GMI700/31Ux – Use of A-
frame – Integration Phase
(a bench with slave parts of the vehicle) to test the
wiring supplied for each vehicle to avoid reworks
during assembly process due to quality issues from
supplier or mismatch between property options and
wiring circuits.
 GMI700/31Ux Program – New mid size truck & SUV
for emerging markets (like Chevrolet Colorado in the
US). Join Venture between GM and Isuzu Japan.
There were About 300 vehicles assembled in the
experimental engineering (50 mules, 250 integration).
 Many issues in integration phase were found during
final check of vehicle before calling sign off. Issues
related to the poor quality of wiring prototypes and
related to the wiring design process.
 Consequence: unexpected reworks in a urgency way
in order to not jeopardize the sign off date and delivery
to proving grounds. Wiring is a hidden part and time
wasting in unavoidable depending on the kind and
location of the issue (engine or passenger
compartments).
 What was the challenge: reduce the risk of rework activities
during complete vehicle final check and impact in next step
(sign off and tests beginning in the proving ground).
 There was about 250 vehicles to be assembled in the
experimental engineering in five different buckets (one year
and a half). Many features and features combinations in the
same time (engines, cabins, drive lines, drive sides, others).
 Electrical laboratory examined only few combinations due to
space, time and cost constraints. Visual checks and beep
tests in the supplier were not able to got all the issues once
bad crimpings were hidden inside connector’s housing. Other
issues were related to EPL’s (Electronic Part List containing
all harness part numbers) and Netlist’s (list of all circuits of
vehicle) files quality and markup manual selection of part
numbers.
 Consequences: harness part numbers selected were not
compatible with vehicle features or were delivered with
missing, inverted or wrong circuits (short/long/others).
 Two additional benches were built by the electrical laboratory and
sent to PPO (Pre Production Operations). Benches contained all
electrical parts used in all vehicle versions (batteries, fuse boxes,
ECU’s, clusters, switches, power window motors, door lock motors,
head lamps, rear lamps, others). One bench was arranged for LHD
(left hand drive) version and the other one for RHD (right hand
drive) version according to each harness different layout
configuration.
 A list with all vehicles to be assembled during a specific bucket was
printed from GM Embassy system. The list contained the property
number and the RPO’s (sequence of features codes) applied to it.
 The complete schematic of all vehicle versions and used for
harness construction was provided and two electricians were
allocated to execute the two EVC’s – Electrical Vehicle Check. A flip
chart to write all issues found during the EVC of each vehicle was
used by the operators. All parts in the bench remained fixed (slave
parts) except the wiring harness set. Each property wiring harness
set was tested connecting and energizing all parts and testing the
most common functions (lighting, power windows, power mirrors,
radio, ventilation, others). Complete activity including installing and
 There was a drastic reduction of unexpected reworks due to electrical issues caused by wirings
during final check of complete vehicle. More confident to call sign off and deliver vehicle to
proving ground on time (big 4). Interference issues and other issues related to the layout of the
harness still found in the vehicle during assembly process however the impact of those in the
activities were small.
 It was possible to anticipate and register schematic, EPL and Netlist issues into PRTS (Problem
Resolution Tracking System) before starting vehicle assembly.
 It was possible to anticipate and register supplier quality issues into PRR (Problem Resolution
Report). Supplier provided a part time resident engineer to perform wiring reworks during the EVC
activity.
 All reworks were registered in time by Design Release Engineer (DRE) into GM E2 system
through edition of a WO BSD (Work Oder – Built Site Direction).
 Change in the MRD (Material Request Date) for wiring harness set in order to accommodate the
time necessary to complete EVC activities. Supplier agreement to deliver the set in anticipation to
the official MRD provided by the program management.
 Possibility to convert the two benches to LHD or RHD versions depending on the amount of
vehicles of a specific configuration in a bucket.
 Extension of the EVC activity to other programs and platforms. Started in GMI700 (Mid Size
Truck), extended to GMI31Ux (SUV), Global Small Vehicle (GSV – Cobalt and Spin) and others.

More Related Content

What's hot (20)

Belle River Simulator: A GSE, DTE and ABB Collaboration
Belle River Simulator: A GSE, DTE and ABB CollaborationBelle River Simulator: A GSE, DTE and ABB Collaboration
Belle River Simulator: A GSE, DTE and ABB Collaboration
 
Function blocks and scheduling
Function blocks and scheduling Function blocks and scheduling
Function blocks and scheduling
 
cv ehab
cv ehabcv ehab
cv ehab
 
Sherif CV
Sherif CVSherif CV
Sherif CV
 
Raghavendra Rao A
Raghavendra Rao ARaghavendra Rao A
Raghavendra Rao A
 
Device exchange and calibration
Device exchange and calibration Device exchange and calibration
Device exchange and calibration
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
Control & HMI Emulation Project
Control & HMI Emulation ProjectControl & HMI Emulation Project
Control & HMI Emulation Project
 
Ziad .CV
Ziad .CVZiad .CV
Ziad .CV
 
Bharath Resume
Bharath Resume Bharath Resume
Bharath Resume
 
Mohamed A.Razaq
Mohamed A.RazaqMohamed A.Razaq
Mohamed A.Razaq
 
FYP PPT
FYP PPTFYP PPT
FYP PPT
 
Resume-Bill_2016
Resume-Bill_2016Resume-Bill_2016
Resume-Bill_2016
 
CV_Dominic_Issac_DelatV Control System Engineer
CV_Dominic_Issac_DelatV Control System EngineerCV_Dominic_Issac_DelatV Control System Engineer
CV_Dominic_Issac_DelatV Control System Engineer
 
airvolt poster
airvolt posterairvolt poster
airvolt poster
 
DG cement exprnc
DG cement exprncDG cement exprnc
DG cement exprnc
 
Khaled Abdel Aziz C.V
Khaled Abdel Aziz C.VKhaled Abdel Aziz C.V
Khaled Abdel Aziz C.V
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 
Portfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENGPortfolio of skills_ROMANO_Claudio - ENG
Portfolio of skills_ROMANO_Claudio - ENG
 

Viewers also liked

Photography slide show
Photography slide showPhotography slide show
Photography slide showEmily Berbells
 
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...OmniCure
 
3100 Ozada Ave parkade roof membrane
3100 Ozada Ave parkade roof membrane3100 Ozada Ave parkade roof membrane
3100 Ozada Ave parkade roof membraneroaron
 
Sealed Air UPS Case Study
Sealed Air UPS Case StudySealed Air UPS Case Study
Sealed Air UPS Case StudyUPS Longitudes
 
OmniCure UV Curing Radtech 2014
OmniCure UV Curing Radtech 2014OmniCure UV Curing Radtech 2014
OmniCure UV Curing Radtech 2014OmniCure
 
The Rise of Smart Operations
The Rise of Smart OperationsThe Rise of Smart Operations
The Rise of Smart OperationsUPS Longitudes
 

Viewers also liked (11)

Mar 2015
Mar 2015Mar 2015
Mar 2015
 
Photography slide show
Photography slide showPhotography slide show
Photography slide show
 
About me presentation
About me presentationAbout me presentation
About me presentation
 
Innovative use of technology
Innovative use of technologyInnovative use of technology
Innovative use of technology
 
Final-Presentation (2)
Final-Presentation (2)Final-Presentation (2)
Final-Presentation (2)
 
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...
Multi-zone Irradiance Control in UV LED Systems for Uniform Curing of Non-Lin...
 
3100 Ozada Ave parkade roof membrane
3100 Ozada Ave parkade roof membrane3100 Ozada Ave parkade roof membrane
3100 Ozada Ave parkade roof membrane
 
Made in China 2.0
Made in China 2.0Made in China 2.0
Made in China 2.0
 
Sealed Air UPS Case Study
Sealed Air UPS Case StudySealed Air UPS Case Study
Sealed Air UPS Case Study
 
OmniCure UV Curing Radtech 2014
OmniCure UV Curing Radtech 2014OmniCure UV Curing Radtech 2014
OmniCure UV Curing Radtech 2014
 
The Rise of Smart Operations
The Rise of Smart OperationsThe Rise of Smart Operations
The Rise of Smart Operations
 

Similar to Behaviour Based Interviewing Humberto Ribeiro

Jerald j.2 10-2020 Resume
Jerald j.2 10-2020 ResumeJerald j.2 10-2020 Resume
Jerald j.2 10-2020 ResumeJerald Jones
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Todd Calvert
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
Car electronization trend in automotive industry
Car electronization   trend in automotive industryCar electronization   trend in automotive industry
Car electronization trend in automotive industryKenji Suzuki
 
AAI Notable Projects
AAI Notable ProjectsAAI Notable Projects
AAI Notable ProjectsSrijita Mori
 
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...Cheryl Tulkoff
 
Ramawadh yadav profile
Ramawadh yadav profileRamawadh yadav profile
Ramawadh yadav profileramand
 
Srinivas avioinics 6yrs
Srinivas avioinics 6yrsSrinivas avioinics 6yrs
Srinivas avioinics 6yrsSrinivas KV
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_oAllan Lewis
 
BOA nCode Case Study
BOA nCode Case StudyBOA nCode Case Study
BOA nCode Case StudyHao Nguyen
 
Electrical_Resume_03082015
Electrical_Resume_03082015Electrical_Resume_03082015
Electrical_Resume_03082015Daniel Monroe
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_oAllan Lewis
 
J1939 elektronik automotive_200809_pressarticle_en
J1939 elektronik automotive_200809_pressarticle_enJ1939 elektronik automotive_200809_pressarticle_en
J1939 elektronik automotive_200809_pressarticle_enJoko Setio Purnomo
 
CV Wally Hudnall 2016
CV Wally Hudnall 2016CV Wally Hudnall 2016
CV Wally Hudnall 2016Wally Hudnall
 

Similar to Behaviour Based Interviewing Humberto Ribeiro (20)

Jerald j.2 10-2020 Resume
Jerald j.2 10-2020 ResumeJerald j.2 10-2020 Resume
Jerald j.2 10-2020 Resume
 
K Singh CV 2015
K Singh CV 2015K Singh CV 2015
K Singh CV 2015
 
Michael%20Weir-3
Michael%20Weir-3Michael%20Weir-3
Michael%20Weir-3
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Resume
ResumeResume
Resume
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Car electronization trend in automotive industry
Car electronization   trend in automotive industryCar electronization   trend in automotive industry
Car electronization trend in automotive industry
 
AAI Notable Projects
AAI Notable ProjectsAAI Notable Projects
AAI Notable Projects
 
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...
Enhancing & Predicting Auto Reliability Using Physics of Failure Software Mod...
 
Ramawadh yadav profile
Ramawadh yadav profileRamawadh yadav profile
Ramawadh yadav profile
 
2015 formula-hybrid-rules-rev-3
2015 formula-hybrid-rules-rev-32015 formula-hybrid-rules-rev-3
2015 formula-hybrid-rules-rev-3
 
Srinivas avioinics 6yrs
Srinivas avioinics 6yrsSrinivas avioinics 6yrs
Srinivas avioinics 6yrs
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
 
BOA nCode Case Study
BOA nCode Case StudyBOA nCode Case Study
BOA nCode Case Study
 
Electrical_Resume_03082015
Electrical_Resume_03082015Electrical_Resume_03082015
Electrical_Resume_03082015
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
 
J1939 elektronik automotive_200809_pressarticle_en
J1939 elektronik automotive_200809_pressarticle_enJ1939 elektronik automotive_200809_pressarticle_en
J1939 elektronik automotive_200809_pressarticle_en
 
Embedded Systems in Automotive
Embedded Systems in Automotive Embedded Systems in Automotive
Embedded Systems in Automotive
 
CV Wally Hudnall 2016
CV Wally Hudnall 2016CV Wally Hudnall 2016
CV Wally Hudnall 2016
 

Behaviour Based Interviewing Humberto Ribeiro

  • 1. GMI700/31Ux – Use of A- frame – Integration Phase (a bench with slave parts of the vehicle) to test the wiring supplied for each vehicle to avoid reworks during assembly process due to quality issues from supplier or mismatch between property options and wiring circuits.
  • 2.  GMI700/31Ux Program – New mid size truck & SUV for emerging markets (like Chevrolet Colorado in the US). Join Venture between GM and Isuzu Japan. There were About 300 vehicles assembled in the experimental engineering (50 mules, 250 integration).  Many issues in integration phase were found during final check of vehicle before calling sign off. Issues related to the poor quality of wiring prototypes and related to the wiring design process.  Consequence: unexpected reworks in a urgency way in order to not jeopardize the sign off date and delivery to proving grounds. Wiring is a hidden part and time wasting in unavoidable depending on the kind and location of the issue (engine or passenger compartments).
  • 3.  What was the challenge: reduce the risk of rework activities during complete vehicle final check and impact in next step (sign off and tests beginning in the proving ground).  There was about 250 vehicles to be assembled in the experimental engineering in five different buckets (one year and a half). Many features and features combinations in the same time (engines, cabins, drive lines, drive sides, others).  Electrical laboratory examined only few combinations due to space, time and cost constraints. Visual checks and beep tests in the supplier were not able to got all the issues once bad crimpings were hidden inside connector’s housing. Other issues were related to EPL’s (Electronic Part List containing all harness part numbers) and Netlist’s (list of all circuits of vehicle) files quality and markup manual selection of part numbers.  Consequences: harness part numbers selected were not compatible with vehicle features or were delivered with missing, inverted or wrong circuits (short/long/others).
  • 4.  Two additional benches were built by the electrical laboratory and sent to PPO (Pre Production Operations). Benches contained all electrical parts used in all vehicle versions (batteries, fuse boxes, ECU’s, clusters, switches, power window motors, door lock motors, head lamps, rear lamps, others). One bench was arranged for LHD (left hand drive) version and the other one for RHD (right hand drive) version according to each harness different layout configuration.  A list with all vehicles to be assembled during a specific bucket was printed from GM Embassy system. The list contained the property number and the RPO’s (sequence of features codes) applied to it.  The complete schematic of all vehicle versions and used for harness construction was provided and two electricians were allocated to execute the two EVC’s – Electrical Vehicle Check. A flip chart to write all issues found during the EVC of each vehicle was used by the operators. All parts in the bench remained fixed (slave parts) except the wiring harness set. Each property wiring harness set was tested connecting and energizing all parts and testing the most common functions (lighting, power windows, power mirrors, radio, ventilation, others). Complete activity including installing and
  • 5.  There was a drastic reduction of unexpected reworks due to electrical issues caused by wirings during final check of complete vehicle. More confident to call sign off and deliver vehicle to proving ground on time (big 4). Interference issues and other issues related to the layout of the harness still found in the vehicle during assembly process however the impact of those in the activities were small.  It was possible to anticipate and register schematic, EPL and Netlist issues into PRTS (Problem Resolution Tracking System) before starting vehicle assembly.  It was possible to anticipate and register supplier quality issues into PRR (Problem Resolution Report). Supplier provided a part time resident engineer to perform wiring reworks during the EVC activity.  All reworks were registered in time by Design Release Engineer (DRE) into GM E2 system through edition of a WO BSD (Work Oder – Built Site Direction).  Change in the MRD (Material Request Date) for wiring harness set in order to accommodate the time necessary to complete EVC activities. Supplier agreement to deliver the set in anticipation to the official MRD provided by the program management.  Possibility to convert the two benches to LHD or RHD versions depending on the amount of vehicles of a specific configuration in a bucket.  Extension of the EVC activity to other programs and platforms. Started in GMI700 (Mid Size Truck), extended to GMI31Ux (SUV), Global Small Vehicle (GSV – Cobalt and Spin) and others.