Design and Implementation of Road Maintenance Reform. Republic of Moldova
Re- estabilishing PMS
Nov 22, 2010
Design and Implementation of Road Maintenance Reform
Design and Implementation of Road Maintenance Reform. Republic of Moldova
01/27/15
1. Management Cycle
2. Data collection and Road inventory
3. Program and Project analysis
4. Modern Road works planning
Agenda
2
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Management Cycle
Design and Implementation of Road Maintenance Reform. Republic of Moldova
0-500 500-1500 1500-4000 4000-7000 7000-
0
20
40
60
80
100
120
Important Elements in the plan:
 Name of section
 Geographical location
 Length
Type of works
 Cost estimates
 Timing of work
Packaging appropriate
mix of Road works
with regards to
available budgetV ä g m a r k e r in g
V ä g t r u m m o r
B e r g a r b e t e n , b o r r n in g
s p r ä n g n in gM ä tn in g a v
v ä g y ta n s tills tå n d
S lä n te r
E r o s io n s s k y d d
B e lä g g n in g
B ä r la g e r
B ä r ig h e ts m ä tn in g
F a llv ik ts d e f le k t o m e t e r
April- September
August
October
December- March
March - October
September- November
New plan
November- December
August-
October
Road Class
Paved Roads Unpaved Roads
Good Fair Poor Bad Good Poor Bad
National Roads 4 6 8 >8 - - -
Secondary 5 7 9 >9 6 8 10
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Road Inventory/Inspection
needs
Engineering
Design and Implementation of Road Maintenance Reform. Republic of Moldova
To carry out
• Describe the Road Network
– Data collection (condition data)
• Quantifying the amount of road works needed
• Timing the road works (periodic mtnce, rehab)
• Present a (usually) 3-5 year plan
• Check the available annual budget
• Adjust the planned activities
Design and Implementation of Road Maintenance Reform. Republic of Moldova
The content in an engineering plan
Usually available data:
 Name of section
 Geographical location
 Length
 Cost estimates
 Timing of work
Design and Implementation of Road Maintenance Reform. Republic of Moldova
The content in an engineering plan
Usually available data:
 Name of section
 Geographical location
 Length
 Cost estimates
 Timing of work
Developing the concept
 Name of section
 Geographical location
 Length
 Cost estimates for different strategy
 Timing of work
 Road Network Condition
 Defined Rehab/Maintenance strategy
 RN Condition during analysis period (5 Y)
 Objective of Road Network Expenditures
 Benefit and Cost analysis considering
– Road Agency Cost
– Road User Benefit
 Prioritization between sections
 Different budget scenarios/RD
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Modern Road Maintenance planning
0-500 500-1500 1500-4000 4000-7000 7000-
0
20
40
60
80
100
120
GIS
HDM 4
Road Network Development
Cost & Benefit Analysis
Prioritization of works
Quantity of works
Budget appraisal, etc..
Visual Inspection
Bump Integrator
IRI
Distress
Mode
All
Structural
Cracking
(%)
Wide
Structural
Cracking
(%)
Transverse
Thermal
Cracking
(%)
Ravelling
(%)
No.
potholes
per km
Edge
break (m²
per km)
Mean rut
depth
(mm)
New 0 0 0 1 0 0 2
Good 5 0 0 10 0 10 5
Fair 15 9.5 0 20 5 100 15
Poor 20 15 0 25 20 200 20
Bad 25 19 0 30 50 300 25
Design and Implementation of Road Maintenance Reform. Republic of Moldova
The plan has to address:
• Road Network Condition development with
regards to different budget scenarios
• Budget allocation:
– Routine maintenance
– Periodic maintenance
– Rehabilitation/reconstruction works
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Proposed Road Network standards
TRAFFIC
CLASSES
TERM
(USED FOR
MODELLING IN
HDM4)
SECTIONS > 1000M
Mean Roughness (IRI)
Mean Rutting
(mm)
Periodic
Mtnce
Rehabilitation Reconstruction
Periodic
Mtnce
0-500
Low Traffic (L.
Tra) 5.5 7.0 10.0 25
501-2000
Low – Medium
Traffic (LMTra) 5.5 6.0 10.0 25
2001-4000
Low-Medium
high Traffic
(LMHTra)
5.5 6.0 10.0 18
4001-7000
Medium-High
Traffic (MHTra) 4.5 5.0 9.0 18
> 7000
High Traffic
(HTra) 4.5 5.0 8.0 14
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Proposed Road Network standards
TRAFFIC
CLASSES
TERM
(USED FOR
MODELLING IN
HDM4)
SECTIONS > 1000M
Mean Roughness (IRI)
Mean Rutting
(mm)
Periodic
Mtnce
Rehabilitation Reconstruction
Periodic
Mtnce
0-500
Low Traffic (L.
Tra) 5.5 7.0 10.0 25
501-2000
Low – Medium
Traffic (LMTra) 5.5 6.0 10.0 25
2001-4000
Low-Medium
high Traffic
(LMHTra)
5.5 6.0 10.0 18
4001-7000
Medium-High
Traffic (MHTra) 4.5 5.0 9.0 18
> 7000
High Traffic
(HTra) 4.5 5.0 8.0 14
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Road works
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Assigned Rehabilitation Maintenance
 4 different standards
1. Do minimum (only Routine mtnce)
2. Minimum Standard (A)
3. Moderate Standard (B)
4. Required Standard (C)
A, B, C is compared to Do minimum
( Do Minimum = basically, routine maintenance )
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Routine maintenance
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
ROUTINE MAINTENANCE
UNIT
COSTS
LEI
(m2
)
Minimum
(A)
Moderate
(B)
Required
(C)
Routine
Crack Sealing Wide structural
cracking > 10%
Wide structural
cracking > 7%
Wide structural
cracking > 5%
67.0
Edge repair Edge break > 5
m2
/km
Edge break > 2
m2
/km
Edge break > 1
m2
/km
134.0
Pothole
Patching
Pothole > 4
no/km
Pothole > 2
no/km
Pothole > 1
no/km
167.0
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Routine maintenance
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
ROUTINE MAINTENANCE
UNIT
COSTS
LEI
(m2
)
Minimum
(A)
Moderate
(B)
Required
(C)
Routine
Crack Sealing Wide structural
cracking > 10%
Wide structural
cracking > 7%
Wide structural
cracking > 5%
67.0
Edge repair Edge break > 5
m2
/km
Edge break > 2
m2
/km
Edge break > 1
m2
/km
134.0
Pothole
Patching
Pothole > 4
no/km
Pothole > 2
no/km
Pothole > 1
no/km
167.0
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Routine maintenance
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
ROUTINE MAINTENANCE
UNIT
COSTS
LEI
(m2
)
Minimum
(A)
Moderate
(B)
Required
(C)
Routine
Crack Sealing Wide structural
cracking > 10%
Wide structural
cracking > 7%
Wide structural
cracking > 5%
67.0
Edge repair Edge break > 5
m2
/km
Edge break > 2
m2
/km
Edge break > 1
m2
/km
134.0
Pothole
Patching
Pothole > 4
no/km
Pothole > 2
no/km
Pothole > 1
no/km
167.0
Design and Implementation of Road Maintenance Reform. Republic of Moldova
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
MAINTENACE PROGRAM
UNIT
COSTS
LEI
(m2)
DoMinimum(table6)
Routinemaintenanceonly
Minimum
(A)
Moderate
(B)
Required
(C)
Periodic
maintenance
Surface dressing
with shape
correction 20 mm
5.5< IRI <
6.5
5.0 < IRI < 6.5 4.5 < IRI < 6.5 107,0
Rehabilitation
40 mm asphalt on
existing material
IRI > 8.0 IRI > 7.0 207,7
Reconstruction
Asphalt mix on
granular base 50
mm
IRI > 10 268,0
Strategies for roads with traffic < 500
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Strategies for roads with traffic > 501 < 2000
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
REHABILITATION PROGRAM
UNIT
COSTS
LEI
(m2)
DoMinimum
Routinemaintenanceonly
Minimum
(A)
Moderate
(B)
Required
(C)
Periodic
maintenance
Surface dressing
with shape
correction 25
mm
5.5< IRI < 6.5 5.0 < IRI < 6.5
4.5 < IRI <
6.5
127,3
Rehabilitation
50 mm asphalt
on existing
material
IRI > 8.0 IRI > 6.0
247,9
Reconstruction
40 mm asphalt
on
60 mm asphalt
base
IRI > 10 469
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Strategies for roads with traffic > 2001 < 4000
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
REHABILITATION PROGRAM
UNIT
COSTS
LEI
(m2)
DoMinimum
Routinemaintenanceonly
Minimum
(A)
Moderate
(B)
Required
(C)
Periodic
maintenance
Surface dressing
with shape
correction 30 mm
5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5
147,4
Rehabilitation
50 mm asphalt on
existing material
IRI > 7.0 IRI > 6.0 247,9
Reconstruction
50 mm asphalt on
60 mm Asphalt
Base
IRI > 10 556,1
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Strategies for roads with traffic > 4001 < 7000
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
REHABILITATION PROGRAM
UNIT
COSTS
LEI
(m2)
DoMinimum
Routinemaintenanceonly
Minimum
(A)
Moderate
(B)
Required
(C)
Periodic
maintenance
Surface dressing
with shape
correction 30 mm
5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5
147,4
Rehabilitation
50 mm asphalt on
existing material
IRI > 7.0 IRI > 6.0 247,9
Reconstruction
50 mm asphalt on
110 mm Asphalt
Base
IRI > 10 703,5
Design and Implementation of Road Maintenance Reform. Republic of Moldova
Strategies for roads with traffic > 4001 < 7000
TYPE WORK
ACTIVITY
INTERVENTION CRITERIA FOR
REHABILITATION PROGRAM
UNIT
COSTS
LEI
(m2)
DoMinimum
Routinemaintenanceonly
Minimum
(A)
Moderate
(B)
Required
(C)
Periodic
maintenance
Surface dressing
with shape
correction 30 mm
5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5
147,4
Rehabilitation
50 mm asphalt on
existing material
IRI > 7.0 IRI > 6.0 247,9
Reconstruction
50 mm asphalt on
140 mm Asphalt
Base
IRI > 10 770,5

More Related Content

What's hot

Irs concrete bridge code
Irs concrete bridge codeIrs concrete bridge code
Irs concrete bridge codeAjay Kumar
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Devyn Barrie
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...Kevin Callen
 
Service District Improvements and Potential Rate: March 18, 2013
Service District Improvements and Potential Rate: March 18, 2013Service District Improvements and Potential Rate: March 18, 2013
Service District Improvements and Potential Rate: March 18, 2013Fairfax County
 
Roc swana va 03302017 v2
Roc swana va 03302017 v2Roc swana va 03302017 v2
Roc swana va 03302017 v2sourabhmehta21
 
Sharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemSharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemUGPTI
 
Air Quality Modelling
Air Quality ModellingAir Quality Modelling
Air Quality ModellingMark Chapman
 
Pavement Management: Just Do It!
Pavement Management: Just Do It!Pavement Management: Just Do It!
Pavement Management: Just Do It!Jill Reeves
 
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...IRJET Journal
 
Smart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban RoadsSmart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban RoadsIRJET Journal
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Lesson 2. Field validation
Lesson 2. Field validation Lesson 2. Field validation
Lesson 2. Field validation Colleen Curran
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House SlidesCrosstown TO
 
Item 8.5 2014 lua update
Item 8.5   2014 lua updateItem 8.5   2014 lua update
Item 8.5 2014 lua updateepdevelopment
 
Draft EIR - Why Not The 710 Tunnel
Draft EIR - Why Not The 710 TunnelDraft EIR - Why Not The 710 Tunnel
Draft EIR - Why Not The 710 TunnelBeyondThe710
 
Draft EIR - Why Not The 710 Tunnel?
Draft EIR - Why Not The 710 Tunnel?Draft EIR - Why Not The 710 Tunnel?
Draft EIR - Why Not The 710 Tunnel?BeyondThe710
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areasRana Ibrahim
 
Sample Airport / Aviation Projects (2015 - 2020)
Sample Airport / Aviation Projects (2015 - 2020)Sample Airport / Aviation Projects (2015 - 2020)
Sample Airport / Aviation Projects (2015 - 2020)Nelson Ekeh E.I.T.
 
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Fairfax County
 

What's hot (20)

Irs concrete bridge code
Irs concrete bridge codeIrs concrete bridge code
Irs concrete bridge code
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
 
Service District Improvements and Potential Rate: March 18, 2013
Service District Improvements and Potential Rate: March 18, 2013Service District Improvements and Potential Rate: March 18, 2013
Service District Improvements and Potential Rate: March 18, 2013
 
Roc swana va 03302017 v2
Roc swana va 03302017 v2Roc swana va 03302017 v2
Roc swana va 03302017 v2
 
Sharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation SystemSharing the Vision for North Dakota's Transportation System
Sharing the Vision for North Dakota's Transportation System
 
Design of National Highway-13
Design of National Highway-13Design of National Highway-13
Design of National Highway-13
 
Air Quality Modelling
Air Quality ModellingAir Quality Modelling
Air Quality Modelling
 
Pavement Management: Just Do It!
Pavement Management: Just Do It!Pavement Management: Just Do It!
Pavement Management: Just Do It!
 
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
 
Smart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban RoadsSmart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban Roads
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Lesson 2. Field validation
Lesson 2. Field validation Lesson 2. Field validation
Lesson 2. Field validation
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Item 8.5 2014 lua update
Item 8.5   2014 lua updateItem 8.5   2014 lua update
Item 8.5 2014 lua update
 
Draft EIR - Why Not The 710 Tunnel
Draft EIR - Why Not The 710 TunnelDraft EIR - Why Not The 710 Tunnel
Draft EIR - Why Not The 710 Tunnel
 
Draft EIR - Why Not The 710 Tunnel?
Draft EIR - Why Not The 710 Tunnel?Draft EIR - Why Not The 710 Tunnel?
Draft EIR - Why Not The 710 Tunnel?
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
 
Sample Airport / Aviation Projects (2015 - 2020)
Sample Airport / Aviation Projects (2015 - 2020)Sample Airport / Aviation Projects (2015 - 2020)
Sample Airport / Aviation Projects (2015 - 2020)
 
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
Dulles Metrorail Silver Line: Status Report & Transportation Infrastructure F...
 

Similar to 22 nov re estabilishing pms

Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
County and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsCounty and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsUGPTI
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportUGPTI
 
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...IRJET Journal
 
25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldovaHamid62
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.IRJET Journal
 
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra
Highway Failure and Their Maintenance: A Study of Amravati City, MaharashtraHighway Failure and Their Maintenance: A Study of Amravati City, Maharashtra
Highway Failure and Their Maintenance: A Study of Amravati City, MaharashtraIRJET Journal
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET Journal
 
Stirling Regional Centre Modelling
Stirling Regional Centre ModellingStirling Regional Centre Modelling
Stirling Regional Centre ModellingJumpingJaq
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Sok-Tharath CHREUNG
 
Multi-Criteria Assessment
Multi-Criteria AssessmentMulti-Criteria Assessment
Multi-Criteria AssessmentMike Iswalt
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdfAnshuRaj51911
 
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...UGPTI
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Matters
 
Highway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxHighway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxkiranmaqsood5
 

Similar to 22 nov re estabilishing pms (20)

Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
County and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsCounty and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure Needs
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...
Investigation and Improvement of Road Pavement Section for Rankuva Crossing t...
 
25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova
 
R130403115130
R130403115130R130403115130
R130403115130
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra.
 
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra
Highway Failure and Their Maintenance: A Study of Amravati City, MaharashtraHighway Failure and Their Maintenance: A Study of Amravati City, Maharashtra
Highway Failure and Their Maintenance: A Study of Amravati City, Maharashtra
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Stirling Regional Centre Modelling
Stirling Regional Centre ModellingStirling Regional Centre Modelling
Stirling Regional Centre Modelling
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
 
Training report 2
Training report 2Training report 2
Training report 2
 
Multi-Criteria Assessment
Multi-Criteria AssessmentMulti-Criteria Assessment
Multi-Criteria Assessment
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...
Infrastructure Needs: North Dakota’s County, Township, & Tribal Roads & Bridg...
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
 
Highway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxHighway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptx
 

Recently uploaded

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Recently uploaded (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

22 nov re estabilishing pms

  • 1. Design and Implementation of Road Maintenance Reform. Republic of Moldova Re- estabilishing PMS Nov 22, 2010 Design and Implementation of Road Maintenance Reform
  • 2. Design and Implementation of Road Maintenance Reform. Republic of Moldova 01/27/15 1. Management Cycle 2. Data collection and Road inventory 3. Program and Project analysis 4. Modern Road works planning Agenda 2
  • 3. Design and Implementation of Road Maintenance Reform. Republic of Moldova Management Cycle
  • 4. Design and Implementation of Road Maintenance Reform. Republic of Moldova 0-500 500-1500 1500-4000 4000-7000 7000- 0 20 40 60 80 100 120 Important Elements in the plan:  Name of section  Geographical location  Length Type of works  Cost estimates  Timing of work Packaging appropriate mix of Road works with regards to available budgetV ä g m a r k e r in g V ä g t r u m m o r B e r g a r b e t e n , b o r r n in g s p r ä n g n in gM ä tn in g a v v ä g y ta n s tills tå n d S lä n te r E r o s io n s s k y d d B e lä g g n in g B ä r la g e r B ä r ig h e ts m ä tn in g F a llv ik ts d e f le k t o m e t e r April- September August October December- March March - October September- November New plan November- December August- October Road Class Paved Roads Unpaved Roads Good Fair Poor Bad Good Poor Bad National Roads 4 6 8 >8 - - - Secondary 5 7 9 >9 6 8 10
  • 5. Design and Implementation of Road Maintenance Reform. Republic of Moldova Road Inventory/Inspection needs Engineering
  • 6. Design and Implementation of Road Maintenance Reform. Republic of Moldova To carry out • Describe the Road Network – Data collection (condition data) • Quantifying the amount of road works needed • Timing the road works (periodic mtnce, rehab) • Present a (usually) 3-5 year plan • Check the available annual budget • Adjust the planned activities
  • 7. Design and Implementation of Road Maintenance Reform. Republic of Moldova The content in an engineering plan Usually available data:  Name of section  Geographical location  Length  Cost estimates  Timing of work
  • 8. Design and Implementation of Road Maintenance Reform. Republic of Moldova The content in an engineering plan Usually available data:  Name of section  Geographical location  Length  Cost estimates  Timing of work Developing the concept  Name of section  Geographical location  Length  Cost estimates for different strategy  Timing of work  Road Network Condition  Defined Rehab/Maintenance strategy  RN Condition during analysis period (5 Y)  Objective of Road Network Expenditures  Benefit and Cost analysis considering – Road Agency Cost – Road User Benefit  Prioritization between sections  Different budget scenarios/RD
  • 9. Design and Implementation of Road Maintenance Reform. Republic of Moldova Modern Road Maintenance planning 0-500 500-1500 1500-4000 4000-7000 7000- 0 20 40 60 80 100 120 GIS HDM 4 Road Network Development Cost & Benefit Analysis Prioritization of works Quantity of works Budget appraisal, etc.. Visual Inspection Bump Integrator IRI Distress Mode All Structural Cracking (%) Wide Structural Cracking (%) Transverse Thermal Cracking (%) Ravelling (%) No. potholes per km Edge break (m² per km) Mean rut depth (mm) New 0 0 0 1 0 0 2 Good 5 0 0 10 0 10 5 Fair 15 9.5 0 20 5 100 15 Poor 20 15 0 25 20 200 20 Bad 25 19 0 30 50 300 25
  • 10. Design and Implementation of Road Maintenance Reform. Republic of Moldova The plan has to address: • Road Network Condition development with regards to different budget scenarios • Budget allocation: – Routine maintenance – Periodic maintenance – Rehabilitation/reconstruction works
  • 11. Design and Implementation of Road Maintenance Reform. Republic of Moldova Proposed Road Network standards TRAFFIC CLASSES TERM (USED FOR MODELLING IN HDM4) SECTIONS > 1000M Mean Roughness (IRI) Mean Rutting (mm) Periodic Mtnce Rehabilitation Reconstruction Periodic Mtnce 0-500 Low Traffic (L. Tra) 5.5 7.0 10.0 25 501-2000 Low – Medium Traffic (LMTra) 5.5 6.0 10.0 25 2001-4000 Low-Medium high Traffic (LMHTra) 5.5 6.0 10.0 18 4001-7000 Medium-High Traffic (MHTra) 4.5 5.0 9.0 18 > 7000 High Traffic (HTra) 4.5 5.0 8.0 14
  • 12. Design and Implementation of Road Maintenance Reform. Republic of Moldova Proposed Road Network standards TRAFFIC CLASSES TERM (USED FOR MODELLING IN HDM4) SECTIONS > 1000M Mean Roughness (IRI) Mean Rutting (mm) Periodic Mtnce Rehabilitation Reconstruction Periodic Mtnce 0-500 Low Traffic (L. Tra) 5.5 7.0 10.0 25 501-2000 Low – Medium Traffic (LMTra) 5.5 6.0 10.0 25 2001-4000 Low-Medium high Traffic (LMHTra) 5.5 6.0 10.0 18 4001-7000 Medium-High Traffic (MHTra) 4.5 5.0 9.0 18 > 7000 High Traffic (HTra) 4.5 5.0 8.0 14
  • 13. Design and Implementation of Road Maintenance Reform. Republic of Moldova Road works
  • 14. Design and Implementation of Road Maintenance Reform. Republic of Moldova Assigned Rehabilitation Maintenance  4 different standards 1. Do minimum (only Routine mtnce) 2. Minimum Standard (A) 3. Moderate Standard (B) 4. Required Standard (C) A, B, C is compared to Do minimum ( Do Minimum = basically, routine maintenance )
  • 15. Design and Implementation of Road Maintenance Reform. Republic of Moldova Routine maintenance TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR ROUTINE MAINTENANCE UNIT COSTS LEI (m2 ) Minimum (A) Moderate (B) Required (C) Routine Crack Sealing Wide structural cracking > 10% Wide structural cracking > 7% Wide structural cracking > 5% 67.0 Edge repair Edge break > 5 m2 /km Edge break > 2 m2 /km Edge break > 1 m2 /km 134.0 Pothole Patching Pothole > 4 no/km Pothole > 2 no/km Pothole > 1 no/km 167.0
  • 16. Design and Implementation of Road Maintenance Reform. Republic of Moldova Routine maintenance TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR ROUTINE MAINTENANCE UNIT COSTS LEI (m2 ) Minimum (A) Moderate (B) Required (C) Routine Crack Sealing Wide structural cracking > 10% Wide structural cracking > 7% Wide structural cracking > 5% 67.0 Edge repair Edge break > 5 m2 /km Edge break > 2 m2 /km Edge break > 1 m2 /km 134.0 Pothole Patching Pothole > 4 no/km Pothole > 2 no/km Pothole > 1 no/km 167.0
  • 17. Design and Implementation of Road Maintenance Reform. Republic of Moldova Routine maintenance TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR ROUTINE MAINTENANCE UNIT COSTS LEI (m2 ) Minimum (A) Moderate (B) Required (C) Routine Crack Sealing Wide structural cracking > 10% Wide structural cracking > 7% Wide structural cracking > 5% 67.0 Edge repair Edge break > 5 m2 /km Edge break > 2 m2 /km Edge break > 1 m2 /km 134.0 Pothole Patching Pothole > 4 no/km Pothole > 2 no/km Pothole > 1 no/km 167.0
  • 18. Design and Implementation of Road Maintenance Reform. Republic of Moldova TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR MAINTENACE PROGRAM UNIT COSTS LEI (m2) DoMinimum(table6) Routinemaintenanceonly Minimum (A) Moderate (B) Required (C) Periodic maintenance Surface dressing with shape correction 20 mm 5.5< IRI < 6.5 5.0 < IRI < 6.5 4.5 < IRI < 6.5 107,0 Rehabilitation 40 mm asphalt on existing material IRI > 8.0 IRI > 7.0 207,7 Reconstruction Asphalt mix on granular base 50 mm IRI > 10 268,0 Strategies for roads with traffic < 500
  • 19. Design and Implementation of Road Maintenance Reform. Republic of Moldova Strategies for roads with traffic > 501 < 2000 TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR REHABILITATION PROGRAM UNIT COSTS LEI (m2) DoMinimum Routinemaintenanceonly Minimum (A) Moderate (B) Required (C) Periodic maintenance Surface dressing with shape correction 25 mm 5.5< IRI < 6.5 5.0 < IRI < 6.5 4.5 < IRI < 6.5 127,3 Rehabilitation 50 mm asphalt on existing material IRI > 8.0 IRI > 6.0 247,9 Reconstruction 40 mm asphalt on 60 mm asphalt base IRI > 10 469
  • 20. Design and Implementation of Road Maintenance Reform. Republic of Moldova Strategies for roads with traffic > 2001 < 4000 TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR REHABILITATION PROGRAM UNIT COSTS LEI (m2) DoMinimum Routinemaintenanceonly Minimum (A) Moderate (B) Required (C) Periodic maintenance Surface dressing with shape correction 30 mm 5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5 147,4 Rehabilitation 50 mm asphalt on existing material IRI > 7.0 IRI > 6.0 247,9 Reconstruction 50 mm asphalt on 60 mm Asphalt Base IRI > 10 556,1
  • 21. Design and Implementation of Road Maintenance Reform. Republic of Moldova Strategies for roads with traffic > 4001 < 7000 TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR REHABILITATION PROGRAM UNIT COSTS LEI (m2) DoMinimum Routinemaintenanceonly Minimum (A) Moderate (B) Required (C) Periodic maintenance Surface dressing with shape correction 30 mm 5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5 147,4 Rehabilitation 50 mm asphalt on existing material IRI > 7.0 IRI > 6.0 247,9 Reconstruction 50 mm asphalt on 110 mm Asphalt Base IRI > 10 703,5
  • 22. Design and Implementation of Road Maintenance Reform. Republic of Moldova Strategies for roads with traffic > 4001 < 7000 TYPE WORK ACTIVITY INTERVENTION CRITERIA FOR REHABILITATION PROGRAM UNIT COSTS LEI (m2) DoMinimum Routinemaintenanceonly Minimum (A) Moderate (B) Required (C) Periodic maintenance Surface dressing with shape correction 30 mm 5.5< IRI < 6.5 4.5 < IRI < 6.5 4 < IRI < 6.5 147,4 Rehabilitation 50 mm asphalt on existing material IRI > 7.0 IRI > 6.0 247,9 Reconstruction 50 mm asphalt on 140 mm Asphalt Base IRI > 10 770,5