and desktop exercise with
detailed geohazard assessment and consideration of ESIA and Land
Acquisition issues (aerial photo + vector data available)
8
ROUTE SELECTION
Route - Overview
Approx. (predominant) Terrain Conditions
Plain to hilly 40%
Hilly to mountainous30%
Mountainous 30%
Greece Offshore Eskisehir Ankara Sivas Erzurum Kars Posof
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
9
PIPELINE ELEVATION PROFILE (ONSHORE)
Thrace Offtake
1,739.50 km
10
PIPELINE ELEVATION PROFILE (OFFSHORE)
Thrace Offtake
1,739.50 km
11
MAJOR CHALLENGES
12
 Tight Project Schedule (1st Gas to BOTAŞ: June 2018)
 Largest diameter (56/48 inch) and longest (1810 km) pipeline ever built in
Turkey
 Handling and transportation problems (Use of 1.200.000 tonnes of X70 steel /
160.000 steel pipes (˃ 8 tonnes each) / 3 steel pipes only per wagon/trailer)
 High altitude regions with short construction
season - Only 110 days in mountainous regions
13
MAJOR CHALLENGES
 Number of crossings (roads, railways, existing pipelines, wet lands, rivers and
Dardanelle Strait with congested traffic)
 Mountaineous terrain with steep slopes,
14
MAJOR CHALLENGES
 Land acquisitions and expropriations by Land Rights Entity (BOTAŞ)
 Expropriation Decision by BOTAS/LRE
 Decision of Public Interest (by MENR)
 Authorization to apply for Article 27 (by Cabinet of Ministers)
 Paralelism protocol with BOTAŞ for existing pipelines signed
 Approval and publication of Livelihood Restoration Plan / Resettlement Action
Plan (in progress)
 Land acqusitions based upon amicable solutions
 Collection of parcel and owner information completed for 500 m corridor
15
LAND ACQUISITIONS AND EXPROPRIATIONS
16
 EIA/ESIA study incomplaince with lender (IFC, EIB) requirements
 1 x Local and 2 x International ESIA consultants
 Local ESIA process is in progress with MoEU
 Public Participation Meetings (PPMs) conducted in March 2013 in 21
provinces and 56 districts along the route as preliminary engagement of ESIA
process
 Stakeholder Engagement Plan (SEP) finalised by Q4 of 2013
 Complementary public hearing meetings conducted as a part of overall SEP
 Grievance Mechanism Framework prepared in accordance with existing
national and international policies, procedures, laws and regulations
 Stakeholder Engagement and Grievance Mechanism Management (ongoing)
 Submission of EIA/ESIA Report to MoEU for approval: April 2014
 ESIA approval by ESIA Advisor : June 2014
 EIA approval by MoEU expected in August 2014
EIA/ESIA
17
EIA/ESIA
PUBLIC PARTICIPATION
18
EIA/ESIA
STAKEHOLDER ENGAGEMENT AND GRIEVANCE MANAGEMENT
Registeration Monitoring Reporting
19
PROCUREMENT AND CONTRACTING
 Procurement of LLIs
 Line pipes (prequalification completed, ITB issued, bid submissions in
April 2014)
 Block valves and actuators (Prequalification on-going)
 Turbo compressor units (ITB documents under preparation)
 Selection of EPC Contractors for Onshore Pipeline Construction
(prequalification completed, issuance of ITB to short-listed companies in
April 2014)
 Selection of EPC Contractors for Stations (prequalification on-going)
 Selection of EPC Contractors for Offshore Pipeline Construction
(preliminary studies on-going)
 Selection of EPC Contractor for Telecom/Scada System (prequalification
package under preparation)
ʺ Start of Construction of Onshore Pipeline expected in April 2015ʺ
20
THANK YOU

More Related Content

What's hot

Cement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessCement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessJohn Kline
 
Myanmar offshore supply base options
Myanmar offshore supply base optionsMyanmar offshore supply base options
Myanmar offshore supply base optionsZaw Naing
 
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...Sardegna Ricerche
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020David Seow
 
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAGreen Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAFadi Maalouf, PMP
 
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...OECD Environment
 
Specifics of Managing Large, Complex Projects
Specifics of Managing Large, Complex ProjectsSpecifics of Managing Large, Complex Projects
Specifics of Managing Large, Complex ProjectsJeremie Averous
 
20230328_EV Charging & Battery Swap v3.pdf
20230328_EV Charging & Battery Swap v3.pdf20230328_EV Charging & Battery Swap v3.pdf
20230328_EV Charging & Battery Swap v3.pdfdikas7
 

What's hot (10)

Cement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessCement and CO2: A Victim of Success
Cement and CO2: A Victim of Success
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Lng eng
Lng engLng eng
Lng eng
 
Myanmar offshore supply base options
Myanmar offshore supply base optionsMyanmar offshore supply base options
Myanmar offshore supply base options
 
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...
Produzione di idrogeno verde su larga scala: un fattore abilitante della tran...
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020
 
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAGreen Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOA
 
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...
Green hydrogen production potential and opportunities for Vietnam, Dr Pham Du...
 
Specifics of Managing Large, Complex Projects
Specifics of Managing Large, Complex ProjectsSpecifics of Managing Large, Complex Projects
Specifics of Managing Large, Complex Projects
 
20230328_EV Charging & Battery Swap v3.pdf
20230328_EV Charging & Battery Swap v3.pdf20230328_EV Charging & Battery Swap v3.pdf
20230328_EV Charging & Battery Swap v3.pdf
 

Viewers also liked

Transmission and transnational gas pipelines
Transmission and transnational gas pipelinesTransmission and transnational gas pipelines
Transmission and transnational gas pipelinesRiddhima Kartik
 
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.Md Abdur Rashid Rony
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesvinod kumar
 
Subsea Pipeline Engineering
Subsea Pipeline EngineeringSubsea Pipeline Engineering
Subsea Pipeline EngineeringpetroEDGE
 
Design of an Export Pipeline
Design of an Export Pipeline Design of an Export Pipeline
Design of an Export Pipeline Sarah Busef
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...Sigve Hamilton Aspelund
 

Viewers also liked (11)

Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Transmission and transnational gas pipelines
Transmission and transnational gas pipelinesTransmission and transnational gas pipelines
Transmission and transnational gas pipelines
 
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
 
Subsea Pipeline Engineering
Subsea Pipeline EngineeringSubsea Pipeline Engineering
Subsea Pipeline Engineering
 
Design of an Export Pipeline
Design of an Export Pipeline Design of an Export Pipeline
Design of an Export Pipeline
 
INIO2014 Presentation
INIO2014 PresentationINIO2014 Presentation
INIO2014 Presentation
 
C&i systems
C&i systemsC&i systems
C&i systems
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...
Inspection & maintenance of subsea pipeline and offshore, Sigve Hamilton Aspe...
 
ppt on PLC
ppt on PLCppt on PLC
ppt on PLC
 

Similar to TANAP - Trans Anatolian Natural Gas Pipeline Project

Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Projectzubeditufail
 
Opportunities for the Hydrographic Sector Using Satellite Observation Services
Opportunities for the Hydrographic Sector Using Satellite Observation ServicesOpportunities for the Hydrographic Sector Using Satellite Observation Services
Opportunities for the Hydrographic Sector Using Satellite Observation ServicesHydrographic Society Benelux
 
Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and DataStankovic G
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Saksham Bhutani
 
FERC Draft Environmental Impact Statement for Constitution Pipeline
FERC Draft Environmental Impact Statement for Constitution PipelineFERC Draft Environmental Impact Statement for Constitution Pipeline
FERC Draft Environmental Impact Statement for Constitution PipelineMarcellus Drilling News
 
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSS
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSSUKRAINE - UKraine Replication, Awareness and INnovation based on EGNSS
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSSThe European GNSS Agency (GSA)
 
Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)Parag Chaubey
 
TGS GPS- Post Well Analysis - mid Norway
TGS GPS- Post Well Analysis - mid Norway TGS GPS- Post Well Analysis - mid Norway
TGS GPS- Post Well Analysis - mid Norway TGS
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahoreAyesha Akhtar
 
PROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDUPROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDUSubhendu Samui
 
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUISubhendu Samui
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale BridgeZeynepUla2
 
Copernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus ECMWF
 
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...Integrated Carbon Observation System (ICOS)
 
Romania - Turkey cable.ppt
Romania - Turkey cable.pptRomania - Turkey cable.ppt
Romania - Turkey cable.pptAndreiP9
 

Similar to TANAP - Trans Anatolian Natural Gas Pipeline Project (20)

Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
 
Opportunities for the Hydrographic Sector Using Satellite Observation Services
Opportunities for the Hydrographic Sector Using Satellite Observation ServicesOpportunities for the Hydrographic Sector Using Satellite Observation Services
Opportunities for the Hydrographic Sector Using Satellite Observation Services
 
Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and Data
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
FGSA_RHS_Workshop
FGSA_RHS_WorkshopFGSA_RHS_Workshop
FGSA_RHS_Workshop
 
FERC Draft Environmental Impact Statement for Constitution Pipeline
FERC Draft Environmental Impact Statement for Constitution PipelineFERC Draft Environmental Impact Statement for Constitution Pipeline
FERC Draft Environmental Impact Statement for Constitution Pipeline
 
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSS
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSSUKRAINE - UKraine Replication, Awareness and INnovation based on EGNSS
UKRAINE - UKraine Replication, Awareness and INnovation based on EGNSS
 
Towards an anthropogenic CO2 emissions monitoring system
Towards an anthropogenic CO2 emissions monitoring systemTowards an anthropogenic CO2 emissions monitoring system
Towards an anthropogenic CO2 emissions monitoring system
 
Formulation of detailed project report(final)
Formulation of detailed project report(final)Formulation of detailed project report(final)
Formulation of detailed project report(final)
 
TGS GPS- Post Well Analysis - mid Norway
TGS GPS- Post Well Analysis - mid Norway TGS GPS- Post Well Analysis - mid Norway
TGS GPS- Post Well Analysis - mid Norway
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Rehder, Gregor: Making Atmopheric measurements onboard SOOPs
Rehder, Gregor: Making Atmopheric measurements onboard SOOPsRehder, Gregor: Making Atmopheric measurements onboard SOOPs
Rehder, Gregor: Making Atmopheric measurements onboard SOOPs
 
PROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDUPROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDU
 
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale Bridge
 
Gis Application
Gis ApplicationGis Application
Gis Application
 
Copernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introductionCopernicus Atmosphere Monitoring Service - An introduction
Copernicus Atmosphere Monitoring Service - An introduction
 
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...
Sha Mahesh, Kumar: Measurements of greenhouse gases from ground-based remote ...
 
Romania - Turkey cable.ppt
Romania - Turkey cable.pptRomania - Turkey cable.ppt
Romania - Turkey cable.ppt
 
Security of Gas Supply in the Energy Community
Security of Gas Supply in the Energy CommunitySecurity of Gas Supply in the Energy Community
Security of Gas Supply in the Energy Community
 

More from ITE Oil&Gas

Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...ITE Oil&Gas
 
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015Update on realization of GEMM 2015: Georgian Electricity Market Model 2015
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015ITE Oil&Gas
 
Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?ITE Oil&Gas
 
Energy community: scope, functioning and implications for Georgia
Energy community: scope, functioning and implications for GeorgiaEnergy community: scope, functioning and implications for Georgia
Energy community: scope, functioning and implications for GeorgiaITE Oil&Gas
 
Oil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsOil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsITE Oil&Gas
 
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...ITE Oil&Gas
 
Turkish E&P Sector & New Petroleum Law
Turkish E&P Sector & New Petroleum LawTurkish E&P Sector & New Petroleum Law
Turkish E&P Sector & New Petroleum LawITE Oil&Gas
 
Smart Fractured Reservoir Development Strategies
Smart Fractured Reservoir Development StrategiesSmart Fractured Reservoir Development Strategies
Smart Fractured Reservoir Development StrategiesITE Oil&Gas
 
Exploration & Production onshore and offshore: technical challenges and their...
Exploration & Production onshore and offshore: technical challenges and their...Exploration & Production onshore and offshore: technical challenges and their...
Exploration & Production onshore and offshore: technical challenges and their...ITE Oil&Gas
 

More from ITE Oil&Gas (9)

Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
Turkmen gas for consumers in Europe – a fully fledged Southern Gas Corridor i...
 
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015Update on realization of GEMM 2015: Georgian Electricity Market Model 2015
Update on realization of GEMM 2015: Georgian Electricity Market Model 2015
 
Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?
 
Energy community: scope, functioning and implications for Georgia
Energy community: scope, functioning and implications for GeorgiaEnergy community: scope, functioning and implications for Georgia
Energy community: scope, functioning and implications for Georgia
 
Oil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsOil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projects
 
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...
Global Development & Trends in Turkey & its Neighbours & the Rest of the Oil ...
 
Turkish E&P Sector & New Petroleum Law
Turkish E&P Sector & New Petroleum LawTurkish E&P Sector & New Petroleum Law
Turkish E&P Sector & New Petroleum Law
 
Smart Fractured Reservoir Development Strategies
Smart Fractured Reservoir Development StrategiesSmart Fractured Reservoir Development Strategies
Smart Fractured Reservoir Development Strategies
 
Exploration & Production onshore and offshore: technical challenges and their...
Exploration & Production onshore and offshore: technical challenges and their...Exploration & Production onshore and offshore: technical challenges and their...
Exploration & Production onshore and offshore: technical challenges and their...
 

Recently uploaded

call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSebastiano Panichella
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 

Recently uploaded (20)

call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 

TANAP - Trans Anatolian Natural Gas Pipeline Project

  • 1. 1 Trans Anatolian Natural Gas Pipeline Project
  • 2. TANAP’S VISION AND MISSION 2 TANAP’S VISION: “To create a new gas supply corridor from Azerbaijan to Europe in order to enhance supply security and diversity in Turkish and European Gas Markets and strengthen the economic cooperation among the countries in the supply chain by stimulating the investments.” TANAP’S MISSION: “To build and operate a secure and reliable gas transmission pipeline system to the highest quality, health and safety, environmental and social standards.”
  • 3.  Existing/Potential Shareholders: SOCAR, BOTAŞ and BP  FID (Resolution to Construct the P/L): 17 December 2013  Initial investment for Phase-1: 16 bcma (6 bcma for BOTAŞ and 10 bcma for TAP)  Agreements that constitute the legal and commercial basis for the Project:  Intergovernmental Agreement between Republic of Turkey and Republic of Azerbaijan (İmza Tarihi: 26 Haziran 2012, Yürürlük Tarihi: 4 Nisan 2013)  Host Government Agreement between Republic of Turkey and SOCAR (HGA) (İmza Tarihi: 26 Haziran 2012, Yürürlük Tarihi: 4 Nisan 2013)  Shareholders Agreement among SOCAR - BOTAŞ - BP  Gas Transportation Agreement between TANAP and Shah Deniz Consorsium  Gas Transportation Agreement between TANAP and BOTAŞ BACKGROUND 3
  • 4. 4 PROJECT SCOPE PIPELINE  1,810 km (From Georgia/Turkey border to Turkey-Greece border) - 56“ - 1,333 km. (From Georgia-Turkey border to Eskişehir off-take point) - 48“ - 458 km. (From Eskişehir off-take point to Turkey-Greece border) - 2 x 36“ - 19 km. (Dardanelle Strait Crossing) - 30“ - 31 km. (Lateral line to Eskişehir off-take point) STATIONS  Compressor stations (CS) - Phase-1 (16 bcma) : 2 CS - Phase-2 (24 bcma) : + 1 CS (Total 3) - Phase-3 (31 bcma) : + 2 CS (Total 6)  Fiscal Metering Station (FMS) : Georgia-Turkey border  Metering Station (MS) : Turkey-Greece border  2 x Pressure Reduction & Metering Station (PRMS): Eskişehir ve Thrace off-take points  Pig launchers/receivers and block valves TELECOM-SCADA SYSTEM
  • 5. 5 FEED PROGRESS • FEED for Onshore Pipeline is completed as of April 2014 as planned. • FEED completion for Stations is expected in early May 2014. ROUTE SELECTION • Centerline definition based on surveys and field studies completed for 1810 km up to Greece Border - 100% GEOHAZARD ASSESSMENT • Geohazard assessment by EC with support of international consultant for landslides completed for the entire route • Identification of active faults and preliminary assessment of displacement values completed, 13 faults are identified and will be assessed further during detail engineering. • 10 different locations found critical in 233 km section of the centerline. • After re-routings, Rev. H route (100%) issued based upon field studies and consultations with public authorities. ENGINEERING STUDIES
  • 6. 6 ROUTE SELECTION Main Route Selection Principles Applied The process is constraint driven to “identify a technically feasible and safe pipeline centerline, respectively AGI site with reasonably low impact on environment and land use” Constraint Based Principles: • Environment (avoid no-go areas, minimize crossing of protected areas) • Public Health and Safety (distance to settlements) • Constructability (topography, geological extremities) • Structural Integrity (geohazards – considered as key issue in Tanap route) • Land Use (avoid areas of distinct utilization) • Infrastructure (minimize crossings of major infrastructure) • Construction cost (pipeline length)
  • 7. 7 ROUTE SELECTION Methodology Applied for Route Selection Process • Pre-definitions: Entry & exit points and areas for off-takes • Project Corridor: selection based on evaluation of major constraints high level “resistance factors” by GIS application (desktop study) • Route alternatives inside project corridor: evaluation based on refined “resistance factors” (ESIA no-go) by GIS application (desktop study) • Preferred Corridor – 2 km: further refined evaluation of resistance data (e.g. geohazard mapping) by GIS application, basically as desktop study, supported by engineering judgment • Specified Corridor - 500 m: as combined field and desktop exercise with refined geohazard assessment (aerial photo + DTM available) • Centerline (construction corridor) as combined field and desktop exercise with detailed geohazard assessment and consideration of ESIA and Land Acquisition issues (aerial photo + vector data available)
  • 8. 8 ROUTE SELECTION Route - Overview Approx. (predominant) Terrain Conditions Plain to hilly 40% Hilly to mountainous30% Mountainous 30% Greece Offshore Eskisehir Ankara Sivas Erzurum Kars Posof 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00
  • 9. 9 PIPELINE ELEVATION PROFILE (ONSHORE) Thrace Offtake 1,739.50 km
  • 10. 10 PIPELINE ELEVATION PROFILE (OFFSHORE) Thrace Offtake 1,739.50 km
  • 11. 11
  • 13.  Tight Project Schedule (1st Gas to BOTAŞ: June 2018)  Largest diameter (56/48 inch) and longest (1810 km) pipeline ever built in Turkey  Handling and transportation problems (Use of 1.200.000 tonnes of X70 steel / 160.000 steel pipes (˃ 8 tonnes each) / 3 steel pipes only per wagon/trailer)  High altitude regions with short construction season - Only 110 days in mountainous regions 13 MAJOR CHALLENGES
  • 14.  Number of crossings (roads, railways, existing pipelines, wet lands, rivers and Dardanelle Strait with congested traffic)  Mountaineous terrain with steep slopes, 14 MAJOR CHALLENGES
  • 15.  Land acquisitions and expropriations by Land Rights Entity (BOTAŞ)  Expropriation Decision by BOTAS/LRE  Decision of Public Interest (by MENR)  Authorization to apply for Article 27 (by Cabinet of Ministers)  Paralelism protocol with BOTAŞ for existing pipelines signed  Approval and publication of Livelihood Restoration Plan / Resettlement Action Plan (in progress)  Land acqusitions based upon amicable solutions  Collection of parcel and owner information completed for 500 m corridor 15 LAND ACQUISITIONS AND EXPROPRIATIONS
  • 16. 16  EIA/ESIA study incomplaince with lender (IFC, EIB) requirements  1 x Local and 2 x International ESIA consultants  Local ESIA process is in progress with MoEU  Public Participation Meetings (PPMs) conducted in March 2013 in 21 provinces and 56 districts along the route as preliminary engagement of ESIA process  Stakeholder Engagement Plan (SEP) finalised by Q4 of 2013  Complementary public hearing meetings conducted as a part of overall SEP  Grievance Mechanism Framework prepared in accordance with existing national and international policies, procedures, laws and regulations  Stakeholder Engagement and Grievance Mechanism Management (ongoing)  Submission of EIA/ESIA Report to MoEU for approval: April 2014  ESIA approval by ESIA Advisor : June 2014  EIA approval by MoEU expected in August 2014 EIA/ESIA
  • 18. 18 EIA/ESIA STAKEHOLDER ENGAGEMENT AND GRIEVANCE MANAGEMENT Registeration Monitoring Reporting
  • 19. 19 PROCUREMENT AND CONTRACTING  Procurement of LLIs  Line pipes (prequalification completed, ITB issued, bid submissions in April 2014)  Block valves and actuators (Prequalification on-going)  Turbo compressor units (ITB documents under preparation)  Selection of EPC Contractors for Onshore Pipeline Construction (prequalification completed, issuance of ITB to short-listed companies in April 2014)  Selection of EPC Contractors for Stations (prequalification on-going)  Selection of EPC Contractors for Offshore Pipeline Construction (preliminary studies on-going)  Selection of EPC Contractor for Telecom/Scada System (prequalification package under preparation) ʺ Start of Construction of Onshore Pipeline expected in April 2015ʺ