Annexure A1 – Project Profile
• Name of Project: Komoto Copper Company SARL Kolwezi– August 2014-Current
• Type and description of project:
Komoto Copper Company SARL (KCC SARL) operates a large scale copper-cobalt mine
complex at Kolwezi in the Democratic Republic of Congo(DRC).KCC SARL is refurbishing and
expanding this operation to produce a world class copper and cobalt company that brings
benefit to all stakeholders.
CONSTRUCTION OF KOV STONE CRUSHER/COVEYOR BELTS AND TRANSFER TOWERS OF CONVEYORS.
The KOV Stone Crusher is used to Crush Ore Stone by means of Rock Breaker, Apron Feeder,
Vibrating Grizzly and Jaw Crusher for crushing Ore Stone in Small pieces and transporting them to
the stock piles by means of conveyor belts and transfer towers.
Mined ore- gets transported by dump trucks
from the blasting area to the Stone Crusher
then to Vibrating Grizzly from where the small
stones are discharged on conveyor belts and
all the large stones are dispatched to Jaw
crusher where they are crushed in a small
pieces and being transported by means of
conveyor and transfer towers to the stock
piles. Once the crushed ore is in stockpile
conveyors, then to CM5 Cyclone flotation
tanks where the Ore rises and overflows into
tanks. The product is then pumped to
receiving area through belt filters to remove
water and then pumped to Re-pulp area
where it’s mixed with sulphuric acid
electrolyte. The product is then pumped to the
Leaching preparation tanks to remove iron,
then to the CCD area which prepares for the
final Copper rich solution.
• Geographic Location Of project
- Democratic Republic of Congo-Kolwezi Region.(Katanga Copper Belt)
• Name of client and position and contact details of client representative
- KCC SARL DRC Kolwezi- Sabhi Ahmed Project HSE Manager +243 990346 266.
-
• List of participating organizations
- KCC SARL, Sandvik(Vendor), Redis Construction Afrika.
• Year started and year completed (or planned completed date)
- July 2013 - October 2015
• Original Completion date
- 20 October 2015
• Actual completion date
- Project Current
• Percentage of Practical Completion
- 100%
• Total Value of project
- R40 Million
• Percentage Participation of your Organization in the project
- 90%
• Your Specific role in the project
- Site Safety Officer
• Was the project successfully completed
- Yes !

More Related Content

What's hot

10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templatesDwarika Bhushan Sharma
 
HSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptHSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptGkMechanical
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedureMohammed Alam
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers Content Mutual
 
Nebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixNebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixCiske Berrington
 
SAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITESAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITEHasnizam Md Saad
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at heightjohnbarsellona
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.doganiArber Dogani
 
Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Mainraj
 

What's hot (20)

shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
HSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.pptHSE-BMS-004 Supervisors Training.ppt
HSE-BMS-004 Supervisors Training.ppt
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers
 
HSE plan and Bridging document
HSE plan and Bridging documentHSE plan and Bridging document
HSE plan and Bridging document
 
Shassic Checklist
Shassic ChecklistShassic Checklist
Shassic Checklist
 
Nebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrixNebosh International Diploma unit A questions matrix
Nebosh International Diploma unit A questions matrix
 
SAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITESAFETY REQUIREMENTS & GUIDELINES AT SITE
SAFETY REQUIREMENTS & GUIDELINES AT SITE
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at height
 
Safety management
Safety managementSafety management
Safety management
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.Cv of mr. mainraj safety officer.
Cv of mr. mainraj safety officer.
 
JOB SAFETY ANALYSIS
JOB SAFETY ANALYSISJOB SAFETY ANALYSIS
JOB SAFETY ANALYSIS
 
Contractor Safety
Contractor SafetyContractor Safety
Contractor Safety
 

Similar to Komoto Copper Project Profile

CES Capability Statement V1
CES Capability Statement V1CES Capability Statement V1
CES Capability Statement V1Steve Coleman
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectJames AH Campbell
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022ContourMC
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesSymposium
 
Corporate Profile E Version
Corporate Profile E VersionCorporate Profile E Version
Corporate Profile E VersionTrish Spinozzi
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
Company Presentation - Kariertau LLP
Company Presentation - Kariertau LLPCompany Presentation - Kariertau LLP
Company Presentation - Kariertau LLPAnuar Seidaliyev
 
Cdm presentation oct
Cdm presentation octCdm presentation oct
Cdm presentation octCobreDelMayo
 
Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1SNC-Lavalin
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17Charl Du Preez
 
STA Capability Statement
STA Capability StatementSTA Capability Statement
STA Capability StatementRoss Yendle
 

Similar to Komoto Copper Project Profile (20)

GEM - EMW Company Profile
GEM - EMW Company ProfileGEM - EMW Company Profile
GEM - EMW Company Profile
 
CES Capability Statement V1
CES Capability Statement V1CES Capability Statement V1
CES Capability Statement V1
 
KMOC ASIA Ltd.
KMOC ASIA Ltd.KMOC ASIA Ltd.
KMOC ASIA Ltd.
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Mining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan ProjectMining Review Rockwell Diamonds Wouterspan Project
Mining Review Rockwell Diamonds Wouterspan Project
 
Equipment
EquipmentEquipment
Equipment
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon Resources
 
Corporate Profile E Version
Corporate Profile E VersionCorporate Profile E Version
Corporate Profile E Version
 
Barry-Knight-5
Barry-Knight-5Barry-Knight-5
Barry-Knight-5
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Company Presentation - Kariertau LLP
Company Presentation - Kariertau LLPCompany Presentation - Kariertau LLP
Company Presentation - Kariertau LLP
 
Cdm presentation oct
Cdm presentation octCdm presentation oct
Cdm presentation oct
 
Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1Spectrum 2013 Edition Number 1
Spectrum 2013 Edition Number 1
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
 
STA Capability Statement
STA Capability StatementSTA Capability Statement
STA Capability Statement
 

More from HITESH RATHOD

More from HITESH RATHOD (9)

img587
img587img587
img587
 
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
 
img589
img589img589
img589
 
SHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR ConstructionSHE ORGANOGRAM QATAR Construction
SHE ORGANOGRAM QATAR Construction
 
img581
img581img581
img581
 
img578
img578img578
img578
 
img577
img577img577
img577
 
img576
img576img576
img576
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 

Komoto Copper Project Profile

  • 1. Annexure A1 – Project Profile • Name of Project: Komoto Copper Company SARL Kolwezi– August 2014-Current • Type and description of project: Komoto Copper Company SARL (KCC SARL) operates a large scale copper-cobalt mine complex at Kolwezi in the Democratic Republic of Congo(DRC).KCC SARL is refurbishing and expanding this operation to produce a world class copper and cobalt company that brings benefit to all stakeholders. CONSTRUCTION OF KOV STONE CRUSHER/COVEYOR BELTS AND TRANSFER TOWERS OF CONVEYORS. The KOV Stone Crusher is used to Crush Ore Stone by means of Rock Breaker, Apron Feeder, Vibrating Grizzly and Jaw Crusher for crushing Ore Stone in Small pieces and transporting them to the stock piles by means of conveyor belts and transfer towers. Mined ore- gets transported by dump trucks from the blasting area to the Stone Crusher then to Vibrating Grizzly from where the small stones are discharged on conveyor belts and all the large stones are dispatched to Jaw crusher where they are crushed in a small pieces and being transported by means of conveyor and transfer towers to the stock piles. Once the crushed ore is in stockpile conveyors, then to CM5 Cyclone flotation tanks where the Ore rises and overflows into tanks. The product is then pumped to receiving area through belt filters to remove water and then pumped to Re-pulp area where it’s mixed with sulphuric acid electrolyte. The product is then pumped to the Leaching preparation tanks to remove iron, then to the CCD area which prepares for the final Copper rich solution. • Geographic Location Of project - Democratic Republic of Congo-Kolwezi Region.(Katanga Copper Belt) • Name of client and position and contact details of client representative - KCC SARL DRC Kolwezi- Sabhi Ahmed Project HSE Manager +243 990346 266. - • List of participating organizations - KCC SARL, Sandvik(Vendor), Redis Construction Afrika.
  • 2. • Year started and year completed (or planned completed date) - July 2013 - October 2015 • Original Completion date - 20 October 2015 • Actual completion date - Project Current • Percentage of Practical Completion - 100% • Total Value of project - R40 Million • Percentage Participation of your Organization in the project - 90% • Your Specific role in the project - Site Safety Officer • Was the project successfully completed - Yes !