Today’s Meeting <ul><li>Program Update </li></ul><ul><li>River Road Improvements </li></ul><ul><li>Next Meeting Date </li>...
Program Update – Financing <ul><li>Took out $34 million in loans this year </li></ul><ul><ul><li>Extremely favorable terms...
Program Update – Metroparks Partnership <ul><li>Wetland mitigation </li></ul><ul><ul><li>If we use wetlands for constructi...
River Road SSOs <ul><li>4 in the River Road Area </li></ul><ul><li>Must be eliminated by November of 2006 </li></ul><ul><u...
Past & Ongoing River Road Area Projects <ul><li>Sanitary sewer study – 2000/2001 </li></ul><ul><li>Storm sewer study – 200...
Proposed River Road  Area Projects <ul><li>Underground Equalization Basin – River Road Park </li></ul><ul><li>Underground ...
Project Schedules <ul><li>Projects will be built concurrently  </li></ul><ul><li>Construction bids – October/November 2004...
Equalization Basin <ul><li>Underground facility </li></ul><ul><ul><li>3 million gallon storage capacity </li></ul></ul><ul...
Equalization Basin
EQ Basin  Issues & Discussion <ul><li>Construction Access Road </li></ul><ul><ul><li>From River Road to site (between play...
Issues and Discussion <ul><li>Baseball field </li></ul><ul><ul><li>Will be lost for one season due to construction </li></...
River Road Park  Pump Station <ul><li>Located next to Equalization Basin </li></ul><ul><li>Bulk of facility underground </...
Beverly Pump Station <ul><li>Underground – with control panel(s) above ground </li></ul><ul><li>Will pump waste from Bever...
Force Main Sewer <ul><li>New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equ...
New Relief Sewers <ul><li>From River Road, Midland or Hemlock down River Road to Brookford </li></ul><ul><ul><li>New water...
New Relief Sewers <ul><li>On Beverly from Brookford to Medford </li></ul><ul><li>Both relief sewer lines should help allev...
Future Meetings <ul><li>Next meeting date? </li></ul><ul><li>Best time and location? </li></ul>
Upcoming SlideShare
Loading in …5
×

CPAC Meeting 9-8-04

425 views

Published on

  • Be the first to comment

  • Be the first to like this

CPAC Meeting 9-8-04

  1. 1. Wednesday, September 8, 2004 River Road Area Sewer Improvements
  2. 2. Today’s Meeting <ul><li>Program Update </li></ul><ul><li>River Road Improvements </li></ul><ul><li>Next Meeting Date </li></ul>
  3. 3. Program Update – Financing <ul><li>Took out $34 million in loans this year </li></ul><ul><ul><li>Extremely favorable terms </li></ul></ul><ul><ul><li>Paid back after project is completed </li></ul></ul><ul><ul><li>Borrowed as needed </li></ul></ul><ul><li>Will take out approximately $110 million in loans next year </li></ul><ul><li>Not selling bonds this year </li></ul><ul><ul><li>Doing well with low-interest loans </li></ul></ul>
  4. 4. Program Update – Metroparks Partnership <ul><li>Wetland mitigation </li></ul><ul><ul><li>If we use wetlands for construction (mooring basin at plant) must restore wetlands 2 to 1 </li></ul></ul><ul><ul><li>City reimbursing Metroparks for $45,00 toward purchase of 10 acres of land in Spencer Township (Angola and Eber Roads) </li></ul></ul><ul><li>Stream bank mitigation </li></ul><ul><ul><ul><li>$12,000 for improvements at SideCut Metropark </li></ul></ul></ul>
  5. 5. River Road SSOs <ul><li>4 in the River Road Area </li></ul><ul><li>Must be eliminated by November of 2006 </li></ul><ul><ul><li>Stiff penalties for missed deadlines </li></ul></ul>
  6. 6. Past & Ongoing River Road Area Projects <ul><li>Sanitary sewer study – 2000/2001 </li></ul><ul><li>Storm sewer study – 2002/2003 </li></ul><ul><li>Sewer lining – 2002/ongoing </li></ul><ul><li>Copland storm sewer – 2002 </li></ul><ul><li>Beverly/Medford storm sewer – 2004/ongoing </li></ul>
  7. 7. Proposed River Road Area Projects <ul><li>Underground Equalization Basin – River Road Park </li></ul><ul><li>Underground Pump Station – River Road Park </li></ul><ul><li>New Force Main Sewer – Brookford Drive </li></ul><ul><li>New Relief Sewer– Beverly and River Road </li></ul><ul><li>Beverly Pump Station – West of Trail </li></ul>
  8. 8. Project Schedules <ul><li>Projects will be built concurrently </li></ul><ul><li>Construction bids – October/November 2004 </li></ul><ul><li>Break Ground – Spring 2005 </li></ul><ul><li>Completed by November 2006 </li></ul>
  9. 9. Equalization Basin <ul><li>Underground facility </li></ul><ul><ul><li>3 million gallon storage capacity </li></ul></ul><ul><ul><li>120 ft. x 240 ft. </li></ul></ul><ul><ul><li>17 ft. deep </li></ul></ul><ul><li>To be located at River Road Park ball diamond site </li></ul><ul><ul><li>Tanks from old Toledo Water Plant currently located there </li></ul></ul>
  10. 10. Equalization Basin
  11. 11. EQ Basin Issues & Discussion <ul><li>Construction Access Road </li></ul><ul><ul><li>From River Road to site (between playgrounds) </li></ul></ul><ul><ul><li>Reduces amount of construction equipment entering site from Brookford </li></ul></ul><ul><ul><li>Could disrupt playground areas </li></ul></ul>
  12. 12. Issues and Discussion <ul><li>Baseball field </li></ul><ul><ul><li>Will be lost for one season due to construction </li></ul></ul><ul><ul><li>Alternative options for replacement of the field </li></ul></ul>
  13. 13. River Road Park Pump Station <ul><li>Located next to Equalization Basin </li></ul><ul><li>Bulk of facility underground </li></ul><ul><li>Control panel above ground </li></ul><ul><li>Will pump waste from River Road sewer to equalization basin </li></ul>
  14. 14. Beverly Pump Station <ul><li>Underground – with control panel(s) above ground </li></ul><ul><li>Will pump waste from Beverly sewer to new EQ basin </li></ul>
  15. 15. Force Main Sewer <ul><li>New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin </li></ul><ul><li>To be located on south side of Brookford </li></ul><ul><li>Shouldn’t disturb street – except for crossings at OLPH and Island Avenue </li></ul><ul><li>Traffic maintained </li></ul><ul><ul><li>Will work with committee to minimize disruption </li></ul></ul>
  16. 16. New Relief Sewers <ul><li>From River Road, Midland or Hemlock down River Road to Brookford </li></ul><ul><ul><li>New water line will be installed at same time </li></ul></ul><ul><ul><ul><li>Should help resolve water pressure problems </li></ul></ul></ul><ul><ul><li>Preferred sewer location is in east lane of River Road </li></ul></ul>
  17. 17. New Relief Sewers <ul><li>On Beverly from Brookford to Medford </li></ul><ul><li>Both relief sewer lines should help alleviate basement flooding in area </li></ul>
  18. 18. Future Meetings <ul><li>Next meeting date? </li></ul><ul><li>Best time and location? </li></ul>

×