1. 12 MWCPP PROJECT:
Erection and commissioned of 12 MW Captive Power Plant Project, DCS
Controlled System. Responsibility of Erection, commissioning & testing
works of all Electrical equipment & Switchgears of Turbine auxiliaries,
boilers auxiliaries, DM Plant, Coal & Ash Handling Plant, ESP, Cooling
Tower, Water Cool Air Conditioner.
1. 2 x 6.6 KV Switchgear Panel Board of Siemens Make.
2. L.T PCC, MCC & DBs of DM Plant, Turbine Aux., Cooling Tower, ESP
& Coal Handling Plant
3. 12 MW Generator Relay & Metering Panel, Synchronizing Panel & AVR
Panel
4. 2 x 20 KVA UPS system
5. 110V DC, 400AH Battery & Two Float cum Boost Charger Panel.
6. 2000 A rated current H.T & 4000 A rated current L.T Bus duct
7. 2.5 MVA, 6600/430 volts Power Transformer
8. H.T Motors of I.D, F.D, P.A Fans & Boiler Feed Pumps up to 560 KW
9. L.T Motors up to 200 KW & Motorized Electric Valves.
10.2 x 16.5 TR, 5 TR Water Cooled Air Conditioner.
11.AC VFD panels for rotary air lock feeder & coal feeder (Siemens &
China Make)
12.Erection & Commissioning of 50 TPH Coal Handling plant PLC control
Panel.
13.Synchronizing of two TG set and Synchronizing of TG set with Grid.
14.Load shedding during emergency.