Project Phases (Environment)
By Harush D P
Process Design Engineer
harush.24u@gmail.com
Environment
• Comprises of our surroundings
• Air
• Water
• Soil
• others
Pollution
 Human activities
 Deforestation
 Industrialization
 Uncontrolled Discharges
Water Treatment
 Domestic sewage
 Industrial Effluent
 Drinking water treatment
Type of treatment
 Primary treatment
 Secondary
 Aerobic
 Anaerobic
 Anoxic
 Tertiary
Projects
 Drinking Water Treatment Projects
 Jackwell, pipeline and ESR construction for water supply
 Water supply Networking
 Sewage Treatment Plants
 UGD for cities
 Industrial Effluent Treatment projects
 CETP
 Operation and Maintenance
Tender
 Prepare tender document by reputed consultants
 Government Bodies call for tenders
 Specify Requirements
 Floats tender via various Media
 Calls for bidding
Tender Contents
 Important Dates
 Scope of work
 PRQ
 Pre-bid Details
 Technical Details
 Financial details (project Estimated cost)
 Bidding process
 Cost Breakups
Working
 Process Design (units its sizing and Process flow drawing)
 Civil Estimation ( Quantities)
 Mechanical Estimation ( Equipment's, Pipes, Valves,)
 Instrumentation Estimation ( Scada Design and Estimation)
 Electrical Estimation ( Power Requirement, Costing)
 Operation and Maintenance ( Labor, Chemical, Power Requirement Etc)
 Over all cost calculation
 Cash flow preparation
 Construction schedule preparation.
 E-Portal Submission of Documents and EMD
Notifications
 After successful submission check for regular notification.
 Date of opening of Technical BID.
 Date of opening of Financial BID.
 Lowes BID qualification.
 Award of contract.
Project Phases
 Preparation of Technical Documents
 Getting approval from consultant and client.
 Process Design calculations
 Mass Balance
 Hydraulic Design Calculations
 Drain Calculations
 Plant Water Utility
 Datasheet for mechanical Equipment's
 Structural Design calculations
Drawing Approvals
 PFD
 Layout
 Hydraulic Flow Drawing
 Mass Balance
 P&ID
 Mechanical GA
 Equipment GA
 Civil GA
 Structural Drawing
Mean while at site
 Topographical Survey Completion
 Site Mobilization
 Site Clearing
 Compound Structure
 Drainages
 Excavations
Site Progress
 After approval of drawings construction commences.
 As per Planned Construction Schedule.
 Getting Release of RA Bills as per the progress of work.
 Hydraulic Testing of Structures
 Mechanical Equipment's Installations
 Testing of Equipment's
 Completion of work and trial run
Operation and Maintenance
 Flow measurement
 Inlet Parameter Analysis
 Stabilize the STP
 Culture Development
 Chemical Dosing
 Achievement of said outlet parameter
 Trouble shooting
Design Glimpse
 Analyze the type of effluent to be treated
 Collect population density of area and sources of waste generation
 Collect Flow quantity (hydraulic Loading)
 Collect Effluent Quality parameters (Organic Loading)
 Analyze and plan process design units
 Collect standards required from Standard Manuals (CPHEEO)
 Collects Requirements Specified by Client
 Collect Area Available for construction and inlet point of effluent
Designing
 A sewage Treatment plant will be designed with following flow
 SPS (sewage Pumping Station)
 MPS (Main Pumping Station)
 STP (Sewage Treatment Plant)
 Disposal of Treated Sewage
 Treatment Of Sludge and its Disposal
MPS (Main Pumping Station)
 Why ?
 Units
 Inlet chamber
 Course Screen Channel
 Wetwell
 Pumps and pumping main
STP
 Receives Flow from MPS/ISPS
 Units
 Inlet chamber
 Fine screen Channel
 Grit Chamber
 Flow Measurement
 Secondary Treatment unit (SBR, ASP, MBBR,)(Digester, Trickling Filter etc)
 Clarifier
 Disinfection unit (CCT)
 Disposal or Tertiary treatment
Sludge Treatment
 Sludge Sump
 Gravity Sludge Thickener (GST)
 Sludge Digester/Sludge Holding Tank
 Gas Holder, Power Generation units
 Centrifuge/Belt Filter
 Sludge Cake Disposal
Wet well
construction
Illustrative
photos
Digester lamella clarifier, Biotower
Aeriation Tank
Anaerobic tanks
Complete plant, Digesters and gas holders
Thank you

More Related Content

What's hot

summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314Lynn Schroeder P.E.
 
Gl group profile r5
Gl group profile r5Gl group profile r5
Gl group profile r5Ishu Vohra
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Nicholas Naing
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Nicholas Naing
 
Module 13 plant piping design
Module 13 plant piping designModule 13 plant piping design
Module 13 plant piping designMuhammad Rahman
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soiljaapverheul
 
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...ASC-HRSC
 
مهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتمهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتAbd Ellatif Gebril
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structuresLloyd's Register Energy
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...Alberto Alva-Argaez
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeProcess Ecology Inc
 
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsArtificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsAndres Martingano
 

What's hot (18)

summary_analytical-services_yr_052314
summary_analytical-services_yr_052314summary_analytical-services_yr_052314
summary_analytical-services_yr_052314
 
Gl group profile r5
Gl group profile r5Gl group profile r5
Gl group profile r5
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Process Ecology toolbox
Process Ecology toolboxProcess Ecology toolbox
Process Ecology toolbox
 
Module 13 plant piping design
Module 13 plant piping designModule 13 plant piping design
Module 13 plant piping design
 
Process And Chemial Industry Soil
Process And Chemial Industry   SoilProcess And Chemial Industry   Soil
Process And Chemial Industry Soil
 
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
Improving Remedial Actions Through Integrated Use of Direct-Push HRSC Technol...
 
Helen Yan - Resume 2016
Helen Yan - Resume 2016Helen Yan - Resume 2016
Helen Yan - Resume 2016
 
مهندس ميكانيكا دراسات
مهندس ميكانيكا دراساتمهندس ميكانيكا دراسات
مهندس ميكانيكا دراسات
 
Vsm
VsmVsm
Vsm
 
Design Appraisal for offshore structures
Design Appraisal for offshore structuresDesign Appraisal for offshore structures
Design Appraisal for offshore structures
 
State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...State of the art review and recent development of the glycol dehydration faci...
State of the art review and recent development of the glycol dehydration faci...
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations Change
 
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir ConsiderationsArtificial Lift Screening and Selection - Focus on Reservoir Considerations
Artificial Lift Screening and Selection - Focus on Reservoir Considerations
 
Plant Performance Monitoring
Plant Performance Monitoring Plant Performance Monitoring
Plant Performance Monitoring
 

Viewers also liked

Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentationfought70
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarlMKuttler
 
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Netsol Water Solutions
 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plantBhavik Patel
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewageBibhabasu Mohanty
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-pptabhiiii4558
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculationSharifah Ain
 

Viewers also liked (9)

Ligonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant PresentationLigonier Wastewater Treatment Plant Presentation
Ligonier Wastewater Treatment Plant Presentation
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
Construction of Sewage Treatment Plant STP – 350 kld for CPMF Part 1
 
sewage treatment plant
sewage treatment plantsewage treatment plant
sewage treatment plant
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Waste Water Treatment
Waste Water TreatmentWaste Water Treatment
Waste Water Treatment
 
Specialized bioreactor
Specialized bioreactor  Specialized bioreactor
Specialized bioreactor
 
28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt28737268 waste-water-treatment-ppt
28737268 waste-water-treatment-ppt
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 

Similar to Phase of project Environment (Tendering to construction )

2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptxKarenGedalanga
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxssuser0a41e6
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxMathewHany1
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeCenter for Neighborhood Technology
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stationsebiskis
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 
Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816William Deskin
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptxAbubakar171727
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas ExpertiseTEKNORGE AS
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGETEKNORGE AS
 
TEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE AS
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Ashish Verma
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Fiena Azmi
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newlisa zhang
 

Similar to Phase of project Environment (Tendering to construction ) (20)

2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 
Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptx
 
Planning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptxPlanning_and_design_of_assured_potable_water.pptx
Planning_and_design_of_assured_potable_water.pptx
 
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak StreetscapeMonitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
Monitoring and Modeling of the CDOT Blue Island/Cermak Streetscape
 
In Rural Water Alliance Pump Stations
In Rural Water Alliance Pump StationsIn Rural Water Alliance Pump Stations
In Rural Water Alliance Pump Stations
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816
 
1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx1st lect Fertilizers(1).pptx
1st lect Fertilizers(1).pptx
 
TEKNORGE Oil & Gas Expertise
TEKNORGE  Oil & Gas ExpertiseTEKNORGE  Oil & Gas Expertise
TEKNORGE Oil & Gas Expertise
 
EXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGEEXPERTISE - Oil & Gas-TEKNORGE
EXPERTISE - Oil & Gas-TEKNORGE
 
TEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas ExpertiseTEKNORGE- Oil & Gas Expertise
TEKNORGE- Oil & Gas Expertise
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
yousef_cv_mk
yousef_cv_mk yousef_cv_mk
yousef_cv_mk
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 

Recently uploaded

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

Phase of project Environment (Tendering to construction )

  • 1. Project Phases (Environment) By Harush D P Process Design Engineer harush.24u@gmail.com
  • 2. Environment • Comprises of our surroundings • Air • Water • Soil • others
  • 3. Pollution  Human activities  Deforestation  Industrialization  Uncontrolled Discharges
  • 4. Water Treatment  Domestic sewage  Industrial Effluent  Drinking water treatment
  • 5. Type of treatment  Primary treatment  Secondary  Aerobic  Anaerobic  Anoxic  Tertiary
  • 6. Projects  Drinking Water Treatment Projects  Jackwell, pipeline and ESR construction for water supply  Water supply Networking  Sewage Treatment Plants  UGD for cities  Industrial Effluent Treatment projects  CETP  Operation and Maintenance
  • 7. Tender  Prepare tender document by reputed consultants  Government Bodies call for tenders  Specify Requirements  Floats tender via various Media  Calls for bidding
  • 8.
  • 9. Tender Contents  Important Dates  Scope of work  PRQ  Pre-bid Details  Technical Details  Financial details (project Estimated cost)  Bidding process  Cost Breakups
  • 10.
  • 11.
  • 12.
  • 13. Working  Process Design (units its sizing and Process flow drawing)  Civil Estimation ( Quantities)  Mechanical Estimation ( Equipment's, Pipes, Valves,)  Instrumentation Estimation ( Scada Design and Estimation)  Electrical Estimation ( Power Requirement, Costing)  Operation and Maintenance ( Labor, Chemical, Power Requirement Etc)  Over all cost calculation  Cash flow preparation  Construction schedule preparation.  E-Portal Submission of Documents and EMD
  • 14. Notifications  After successful submission check for regular notification.  Date of opening of Technical BID.  Date of opening of Financial BID.  Lowes BID qualification.  Award of contract.
  • 15. Project Phases  Preparation of Technical Documents  Getting approval from consultant and client.  Process Design calculations  Mass Balance  Hydraulic Design Calculations  Drain Calculations  Plant Water Utility  Datasheet for mechanical Equipment's  Structural Design calculations
  • 16. Drawing Approvals  PFD  Layout  Hydraulic Flow Drawing  Mass Balance  P&ID  Mechanical GA  Equipment GA  Civil GA  Structural Drawing
  • 17. Mean while at site  Topographical Survey Completion  Site Mobilization  Site Clearing  Compound Structure  Drainages  Excavations
  • 18. Site Progress  After approval of drawings construction commences.  As per Planned Construction Schedule.  Getting Release of RA Bills as per the progress of work.  Hydraulic Testing of Structures  Mechanical Equipment's Installations  Testing of Equipment's  Completion of work and trial run
  • 19. Operation and Maintenance  Flow measurement  Inlet Parameter Analysis  Stabilize the STP  Culture Development  Chemical Dosing  Achievement of said outlet parameter  Trouble shooting
  • 20. Design Glimpse  Analyze the type of effluent to be treated  Collect population density of area and sources of waste generation  Collect Flow quantity (hydraulic Loading)  Collect Effluent Quality parameters (Organic Loading)  Analyze and plan process design units  Collect standards required from Standard Manuals (CPHEEO)  Collects Requirements Specified by Client  Collect Area Available for construction and inlet point of effluent
  • 21. Designing  A sewage Treatment plant will be designed with following flow  SPS (sewage Pumping Station)  MPS (Main Pumping Station)  STP (Sewage Treatment Plant)  Disposal of Treated Sewage  Treatment Of Sludge and its Disposal
  • 22. MPS (Main Pumping Station)  Why ?  Units  Inlet chamber  Course Screen Channel  Wetwell  Pumps and pumping main
  • 23. STP  Receives Flow from MPS/ISPS  Units  Inlet chamber  Fine screen Channel  Grit Chamber  Flow Measurement  Secondary Treatment unit (SBR, ASP, MBBR,)(Digester, Trickling Filter etc)  Clarifier  Disinfection unit (CCT)  Disposal or Tertiary treatment
  • 24. Sludge Treatment  Sludge Sump  Gravity Sludge Thickener (GST)  Sludge Digester/Sludge Holding Tank  Gas Holder, Power Generation units  Centrifuge/Belt Filter  Sludge Cake Disposal
  • 29. Complete plant, Digesters and gas holders