2. About Company
• Headquartered in Mumbai, Larsen & Toubro Limited is one of the largest and
most respected companies in India's private sector.
• With over 80 years of a strong, customer focused approach and a continuous
quest for world-class quality, L&T has unmatched capabilities across
Technology, Engineering, Construction, and Manufacturing, and maintains a
leadership in all its major lines of business.
• We are engaged in core , high impact sectors of the economy and our
integrated capabilities span the entire spectrum of ‘design to delivery’.
• Every aspect of L&T's businesses is characterized by professionalism and high
standards of corporate governance. Sustainability is embedded into our long-
term strategy for growth.
8. What I did
Completion of module 1
Completion of module 2
Completion of module 3
Offline join
9. Objective(s)
• Completion of Module 1 ( Code)
• C Program
• Practice Test
• Getting started with GitHub and
Visual Studio Code
• Assessment
Link for module 1
12. Objective(s)
• Completion of module 2 ( Embedded)
• C Program
• Practice Test
• GitHub and Visual Studio Code
• 2 Case Study
• 1 Project (GREEN HOUSE
MONITORING AND CONTROL)
Link of 2nd module
13.
14. Output or Result
• If temperature is lower than the set point: Heater relay will Turn ON and fan will turn OFF.
• If temperature is higher than the set point: then Fan will be Turned ON and heater will turn OFF.
• If Humidity is higher than the set point: then Fan / Humidifier will be Turned ON and heater /
Dehumidifier will turn OFF.
• If Humidity is lower than the set point: then Fan / Humidifier will be Turned OFF and heater /
Dehumidifier will turn ON.
• If temperature is higher than the set point: then Fan will be Turned ON and heater will turn OFF.
• If Light Intensity is higher than the set point: turn OFF the bulb.
• If Light Intensity is lower than the set point: turn ON the bulb.
14
18. Objective(s)
• Completion of Module 3 ( Micro-controllers)
• Embedded C Program
• Group based project
• Practice Test
• Assessment
• 2 Topics for project
Link of module 3
28. Work Plan
28
S .No Nature Of Work Schedule Status
1 Join LTTS Offline March 2022 Completed
2 Second Review March 2022 Completed
3 New modules to assign March 2022 Completed
4 Final Review Yet to be done