A	Critical	Post	Operational	Review:
Environmental	Impact	Assessment	for
Jebel	Ali	Power	and	Desalination	Station	M,	
Dubai,	UAE
Gary	D.	Moore
Prepared	in	partial	fulfilment	of	575.437	Environmental	Impact	Assessment
December,	2016
1
Outline
Part One
Comparison of NEPA and UAE EIA Program
Introduction
UAE EIA Framework
Comparative Analysis
Part Two
EIS Critical Review
Background
Purpose and Need for Action
Alternations to the Proposed Action
Affected Environment
Impact Analysis Framework
Impacts of the Alternatives
Cumulative Impact
Other factors Considered
Summary and Evaluation of the EIS
2
โ€ข The	United	Arab	Emirates	(UAE)	under	Law	24	(1999)	has	an	
environmental	impact	assessment	(EIA)	program.
โ€ข The	Environment	Agency	โ€“ Abu	Dhabi	(EAD)	may	require	an	EIA	for	any	
development	project	that	has	the	potential	to	effect	the	environment.
Part	1:	Introduction
Part	One:	UAE	EIA	Framework
โ€ข The	impact	assessment	framework	in	the	UAE	is	similar	to	NEPA,	but	
substantially	weaker,	lacking	requirements	in	fundamental	areas.	A	
comparative	analysis	of	the	two	programs	(next	slide)	is	included.	
โ€ข The	UAE	EIA	program	is	a	NEPA	inspired	โ€˜command	and	controlโ€™	policy	
administered	by	the	Environment	Agency	โ€“ Abu	Dhabi	(EAD)
โ€ข The	UAE	EIA	process	is	part	of	a	landuse	control	and	environmental	
protection	process,	requiring	state	review	and	approval	of	a	proposed	
landuse	project	prior	to	construction.
Part	One:	Comparative	Analysis
โ€ข Substantial	difference	exist	between	NEPA	and	the	UAE	EIA	program.	The	
most	significant	differences	are	summarized	below.	
โ€ข The	UAE	EIA	process:
โ€ข No	public/stakeholders	input	in	the	process
โ€ข No	public/stakeholder	review	of	EIA
โ€ข Only	partial	requirements	for	mitigation	measures;	they	are	included	
in	an	EIA,	but	no	verification	of	implementation	or	effectiveness	is	
required.
โ€ข Projects	requiring	an	EIA	are	seldom	rejected,	withdrawn,	or	scaled	
back,	regardless	of	the	environmental	impacts.	(Heaton	and	Burns,	
Table	2,	p.	248,	2014)
Part	Two:	Background
โ€ข In	2009	an	environmental	impact	assessment	was	performed	by	
Environmental	International	Consultants	for	the	expansion	of	an	existing	
electrical	power	production	and	desalination	plant	in	the	UAE.	The	EIA	
report,	โ€œ	Environmental	Impact	Assessment	for	Jebel	Ali	Power	and	
Desalination	Station	Mโ€	is	the	subject	of	this	review.
โ€ข The	goal of	submitting	the	EIA	is	receiving	an	approval for	the	proposed	
project	from	the	Environment	Agency	โ€“ Abu	Dhabi.	An	approval is	
formalized	by	the	issuance	of	an	Environmental	Permit,	which	is	one	of	the	
permits	required	to	construct	a	project.
โ€ข Under	the	UAE	EIA	program,	neither	a	Record	of	Decision	nor	Alternative	
Analysis	are	required
โ€ข The	project	was	approved	and	construction.	This	presented	an	opportunity	
to	conduct	a	limited	post-construction	and	operation	audit	of	information	
media	for	published	environmental	impacts	and/or	concerns.
Part	Two:	Purpose	and	Need	for	
Action
โ€ข This	is	an	infrastructure	project.		It	is	designed	to	generate	electrical	power	and	
produce	drinkable	water	to	meet	the	increasing	demands	for	utility	services	
from	a	growing	industrial	sector	and	residential	population.	
โ€ข This	project,	i.e.,	Jebel	Ali	Power	and	Desalination	Station	M,	is	an	expansion	of	
an	existing	power	plant.	The	existing	plant	and	the	expansion	(this	project,	
Station	โ€˜Mโ€™)	are	located	on	the	coast	of	the	Arabian	Gulf.
Part	Two:	Alternatives	to	the	
Proposed	Action
โ€ข Under	the	UAE	EIA	program,	project	alternatives	are	not	assessed.	
Rather	the	proposed	project	is	solely	the	focus	of	an	EIA.	
โ€ข For	this	project,	the	proposed	action	is:	construction	and	operation	of	
the	Jebel	Ali	Power	and	Desalination	Station	M.
Part	Two:	Affected	Environment
The	proposed	project	is	to	be	located:
โ€ข coastal	area	southwest	of	Doha	(the	capital	city	of	Qatar)
โ€ข In	a	mixed-use	industrial,	commercial,	and	residential	area
โ€ข marine	coastal	and	near-coastal	ecosystem	are	located	to	the	
immediate	southwest	along	a	wide	intertidal	area
โ€ข to	the	northeast	are	recreational	beaches	used	by	residents	and	
tourists
The	coastal	marine	environment	includes	sensitive	and/or	protected	
ecosystems	(see	Table	1):
Table 1
Shallow	bays Saltmarshes
Coral	reefs Rocky	shores
Seaweed	meadows Bird	islands
Intertidal	flats Cyanobacteria	mats
Mangroves Coastal sabkhas
Source:	EIA,	2009,	Environmental	International	Consultants.
Part	Two:	Affected	Environment
โ€ข Environmental	conditions		potentially	negatively	(and	positive	where	
noted)	impacted	by	the	proposed	project	are	presented	in	Table	2
Table 2
Noise environment Construction	worker	health	and	
safety
Air	quality	โ€“ dust and	other	
emissions
Traffic and	transportation	systems
Both	terrestrial	and	marine	flora	
and fauna	near	the	proposed	
project
Socioeconomic	โ€“ employment	
(positive)
Source:	EIA,	2009,	Environmental	International	Consultants.
Part	Two:	Affected	Environment
โ€ข The	analysis	methodologies	used	in	the	EIA	are	not	described.	
However,	the	following	was	interpreted	from	EIA.
โ€ข The	EIA	was	based	on:
โ€ข a	combination	of	profession	judgement	(unnamed	professionals)
โ€ข limited	references	to	scientific	literature
โ€ข references	to	historical	sampling	and	analysis	performed	by	
national	and	international	organizations	(baseline	conditions)	
โ€ข In	a	rare	instance	cited	in	the	2009	EIA	report,	EIA	professionals	
collected	two	water	samples	of	the	Arabian	Gulf.
Part	Two:	Affected	Environment
โ€ข The	following	baseline	conditions were	described	in	the	EIA:
Climate and	Atmosphere
Landuse	โ€“ undeveloped	desert
Air	quality
Terrestrial	flora	and	fauna
Marine	flora	and	fauna
Marine	ecology
Cultural	Heritage
Water	quality	(including the	marine	environment)
Landscape	and	topography
Area recreation
Population
Part	Two:	Affected	Environment
Baseline	conditions	summary	(EIA,	2009,	Environmental	International	
Consultants):
The	site	for	the	proposed	project	is	a	mix	of	undeveloped	desert	and	
existing	industrial	use	(i.e.,	existing	powerplant).	The	surrounding	areas	
include	marine	ecosystems	and	coastal	habitats	with	associated	flora	
and	fauna,	and	recreational	beaches;	other	industrial	activities	
(aluminum	smelting	plant)	southwest	of	the	existing	powerplant.	
Between	3	and	10	kilometers	from	the	proposed	project	there	exists	
several	high	density	population	centers.	The	closest	of	these	is	located	3	
kilometers	north	(Dubai	marina	and	Jumeirah	Lake	Towers	(120,000	
population).	Other	resort	and/or	residential	developments	are	planned	
for	the	area	including	the	construction	of	two	large	โ€˜palm	islandsโ€™	along	
the	coast	near	the	proposed	project	site.
Part	Two:	Impact	Analysis	Framework
โ€ข A	simple	matrix	method	was	used	to	classify	the	potential	severity
and	likelihood	of	occurrence	of	an	action	to	infer	an	impact (see	
Tables	5.1	and	5.2	in	EIA,	2009).
โ€ข No	supporting	information	was	provided	such	as:
โ€ข No	- Source	of	matrix	methodology
โ€ข No	- Assumptions	inherent	in	the	matrix	methodology
โ€ข No	- Limitations	in	the	matrix	methodology
โ€ข No	- References	from	peer-reviewed	scientific	literature	
documenting	prior	successful	application	of	the	methodology
Part	Two:	Impact	Analysis	Framework
It	appears	the	matrix	method	is	implemented	as	follows.
1. The	potential	intensity of	an	action	is	classified	as:	Beneficial,	
Adverse;	Short	or	Long	Term;	Localized	or	Regional.
2. Next,	the	potential	severity of	an	action	is	classified	as:	Slight;	
Low;	Medium;	High.
3. Lastly,	once	the	above	qualitative	classifications	are	made,	the	
Tables	5.1	and	5.2	(EIA,	2009,	pp.	5-2	and	5-3)	are	used	to	
estimate	impact	of	an	action.	According	to	Table	5.2	the	
possible	impact	classifications	are:	Unlikely;	Negligible;	Minor;	
Moderate,	Major.	
โ€ข According	to	Table	5.2,	impacts	classified	as	Moderate should	be	
mitigated,	and	those	classified	as	Major must	be	mitigated.
โ€ข Only	potential	direct and	indirect impacts	were	assessed;	
cumulative	impacts	were	not assessed.
Part	Two:	Impact	Analysis	Framework
Estimates	of	specific	impacts	were	made	as	described	below:
โ€ข Pollution	discharges:	For	all	media	(soil,	water,	air)	the	source(s)	
of	individual	potential contaminant	concentrations	were	not	
provided.	It	is	assumed	these	concentrations	were	obtained	
from	the	equipment	manufacturerโ€™s	design	specifications.
โ€ข Resources	required	or	consumed	for	construction	and	
operation:	No	consideration	of	resources	required	or	consumed	
was	included	in	the	EIA.	
โ€ข Costs:	Monetary	costs	where	not	part	of	the	EIA.	However,	the	
estimated	cost	of	construction	of	Station	M	was	included	under	
the	general	project	description,	as	was	an	estimate	of	the	
number	of	jobs	to	be	created.
Part	Two:	Impacts	of	the	Alternatives
No	project	alternatives	are	included	in	the	EIA.
Part	Two:	Cumulative	Impact
Cumulative	impacts	are	not	considered	in	the	EIA.
Part	Two:	Other	Factors	Considered
According	to	the	EIA		(section	6.1,	p.	6-1),	โ€	The	proposed	Power	and	
Desalination	Plant	โ€™Mโ€™	will	be	constructed	and	operated	according	to	
high	environmental,	health,	and	safety	(EHS)	standards.
However,	some	mitigation	measures (focused	on	the	construction	
and	operation	of	the	expansion)	are	proposed	as	described	below:
During	construction
โ€ข Dust	emissions:	roads	watered,	stockpiles	covered,	transport	
dump	trucks	materials	covered	
โ€ข Effluent	Runoff:	collected	and	properly	disposed	offsite
โ€ข Traffic	and	Transport:	avoid	peak	hours,	notices	published	
for	large	over-land	transport,	staggering	working	hours,	
construction	worker	transported	to	site	using	bus.
โ€ข Solid	Waste:	only	licensed	contractors	will	be	used,	disposal	
procedures	will	be	audited	by	the	State,	strict	manifest	
procedures	followed.
Part	Two:	Other	Factors	Considered
During	Construction	(continued)
โ€ข Solid	Waste:	On-site	engineer	assigned	to	ensure	all	waste	
management	management	procedures	are	followed
โ€ข Occupational	safety	and	health:	a	range	of	industry	standard	
measures	to	protect	worker	health	and	safety.	
During	Operation
โ€ข Occupational	safety	and	health:	A	full	time	HSE	department
โ€ข Emissions:	high	efficiency	fuel,	low	NOx	burners,	stack	deign	
height	to	ensure	atmospheric	dilution	of	discharge
โ€ข Noise:	air	compressors	equipped	with	air	silencers,	outdoor	
equipment	will	meet	less	than	85	dB	limit	standard
โ€ข Visual	Impact:	trees	to	be	strategically	planted	along	the	
property	line	to	hide	plant	construction	view
Part	Two:	Other	Factors	Considered
An	extensive	environmental	monitoring	program	will	be	
implemented.	A	summary	of	the	monitoring	program	is	provided	
below	(section	6.4,	p.	6-11).
โ€ข Ambient	air	quality	in	and	around	the	plant
โ€ข Stack	monitoring	to	assess	the	gas	emissions
โ€ข Marine	water	quality	at	intake	and	at	final	discharge	point
โ€ข Ambient	noise	levels	around	the	plant	boundary
โ€ข The	noise	levels	of	major	equipment	at	distance
โ€ข Assessment	of	quality	and	quantity	of	solid	waste
No	discussion	of	what	would	be	done	to	modify	operations	when	a	
monitored	environment	indicates	degradation.	
Trade	Offs
It	appears,	based	on	the	poor	quality	of	the	environmental	impact	
information	contained	in	the	EIA,	the	State	is	willing	to	trade	
potential	environmental	degradation	for	long	term	increases	in	
electrical	power	generation	and	drinking	water	production.
Part	Two:	Other	Factors	Considered
Irreversible	or	Irretrievable	Resource	Commitments:
Based	on	research	of	published	scientific	investigations	concerning	
environmental	impacts	of		desalination	plants,	and	the	high	
concertation	of	such	plants	in	the	Arabian	Gulf,	marine	ecosystems	
may	be	at	risk	of	damage	either	directly	from	this	project,	or,	
cumulatively from	the	combined	effects	of	the	numerous	other		
plants	operating	or	proposed	in	the	region.
This	situation	may	represent	a	shift	causing	irreversible	damage	on	
the	scale	of	several	human	generations.
Part	Two:	Summary	and	Evaluation	
of	the	EIS
EIA	report	conclusion:
The	EIA	was	prepared	to	meet	the	minimum	requirements	of	the	State	of	
Qatar	for	the	issuance	of	an	Environmental	Permit.	
The	report	contains	a	description	of	the	project	to	be	built,	and	limited	
description	of	selected	impacts	from	constructing	and	operating	the	plant.	
Baseline	information	was	presented	and	limited	site	specific	baseline	data	
were	included.	Based	on	analysis	of	possible	project	impacts	and	proposed	
mitigation	measures,	the	proposed	project	should	be	approved.
Part	Two:	Summary	and	Evaluation	
of	the	EIS
EIA	critical	review	comments:
โ€ข It	appears	the	outcome	of	the	EIA	was	predetermined,	namely	little	to	
no	adverse	environmental	impact.
โ€ข Major	issues	and	concerns	identified	in	the	critical	review	are:
โ€ข Project	alternatives	not	included
โ€ข Stakeholder	and	public	input	not	included
โ€ข Limited	to	no	references	included
โ€ข EIA	Investigators	not	identified,	qualifications	not	presented		
โ€ข Impact	analysis	methods	not	sufficiently	described	or	referenced
โ€ข Cumulative	impacts	(potentially	serious)	not	included	
โ€ข EIA	report	frequently	not	clear	due	to	poor	English
โ€ข Segmentation?	i.e.,	this	project	is	Station	M,	part	of	a	long	line	of	
plant	expansions	since	1976,	e.g.,	prior	Stations	A,	E.	G,	K,	L;	
Siemens	is	currently	expanding	Station	M,	to	be	completed	in	2018	
(News	Release,	Water	Technology	Market,	2015).
Part	Two:	Summary	and	Evaluation	
of	the	EIS
Major	issues	and	concerns	(continued)
Cumulative	Effects	(additional)
According	to	Latteman and	Hopner	(2008):
โ€ข โ€The	largest	number	of	desalination	plants	in	the	world	can	be	found	in	
the	Arabian	Gulf	with	a	total	seawater	desalination	capacity	of	
approximately	11	million	m3/day	which	means	a	little	less	than	half	of	
the	worldwide	daily	production.โ€
โ€ข โ€A	key	concern	of	desalination	plants	are	the	concentrate	and	chemical	
discharges	to	the	marine	environment,	which	may	may	have	adverse	
effects	on	water	and	sediment	quality,	impair	marine	life	and	the	
functioning	and	intactness	of	coastal	ecosystems.โ€		
โ€ข And	in	addition,	โ€œโ€ฆin	recent	publications	special	attention	is	
furthermore	given	to	some	regional	seas	with	high	or	increasing	
desalination	activity,	such	as	the	Arabian	Gulf...โ€
Part	Two:	Summary	and	Evaluation	
of	the	EIS
Major	issues	and	concerns	(continued)
Cumulative	Effects	(additional)
Therefore,	based	on	the	above	observations,	a	cumulative	effect	of	
impacts	from	this	project	may	be	significant	and	should	be	thoroughly	
investigated	by	a	qualified	interdisciplinary	team.
Part	Two:	Summary	and	Evaluation	
of	the	EIS
EIA	critical	review	comments	(continued)
Post	Audit
A	review	of	published	news	regarding	the	EIA	(six	years	following	
project	completion).	A	summary	of	the	news	sources	reviewed	is	
presented	below:
โ€ข Online	media	searched	for	reports	on	the	operation	and/or	
impact(s)	of	Station	M.	No	negative	reports	found.	
โ€ข Searched	the	Dubai	Electricity	and	Water	Authority	website	
(url =	https://www.dewa.gov.ae/en) - no	post	operation	
information	(regarding	the	EIA	or	Plant	Station	โ€˜Mโ€™)	was	
discovered.
โ€ข Searched	all	regional	news	sources	through	Google/News	โ€“ no	
post- construction	information	(regarding	the	EIA	or	Plant	Station	
โ€˜Mโ€™)	was	discovered.
Bibliography
Dawoud,	M.A.,	2012.	Environmental	impacts	of	seawater	desalination:	Arabian	Gulf	case	study.	International	Journal	of	Environment	and	Sustainability	(IJES),	1(3).
Darwish,	M.A.,	Abdulrahim,	H.K.	and	Mohieldeen,	Y.,	2015.	Qatar	and	GCC	water	security.	Desalination	and	Water	Treatment,	55(9),	pp.2302-2325.
Desalination.biz,	2016.	Dubai	prepares	to	add	desalination	capacity	to	Jebel	Ali	power	station.	[online]	Available	at:	<	http://www.desalination.biz/news/0/Dubai-
prepares-to-add-desalination-capacity-at-Jebel-Ali-power-station/8515/>.	[Accessed	5	December	2016]
Eccleston,	C.	&	Doub,	J.P.	2012,	Preparing	NEPA	Environmental	Assessments:	A	Userโ€™s	Guide	to	Best	Professional	Practices,	CRC	Press.
Heaton,	C.	and	Burns,	S.,	2014.	An	evaluation	of	environmental	impact	assessment	in	Abu	Dhabi,	United	Arab	Emirates.	Impact	Assessment	and	Project	Appraisal,	32	
(3),	pp.246-251.
Lattemann,	S.	and	Hรถpner,	T.,	2008.	Environmental	impact	and	impact	assessment	of	seawater	desalination.	Desalination,	220(1),	pp.1-15.
Lee,	N.	&	George,	C.	2000,	"Environmental	assessment	in	developing	and	transitional	countries",	Journal	of	Environmental	Assessment	Policy	and	Management,	vol.	2,	
no.	2,	pp.	275-277.
Water	Technology,	2015.	Siemens	to	expand	M-Station	power	and	desalination	plant	in	Dubai.	[online]	Available	at:	<	http://www.water-
technology.net/news/newssiemens-to-expand-m-station-power-and-desalination-plant-in-dubai-4517932.	[Accessed	on:	5	December	2016]
28
29
Conclusion

More Related Content

What's hot

Quantitative risk assessment in chemical process
Quantitative risk assessment in chemical processQuantitative risk assessment in chemical process
Quantitative risk assessment in chemical processThapa Prakash (TA-1)
ย 
Introduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxIntroduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxAlmawYetnayet
ย 
Process Design to Process Validation
Process Design to Process Validation Process Design to Process Validation
Process Design to Process Validation Almas Altaf R.Ph
ย 
Sampling in process validation
Sampling in process validationSampling in process validation
Sampling in process validationSalum Mkata
ย 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessmentPrabha Panth
ย 
Handbook of cognition and emotion
Handbook of cognition and emotionHandbook of cognition and emotion
Handbook of cognition and emotionNicholas Uchoa
ย 
Presentation cleaning-validation
Presentation cleaning-validationPresentation cleaning-validation
Presentation cleaning-validationFasika Alemu
ย 
Quality by design
Quality by designQuality by design
Quality by designBALASUNDARESAN M
ย 
Cleaning validation presentation(1)
Cleaning validation presentation(1)Cleaning validation presentation(1)
Cleaning validation presentation(1)Randheer Dubey
ย 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)S.Shafiqur Rehman
ย 
Grievance Redress Mechanisms
Grievance Redress MechanismsGrievance Redress Mechanisms
Grievance Redress MechanismsBesa Rizvanolli
ย 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationSagar Savale
ย 
Pharma protocol manufacturing
Pharma protocol   manufacturingPharma protocol   manufacturing
Pharma protocol manufacturingManikandan sarma
ย 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentationsujit roy
ย 

What's hot (20)

Quantitative risk assessment in chemical process
Quantitative risk assessment in chemical processQuantitative risk assessment in chemical process
Quantitative risk assessment in chemical process
ย 
Introduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxIntroduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptx
ย 
Calculation of Risk Priority Numbar
Calculation of  Risk Priority NumbarCalculation of  Risk Priority Numbar
Calculation of Risk Priority Numbar
ย 
Process Design to Process Validation
Process Design to Process Validation Process Design to Process Validation
Process Design to Process Validation
ย 
Gmp checklist
Gmp checklistGmp checklist
Gmp checklist
ย 
FDA Guidance on Facing Manufacturing Inspections
FDA Guidance on Facing Manufacturing InspectionsFDA Guidance on Facing Manufacturing Inspections
FDA Guidance on Facing Manufacturing Inspections
ย 
Sampling in process validation
Sampling in process validationSampling in process validation
Sampling in process validation
ย 
So what is alarp risktec
So what is alarp    risktecSo what is alarp    risktec
So what is alarp risktec
ย 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
ย 
Handbook of cognition and emotion
Handbook of cognition and emotionHandbook of cognition and emotion
Handbook of cognition and emotion
ย 
Presentation cleaning-validation
Presentation cleaning-validationPresentation cleaning-validation
Presentation cleaning-validation
ย 
Quality by design
Quality by designQuality by design
Quality by design
ย 
Cleaning validation presentation(1)
Cleaning validation presentation(1)Cleaning validation presentation(1)
Cleaning validation presentation(1)
ย 
Cleaning Validation "Part 1"
Cleaning Validation "Part 1"Cleaning Validation "Part 1"
Cleaning Validation "Part 1"
ย 
Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)Strategic Environmental Assessment (SEA)
Strategic Environmental Assessment (SEA)
ย 
Basic cGMP
Basic cGMPBasic cGMP
Basic cGMP
ย 
Grievance Redress Mechanisms
Grievance Redress MechanismsGrievance Redress Mechanisms
Grievance Redress Mechanisms
ย 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
ย 
Pharma protocol manufacturing
Pharma protocol   manufacturingPharma protocol   manufacturing
Pharma protocol manufacturing
ย 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
ย 

Similar to A Critical Post Operational Review: Environmental Impact Assessment for Jebel Ali Power and Desalination Station M, Dubai, UAE

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)Angom Baleshwor
ย 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
ย 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
ย 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
ย 
EIA Report Preparation and its Challenges.pptx
 EIA Report Preparation and its Challenges.pptx EIA Report Preparation and its Challenges.pptx
EIA Report Preparation and its Challenges.pptxAmit Chaudhary
ย 
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdfFA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdfMuhammad Sulaiman
ย 
Environment impact assessment.pptii
Environment impact assessment.pptiiEnvironment impact assessment.pptii
Environment impact assessment.pptiiApoorva Mathur
ย 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
ย 
Environmental management
Environmental managementEnvironmental management
Environmental managementmunyemanaemmanuel
ย 
EIA SCREENING presentation
EIA SCREENING  presentationEIA SCREENING  presentation
EIA SCREENING presentationSyeda Fatima
ย 
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA Project
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA ProjectRegulatory Approach in Soil Erosion and Sedimentation Control for EIA Project
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA ProjectDrAbdulRahmanMahmud
ย 
Michael Bull - DMUG 2014
Michael Bull -  DMUG 2014Michael Bull -  DMUG 2014
Michael Bull - DMUG 2014IES / IAQM
ย 
South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102Patrรญcia Pereira
ย 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.pptApoorva Mathur
ย 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIAbishal sapkota
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Sciencetheijes
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSayyid Ina
ย 
Potential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIEPotential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIEMARIE Project
ย 
EIA of Yamuna Riverfront (2022).pptx
EIA of Yamuna Riverfront (2022).pptxEIA of Yamuna Riverfront (2022).pptx
EIA of Yamuna Riverfront (2022).pptxIrshadrazvi
ย 
Session4Presentation.ppt
Session4Presentation.pptSession4Presentation.ppt
Session4Presentation.pptBlackworld7
ย 

Similar to A Critical Post Operational Review: Environmental Impact Assessment for Jebel Ali Power and Desalination Station M, Dubai, UAE (20)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ย 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ย 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
ย 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
ย 
EIA Report Preparation and its Challenges.pptx
 EIA Report Preparation and its Challenges.pptx EIA Report Preparation and its Challenges.pptx
EIA Report Preparation and its Challenges.pptx
ย 
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdfFA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
FA-EIA-GUIDELINE-IN-MALAYSIA-1.pdf
ย 
Environment impact assessment.pptii
Environment impact assessment.pptiiEnvironment impact assessment.pptii
Environment impact assessment.pptii
ย 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
ย 
Environmental management
Environmental managementEnvironmental management
Environmental management
ย 
EIA SCREENING presentation
EIA SCREENING  presentationEIA SCREENING  presentation
EIA SCREENING presentation
ย 
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA Project
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA ProjectRegulatory Approach in Soil Erosion and Sedimentation Control for EIA Project
Regulatory Approach in Soil Erosion and Sedimentation Control for EIA Project
ย 
Michael Bull - DMUG 2014
Michael Bull -  DMUG 2014Michael Bull -  DMUG 2014
Michael Bull - DMUG 2014
ย 
South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102
ย 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
ย 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
ย 
The International Journal of Engineering and Science
The International Journal of Engineering and ScienceThe International Journal of Engineering and Science
The International Journal of Engineering and Science
ย 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
ย 
Potential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIEPotential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIE
ย 
EIA of Yamuna Riverfront (2022).pptx
EIA of Yamuna Riverfront (2022).pptxEIA of Yamuna Riverfront (2022).pptx
EIA of Yamuna Riverfront (2022).pptx
ย 
Session4Presentation.ppt
Session4Presentation.pptSession4Presentation.ppt
Session4Presentation.ppt
ย 

Recently uploaded

VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
ย 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
ย 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha ThakurSUHANI PANDEY
ย 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
ย 
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...Chandigarh Call girls 9053900678 Call girls in Chandigarh
ย 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...SUHANI PANDEY
ย 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
ย 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
ย 
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...Call Girls in Nagpur High Profile
ย 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
ย 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...SUHANI PANDEY
ย 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
ย 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170 Independent Female ...adilkhan87451
ย 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
ย 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
ย 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptxShovan Prita Paul .
ย 

Recently uploaded (20)

VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
ย 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
ย 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
ย 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
ย 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
ย 
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...
Russian๐ŸŒDazzling Hottie Getโ˜Ž๏ธ 9053900678 โ˜Ž๏ธcall girl In Chandigarh By Chandig...
ย 
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
Pimple Gurav ) Call Girls Service Pune | 8005736733 Independent Escorts & Dat...
ย 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
ย 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
ย 
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
ย 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
ย 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
ย 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
ย 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
ย 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰9873777170 Independent Female ...
ย 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
ย 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
ย 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
ย 

A Critical Post Operational Review: Environmental Impact Assessment for Jebel Ali Power and Desalination Station M, Dubai, UAE