4. A BASIC OVERVIEW
• Before installation
remove any kind of
molding
• Remove Carpet, Pad
and Tack Strips
• Remove wood
flooring if installed
at concrete subfloor
• Make sure that
surface is flat
• Do not install
without underlay
5. REQUIREMENTS FOR LAYOUT
• Before starting installing leave it open for 49-
96 hours
• Temperature should be 65*F
• Pergo Silent Step/ Soundbloc Foam
• Pergo Moisturbloc on cement floor
• Check damage before installation
6. PROCESS TO LAYOUT
• Job Site Evaluation
• Moisture Test
• Subfloor Requirements and Check
• Installation should be late in the building cycle
• Crawl Spaces must be closed
• Foam Should be laid
• Finally Pergo should be laid
• Ends to feel
7. MAINTENANCE
• Mop it with Lamello on daily basis
• Vacuum the floor with bristles on
• Damp mop should be done to keep the shine
• Use R2 to sanitize and clean the floor
• Use buffing pads occasionally to maintain the
shine.
8. DO’S AND DON’TS
DO’S DON’TS
Make sure all furniture has shoes to avoid Do not drag the furniture
scratches
Use damp mop Do not throw any burning thing on the
floor
Use Bristles while vacuuming Do not use wet mop
Do not vacuum without bristles on