SlideShare a Scribd company logo
1 of 4
Gregory Hawkins, PMP
1970 Tower Rd. Norlina, NC 27563
804-691-0272 Hawkins762@gmail.com
Project Manager
Experience
R&D Engineering / Maintenance Planner Honeywell (via CB&I) 2014 - Present
• Project Management of construction and installation of manufacturing equipment in excess of
$10 million (R&D pilot line).
• Collaborate with Engineering, Maintenance and Production departments in planning of work
arounds, shutdowns and tie-ins.
• Develop spare parts list to reduce redundancies in inventory
• Manage contractors/subcontractors on a variety of factory construction projects, up to 80
different tradesmen daily, obtained or verified that the contractors/subcontractors obtained all
necessary permits for construction purposes.
• Coordinate the installation and trial runs for Resins and Polymer in the labs through the CPMP
process for the improvement of Honeywell production facilities.
• Maintenance planning and execution. Organized maintenance group structure to better support
operations.
Construction Superintendent Trillium Construction – Durham, NC 2013 – 2014
• Provide technical expertise throughout the Pre-Construction process.
• Established credibility among Owners, trade contractors, unions etc. by maintaining a fair and
trustworthy environment.
• Run the day-to-day operations on the construction site and control the short-term schedule.
• Insure job safety requirements are understood and implemented by all project personnel and
trade contractors (up to 100 daily), working with safety support personnel as a resource.
Continually strive for Zero Injury on all projects.
• Review the plans and specifications for constructability and construction schedules and advise
the project team of issues or deficiencies including change orders.
• Maintained a thorough understanding of contract documents to plan ahead and anticipate
potential problems before they arise.
Account Manager Applied Industrial Technologies – Alexandria, Va. 2012-2013
• Consistently achieves sales and profit goals.
• Working knowledge of Commercial power transmission equipment and HVAC energy efficient
changeovers for customers to achieve LEED certification.
• Ability to retain current customers while building customer base.
• Prepares quotations and proposals, negotiates contract terms, and closes sales transactions
Maintenance Planner Coca-Cola Refreshments – Silver Spring, MD 2011-2012
• Maintained and executed Preventive Maintenance program. Organized maintenance group
structure to better support operations.
• Implemented Proactive Maintenance methodologies and are achieving world class reliability
from equipment.
• Maintained appropriate inventory levels using SAP (CMMS)
• Created reports to track performance against goals according to established metrics
• Established Preventative Maintenance schedule and repair tracking to decrease and/or
eliminate down time of factory equipment
Construction Project Manager Philip Morris USA (via Progressive Design and Industrial Turn Around Corp)
Richmond, VA 2000-2011
• Project management of construction of and installation of manufacturing equipment.
• Collaborate with Engineering, Maintenance and Production departments in planning of work
arounds, shutdowns and tie-ins.
• Developed spare parts lists to reduce redundancies in inventory
• Managed contractors/subcontractors in the installation of capital expenditure projects over
$800,000. Project involved the installation and testing of new flavor process equipment never
used before in the process. No impact to production during installation and testing.
Inventory Planner, Maxxim Medical - Richmond, VA 1999-2000
• Ordered and scheduled inventory replenishments, reviewed and analyzed usage and forecasted
inventory requirements.
• Maintained and developed planning systems and vendor relations.
• Monitored vendor performance
Equipment/Raw Materials Purchasing Supervisor, Weyerhaeuser – Richmond, VA 1996-1998
• Developed Preventative Maintanence program
• Created spare parts list for purchasing department
• Maintained expenses, under budget, while meeting inventory needs
• Trained and supervised technicians in preventive maintenance ensuring compliance with company
safety programs, contracts, policies and procedures.
Summary
Experienced Project Manager with proficiencies in Commercial Construction, the Manufacturing Process
to include Preventative Maintenance Planning, Inventory Control, Forecasting, Budgeting and Contract
Negotiation.
Education
University of Richmond, Robins School of Business 2008
Project Management Series
• Strategic Project Management
• Project Risk Management
• Management Tools & Techniques for the Tech Professional
• Advanced Project Management
Durham Technical Institute 1984
Business Administration
Certifications
• LEED certified 2013
• SAP / Micro Station SE User Training – Philip Morris USA – 7/00
• Certificate: Electrical Counters, Encoders, Timers and Meters – Durant –Division of Eaton
Corporation – 7/99
• Certificate: Maintenance Planning II – DataStream/PBS - Oracle – 12/97
• Certificate: Hydraulics and Pneumatics – Dana – Division of Weatherhead – 6/95
Summary of Qualifications
• Ability to estimate man-hours and skill sets required for planned work and track work order
completion data to determine actual versus estimated man-hours used
• Ability to develop scope of work with limited supervision
• Creation of training programs to increase safety, productivity, and quality
• Experience with OSHA and Department of Environmental Quality (DEQ) regulations
• Ability to manage contractors and subcontractors for project duration
• Proficient in the use of desktop computer software : Word, Excel, Outlook, Project, CMMS, SAP,
PERMAC
• Experience with concepts and principles of a Quality System and Union environment
• Experience with trial runs for Resins and Polymer in labs

More Related Content

What's hot

Jack E Resume New
Jack E Resume NewJack E Resume New
Jack E Resume NewJack Hebert
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016Nigel Vieira
 
resume_Beatriz_Barba
resume_Beatriz_Barbaresume_Beatriz_Barba
resume_Beatriz_BarbaBeatriz Barba
 
Mr.Lacy Resume 2
Mr.Lacy Resume 2Mr.Lacy Resume 2
Mr.Lacy Resume 2NATE LACY
 
Perez , Nelson 01 26 09
Perez , Nelson 01 26 09Perez , Nelson 01 26 09
Perez , Nelson 01 26 09guestd1ee13
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell Portis
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)jmusiel
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015Roxanne Smith
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Evbex
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementLakshminarasimman S
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary Giblock
 
Resume2021
Resume2021Resume2021
Resume2021emad bek
 
CV Elie_Ghattas update
CV Elie_Ghattas updateCV Elie_Ghattas update
CV Elie_Ghattas updateElie Ghattas
 

What's hot (18)

CV
CVCV
CV
 
Jack E Resume New
Jack E Resume NewJack E Resume New
Jack E Resume New
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
 
resume_Beatriz_Barba
resume_Beatriz_Barbaresume_Beatriz_Barba
resume_Beatriz_Barba
 
Mr.Lacy Resume 2
Mr.Lacy Resume 2Mr.Lacy Resume 2
Mr.Lacy Resume 2
 
vikas goel
vikas goelvikas goel
vikas goel
 
Perez , Nelson 01 26 09
Perez , Nelson 01 26 09Perez , Nelson 01 26 09
Perez , Nelson 01 26 09
 
Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015Lionell-Portis. resume update 10-2015
Lionell-Portis. resume update 10-2015
 
MahoneyResume2017
MahoneyResume2017MahoneyResume2017
MahoneyResume2017
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
 
JAS Resume
JAS ResumeJAS Resume
JAS Resume
 
Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021Facilities management opportunities post COVID-19 Jan-2021
Facilities management opportunities post COVID-19 Jan-2021
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Resume2021
Resume2021Resume2021
Resume2021
 
CV Elie_Ghattas update
CV Elie_Ghattas updateCV Elie_Ghattas update
CV Elie_Ghattas update
 
RESUME BP 04-25-2016
RESUME BP 04-25-2016RESUME BP 04-25-2016
RESUME BP 04-25-2016
 

Similar to Gregory_Hawkins-3-3 doc

Similar to Gregory_Hawkins-3-3 doc (20)

Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
Functional Resume Rework Mar 2015
Functional Resume Rework Mar 2015Functional Resume Rework Mar 2015
Functional Resume Rework Mar 2015
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
KPavanKumar_Resume
KPavanKumar_ResumeKPavanKumar_Resume
KPavanKumar_Resume
 
CV Amro Mohammed Noor Khayat
CV  Amro Mohammed Noor KhayatCV  Amro Mohammed Noor Khayat
CV Amro Mohammed Noor Khayat
 
GARRETTC_Resume M
GARRETTC_Resume MGARRETTC_Resume M
GARRETTC_Resume M
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
new sales eng
new sales engnew sales eng
new sales eng
 
C.V. William 15
C.V. William 15C.V. William 15
C.V. William 15
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
KingsleyOkwudiriEmegheboResume (1)
KingsleyOkwudiriEmegheboResume (1)KingsleyOkwudiriEmegheboResume (1)
KingsleyOkwudiriEmegheboResume (1)
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Resume
Resume Resume
Resume
 
Tracie Kilbourn Resume
Tracie Kilbourn ResumeTracie Kilbourn Resume
Tracie Kilbourn Resume
 

Gregory_Hawkins-3-3 doc

  • 1. Gregory Hawkins, PMP 1970 Tower Rd. Norlina, NC 27563 804-691-0272 Hawkins762@gmail.com Project Manager Experience R&D Engineering / Maintenance Planner Honeywell (via CB&I) 2014 - Present • Project Management of construction and installation of manufacturing equipment in excess of $10 million (R&D pilot line). • Collaborate with Engineering, Maintenance and Production departments in planning of work arounds, shutdowns and tie-ins. • Develop spare parts list to reduce redundancies in inventory • Manage contractors/subcontractors on a variety of factory construction projects, up to 80 different tradesmen daily, obtained or verified that the contractors/subcontractors obtained all necessary permits for construction purposes. • Coordinate the installation and trial runs for Resins and Polymer in the labs through the CPMP process for the improvement of Honeywell production facilities. • Maintenance planning and execution. Organized maintenance group structure to better support operations. Construction Superintendent Trillium Construction – Durham, NC 2013 – 2014 • Provide technical expertise throughout the Pre-Construction process. • Established credibility among Owners, trade contractors, unions etc. by maintaining a fair and trustworthy environment. • Run the day-to-day operations on the construction site and control the short-term schedule. • Insure job safety requirements are understood and implemented by all project personnel and trade contractors (up to 100 daily), working with safety support personnel as a resource. Continually strive for Zero Injury on all projects. • Review the plans and specifications for constructability and construction schedules and advise the project team of issues or deficiencies including change orders.
  • 2. • Maintained a thorough understanding of contract documents to plan ahead and anticipate potential problems before they arise. Account Manager Applied Industrial Technologies – Alexandria, Va. 2012-2013 • Consistently achieves sales and profit goals. • Working knowledge of Commercial power transmission equipment and HVAC energy efficient changeovers for customers to achieve LEED certification. • Ability to retain current customers while building customer base. • Prepares quotations and proposals, negotiates contract terms, and closes sales transactions Maintenance Planner Coca-Cola Refreshments – Silver Spring, MD 2011-2012 • Maintained and executed Preventive Maintenance program. Organized maintenance group structure to better support operations. • Implemented Proactive Maintenance methodologies and are achieving world class reliability from equipment. • Maintained appropriate inventory levels using SAP (CMMS) • Created reports to track performance against goals according to established metrics • Established Preventative Maintenance schedule and repair tracking to decrease and/or eliminate down time of factory equipment Construction Project Manager Philip Morris USA (via Progressive Design and Industrial Turn Around Corp) Richmond, VA 2000-2011 • Project management of construction of and installation of manufacturing equipment. • Collaborate with Engineering, Maintenance and Production departments in planning of work arounds, shutdowns and tie-ins. • Developed spare parts lists to reduce redundancies in inventory • Managed contractors/subcontractors in the installation of capital expenditure projects over $800,000. Project involved the installation and testing of new flavor process equipment never used before in the process. No impact to production during installation and testing. Inventory Planner, Maxxim Medical - Richmond, VA 1999-2000
  • 3. • Ordered and scheduled inventory replenishments, reviewed and analyzed usage and forecasted inventory requirements. • Maintained and developed planning systems and vendor relations. • Monitored vendor performance Equipment/Raw Materials Purchasing Supervisor, Weyerhaeuser – Richmond, VA 1996-1998 • Developed Preventative Maintanence program • Created spare parts list for purchasing department • Maintained expenses, under budget, while meeting inventory needs • Trained and supervised technicians in preventive maintenance ensuring compliance with company safety programs, contracts, policies and procedures. Summary Experienced Project Manager with proficiencies in Commercial Construction, the Manufacturing Process to include Preventative Maintenance Planning, Inventory Control, Forecasting, Budgeting and Contract Negotiation. Education University of Richmond, Robins School of Business 2008 Project Management Series • Strategic Project Management • Project Risk Management • Management Tools & Techniques for the Tech Professional • Advanced Project Management Durham Technical Institute 1984 Business Administration Certifications • LEED certified 2013 • SAP / Micro Station SE User Training – Philip Morris USA – 7/00 • Certificate: Electrical Counters, Encoders, Timers and Meters – Durant –Division of Eaton Corporation – 7/99
  • 4. • Certificate: Maintenance Planning II – DataStream/PBS - Oracle – 12/97 • Certificate: Hydraulics and Pneumatics – Dana – Division of Weatherhead – 6/95 Summary of Qualifications • Ability to estimate man-hours and skill sets required for planned work and track work order completion data to determine actual versus estimated man-hours used • Ability to develop scope of work with limited supervision • Creation of training programs to increase safety, productivity, and quality • Experience with OSHA and Department of Environmental Quality (DEQ) regulations • Ability to manage contractors and subcontractors for project duration • Proficient in the use of desktop computer software : Word, Excel, Outlook, Project, CMMS, SAP, PERMAC • Experience with concepts and principles of a Quality System and Union environment • Experience with trial runs for Resins and Polymer in labs