2. +
Background
Honaunau School
150 +/- enrollment
12 full-time teachers
Grades Pre-K to 5
Computer-based
Adaptive
Measures Student Growth
NWEA MAP Test
3. +
Urgency
Testing occurs 3 times a year
Test environment needs to be re-configured every time
Test environment (Hardware):
1 Mac OSX server
+/- 25 client workstations (Mac)
1 gateway computer (PC)
No officially-designated Test Coordinator or Computer
Technician
NWEA does not provide support for servers
4. +
Project Description
Target Audience: HES Faculty & Staff designated to NWEA
test
Delivery Method: Printed & bound; electronic formats
Prerequisites: Introduction to NWEA & MAP; basic computer
skills; working knowledge of MS Excel, basic understanding of
server/client relationship
Design Assumptions: Use of module will be for HES; users will
have access to school database, admin access to server;
computer with Excel and .pdf reader, technical requirements to
administer NWEA MAP test
Assessment: Post survey taken by learners
5. +
Objective 1
Learners will be able to:
Create and manage the school’s data for the NWEA MAP test
1.1 create the NWEA CRF 1.2 create the NWEA SPF
1.3 upload files to NWEA 1.4 assign file server configuration
1.5 download tests and data 1.6 upload results to NWEA
1.7 declare testing complete 1.8 order test reports
6. +
Objectives 2 & 3
Learners will be able to:
2. Configure and maintain the school’s NWEA file server to administer
the test
3. Configure and maintain the client workstations to administer the
NWEA MAP test
2.1 set up the NWEA test season 2.2 Share and Unshare the test
folder season folder
3.1 set the configuration for the NWEA client workstation computers